ROADWORKS SUMMARY
Beaufort Gardens, LONDON, NW4 3QP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Beaufort Gardens, NW4 3QP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Beaufort Gardens, LONDON, NW4 3QP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Beaufort Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
31 Jan 2026
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 May 2025 at 11:16.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

Network Rail logo
LONG TERM
Until
30 Jul 2026
Details
View Map
Share
Follow
Junction Place

Network Rail are carrying out Works for Rail Purposes on Junction Place, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 30 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 07:03.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:24.

London Borough Of Barnet logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

Thames Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Barnet Road

Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 22 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 22 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2025 at 09:40.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Queen's Crescent

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Jul 2025 at 10:25.

Thames Water logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 07:22.

London Borough Of Camden logo
LONG TERM
Between
6 Apr and 31 Dec 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.

Thames Water logo
LONG TERM
Between
28 Apr and 3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

Transport for London (TfL) logo
LONG TERM
Between
21 May 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 17 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 06:09.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Harrow Road

Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

Thames Water logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are carrying out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:45 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 15:00.

Thames Water logo
LONG TERM
Between
30 Jun 2025 and 26 Jan 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:40.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:26 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 08:48.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:23 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 08:49.

UK Power Networks Eastern & London logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 July 2025 at 13:00 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jul 2025 at 13:37.

London Borough Of Barnet logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are carrying out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2025 at 15:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 26 Sep 2025 at 14:33.

Thames Water logo
LONG TERM
Between
18 Jul 2025 and 15 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 February 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 10:33.

Thames Water logo
LONG TERM
Until
16 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are carrying out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:30 and could run through until 16 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 09:12.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 09:13.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Finchley Road

HS2 are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 10:55.

HS2 logo
LONG TERM
Between
21 Jul 2025 and 26 Jun 2026
Details
View Map
Share
Follow
College Crescent

HS2 are proposing to carry out Works for Rail Purposes on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 10 Mar 2025 at 16:30.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
College Crescent

HS2 are carrying out Section 50 on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 10 Sep 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Until
17 Jul 2026
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 17 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:22.

London Borough Of Haringey logo
LONG TERM
Between
25 Jul and 25 Oct 2025
Details
View Map
Share
Follow
Ferme Park Road

London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Ferme Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 29 Jul 2025 at 08:09.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 09:45.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:00.

Thames Water logo
LONG TERM
Until
30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 13:40 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 15:20.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 1 June 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:12.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway

Thames Water were proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:49.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway Close

Thames Water were proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 08:19.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 08:52.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 13:12.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 13:44.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 14:41.

Murphy Gas Networks logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are carrying out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 13 Aug 2025 at 12:13.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 15 Jul 2025 at 10:33.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 11:10.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Fortis Green

London Borough Of Haringey were proposing to carry out Remedial works on Fortis Green, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 14:55.

London Borough Of Barnet logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Regents Park Road

London Borough Of Barnet are carrying out roadworks on Regents Park Road, Finchley, London.

These works are categorised as Major.

The works started on 17 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Oct 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 10:29.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 16:08.

Transport for London (TfL) logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are carrying out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 15:46.

Transport for London (TfL) logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 08:33.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

HS2 are carrying out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:00.

Thames Water logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are carrying out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 09:32.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 12:43.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:18.

Thames Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are carrying out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 09:06 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 08:26.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 12:43.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:39.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 11:12.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 May 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 14 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 10:11.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:14.

London Borough Of Camden logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:26.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:13.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Dec 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 14:00 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2025 at 14:36.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 14:00.

Thames Water logo
LONG TERM
Between
1 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are proposing to carry out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are carrying out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:59.

Thames Water logo
LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:06.

Thames Water logo
LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 07:46.

Thames Water logo
LONG TERM
Between
1 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Broadlands Road

Thames Water are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 09:19.

Thames Water logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Broadlands Road

Thames Water are carrying out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:52.

London Borough Of Barnet logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 13 Jun 2025 at 14:30.

London Borough Of Barnet logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Aug 2025 at 16:09.

London Borough Of Barnet logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2025 at 12:40.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 4 Sep 2025 at 13:24.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Sep 2025 at 16:17.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 10:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Leamington Park

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 10:35 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Sep 2025 at 11:31.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Murray Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2025 at 11:56.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are carrying out Utility asset works on Pound Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:49 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 14:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:14.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 16:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:38 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:59.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Crouch End Hill

London Borough Of Haringey are proposing to carry out Highway improvement works on Crouch End Hill, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2025 at 10:00.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 11:15.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 11:15.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 14:07.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 3 Oct 2025 at 12:25.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 18:59.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 8 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 07:25.

Eunetworks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
North Acton Road

Eunetworks were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 11:49.

Eunetworks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2025 at 12:15.

Eunetworks logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2025 at 08:13.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are carrying out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:09.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are carrying out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:08.

Transport for London (TfL) logo
LONG TERM
Between
10 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 14:08.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 11:04.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 13:22.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 14:29.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 14:50.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 15:23.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Shirland Road

Cadent Gas are carrying out Utility repair and maintenance works on Shirland Road, Harrow Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 13:09 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 09:06.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Woodside Grange Road

Thames Water are carrying out Utility repair and maintenance works on Woodside Grange Road, North Finchley, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 09:30 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 12:49.

Cadent Gas logo
LONG TERM
Until
11 Nov 2025
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are carrying out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:56 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 14:19.

