ROADWORKS SUMMARY
Flowers Close, LONDON, NW2 7EL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Flowers Close, NW2 7EL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Flowers Close, LONDON, NW2 7EL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Flowers Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 18 Dec 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Pembroke Road

Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.

Thames Water logo
LONG TERM
Between
9 Dec 2023 and 10 Dec 2024
Details
View Map
Share
Follow
Du Cane Road

Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 16:28.

City Of Westminster logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Fernhead Road

City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 12:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 14 Nov 2024 at 16:16.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

HS2 logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.

HS2 logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 19 Nov 2024 at 16:12.

HS2 logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.

Transport for London (TfL) logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:34.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Greencroft Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 09:00 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 07:08.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:09.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:14.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Greville Road

HS2 are carrying out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 11:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:16.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Acton Lane

Thames Water are carrying out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:27.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 11:40 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 07:51.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
South Africa Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.

HS2 logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lynwood Road

HS2 are carrying out Utility asset works on Lynwood Road, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 07:00 and could run through until 29 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Greenhill Park

Thames Water are carrying out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 14:35 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 09:49 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:19.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 14:57.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Jul 2024 at 08:02.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 14:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 15:45.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:27.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:29.

HS2 logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:25.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:09.

London Borough Of Camden logo
LONG TERM
Between
16 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Richardson's Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 21 Jun 2024 at 16:21.

London Borough Of Camden logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Richardson's Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 29 November 2024. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 9 Aug 2024 at 11:51.

Transport for London (TfL) logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Cooper Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cooper Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 14:17.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Mount Road

Thames Water are carrying out Utility repair and maintenance works on Mount Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 13:40 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:46.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 7 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Connaught Road

Thames Water are carrying out Utility asset works on Connaught Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.

London Borough Of Camden logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Hermit Place

London Borough Of Camden are carrying out Highway repair and maintenance works on Hermit Place, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 11 Oct 2024 at 14:10.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Hale Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2024 at 10:37.

Network Rail logo
LONG TERM
Between
19 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

Network Rail logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

London Borough Of Brent logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 18 Oct 2024 at 22:19.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 22 Oct 2024 at 08:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Transport for London (TfL) logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 07:30 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 08:34.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are carrying out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:28.

London Borough Of Camden logo
LONG TERM
Between
29 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 Nov 2024 at 12:15.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
London Road

Thames Water are carrying out Utility repair and maintenance works on London Road, Stanmore.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:58.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 10:22.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 5 Dec 2024
Details
View Map
Share
Kilburn High Road

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 12:36.

Thames Water logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are proposing to carry out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Cadent Gas logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are carrying out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:39 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:49.

Finishing
Friday
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Oct 2024 at 09:46.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:17.

London Borough Of Camden logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Nov 2024 at 09:23.

London Borough Of Barnet logo
LONG TERM
Between
6 Nov 2024 and 13 Mar 2025
Details
View Map
Share
Shirehall Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:03.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:57.

London Borough Of Camden logo
LONG TERM
Between
8 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:21.

London Borough Of Camden logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Nov 2024 at 09:11.

Finishing
Today
Details
View Map
Share
Follow
Warwick Road

UK Power Distribution are carrying out Utility asset works on Warwick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 26 Nov 2024 at 10:49.

Thames Water logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:54.

UK Power Networks Eastern & London logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.

London Borough Of Ealing logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:00.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 19:03.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:25.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 09:54.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are carrying out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:23.

London Borough Of Camden logo
Finishing
Monday
Details
View Map
Share
Camden Square

London Borough Of Camden were proposing to carry out Highway improvement works on Camden Square, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Nov 2024 at 12:19.

London Borough Of Camden logo
Finishing
Monday
Details
View Map
Share
Follow
Camden Square

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Nov 2024 at 18:00.

London Borough Of Camden logo
Finishing
Monday
Details
View Map
Share
Follow
Camden Square

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Nov 2024 at 16:31.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are carrying out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:26.

