ROADWORKS SUMMARY
Hill Lands, READING, RG10 8JY
Introduction
View current and future planned roadworks and road closures for Hill Lands, RG10 8JY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hill Lands, READING, RG10 8JY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hill Lands are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
26 Aug and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Jul 2024 at 09:19.
16 Sep 2024 and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 13:35.
16 Feb 2025
Thames Water are carrying out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 10:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 11:42.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Reading Footpath 22, Caversham, Reading.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 26 September 2024 at 11:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 08:15.
12 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hamilton Road, Reading.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 15:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:19.
9 Dec 2024 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 13:51.
9 Dec 2024 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 13:49.
Tuesday
Cadent Gas were proposing to carry out Utility repair and maintenance works on Dodds Lane, Chalfont St Giles.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 17 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 15:00.
Tomorrow
Buckinghamshire Council are carrying out Highway repair and maintenance works on Bockmer Lane, Medmenham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 09:30 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 12 Dec 2024 at 13:03.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Duffield Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:59.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Duffield Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:54.
16 and 20 Dec 2024
Oxfordshire County Council are proposing to carry out Highway improvement works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 2 Oct 2024 at 09:40.
16 and 19 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Duke Street, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:19.
19 and 24 Dec 2024
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 09:38.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:24.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wessex Way, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:30.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wokingham Borough Council on 27 Sep 2024 at 10:06.
6 and 9 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Duffield Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:23.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:51.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 27 Sep 2024 at 10:17.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:54.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 15:47.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Birdwood Road, Maidenhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:20.
13 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Headley Road East, Woodley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:45.
13 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Headley Road East, Woodley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 16:51.
13 and 16 Jan 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on St Andrews Road, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 14:39.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:47.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 12:57.
15 and 17 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Blounts Court Road, Sonning Common, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 10:05.
16 and 18 Jan 2025
Thames Water are proposing to carry out New service connection on Bell Street, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 15:56.
20 and 24 Jan 2025
Thames Water are proposing to carry out Remedial works on Pond Head Lane, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:03.
20 and 24 Jan 2025
Thames Water were proposing to carry out Remedial works on Pond Head Lane, Earley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 07:30.
20 and 24 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.
20 and 24 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:18.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:01.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:39.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:10.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:54.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Hatch Gate Lane, Cockpole Green, Maidenhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 12:36.
28 and 30 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Aston Lane, Aston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:48.
14 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:18.
17 Feb and 7 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 15:24.
17 and 20 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 16:47.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kentons Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 17:06.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kentons Lane, Wargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 07:31.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thameside, Henley-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:44.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 08:14.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:08.
3 and 28 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 19 Nov 2024 at 10:13.
4 and 6 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on New Road, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 13:46.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 10:03.
Roadworks Map near to Hill Lands, READING, RG10 8JY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hill Lands, READING, RG10 8JY (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 Dec 2024)