ROADWORKS SUMMARY
Oxen Piece, OXFORD, OX44 7PL
Introduction

View current and future planned roadworks and road closures for Oxen Piece, OX44 7PL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oxen Piece, OXFORD, OX44 7PL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oxen Piece are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
16 May 2025
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Lower Road, Garsington, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:00 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 09:15.
16 Feb and 6 Apr 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Brake Hill, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Feb 2025 at 13:34.
Wednesday
Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Drayton St Leonard, Wallingford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Dec 2024 at 12:15.
24 Feb and 28 Mar 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Aylesbury Road, Scotsgrove.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 13:08.
28 Feb and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed-a418-single Carriageway(36212246), Thame.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 16:02.
28 Feb and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed-a418-single Carriageway(36212246), Thame.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 13:23.
28 Feb and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Aylesbury Road, Scotsgrove.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 16:30.
28 Feb and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Aylesbury Road, Scotsgrove.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 15:57.
3 and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Wheatley Road, Garsington, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 12:30.
8 and 10 Mar 2025
National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209272), Wheatley, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 March 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 27 Jan 2025 at 08:32.
8 and 10 Mar 2025
National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209273), Wheatley, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 March 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 27 Jan 2025 at 08:37.
25 and 27 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Drayton St Leonard, Wallingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Jan 2025 at 08:38.
25 and 27 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Drayton St Leonard, Wallingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 14:21.
5 and 7 Apr 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209272), Wheatley, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Feb 2025 at 15:13.
5 and 7 Apr 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209273), Wheatley, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Feb 2025 at 15:15.
7 Apr and 16 May 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Thame Road, Wheatley, Oxford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 20 Jan 2025 at 20:52.
7 Apr and 16 May 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Unnamed-a40-dual Carriageway (36209223), South Oxfordshire.
These works are categorised as Major.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 20 Jan 2025 at 20:48.
14 and 16 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on School Lane, Stadhampton, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 10:27.
21 Apr 2025 and 22 Jun 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 22 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Feb 2025 at 10:42.
21 Apr 2025 and 22 Jun 2026
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 22 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2025 at 14:45.
21 Apr and 22 Jun 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Feb 2025 at 12:09.
29 Apr and 15 May 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 13 Dec 2024 at 09:11.
29 Apr and 15 May 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Watlington Road, Garsington, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 13 Dec 2024 at 09:19.
5 and 7 May 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Ickford Road, Shabbington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 30 Jan 2025 at 11:07.
6 and 8 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wheatley Road, Garsington, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Feb 2025 at 15:00.
6 and 8 May 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wheatley Road, Garsington, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Jan 2025 at 12:04.
8 and 12 May 2025
Gigaclear are proposing to carry out Utility asset works on Road Running Through Waterstock, Waterstock, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 12 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Gigaclear on 13 Feb 2025 at 13:43.
12 May and 16 Jun 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Chiselhampton Hill, Chiselhampton, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:20.
19 and 26 May 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Nelson Street, Thame.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 08:24.
19 May and 23 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Electricity Network Company on 14 Feb 2025 at 13:58.
22 May and 13 Nov 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Feb 2025 at 12:08.
Roadworks Map near to Oxen Piece, OXFORD, OX44 7PL (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oxen Piece, OXFORD, OX44 7PL (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.