Thames Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Southwick Street

Thames Water are carrying out Utility repair and maintenance works on Southwick Street, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 12:23.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
St John's Wood Road

Transport for London (TfL) were proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 11:23.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 19 Aug 2025 at 07:34.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Sep 2025 at 07:45.

London Borough Of Camden logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Aug 2025 at 10:40.

London Borough Of Camden logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 Sep 2025 at 08:33.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out Utility asset works on Beaconsfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Beaconsfield Road

Thames Water were proposing to carry out Utility asset works on Beaconsfield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:05.

LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Mount View Road

London Borough Of Islington are carrying out Highway improvement works on Mount View Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 15 Sep 2025 at 08:34.

LONG TERM
Between
15 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Mount View Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mount View Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Aug 2025 at 13:16.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:10.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.

Murphy Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Mayes Road

Murphy Gas Networks are carrying out Utility asset works on Mayes Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 00:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 15 Sep 2025 at 09:14.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 14:50.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are carrying out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are carrying out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:40.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Orion Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Orion Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Orion Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Orion Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 12:32.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Orion Road

Transport for London (TfL) are carrying out Highway improvement works on Orion Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Pinkham Way Slip From North Circular West Bound To Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular West Bound To Colney Hatch Lane, Muswell Hill, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:22.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 14:51.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are carrying out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:43.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:22.

London Borough Of Haringey logo
LONG TERM
Between
16 Sep and 16 Dec 2025
Details
View Map
Share
Follow
Middle Lane

London Borough Of Haringey are proposing to carry out Highway improvement works on Middle Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2025 at 13:19.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sunny Gardens Road

National Highways are proposing to carry out Works for road purposes on Sunny Gardens Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are carrying out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 07:55 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 17 Sep 2025 at 08:37.

London Borough Of Haringey logo
LONG TERM
Between
17 Sep and 17 Dec 2025
Details
View Map
Share
Follow
Park Avenue

London Borough Of Haringey are proposing to carry out Highway improvement works on Park Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Sep 2025 at 11:28.

London Borough Of Haringey logo
LONG TERM
Between
19 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 19 Sep 2025 at 14:06.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Bigwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bigwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:57.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Bigwood Road

Thames Water are carrying out Utility repair and maintenance works on Bigwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2025 at 12:22 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 14:45.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 12:11.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 22 Sep 2025 at 08:40.

City Of Westminster logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Elgin Avenue

City Of Westminster were proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jul 2025 at 14:23.

London Borough Of Camden logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:00 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Sep 2025 at 09:09.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Aug 2025 at 18:06.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Works for Rail Purposes on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:08.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 15 May 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Works for Rail Purposes on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:16.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 09:26.

Thames Water logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:23.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are carrying out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:40 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 13:15.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 11:41.

Finishing
Tomorrow
Details
View Map
Share
Follow
Parkhurst Road

Aurora Utilities Limited are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 11:52.

London Borough Of Barnet logo
LONG TERM
Between
22 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are carrying out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 09:31 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 13:52.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are carrying out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 09:30 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2025 at 10:48.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are carrying out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2025 at 09:31 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 15:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Dec 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 September 2025 at 10:39 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2025 at 10:42.

Cadent Gas logo
Until
21 Oct 2025
Details
View Map
Share
Follow
Pasture Road

Cadent Gas are carrying out Utility repair and maintenance works on Pasture Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 11:30 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 15:51.

London Borough Of Barnet logo
LONG TERM
Between
23 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:14.

London Borough Of Barnet logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are carrying out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2025 at 12:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:58.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 10:30.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 10:50.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Enford Street

Thames Water are carrying out Utility repair and maintenance works on Enford Street, Bryanston & Dorset Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2025 at 09:45 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 14:38.

Thames Water logo
LONG TERM
Between
25 Sep 2025 and 23 Jul 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:31.

London Borough Of Haringey logo
LONG TERM
Between
26 Sep and 27 Dec 2025
Details
View Map
Share
Follow
Sheldon Avenue

London Borough Of Haringey are proposing to carry out Highway improvement works on Sheldon Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 27 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 26 Sep 2025 at 09:37.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 29 Sep 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:03.

Transport for London (TfL) logo
LONG TERM
Until
12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are carrying out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 08:27.

Transport for London (TfL) logo
LONG TERM
Until
12 Nov 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are carrying out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 08:25.

London Borough Of Camden logo
Between
29 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:49.

London Borough Of Camden logo
Until
18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Sep 2025 at 09:07.

UK Power Networks Eastern & London logo
Until
17 Oct 2025
Details
View Map
Share
Follow
Winchelsea Road

UK Power Networks Eastern & London are carrying out Utility asset works on Winchelsea Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2025 at 11:33.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are proposing to carry out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are proposing to carry out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Transport for London (TfL) logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Sep 2025 at 13:47.

Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Parkhurst Road

Aurora Utilities Limited are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 22 Sep 2025 at 16:33.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Utility asset works on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:11.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Holly Walk

Thames Water are carrying out Utility asset works on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:35 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 09:36.

London Borough Of Brent logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crest Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 09:10.

London Borough Of Barnet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are carrying out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 09:30 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Oct 2025 at 15:21.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Murphy Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Brook Road

Murphy Gas Networks are carrying out Utility asset works on Brook Road, Wood Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 9 Oct 2025 at 11:57.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 11:00.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2025 at 12:23.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are carrying out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:55 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Sep 2025 at 08:56.

