ROADWORKS SUMMARY
Stoke Lyne, BICESTER, OX27 8SF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for OX27 8SF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Stoke Lyne, BICESTER, OX27 8SF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
10 Jul 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Street From Bucknell Road To Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Bucknell Road To Banbury Road, Bicester.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 22 Jan 2024 at 12:23.

Oxfordshire County Council logo
LONG TERM
Between
15 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 Jan 2024 at 12:47.

Oxfordshire County Council logo
LONG TERM
Between
15 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

The works will start on or after 15 October 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 15:42.

Oxfordshire County Council logo
LONG TERM
Between
15 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Street From Bucknell Road To Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Bucknell Road To Banbury Road, Bicester.

These works are categorised as Major.

The works will start on or after 15 October 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 15:41.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Blackthorn Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackthorn Road, Launton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 14 Aug 2024 at 16:36.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Blackthorn Road

Oxfordshire County Council are carrying out Highway improvement works on Blackthorn Road, Launton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:30 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 08:58.

Oxfordshire County Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Street From Bucknell Road To Banbury Road

Oxfordshire County Council are carrying out Highway improvement works on Street From Bucknell Road To Banbury Road, Bicester.

These works are categorised as Major.

The works started on 4 November 2024 at 15:01 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 14:18.

Oxfordshire County Council logo
LONG TERM
Between
4 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 1 Nov 2024 at 12:24.

Oxfordshire County Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are carrying out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

The works started on 4 November 2024 at 15:01 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 14:18.

Oxfordshire County Council logo
LONG TERM
Between
4 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Street From Bucknell Road To Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Bucknell Road To Banbury Road, Bicester.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 1 Nov 2024 at 12:24.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Vendee Drive

Oxfordshire County Council are carrying out Works for road purposes on Vendee Drive, Bicester.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 09:24.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Cycle Track Front Of 2-12 Juniper Gardens

Oxfordshire County Council are proposing to carry out Utility asset works on Cycle Track Front Of 2-12 Juniper Gardens, Bicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 22 November 2024. The works will impact the cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 8 Oct 2024 at 07:17.

West Northamptonshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Farthinghoe Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Farthinghoe Road, Brackley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 22 Aug 2024 at 10:38.

West Northamptonshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A422 Farthinghoe Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A422 Farthinghoe Road, Hinton In The Hedges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 22 Aug 2024 at 10:36.

West Northamptonshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A422 Oxford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A422 Oxford Road, Evenley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 22 Aug 2024 at 10:34.

West Northamptonshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Station Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Station Road, Aynho.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 5 Nov 2024 at 14:20.

Anglian Water logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility asset works on Main Street, Chetwode.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 11:53.

Anglian Water logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility asset works on Main Street, Chetwode.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 12:58.

West Northamptonshire Council logo
Finishing
Thursday
Details
View Map
Share
Blenheim

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Blenheim, Croughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Sep 2024 at 10:45.

Buckinghamshire Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Manor Farm Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Manor Farm Road, Barton Hartshorn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Sep 2024 at 09:50.

Oxfordshire County Council logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Cycle Track Front Of 2-12 Juniper Gardens

Oxfordshire County Council are proposing to carry out Utility asset works on Cycle Track Front Of 2-12 Juniper Gardens, Bicester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 10:40.

Anglian Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Fulwell Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Fulwell Lane, Mixbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 09:07.

Anglian Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Fulwell Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Fulwell Lane, Mixbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 29 Aug 2024 at 14:11.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Launton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Launton Road, Stratton Audley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 13:14.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Launton Road

Thames Water were proposing to carry out Utility repair and maintenance works on Launton Road, Stratton Audley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:23.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Footpath Front Of 58-66 Wear Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Footpath Front Of 58-66 Wear Road, Bicester.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:28.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Causeway

Southern Gas Networks were proposing to carry out New service connection on Causeway, Bicester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 10:46.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
South Street

Thames Water were proposing to carry out Utility repair and maintenance works on South Street, Caulcott.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 12:47.

Oxfordshire County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Buckingham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Buckingham Road, Newton Purcell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 11:00.

Oxfordshire County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Buckingham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Buckingham Road, Newton Morrell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 11:00.

Oxfordshire County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Bicester Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Bicester Road, Fringford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:59.

Oxfordshire County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Buckingham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Buckingham Road, Caversfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 11:01.

Anglian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Charlton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Charlton Road, Croughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 13:41.

Oxfordshire County Council logo
Between
27 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Feb 2024 at 14:03.

Oxfordshire County Council logo
Between
29 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Street From Baynards Green To Bucknell

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Baynards Green To Bucknell, Stoke Lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:28.

Oxfordshire County Council logo
Between
29 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Unnamed B4100 Single Carriageway 6808918

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6808918, Cherwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:43.

Oxfordshire County Council logo
Between
29 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Unnamed B4100 Single Carriageway 6809554

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809554, Cherwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:45.

Oxfordshire County Council logo
Between
29 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Unnamed B4100 Single Carriageway 6809202

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809202, Cherwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:28.

Oxfordshire County Council logo
Between
29 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Banbury Road B4100

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road B4100, Caversfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 10:44.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Water Street

Thames Water are proposing to carry out New service connection on Water Street, Somerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:38.

Thames Water logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Croughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 05:31.


Roadworks Map near to Stoke Lyne, BICESTER, OX27 8SF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Stoke Lyne, BICESTER, OX27 8SF (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.