London Borough Of Brent logo
Finishing
Friday
Details
View Map
Share
Follow
Park Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Park Lane, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 31 Oct 2024 at 23:12.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Park Lane, Wembley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Nov 2024 at 12:53.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Vale Of Health

Thames Water are carrying out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:45 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:51.

Finishing
Friday
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 09:41.

Finishing
Friday
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are carrying out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:26 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Nov 2024 at 08:31.

London Borough Of Barnet logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 14:45.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
The Broadway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 15:13.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
The Broadway

UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:43.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
The Broadway

UK Power Networks Eastern & London were proposing to carry out New service connection on The Broadway, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 09:19.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
The Broadway

UK Power Networks Eastern & London are carrying out New service connection on The Broadway, Mill Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:15 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 09:24.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Wessex Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Wessex Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 11 Jul 2024 at 14:30.

Thames Water logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Utility repair and maintenance works on Abbey Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.

Thames Water logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Cumberland Avenue

Thames Water are carrying out Utility repair and maintenance works on Cumberland Avenue, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Granville Road

UK Power Networks Eastern & London are carrying out New service connection on Granville Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:44 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:38.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:38.

London Borough Of Barnet logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are carrying out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 15 Nov 2024 at 14:37.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Butterwick

Transport for London (TfL) are proposing to carry out Highway improvement works on Butterwick, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 11:58.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Butterwick

Transport for London (TfL) are carrying out Highway improvement works on Butterwick, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 22:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 07:52.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Hammersmith Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Hammersmith Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 09:48.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Hammersmith Road

Transport for London (TfL) are carrying out Highway improvement works on Hammersmith Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 22:00 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 07:51.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Lexham Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Lexham Mews, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 12:17.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:11.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Formosa Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Formosa Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:28.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Formosa Street

City Of Westminster are carrying out Highway repair and maintenance works on Formosa Street, Little Venice, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Nov 2024 at 09:00.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are carrying out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:53 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Andover Place

Thames Water were proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:43.

Thames Water logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Chatsworth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chatsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 13:24.

Thames Water logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Chatsworth Road

Thames Water are carrying out Utility repair and maintenance works on Chatsworth Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:25.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are carrying out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:24.

Thames Water logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Willoughby Road

Thames Water are proposing to carry out Utility repair and maintenance works on Willoughby Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:20.

Thames Water logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Willoughby Road

Thames Water are carrying out Utility repair and maintenance works on Willoughby Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:43.

Thames Water logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bolton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:19.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Burnt Oak Broadway

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:12.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are carrying out Utility repair and maintenance works on Leinster Terrace, Lancaster Gate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:16 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:10.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are carrying out Utility repair and maintenance works on Leinster Terrace, Lancaster Gate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:16 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:28.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Prince Of Wales Road

Cadent Gas are carrying out Utility repair and maintenance works on Prince Of Wales Road, Haverstock, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:14 and could run through until 27 November 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:37.

Cadent Gas logo
Until
4 Dec 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are carrying out Utility repair and maintenance works on High Road, Wembley.

The works started on 19 November 2024 at 14:18 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:32.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are carrying out Utility repair and maintenance works on Sunnyside Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:45 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 07:36.

London Borough Of Haringey logo
LONG TERM
Between
19 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Jun 2024 at 11:56.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carlton Hill

Thames Water are carrying out Utility repair and maintenance works on Carlton Hill, Abbey Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 10:37 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 11:58.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Broadley Street

Thames Water are carrying out Utility repair and maintenance works on Broadley Street, Church Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 15:52 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:21.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Warrington Crescent

Cadent Gas are carrying out Utility repair and maintenance works on Warrington Crescent, Little Venice, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 16:55 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:09.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are carrying out Utility repair and maintenance works on Pound Lane, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 05:39 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:39.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
North End Road

Cadent Gas are carrying out Utility repair and maintenance works on North End Road, Golders Green, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 13:51 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:38.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wellgarth Road

Cadent Gas are carrying out Utility repair and maintenance works on Wellgarth Road, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 13:56 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:24.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
East End Road

Cadent Gas are carrying out Utility repair and maintenance works on East End Road, Finchley, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:40 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Briar Close

Cadent Gas are carrying out Utility repair and maintenance works on Briar Close, East Finchley, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:35 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:03.