London Borough Of Brent logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Andrews Avenue

London Borough Of Brent are carrying out Highway improvement works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2025 at 08:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 8 Oct 2025 at 12:25.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are carrying out Highway improvement works on Sussex Gardens, Hyde Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 08:00 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:49.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Hampstead Way

Thames Water were proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 14 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 10:44.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:14.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Sep 2025 at 08:32.

Thames Water logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Way

Thames Water are carrying out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 09:23 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 09:37.

Thames Water logo
Until
28 Oct 2025
Details
View Map
Share
Follow
Shanklin Road

Thames Water are carrying out Utility repair and maintenance works on Shanklin Road, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2025 at 08:50 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 09:56.

London Borough Of Barnet logo
Finishing
Sunday
Details
View Map
Share
Follow
Wilton Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wilton Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Eunetworks logo
Finishing
Sunday
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:27.

Transport for London (TfL) logo
Until
17 Oct 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are carrying out Section 50 on Camden Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 09:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 13:58.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Eagle Road

Affinity Water are carrying out Utility repair and maintenance works on Eagle Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 13:43 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Oct 2025 at 12:59.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Ealing Road

Affinity Water are carrying out Utility repair and maintenance works on Ealing Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 13:43 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:59.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
The Fairway

Cadent Gas are carrying out Utility repair and maintenance works on The Fairway, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 09:30 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 19:19.

Thames Water logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are carrying out Utility asset works on Hillside Gardens, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 07:30 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 07:35.

London Borough Of Haringey logo
LONG TERM
Between
3 Oct 2025 and 3 Jan 2026
Details
View Map
Share
Follow
Muswell Hill

London Borough Of Haringey are proposing to carry out Highway improvement works on Muswell Hill, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 3 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 6 Oct 2025 at 11:54.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Sandringham Road

Thames Water were proposing to carry out Utility asset works on Sandringham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2025 and run through until 14 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 08:32.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Whitton Avenue East

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Whitton Avenue East, Greenford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 15:56 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 12:57.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
Oxford Gardens

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on Oxford Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 21 Oct 2025
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway repair and maintenance works on St Mark's Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 Oct 2025 at 07:11.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Marylebone Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:34.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Until
8 Dec 2025
Details
View Map
Share
Follow
Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 22:00 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:51.

City Of Westminster logo
LONG TERM
Until
6 Feb 2026
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:00 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 6 Oct 2025 at 10:28.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 09:29.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:23.

London Borough Of Camden logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Oct 2025 at 09:14.

London Borough Of Camden logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 14:25.

London Borough Of Camden logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 08:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Oct 2025 at 08:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Churchill Road

Thames Water are proposing to carry out Utility asset works on Churchill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 10:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Churchill Road

Thames Water are carrying out Utility asset works on Churchill Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 11:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:26.

Thames Water logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are carrying out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 11:00 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 11:10.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 18 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 18 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:23.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:26.

London Borough Of Brent logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:55.

London Borough Of Barnet logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are carrying out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 09:30 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 11:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 11:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2025 at 09:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2025 at 13:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are carrying out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:47 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Oct 2025 at 09:47.

Electricity Network Company logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Sep 2025 at 12:33.

Electricity Network Company logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are carrying out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:30 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 6 Oct 2025 at 12:11.

London Borough Of Barnet logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 6 Nov 2026
Details
View Map
Share
Brockenhurst Gardens

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 6 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 13:24.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Adelaide Grove

Thames Water are carrying out Utility repair and maintenance works on Adelaide Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 10:00 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:21.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 00:10 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 14:23.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Watford Way

National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Sep 2025 at 11:39.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Watford Way

National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Oct 2025 at 14:01.

National Highways logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Watford Way

National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2025 at 11:42.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Follow
Bayham Place

Virgin Media are proposing to carry out Utility asset works on Bayham Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 10 Jul 2025 at 13:29.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Bayham Place

Virgin Media were proposing to carry out Utility asset works on Bayham Place, St Pancras And Somers Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 30 Sep 2025 at 09:12.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Follow
Bayham Place

Virgin Media are carrying out Utility asset works on Bayham Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:32 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 8 Oct 2025 at 09:39.

London Borough Of Barnet logo
LONG TERM
Between
8 Oct and 11 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

Affinity Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Elmgrove Road

Affinity Water are carrying out Utility repair and maintenance works on Elmgrove Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:50 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:39.

London Borough Of Brent logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are carrying out Highway improvement works on Hay Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 08:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 8 Oct 2025 at 08:11.

Eunetworks logo
Finishing
Monday
Details
View Map
Share
Follow
Whitmore Gardens

Eunetworks are proposing to carry out roadworks on Whitmore Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 16:05.

Thames Water logo
LONG TERM
Between
9 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Heathfield Park

Thames Water are proposing to carry out Utility asset works on Heathfield Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:51.

London Borough Of Haringey logo
LONG TERM
Between
9 Oct 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Alexandra Park Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Alexandra Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Oct 2025 at 08:53.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 08:56.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 11:28.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 29 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 13:26.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 12:29.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:59.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:55.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:37.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:48.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 08:47.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:31.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

London Borough Of Brent logo
Between
10 and 31 Oct 2025
Details
View Map
Share
Follow
Forty Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Lane, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:53.

London Borough Of Camden logo
LONG TERM
Between
11 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:38.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:30.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 14:20.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Old Oak Common Lane

London Borough Of Ealing are proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 31 Jul 2025 at 16:01.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Old Oak Common Lane

London Borough Of Ealing were proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 14:04.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2025 at 14:32.

