The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Fritwell, BICESTER, OX27 7QT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
14 Apr 2025
Network Rail are carrying out Works for Rail Purposes on Station Road, Aynho.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 18:00 and could run through until 14 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Feb 2025 at 14:49.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809554, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 12:19.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Baynards Green To Bucknell, Stoke Lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:44.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Baynards Green To Bucknell, Stoke Lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 12:21.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6808918, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:35.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6808918, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 12:22.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809554, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:45.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809202, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:45.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809202, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 12:18.
Friday
Oxfordshire County Council are proposing to carry out Highway improvement works on Station Road, Lower Heyford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 11:00.
Friday
Oxfordshire County Council were proposing to carry out Highway improvement works on Station Road, Lower Heyford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 5 Mar 2025 at 11:21.
21 Apr and 16 May 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Croughton Road, Aynho.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 4 Mar 2025 at 06:19.
21 Apr and 16 May 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Roundtown, Aynho.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 4 Mar 2025 at 06:20.
23 and 29 Apr 2025
BT are proposing to carry out Utility asset works on Falkners Close, Adderbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 20 Mar 2025 at 10:02.
28 Apr and 5 May 2025
National Highways are proposing to carry out Highway repair and maintenance works on East Street, Fritwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 5 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:56.
28 Apr and 5 May 2025
National Highways were proposing to carry out Highway repair and maintenance works on East Street, Fritwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Highways on 6 Mar 2025 at 10:51.
28 Apr and 2 May 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Charlton Road, Croughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 13:20.
28 Apr and 5 May 2025
National Highways are proposing to carry out Highway repair and maintenance works on East Street, Fritwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 5 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 6 Mar 2025 at 10:55.
2 and 8 May 2025
BT are proposing to carry out Utility asset works on The Leys, Adderbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Feb 2025 at 12:33.
2 and 8 May 2025
BT are proposing to carry out Utility asset works on The Leys, Adderbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 8 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2025 at 15:37.
12 and 16 May 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Croughton Road, Aynho.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Mar 2025 at 11:59.
12 and 16 May 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Roundtown, Aynho.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Mar 2025 at 11:58.
19 and 23 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Main Street, Clifton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 19 Mar 2025 at 13:44.
27 May and 22 Jun 2025
Last Mile Gas were proposing to carry out Utility repair and maintenance works on Camp Road, Upper Heyford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 22 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Gas on 13 Mar 2025 at 15:58.
27 and 31 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Middleton Stoney Road, Ardley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 12:41.
27 and 31 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Station Road, Ardley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 12:42.
27 and 31 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Middleton Stoney Road, Ardley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 10:38.
27 and 31 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Ardley Road, Middleton Stoney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 12:40.
28 May and 1 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Bicester Road, Middleton Stoney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 5 Mar 2025 at 10:22.
28 May and 1 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Middleton Stoney Road B4030, Bucknell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 5 Mar 2025 at 10:27.
28 May and 1 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Middleton Stoney Road B4030, Chesterton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 5 Mar 2025 at 10:31.
29 May and 1 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Bucknell Road To Banbury Road, Bicester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2025 at 14:12.
30 May and 2 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Baynards Green To Bucknell, Stoke Lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 14 Mar 2025 at 09:51.
30 May and 2 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6808918, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 14 Mar 2025 at 09:52.
30 May and 2 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809554, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 14 Mar 2025 at 09:53.
30 May and 3 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809202, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 14 Mar 2025 at 09:54.
2 and 27 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Croughton Road, Aynho.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 28 Feb 2025 at 11:21.
2 and 27 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Roundtown, Aynho.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 28 Feb 2025 at 11:19.
2 and 6 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Croughton Road, Aynho.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 27 Feb 2025 at 06:26.
2 and 6 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Roundtown, Aynho.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 27 Feb 2025 at 06:24.
2 and 4 Jun 2025
Anglian Water are proposing to carry out Remedial works on Hogg Lane, Newbottle, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Mar 2025 at 06:32.
4 and 17 Jun 2025
Gigaclear are proposing to carry out Utility asset works on Fritwell Road, Fewcott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 12 Mar 2025 at 14:27.
4 and 17 Jun 2025
Gigaclear are proposing to carry out Utility asset works on Market Square, Lower Heyford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 20 Mar 2025 at 14:03.
4 and 17 Jun 2025
Gigaclear are proposing to carry out Utility asset works on Market Square, Lower Heyford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 19 Mar 2025 at 13:32.
4 and 17 Jun 2025
Gigaclear are proposing to carry out Utility asset works on Church Lane, Lower Heyford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 12 Mar 2025 at 14:34.
13 and 17 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Baynards Green To Bucknell, Stoke Lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Mar 2025 at 14:22.
13 and 17 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6808918, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Mar 2025 at 14:18.
13 and 17 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809554, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Mar 2025 at 14:16.
13 and 17 Jun 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed B4100 Single Carriageway 6809202, Cherwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Mar 2025 at 14:14.
13 and 26 Jun 2025
Gigaclear are proposing to carry out Utility asset works on Freehold Street, Lower Heyford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 20 Mar 2025 at 10:18.
16 and 27 Jun 2025
Gigaclear are proposing to carry out Utility asset works on East Street, Fritwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Mar 2025 at 15:35.
16 and 27 Jun 2025
Gigaclear were proposing to carry out Utility asset works on East Street, Fritwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Mar 2025 at 15:33.
16 and 27 Jun 2025
Gigaclear were proposing to carry out Utility asset works on East Street, Fritwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Mar 2025 at 15:32.
16 and 20 Jun 2025
Gigaclear were proposing to carry out Utility asset works on East Street, Fritwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 14 Mar 2025 at 15:29.
Roadworks Map near to Fritwell, BICESTER, OX27 7QT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Fritwell, BICESTER, OX27 7QT (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.