Thames Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Gloucester Place

Thames Water are carrying out Utility repair and maintenance works on Gloucester Place, Bryanston & Dorset Square, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 13:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 11:47.

UK Power Networks Eastern & London logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Hamilton Terrace

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:31.

UK Power Networks Eastern & London logo
Between
22 Nov and 17 Dec 2024
Details
View Map
Share
High Street

UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 15:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Frognal

Thames Water are carrying out Utility repair and maintenance works on Frognal, Frognal And Fitzjohns, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 11:27 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:39.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Court Drive

Affinity Water are carrying out Utility repair and maintenance works on Court Drive, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:07 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 10:59.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Woodside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Woodside Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Aug 2024 at 09:20.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Marylebone High Street

Thames Water are carrying out Utility repair and maintenance works on Marylebone High Street, Marylebone High Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 15:25 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:57.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 10:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:47.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lovett Way

Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.

The works started on 23 November 2024 at 09:54 and could run through until 3 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Nov 2024 at 09:56.

London Borough Of Ealing logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:11.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:04.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Enfield Road

Thames Water are carrying out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 12:24 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:15.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Holland Park Mews

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Holland Park Mews, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 18:44 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 18:46.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Talbot Road

Thames Water were proposing to carry out New service connection on Talbot Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 09:47.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Talbot Road

Thames Water are carrying out New service connection on Talbot Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:34.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Thayer Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:16.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are proposing to carry out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:48.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are carrying out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:22 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:28.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Blandford Street

Thames Water are carrying out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:02 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:16.

UK Power Networks Eastern & London logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:30 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:47.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Marylebone Road

Thames Water are carrying out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:32 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:32.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
Copley Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Copley Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 24 Oct 2024 at 09:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Marylebone Road

Thames Water are carrying out Utility repair and maintenance works on Marylebone Road, Marylebone High Street, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:14 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 18:59.

Finishing
Friday
Details
View Map
Share
Follow
Albany Street

G. Network Communications are proposing to carry out Remedial works on Albany Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 14 Oct 2024 at 14:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:21.

London Borough Of Camden logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:57.

London Borough Of Camden logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are carrying out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 25 Nov 2024 at 09:33.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Quex Road

Thames Water are carrying out Utility repair and maintenance works on Quex Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:33.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:01.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 17:04.

Hyperoptic logo
Finishing
Today
Details
View Map
Share
Follow
Little Green Street

Hyperoptic are proposing to carry out Utility asset works on Little Green Street, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 14 Oct 2024 at 18:10.

Hyperoptic logo
Finishing
Today
Details
View Map
Share
Follow
Little Green Street

Hyperoptic are carrying out Utility asset works on Little Green Street, Kentish Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:20 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 25 Nov 2024 at 15:16.

Hyperoptic logo
Finishing
Today
Details
View Map
Share
Follow
Highgate Road

Hyperoptic are proposing to carry out Utility asset works on Highgate Road, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 22 Oct 2024 at 15:52.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:08.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:32.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 5 Jan 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 10:26.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 10:26.

London Borough Of Barnet logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.

Finishing
Tomorrow
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Oct 2024 at 10:19.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Oct 2024 at 15:19.

London Borough Of Ealing logo
Finishing
Saturday
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Nov 2024 at 16:36.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
The Broadway

London Borough Of Ealing are proposing to carry out Highway improvement works on The Broadway, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Nov 2024 at 16:26.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Westbourne Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Sep 2024 at 15:05.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Westbourne Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Nov 2024 at 15:37.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
The Mall

London Borough Of Ealing are proposing to carry out Highway improvement works on The Mall, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Nov 2024 at 16:18.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Nov 2024 at 14:44.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Senior Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:36.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Senior Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 11:07.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lord Hills Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:41.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lord Hills Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Nov 2024 at 12:55.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Downshire Hill

Thames Water are proposing to carry out Remedial works on Downshire Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:05.

