ROADWORKS SUMMARY
Ruscombe, READING, RG10 9UD
Introduction

View current and future planned roadworks and road closures for RG10 9UD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ruscombe, READING, RG10 9UD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Nov 2024 and 21 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Doddington Close, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 14:22.
25 Nov 2024 and 21 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Meldreth Way, Earley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 11:03.
Saturday
Cadent Gas are carrying out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 12:56 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 12:19.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:54.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:51.
7 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:40 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:43.
17 Feb and 7 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 15:24.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Bath Road, Hare Hatch.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 February 2025 at 12:30 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 15:11.
3 and 28 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 19 Nov 2024 at 10:13.
Tomorrow
Virgin Media were proposing to carry out Utility asset works on The Terrace, Wokingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 27 Dec 2024 at 10:34.
3 Mar and 16 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cannock Way, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:10.
3 and 21 Mar 2025
Thames Water are proposing to carry out New service connection on Reading Road, Shiplake, Henley-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Feb 2025 at 15:42.
11 Apr 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Waltham Road, Twyford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 08:00 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:30.
Tomorrow
Reading Borough Council are carrying out Highway repair and maintenance works on Brooklyn Drive, Emmer Green, Reading.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2025 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Reading Borough Council on 4 Mar 2025 at 08:14.
Thursday
Thames Water were proposing to carry out Utility repair and maintenance works on New Road, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 13:46.
6 and 15 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Peppard Road, Emmer Green, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 7 Jan 2025 at 08:35.
6 and 15 Mar 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Peppard Road, Emmer Green, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 19 Dec 2024 at 14:39.
6 and 15 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Peppard Road, Emmer Green, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 7 Feb 2025 at 11:03.
10 and 14 Mar 2025
Thames Water are proposing to carry out New service connection on New Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 15:16.
10 and 14 Mar 2025
Thames Water are proposing to carry out New service connection on New Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Feb 2025 at 10:49.
12 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on School Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 13:52.
12 and 14 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on School Lane, Wargrave.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:57.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Peppard Road, Emmer Green, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 08:38.
17 and 19 Mar 2025
Gigaclear were proposing to carry out Utility asset works on Black Boy Lane, Hurley, Maidenhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 26 Nov 2024 at 10:42.
17 Mar and 4 Apr 2025
Thames Water were proposing to carry out New service connection on Reading Road, Shiplake, Henley-on-thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:50.
17 Mar and 4 Apr 2025
Thames Water are proposing to carry out New service connection on Reading Road, Shiplake, Henley-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Feb 2025 at 13:18.
17 Mar and 11 Apr 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Crescent, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 27 Feb 2025 at 10:10.
17 Mar and 11 Apr 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Crescent, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 27 Feb 2025 at 16:24.
18 and 20 Mar 2025
South East Water are proposing to carry out Remedial works on Barkham Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 11 Dec 2024 at 12:55.
24 and 26 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Milley Lane, Hare Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:24.
24 and 26 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Milley Lane, Hare Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:38.
25 and 27 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Road, Earley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jan 2025 at 13:36.
25 and 27 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on St Marks Road, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Dec 2024 at 11:39.
25 and 27 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Marks Road, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Feb 2025 at 15:14.
26 and 28 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:45.
26 and 28 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:55.
31 Mar and 27 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Park Avenue, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 08:36.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Castle End Road, Ruscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 16:52.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Castle End Road, Ruscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 12:20.
7 and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 10:00.
7 Apr and 2 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bulmershe Road, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 12:10.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 12:04.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Binfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 12:27.
7 and 10 Apr 2025
Thames Water are proposing to carry out New service connection on Common Lane, Binfield Heath, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 7 Jan 2025 at 08:30.
7 and 10 Apr 2025
Thames Water were proposing to carry out New service connection on Common Lane, Binfield Heath, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 11:18.
7 and 15 Apr 2025
Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bracknell Forest Council on 18 Feb 2025 at 12:36.
8 and 10 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Whiteknights Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Feb 2025 at 18:06.
14 Apr and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colemans Moor Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 10:56.
14 Apr and 2 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Mar 2025 at 10:16.
14 Apr and 2 May 2025
Network Rail were proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Feb 2025 at 14:14.
15 and 18 Apr 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Road Between Mays Green And Chalk Hill, Harpsden, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Jan 2025 at 14:48.
18 and 22 Apr 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Bath Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 16 Jan 2025 at 08:40.
21 and 25 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hatch Gate Lane, Cockpole Green, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 12:22.
21 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Gillotts Lane, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 07:58.
22 and 24 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blakes Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 15:25.
22 and 24 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blakes Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 16:54.
5 May and 13 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waltham Road, Twyford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 12:03.
5 May and 13 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waltham Road, Twyford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 12:41.
12 and 23 May 2025
Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave E, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.
12 and 23 May 2025
Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave W, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.
12 and 30 May 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 10 Jan 2025 at 12:08.
12 and 23 May 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:48.
12 and 23 May 2025
Wokingham Borough Council were proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 11:03.
12 and 23 May 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:23.
12 and 23 May 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.
12 and 23 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Church Street, Twyford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Feb 2025 at 11:39.
19 and 30 May 2025
Thames Water are proposing to carry out New service connection on Reading Road, Shiplake, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Feb 2025 at 09:08.
19 and 25 May 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 20 Feb 2025 at 13:44.
19 May and 27 Jun 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shackleton Way, Woodley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 11:36.
20 and 22 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Blakes Lane, Wargrave.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 22 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Mar 2025 at 09:00.
26 May and 2 Jun 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 21 Feb 2025 at 12:55.
26 May and 2 Jun 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Littlewick Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 09:18.
30 May and 2 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Mar 2025 at 09:04.
Roadworks Map near to Ruscombe, READING, RG10 9UD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ruscombe, READING, RG10 9UD (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Mar 2025 - 11 Mar 2025)
(Scheduled: 3 Mar 2025 - 11 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.