London Borough Of Camden logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Haverstock Hill

London Borough Of Camden were proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 06:53.

Affinity Water logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Copland Avenue

Affinity Water are proposing to carry out Utility asset works on Copland Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 08:37.

London Borough Of Barnet logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 11:01.

T-Mobile (UK) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Strawberry Vale

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Strawberry Vale, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 22 Jul 2025 at 10:41.

Transport for London (TfL) logo
Between
13 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Nether Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nether Street, Dollis Road To Ballards Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 14:21.

Cadent Gas logo
LONG TERM
Between
13 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2025 at 16:02.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Sep 2025 at 13:47.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Sep 2025 at 11:21.

Virgin Media logo
Finishing
Thursday
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

Virgin Media logo
Finishing
Thursday
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2025 at 10:31.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 15:06.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 15 Nov 2025
Details
View Map
Share
Friary Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 15 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:29.

BT logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Darlands Drive

BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2025 at 15:29.

Virgin Media logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Virgin Media are proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Jul 2025 at 16:57.

Virgin Media logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Virgin Media are proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Oct 2025 at 09:39.

Between
15 and 17 Oct 2025
Details
View Map
Share
Station Road

London Borough Of Harrow were proposing to carry out Highway improvement works on Station Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Jul 2025 at 11:42.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Aug 2025 at 10:56.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Oct 2025 at 09:58.

UK Power Networks Eastern & London logo
Between
16 and 22 Oct 2025
Details
View Map
Share
Follow
Ferme Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ferme Park Road, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 10:45.

UK Power Networks Eastern & London logo
Between
16 and 22 Oct 2025
Details
View Map
Share
Follow
Ferme Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Ferme Park Road, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 09:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 08:41.

Thames Water logo
Between
17 and 23 Oct 2025
Details
View Map
Share
Follow
Crediton Hill

Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 12:25.

Thames Water logo
LONG TERM
Between
17 Oct and 22 Dec 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 13:29.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Chapel Side

Thames Water were proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 12:25.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 15:15.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:35.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 27 Aug 2025 at 14:18.

Lumen Technologies logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Coronation Road

Lumen Technologies are proposing to carry out Utility asset works on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lumen Technologies on 28 Aug 2025 at 10:31.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 11:47.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Aug 2025 at 12:00.

London Borough Of Camden logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are proposing to carry out Highway improvement works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2025 at 11:29.

Thames Water logo
LONG TERM
Between
20 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Heathfield Park

Thames Water are proposing to carry out Utility asset works on Heathfield Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 09:52.

Affinity Water logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Turner Close

Affinity Water are proposing to carry out Utility asset works on Turner Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Talbot Road

Affinity Water are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Oct 2025 at 08:40.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:57.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 13:47.

Affinity Water logo
LONG TERM
Between
20 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Oct 2025 at 12:52.

Affinity Water logo
Between
20 Oct and 18 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:15.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:04.

Affinity Water logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Crawford Avenue

Affinity Water are proposing to carry out Utility asset works on Crawford Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:55.

Transport for London (TfL) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:09.

Transport for London (TfL) logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2025 at 14:50.

Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Oct 2025 at 14:45.

Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Oct 2025 at 14:51.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 25 Jul 2025 at 14:58.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 9 Sep 2025 at 11:07.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 15:01.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 9 Sep 2025 at 11:05.

Thames Water logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 10:43.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Well Walk

Thames Water are proposing to carry out New service connection on Well Walk, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 15:08.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Aug 2025 at 13:26.

UK Power Networks Eastern & London logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sudbury Croft

UK Power Networks Eastern & London are proposing to carry out New service connection on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2025 at 08:00.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
The Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 10:11.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Hendon Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2025 at 17:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:41.

London Borough Of Barnet logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
St James Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 14:52.

Thames Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

Thames Water are proposing to carry out New service connection on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 15:00.

London Borough Of Barnet logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2025 at 14:57.

Thames Water logo
Between
23 and 29 Oct 2025
Details
View Map
Share
Follow
St Andrews Road

Thames Water are proposing to carry out New service connection on St Andrews Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 09:49.

City Of Westminster logo
Between
23 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Oct 2025 at 09:17.

City Of Westminster logo
Between
23 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:14.

Thames Water logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 17:25.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:16.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:17.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2025 at 16:15.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
East Acton Lane

Eunetworks were proposing to carry out Utility asset works on East Acton Lane, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 2 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 11:58.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 27 Aug 2025 at 11:34.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
East Acton Lane

Eunetworks are proposing to carry out Utility asset works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 4 Sep 2025 at 10:31.

Eunetworks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Old Oak Road

Eunetworks are proposing to carry out Utility asset works on Old Oak Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 26 Aug 2025 at 11:07.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Holden Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Holden Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Holden Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Holden Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 16:35.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Ashbourne Close

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ashbourne Close, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Ashbourne Close

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ashbourne Close, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 16:34.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Park Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Park Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 16:30.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Grange Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Grange Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Grange Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Grange Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2025 at 16:32.

London Borough Of Barnet logo
Between
25 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 14:28.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Sep 2025 at 11:12.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Osidge Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 16:22.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:27.

London Borough Of Barnet logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 10:01.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Barnet Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 10:10.

London Borough Of Barnet logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Vale Drive

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Vale Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Sep 2025 at 11:23.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 10:01.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
26 and 31 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Blenheim Crescent

Thames Water were proposing to carry out Remedial works on Blenheim Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:49.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out Remedial works on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 16:30.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:33.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 00:10.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
27 Oct and 6 Dec 2025
Details
View Map
Share
Follow
Scrubs Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Scrubs Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 6 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 Oct 2025 at 10:36.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
North Acton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Sep 2025 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
North Acton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2025 at 09:05.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Sep 2025 at 16:26.