Finishing
Friday
Details
View Map
Share
Broadcroft Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.

Finishing
Friday
Details
View Map
Share
Follow
Wolverton Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

City Of Westminster logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hyde Park Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Nov 2024 at 15:35.

City Of Westminster logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Somers Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Nov 2024 at 15:38.

UK Power Networks Eastern & London logo
Between
28 Nov and 5 Dec 2024
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:45.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 12:08.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Nov 2024 at 15:58.

Finishing
Saturday
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.

Finishing
Sunday
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 13:13.

Finishing
Monday
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

London Borough Of Barnet logo
Between
28 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.

UK Power Networks Eastern & London logo
Between
29 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 10:44.

UK Power Networks Eastern & London logo
Between
29 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 10:43.

Thames Water logo
Between
29 Nov and 24 Dec 2024
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.

These works were categorised as Major.

The works were originally planned to start 29 November 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:39.

London Borough Of Camden logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2024 at 10:25.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bulwer Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Thames Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:09.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:51.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:03.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:21.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Braybrook Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 18:14.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Braybrook Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:10.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 11:31.

UK Power Networks Eastern & London logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Devonshire Row Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:39.

UK Power Networks Eastern & London logo
Between
2 and 5 Dec 2024
Details
View Map
Share
William Road

UK Power Networks Eastern & London were proposing to carry out New service connection on William Road, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:52.

Electricity Network Company logo
Between
2 and 25 Dec 2024
Details
View Map
Share
Follow
Fernhead Road

Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Sep 2024 at 16:01.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 09:59.

London Borough Of Camden logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Nov 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:16.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Harefield Road

Thames Water are proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:27.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Tenterden Grove

Thames Water were proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:05.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Southam Street

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Southam Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:36.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Adair Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Adair Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:39.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Golborne Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Golborne Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:33.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Kensal Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensal Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:32.

Affinity Water logo
Between
3 and 11 Dec 2024
Details
View Map
Share
Borthwick Road

Affinity Water were proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:14.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Nov 2024 at 09:57.

Between
4 and 6 Dec 2024
Details
View Map
Share
Naresby Fold

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Naresby Fold

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.

Electricity Network Company logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Bollo Bridge Road

Electricity Network Company are proposing to carry out Utility asset works on Bollo Bridge Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 Nov 2024 at 12:45.

City Of Westminster logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:58.

City Of Westminster logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 26 Nov 2024 at 09:51.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 15:31.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 10:15.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

London Borough Of Barnet logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Transport for London (TfL) logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.

Transport for London (TfL) logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Netheravon Road

Thames Water were proposing to carry out Utility repair and maintenance works on Netheravon Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:45.

Transport for London (TfL) logo
LONG TERM
Between
9 Dec 2024 and 2 May 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

City Of Westminster logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:02.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:05.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Nov 2024 at 10:42.

London Borough Of Camden logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Sep 2024 at 12:17.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Nassington Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Nassington Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Nassington Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Nassington Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Oct 2024 at 15:51.

London Borough Of Camden logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Well Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Well Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grove Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grove Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:47.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 11:20.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:40.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:07.

Cadent Gas logo
Between
9 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 08:28.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:02.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:19.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hampstead Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:31.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 14:54.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Weston Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 18 Oct 2024 at 09:24.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 14:47.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Torrington Park

Thames Water were proposing to carry out Utility asset works on Torrington Park, North Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:24.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Friary Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Way, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 12:22.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Uphill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:01.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:19.

Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Hornton Place

G. Network Communications are proposing to carry out Utility asset works on Hornton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 7 Nov 2024 at 15:47.

BT logo
Between
10 and 25 Dec 2024
Details
View Map
Share
Agar Grove

BT were proposing to carry out Utility asset works on Agar Grove, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 December 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by BT on 9 Sep 2024 at 12:37.

London Borough Of Camden logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Fortune Green Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.

London Borough Of Barnet logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2024 at 17:25.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Sep 2024 at 15:24.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:07.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Havelock Place

London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 09:19.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:24.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 07:56.

Transport for London (TfL) logo
LONG TERM
Between
12 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.

Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Lower Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 12:01.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Nov 2024 at 13:45.

BT logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Lower Terrace

BT were proposing to carry out Utility asset works on Lower Terrace, Hampstead Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:10.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Hanbury Road

Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:16.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Hanbury Road

Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Bristol Gardens

Thames Water were proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:58.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
St Pancras Way

Network Rail were proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 11:07.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Sep 2024 at 18:04.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 08:52.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Aylmer Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 11:13.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

Cadent Gas logo
Between
18 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

Network Rail logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Camden Square

Network Rail are proposing to carry out Works for Rail Purposes on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:17.

Network Rail logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Camden Square

Network Rail are proposing to carry out Works for Rail Purposes on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 08:47.

Thames Water logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.

London Borough Of Barnet logo
Between
24 and 31 Dec 2024
Details
View Map
Share
Woodside

London Borough Of Barnet were proposing to carry out Highway improvement works on Woodside, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:55.

London Borough Of Barnet logo
Until
26 Dec 2024
Details
View Map
Share
Follow
Claverley Villas

London Borough Of Barnet are carrying out Highway improvement works on Claverley Villas, Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 00:00 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2024 at 09:19.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Rectory Lane

London Borough Of Barnet carried out Highway improvement works on Rectory Lane, Edgware.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Dec 2024 and 26 Dec 2024 and were actually completed on between and . The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 12:56.

Murphy Power Distribution logo
Between
26 Dec 2024 and 19 Jan 2025
Details
View Map
Share
Follow
Glengall Road

Murphy Power Distribution are proposing to carry out New service connection on Glengall Road, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 14:47.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.

Scottish Hydro Electric Power Dis logo
Between
1 and 17 Jan 2025
Details
View Map
Share
Bromyard Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:14.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 16:22.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
York Mews

Thames Water were proposing to carry out New service connection on York Mews, Kentish Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:25.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:55.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:47.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 08:04.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 10:43.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Dollis Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 11:50.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Nether Street

Thames Water are proposing to carry out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:51.

Thames Water logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Thames Water logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Etheldene Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Etheldene Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Cadent Gas logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 16:10.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:13.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hillgate Street

Thames Water are proposing to carry out Utility repair and maintenance works on Hillgate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 09:48.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:38.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Kensington Church Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Church Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:22.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:23.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 11:47.

UK Power Networks Eastern & London logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Chapel Side

UK Power Networks Eastern & London were proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 10:02.

UK Power Networks Eastern & London logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Chapel Side

UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Chapel Side

UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:26.

Cadent Gas logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bomore Road

Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bomore Road

Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 14:22.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:38.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Walmer Road

Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:22.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:24.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:50.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:07.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:52.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:07.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:15.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harley Street

Thames Water are proposing to carry out Utility asset works on Harley Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:57.

Thames Water logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:04.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:03.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:45.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Portland Place

Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:59.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:35.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:19.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:58.

Thames Water logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Maida Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Maida Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:20.

UK Power Networks Eastern & London logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 11:58.

Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Randolph Avenue

G. Network Communications are proposing to carry out Remedial works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 9 Oct 2024 at 09:07.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:39.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:59.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:45.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:13.

Thames Water logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:28.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Balmoral Road

Thames Water are proposing to carry out Utility asset works on Balmoral Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:46.

Thames Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Vale Of Health

Thames Water are proposing to carry out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:52.

T-Mobile (UK) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
The Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rotherwick Road

Cadent Gas are proposing to carry out Utility asset works on Rotherwick Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
The Hyde

Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Virgin Media logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Kensington Church Street

Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Sep 2024 at 15:45.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.

London Borough Of Barnet logo
LONG TERM
Between
7 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:58.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:43.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:32.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Walmer Road

Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

City Of Westminster logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Westbourne Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 10:08.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Old Quebec Street

Thames Water are proposing to carry out New service connection on Old Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:13.