Scottish Hydro Electric Power Dis logo
Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Oct 2025 at 12:49.

Cadent Gas logo
LONG TERM
Between
27 Oct and 31 Dec 2025
Details
View Map
Share
Follow
Longstone Avenue

Cadent Gas are proposing to carry out Utility asset works on Longstone Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 12:11.

HS2 logo
LONG TERM
Between
27 Oct 2025 and 5 Apr 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 April 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:40.

HS2 logo
LONG TERM
Between
27 Oct 2025 and 12 Jul 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 July 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:28.

Thames Water logo
Between
27 Oct and 16 Nov 2025
Details
View Map
Share
Lancaster Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 08:45.

Thames Water logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:29.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:15.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Talbot Road

Affinity Water are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility asset works on High Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 08:26.

Affinity Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Crawford Avenue

Affinity Water are proposing to carry out Utility asset works on Crawford Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 12:40.

Affinity Water logo
LONG TERM
Between
27 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 2 Oct 2025 at 13:57.

Affinity Water logo
LONG TERM
Between
27 Oct 2025 and 21 Apr 2026
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:05.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 12:47.

Transport for London (TfL) logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 13:19.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 07:03.

Between
27 and 31 Oct 2025
Details
View Map
Share
Annette Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 16:32.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Sep 2025 at 08:58.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Hornsey Road

Thames Water are proposing to carry out New service connection on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 06:10.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Hornsey Road

Thames Water are proposing to carry out New service connection on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 08:28.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 10:26.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 15:18.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Oct 2025 at 15:49.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Tollington Way

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tollington Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2025 at 07:36.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Tollington Way

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tollington Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 00:10.

London Borough Of Camden logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
The Grove

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on The Grove, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Sep 2025 at 16:44.

London Borough Of Camden logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
The Grove

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on The Grove, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Sep 2025 at 21:12.

Thames Water logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Swain's Lane

Thames Water are proposing to carry out Utility asset works on Swain's Lane, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 22:17.

Thames Water logo
LONG TERM
Between
27 Oct and 22 Dec 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 07:47.

London Borough Of Barnet logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2025 at 12:31.

London Borough Of Barnet logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 08:39.

London Borough Of Barnet logo
Between
27 Oct and 15 Nov 2025
Details
View Map
Share
Ravenscroft Avenue

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 13:09.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Princes Park Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Park Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 14:03.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Princes Park Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Park Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:04.

London Borough Of Barnet logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Norrice Lea

London Borough Of Barnet are proposing to carry out Highway improvement works on Norrice Lea, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:32.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Coppetts Road

Thames Water are proposing to carry out New service connection on Coppetts Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 09:45.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Burnt Oak Broadway

NWP Street (formerly New World Payphones) were proposing to carry out roadworks on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 26 Sep 2025 at 13:37.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

NWP Street (formerly New World Payphones) are proposing to carry out Remedial works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 26 Sep 2025 at 15:22.

Between
27 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

NWP Street (formerly New World Payphones) are proposing to carry out Remedial works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 3 Oct 2025 at 15:49.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 10:29.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 10:44.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 09:22.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Sep 2025 at 09:55.

Thames Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Erica Street

Thames Water are proposing to carry out Utility repair and maintenance works on Erica Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 13:34.

Transport for London (TfL) logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:37.

UK Power Networks Eastern & London logo
Between
30 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 13:08.

BT logo
Between
30 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Mitford Road

BT are proposing to carry out Utility asset works on Mitford Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the footway only.

This roadwork event was last updated by BT on 30 Jul 2025 at 09:13.

Network Rail logo
Between
1 and 9 Nov 2025
Details
View Map
Share
East Lane

Network Rail were proposing to carry out Works for Rail Purposes on East Lane, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2025 and run through until 9 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2025 at 14:56.

Thames Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Mary Place

Thames Water are proposing to carry out Utility repair and maintenance works on Mary Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 11:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2025 at 08:14.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:12.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:50.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Oct 2025 at 18:10.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Chamberlayne Road

Thames Water are proposing to carry out New service connection on Chamberlayne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:50.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:07.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Banister Road

Thames Water are proposing to carry out New service connection on Banister Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

UK Power Networks Eastern & London logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Charles Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Charles Lane, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 08:38.

UK Power Networks Eastern & London logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Charles Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Charles Lane, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2025 at 13:56.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 11:38.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 13:43.

Cadent Gas logo
Between
3 and 28 Nov 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 15:59.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Greenland Street

Thames Water were proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 11:23.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 07:43.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Dartmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dartmouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:34.

Affinity Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Central Road

Affinity Water are proposing to carry out Utility asset works on Central Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Aug 2025 at 13:27.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 09:02.

London Borough Of Barnet logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 15:11.

London Borough Of Barnet logo
Between
3 and 18 Nov 2025
Details
View Map
Share
Deansway

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Deansway, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 18 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 10:11.

London Borough Of Barnet logo
Between
3 and 18 Nov 2025
Details
View Map
Share
Follow
Deansway

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Deansway, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2025 at 12:47.

London Borough Of Barnet logo
Between
3 and 18 Nov 2025
Details
View Map
Share
Follow
Deansway

London Borough Of Barnet are proposing to carry out Highway improvement works on Deansway, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 10:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Selvage Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.

London Borough Of Barnet logo
LONG TERM
Between
4 Nov and 17 Dec 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 15:19.

London Borough Of Barnet logo
LONG TERM
Between
4 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Brunswick Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Sep 2025 at 09:02.

London Borough Of Barnet logo
Between
4 and 11 Nov 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 11 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 13:19.

Electricity Network Company logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 15 Sep 2025 at 11:56.

City Of Westminster logo
LONG TERM
Between
6 Nov 2025 and 10 Jan 2026
Details
View Map
Share
Follow
Droop Street

City Of Westminster are proposing to carry out Highway improvement works on Droop Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 10 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 2 Oct 2025 at 10:51.

Thames Water logo
Between
6 and 13 Nov 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:14.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 25 Jun 2025 at 15:11.

Between
7 and 30 Nov 2025
Details
View Map
Share
Follow
West Gate

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 4 Sep 2025 at 13:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 13:34.

London Borough Of Barnet logo
Between
8 and 9 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 08:14.

London Borough Of Barnet logo
Between
8 and 9 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 10:01.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Newton Road

Thames Water are proposing to carry out New service connection on Newton Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2025 at 13:53.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:13.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:00.

Transport for London (TfL) logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 11:08.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nascot Street

Cadent Gas are proposing to carry out Utility asset works on Nascot Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Glenroy Street

Cadent Gas are proposing to carry out Utility asset works on Glenroy Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 16:30.

Virgin Media logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cambridge Gardens

Virgin Media were proposing to carry out Utility repair and maintenance works on Cambridge Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:56.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:43.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 06:42.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 09:48.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2025 at 08:50.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 17:39.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:08.

UK Power Networks Eastern & London logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Buckland Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 07:34.

UK Power Networks Eastern & London logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Jackman Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Jackman Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2025 at 13:31.

London Borough Of Barnet logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Barnet Lane

BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.

Affinity Water logo
Between
11 and 26 Nov 2025
Details
View Map
Share
Follow
Turner Close

Affinity Water are proposing to carry out Utility asset works on Turner Close, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:16.

London Borough Of Brent logo
Between
11 and 28 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Nov 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:23.

London Borough Of Barnet logo
Between
12 and 20 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 16:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 May 2025 at 12:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

Virgin Media logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Jacksons Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Jacksons Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Aug 2025 at 15:30.

London Borough Of Barnet logo
LONG TERM
Between
12 Nov and 19 Dec 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 14:38.

Thames Water logo
Between
13 and 18 Nov 2025
Details
View Map
Share
Follow
East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove

Thames Water are proposing to carry out Utility asset works on East Acton Lane Service Road To Numbers 115-129 And Beechwood Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 18 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:36.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Underhill Passage

UK Power Networks Eastern & London were proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 26 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 13:05.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Follow
Underhill Passage

UK Power Networks Eastern & London are proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 11:06.

London Borough Of Barnet logo
Between
13 and 18 Nov 2025
Details
View Map
Share
West Heath Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on West Heath Road, Hampstead, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 18 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Aug 2025 at 14:28.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 17:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Nov 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 07:20.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 14:37.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 11:30.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:51.

London Borough Of Camden logo
Between
15 and 28 Nov 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:47.

Electricity Network Company logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Queensway

Electricity Network Company are proposing to carry out Utility asset works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Sep 2025 at 08:21.

UK Power Networks Eastern & London logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Chilworth Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2025 at 07:49.

UK Power Networks Eastern & London logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Chilworth Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2025 at 09:15.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Harcourt Street

Thames Water are proposing to carry out New service connection on Harcourt Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2025 at 09:34.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:10.

London Borough Of Camden logo
LONG TERM
Between
17 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:48.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Greenland Street

Thames Water were proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:47.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Pratt Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:58.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Pratt Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:19.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
St Martin's Close

Transport for London (TfL) are proposing to carry out Highway improvement works on St Martin's Close, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:59.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
St Martin's Close

Transport for London (TfL) are proposing to carry out Highway improvement works on St Martin's Close, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Greenland Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenland Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:42.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Greenland Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenland Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Georgiana Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Georgiana Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:21.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Carol Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carol Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Carol Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carol Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Oct 2025 at 10:22.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2025 at 09:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2025 at 09:56.

London Borough Of Camden logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Agar Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Mar 2025 at 15:03.

London Borough Of Camden logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Agar Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Mar 2025 at 10:38.

Thames Water logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Belton Road

Thames Water are proposing to carry out Utility asset works on Belton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 15:47.

London Borough Of Barnet logo
Between
17 and 29 Nov 2025
Details
View Map
Share
Finchley Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Finchley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 16:10.

London Borough Of Barnet logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Ravenscroft Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Oct 2025 at 12:29.

London Borough Of Barnet logo
Between
17 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Ravenscroft Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Oct 2025 at 10:25.

Cadent Gas logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Myddleton Road

Cadent Gas are proposing to carry out Utility asset works on Myddleton Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 14:34.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out roadworks on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Aug 2025 at 13:26.

Affinity Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Silverston Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Silverston Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 14:46.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Greyfell Close

Cadent Gas are proposing to carry out Utility asset works on Greyfell Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:15.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Stangate Gardens

Cadent Gas are proposing to carry out Utility asset works on Stangate Gardens, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:03.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hewett Close

Cadent Gas are proposing to carry out Utility asset works on Hewett Close, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:01.

London Borough Of Barnet logo
Between
17 Nov and 10 Dec 2025
Details
View Map
Share
Friary Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 12:41.