Thames Water logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Great Cumberland Place

Thames Water were proposing to carry out Works for road purposes on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:37.

Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 26 Nov 2024 at 11:29.

UK Power Networks Eastern & London logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Devonshire Row Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 13:42.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:16.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lisson Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:07.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 14:34.

City Of Westminster logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 15:27.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:14.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:42.

London Borough Of Barnet logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Leeside Crescent

London Borough Of Barnet were proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 14:17.

Thames Water logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.

London Borough Of Barnet logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 13:03.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Aerodrome Road

Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Holden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 14:33.

Cadent Gas logo
LONG TERM
Between
14 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Drayson Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Drayson Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 19:25.

G2 Energy IDNO logo
Between
15 and 28 Jan 2025
Details
View Map
Share
Follow
Oak Tree Road

G2 Energy IDNO are proposing to carry out Utility asset works on Oak Tree Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Nov 2024 at 14:34.

Thames Water logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.

City Of Westminster logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

Thames Water logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:17.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:28.

Thames Water logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Creffield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.

Thames Water logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Creffield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 12:14.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Upper Berkeley Street

Thames Water were proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:23.

City Of Westminster logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 14:30.

Thames Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Luxborough Street

Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.

UK Power Networks Eastern & London logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 14:02.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Adelaide Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 18:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:16.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:54.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 20 Nov 2024 at 08:01.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:21.

Thames Water logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Greenwood Place

Thames Water are proposing to carry out New service connection on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:24.

Cadent Gas logo
Between
23 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:12.

National Highways logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Chalk Farm Road

National Highways were proposing to carry out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:14.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Chalk Farm Road

Network Rail were proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:38.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:40.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Eastbourne Terrace

Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 11:03.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Thayer Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:21.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 4 Nov 2024 at 09:40.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kentish Town Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kentish Town Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 17:00.

Thames Water logo
LONG TERM
Between
27 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:53.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:13.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:54.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.

London Borough Of Barnet logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 09:17.

London Borough Of Barnet logo
Between
29 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 16:13.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kilmarsh Road

Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 13:54.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kilmarsh Road

Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:12.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:40.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Oct 2024 at 11:26.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Golborne Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Nov 2024 at 15:13.

City Of Westminster logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Elgin Mews South

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:36.

City Of Westminster logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Elgin Mews South

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 10:47.

Thames Water logo
LONG TERM
Between
3 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Grove End Road

Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
3 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Grove End Road

Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Thames Water logo
LONG TERM
Between
3 Feb and 8 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
3 Feb and 8 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:38.

UK Power Networks Eastern & London logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Maida Vale

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Maida Vale, Maida Vale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 15:58.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:01.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:00.

Thames Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Bowrons Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Bowrons Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:02.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:48.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 13:36.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Finchley Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:10.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Castleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.

Cadent Gas logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are proposing to carry out Utility asset works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 13:45.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 12:12.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Fernside Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:44.

Thames Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Harrow Road

Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:14.

Thames Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:44.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Norval Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.

Affinity Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Norval Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Thames Water are proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:02.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out roadworks on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 16:26.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:10.

London Borough Of Barnet logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Oct 2024 at 15:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 10:51.

London Borough Of Ealing logo
LONG TERM
Between
9 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 09:49.

UK Power Networks Eastern & London logo
Between
10 and 19 Feb 2025
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 18:24.

Lumen Technologies logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Baker Street

Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 26 Nov 2024 at 19:20.

City Of Westminster logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.

Thames Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:26.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:39.

Transport for London (TfL) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 15:40.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Harefield Road

Thames Water are proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 14:41.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 15:34.

Thames Water logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 12:46.

City Of London Telecomms logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Baker Street

City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 4 Nov 2024 at 09:46.

City Of London Telecomms logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Baker Street

City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 25 Nov 2024 at 13:11.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Hawkins Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Bridge Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:03.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:43.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Pitt Street

Thames Water are proposing to carry out New service connection on Pitt Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:43.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Kensington Place

Thames Water were proposing to carry out Utility repair and maintenance works on Kensington Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:31.