London Borough Of Barnet logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2025 at 15:34.

London Borough Of Barnet logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Oct 2025 at 15:35.

Cadent Gas logo
LONG TERM
Between
17 Nov 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Stanmore Hill

Cadent Gas are proposing to carry out Utility asset works on Stanmore Hill, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 13:29.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Oct 2025 at 10:05.

London Borough Of Barnet logo
Between
17 and 26 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Oct 2025 at 10:27.

London Borough Of Barnet logo
Between
18 and 19 Nov 2025
Details
View Map
Share
Follow
Winnington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2025 at 13:26.

Affinity Water logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Copland Avenue

Affinity Water are proposing to carry out Utility asset works on Copland Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:08.

London Borough Of Brent logo
Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway improvement works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:26.

Eunetworks logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Buller Road

Eunetworks are proposing to carry out roadworks on Buller Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 08:20.

Transport for London (TfL) logo
Between
20 Nov and 16 Dec 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2025 at 15:22.

Between
21 and 25 Nov 2025
Details
View Map
Share
Elmgrove Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Elmgrove Road, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2025 at 12:49.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Crescent Road

Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Crescent Road

Virgin Media were proposing to carry out Utility asset works on Crescent Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Sep 2025 at 11:45.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Crescent Road

Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Oct 2025 at 08:52.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Dollis Road

Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Dollis Road

Virgin Media were proposing to carry out Utility asset works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Sep 2025 at 11:13.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Dollis Road

Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 Oct 2025 at 13:59.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 18:12.

London Borough Of Barnet logo
Between
24 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Briardale Gardens

London Borough Of Barnet are proposing to carry out roadworks on Briardale Gardens, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 15:15.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Rathcoole Gardens

Thames Water are proposing to carry out Disconnection or alteration of supply on Rathcoole Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2025 at 10:32.

Thames Water logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility asset works on Grove Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 14:48.

Thames Water logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility asset works on Grove Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 14:47.

Cadent Gas logo
Between
24 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Oakleigh Road South

Cadent Gas are proposing to carry out Utility asset works on Oakleigh Road South, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 15:53.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Highwood Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

Transport for London (TfL) logo
Between
27 and 29 Nov 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 14:41.

London Borough Of Barnet logo
On
27 Nov 2025
Details
View Map
Share
Follow
The Fairway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Fairway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 27 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Oct 2025 at 08:32.

London Borough Of Camden logo
Between
29 Nov and 13 Dec 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:47.

London Borough Of Barnet logo
Between
30 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Friary Way

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Friary Way, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Oct 2025 at 15:06.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Queensway

Thames Water were proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:53.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Greenland Street

Thames Water are proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2025 at 14:48.

HS2 logo
LONG TERM
Between
1 Dec 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 17 July 2026. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 2 Jul 2025 at 14:40.

Network Rail logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2025 at 17:30.

Affinity Water logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:09.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Jul 2025 at 15:11.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Jul 2025 at 21:23.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 12:49.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:44.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:30.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Sep 2025 at 08:02.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Torrington Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 09:00.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Torrington Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2025 at 12:15.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Torrington Park

Affinity Water were proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 09:27.

Thames Water logo
Between
2 and 22 Dec 2025
Details
View Map
Share
Follow
Lancaster Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 17:01.

Thames Water logo
Between
2 and 22 Dec 2025
Details
View Map
Share
Follow
Lancaster Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 08:57.

London Borough Of Barnet logo
Between
4 and 8 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:44.

London Borough Of Barnet logo
Between
5 and 22 Dec 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Oct 2025 at 12:29.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Mora Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mora Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:01.

UK Power Networks Eastern & London logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Christchurch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Christchurch Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 09:40.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Tenterden Grove

Thames Water were proposing to carry out Remedial works on Tenterden Grove, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 13:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 30 Sep 2025 at 11:00.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Oct 2025 at 16:59.

Network Rail logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Bunns Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bunns Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 15:50.

London Borough Of Barnet logo
Between
11 and 15 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Sep 2025 at 15:44.

Affinity Water logo
LONG TERM
Between
15 Dec 2025 and 29 Jan 2026
Details
View Map
Share
Follow
Chaplin Road

Affinity Water are proposing to carry out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 29 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Sep 2025 at 14:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Dec 2025 and 22 Feb 2026
Details
View Map
Share
The Bishops Avenue

UK Power Networks Eastern & London were proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 22 February 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2025 at 10:34.

Thames Water logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Remedial works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 12:26.

Thames Water logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Tenterden Grove

Thames Water were proposing to carry out Remedial works on Tenterden Grove, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 18 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 11:05.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
The Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Weymouth Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Weymouth Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Russell Grove

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Russell Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Millway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Marsh Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Pike Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Westfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westfield Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Courtland Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Courtland Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2025 at 15:07.

Thames Water logo
Between
20 and 23 Dec 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2025 at 11:15.

BT logo
Between
22 and 24 Dec 2025
Details
View Map
Share
Follow
Barnet Lane

BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2025 at 15:48.

Thames Water logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Newton Road

Thames Water were proposing to carry out New service connection on Newton Road, Bayswater, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 2 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2025 at 09:16.

Thames Water logo
Between
29 Dec 2025 and 1 Jan 2026
Details
View Map
Share
Malton Road

Thames Water were proposing to carry out New service connection on Malton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 1 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:42.

BT logo
Between
29 and 31 Dec 2025
Details
View Map
Share
Queens Avenue

BT were proposing to carry out Utility repair and maintenance works on Queens Avenue, Finchley Central, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 December 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2025 at 13:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jan and 3 Apr 2026
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2026 and could run through until 3 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2026 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:30.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Mar 2025 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 25 Apr 2025 at 11:07.

London Borough Of Hammersmith & Fulham logo
Between
5 and 10 Jan 2026
Details
View Map
Share
Follow
South Africa Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 10 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 15 May 2025 at 17:04.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Oct 2025 at 14:55.

Thames Water logo
Between
5 and 21 Jan 2026
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 8 Oct 2025 at 15:07.

Thames Water logo
Between
5 and 8 Jan 2026
Details
View Map
Share
Follow
Homer Street

Thames Water are proposing to carry out Remedial works on Homer Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 09:01.

UK Power Networks Eastern & London logo
Between
5 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2025 at 16:30.

Thames Water logo
LONG TERM
Between
5 Jan and 22 Mar 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 22 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Sep 2025 at 14:42.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Cooper Road

Thames Water are proposing to carry out New service connection on Cooper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:20.

Thames Water logo
Between
5 and 9 Jan 2026
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2025 at 10:21.

Cadent Gas logo
LONG TERM
Between
5 Jan and 20 Feb 2026
Details
View Map
Share
Follow
Fulton Road

Cadent Gas are proposing to carry out Utility asset works on Fulton Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 08:47.

Cadent Gas logo
Between
5 and 23 Jan 2026
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 09:29.

Thames Water logo
LONG TERM
Between
5 Jan and 2 Apr 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 2 April 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:21.

Virgin Media logo
Between
5 and 7 Jan 2026
Details
View Map
Share
Follow
Park Road

Virgin Media are proposing to carry out Utility asset works on Park Road, West Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 7 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Sep 2025 at 12:35.

Cadent Gas logo
Between
5 and 30 Jan 2026
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 13:41.

Affinity Water logo
Between
5 and 16 Jan 2026
Details
View Map
Share
Follow
Derby Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Derby Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Oct 2025 at 14:43.

Affinity Water logo
Between
5 and 16 Jan 2026
Details
View Map
Share
Follow
Hall Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Hall Street, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Sep 2025 at 13:46.

Affinity Water logo
Between
5 and 16 Jan 2026
Details
View Map
Share
Follow
Hall Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Hall Street, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Oct 2025 at 09:08.

Thames Water logo
Between
6 and 8 Jan 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2025 at 16:10.

Affinity Water logo
Between
6 and 9 Jan 2026
Details
View Map
Share
Follow
Summit Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Summit Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 9 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2025 at 16:34.

Virgin Media logo
Between
6 and 8 Jan 2026
Details
View Map
Share
Follow
Dale Grove

Virgin Media are proposing to carry out Utility asset works on Dale Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Oct 2025 at 08:52.

London Borough Of Barnet logo
Between
6 and 19 Jan 2026
Details
View Map
Share
Follow
Mayfield Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Mayfield Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 19 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Oct 2025 at 10:16.

Affinity Water logo
Between
6 and 8 Jan 2026
Details
View Map
Share
Follow
Barnet Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Barnet Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 8 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 14:52.


Roadworks Map near to Beaufort Gardens, LONDON, NW4 3QP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 10 Oct 2025 02:44
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Beaufort Gardens, LONDON, NW4 3QP (86 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
RENTERS AVENUE, HENDON 
(0.1 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.1
Details
Share
Follow
2
National Highways logo
NORTH CIRCULAR ROAD, BRENT CROSS 
(0.1 miles)
National Highways
Works for road purposes - Carriageway - No carriageway incursion
Planned
Scheduled: 9 Oct 2025 - 10 Oct 2025
0.1
Details
Share
Follow
3
London Borough Of Barnet logo
ALLINGTON ROAD, HENDON 
(0.2 miles)
London Borough Of Barnet
Highway improvement works - Carriageway - Give and take
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.2
Details
Share
Follow
4
Transport for London (TfL) logo
QUEENS ROAD, HENDON 
(0.2 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Stop/go boards
Planned
Scheduled: 10 Oct 2025
0.2
Details
Share
Follow
5
UK Power Networks Eastern & London logo
URGENT
  
CRESPIGNY ROAD, HENDON 
(0.3 miles)
UK Power Networks Eastern & London
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Cancelled
(Scheduled: 6 Oct 2025 - 10 Oct 2025)
0.3
Details
Share
6
London Borough Of Barnet logo
MAYFIELD GARDENS, HENDON 
(0.3 miles)
London Borough Of Barnet
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.3
Details
Share
Follow
7
Transport for London (TfL) logo
MAJOR
  
BRENT CROSS ROUNDABOUT EAST BOUND SLIP FROM NORTH CIRCULAR TO ROUNDABOUT, HENDON 
(0.3 miles)
Transport for London (TfL)
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 11 Nov 2024 22:00
(Scheduled: 18 Nov 2024 - 31 Mar 2026)
0.3
Details
Share
Follow
8
BT logo
FOSCOTE ROAD, HENDON 
(0.3 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.3
Details
Share
Follow
9
London Borough Of Barnet logo
MAYFIELD GARDENS, HENDON 
(0.3 miles)
London Borough Of Barnet
Highway improvement works - Footway - No carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.3
Details
Share
Follow
10
London Borough Of Barnet logo
MAYFIELD GARDENS, HENDON 
(0.3 miles)
London Borough Of Barnet
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 10 Oct 2025 - 14 Oct 2025
0.3
Details
Share
Follow
  • ...