Transport for London (TfL) logo
LONG TERM
Between
17 Feb and 19 May 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Berkeley Mews

Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:23.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Berkeley Mews

Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
17 Feb and 19 May 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:40.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:58.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:58.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:55.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:00.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:55.

Thames Water logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out Utility asset works on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:19.

Thames Water logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:01.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:54.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:20.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Clarendon Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.

London Borough Of Barnet logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 13:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Bank

Thames Water are proposing to carry out New service connection on The Bank, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:20.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wentworth Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 12:20.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
East End Road

Affinity Water were proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 14:42.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 11:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:13.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:51.

Thames Water logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 17:41.

Vodafone logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Caple Road

Vodafone are proposing to carry out Remedial works on Caple Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 11 Nov 2024 at 16:25.

City Of Westminster logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 14:18.

City Of Westminster logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:18.

City Of Westminster logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Oct 2024 at 16:07.

City Of Westminster logo
Between
19 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 14:27.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Northolt Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.

UK Power Networks Eastern & London logo
Between
20 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Lexham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 12:18.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:39.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 15:47.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 15:16.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

London Borough Of Barnet logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Leeside Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 14:13.

Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Kenmore Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Nov 2024 at 13:48.

Thames Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Great Cumberland Place

Thames Water were proposing to carry out New service connection on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:47.

Thames Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Ponsard Road

Thames Water were proposing to carry out roadworks on Ponsard Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:51.

UK Power Networks Eastern & London logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Clifton Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Clifton Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 04:32.

Cadent Gas logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Cadent Gas are proposing to carry out Utility asset works on Christchurch Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 17:30.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

BT are proposing to carry out Utility repair and maintenance works on Greenford Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 15:55.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:41.

London Borough Of Barnet logo
Until
10 Mar 2025
Details
View Map
Share
Follow
Shirehall Lane

London Borough Of Barnet are carrying out Highway improvement works on Shirehall Lane, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:28.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.


Roadworks Map near to Flowers Close, LONDON, NW2 7EL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 03:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Flowers Close, LONDON, NW2 7EL (67 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Brent logo
MAJOR
  
TADWORTH ROAD 
(0.2 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 6 Nov 2024 - 17 Dec 2024
0.2
Details
Share
Follow
2
London Borough Of Brent logo
MAJOR
  
TADWORTH ROAD 
(0.2 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 21 Oct 2024 08:00
(Scheduled: 21 Oct 2024 - 30 Nov 2024)
0.2
Details
Share
Follow
3
UK Power Networks Eastern & London logo
CAIRNFIELD AVENUE 
(0.4 miles)
UK Power Networks Eastern & London
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 3 Dec 2024
0.4
Details
Share
Follow
4
Thames Water logo
REVIEW ROAD 
(0.4 miles)
Thames Water
Utility asset works - Footway - No carriageway incursion
Complete
26 Nov 2024 11:26 - 14:52
0.4
Details
Share
5
Thames Water logo
URGENT
  
HUMBER ROAD 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 26 Nov 2024 11:44
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.5
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
DOLLIS HILL LANE 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 16 Dec 2024
0.5
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
DOLLIS HILL LANE 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 26 Nov 2024 08:43
(Scheduled: 26 Nov 2024 - 17 Dec 2024)
0.5
Details
Share
Follow
8
Hutchinson 3G logo
MAJOR
  
DUDDEN HILL LANE 
(0.5 miles)
Hutchinson 3G
Utility asset works - Footway - Road closure
Planned
Scheduled: 26 Nov 2024 - 30 Nov 2024
0.5
Details
Share
Follow
9
BT logo
URGENT
  
LEELAND WAY 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
26 Nov 2024 09:59 - 15:26
0.5
Details
Share
10
Thames Water logo
URGENT
  
MOUNT ROAD 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 30 Sep 2024 13:40
(Scheduled: 30 Sep 2024 - 1 Dec 2024)
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data