ROADWORKS SUMMARY
Mount Pleasant Road, LONDON, NW10 3EL
Introduction

View current and future planned roadworks and road closures for Mount Pleasant Road, NW10 3EL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mount Pleasant Road, LONDON, NW10 3EL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mount Pleasant Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Jan 2026
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 31 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 28 May 2025 at 11:16.
21 Nov 2025
Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:11.
17 Jan 2024 and 14 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.
14 Feb 2024 and 3 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2024 and could run through until 3 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 15:51.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
27 Aug 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 22:00 and could run through until 27 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Feb 2025 at 17:35.
10 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.
27 Jun 2025
London Borough Of Haringey are carrying out Highway improvement works on Stanhope Road, Hornsey, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 June 2024 at 00:00 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 15 May 2025 at 13:43.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
12 Sep 2025
London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.
15 Aug 2024 and 24 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.
6 Oct 2024 and 31 Mar 2026
City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.
11 Oct 2024 and 9 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2024 and could run through until 9 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:26.
Today
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.
Today
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.
28 Oct 2024 and 12 Dec 2025
HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.
12 Dec 2025
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.
28 Oct 2024 and 12 Sep 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.
16 Jun 2025
Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 00:01 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 16:30.
25 Nov 2024 and 16 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.
26 Nov 2024 and 5 Aug 2025
Transport for London (TfL) are proposing to carry out roadworks on Bressenden Place, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 5 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 10:14.
20 Jun 2025
Thames Water are carrying out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:30 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 15:14.
19 Dec 2024 and 1 Aug 2025
Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2025 at 10:11.
28 Jul 2025
Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 10:08 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 17:08.
6 Jan and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.
1 Jul 2025
London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 16:00 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 6 Jan 2025 at 16:48.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:53.
31 Jul 2025
City Of Westminster are carrying out Highway repair and maintenance works on Howick Place, Vincent Square, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2025 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 May 2025 at 09:31.
Today
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.
Today
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 6 Dec 2024 at 12:37.
20 Jan and 20 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Freeland Road, Ealing.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Ealing on 16 Jan 2025 at 15:21.
15 Aug 2025
London Borough Of Ealing are carrying out Highway improvement works on Freeland Road, Ealing.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 00:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 29 May 2025 at 12:22.
28 Jan and 31 Dec 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.
3 Feb and 18 Jun 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Imperial Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 22 Jan 2025 at 08:36.
3 Feb and 3 Aug 2025
London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Kew Green, Kew.
These works are categorised as Major.
The works will start on or after 3 February 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 Jan 2025 at 15:52.
3 Aug 2025
London Borough Of Richmond Upon Thames are carrying out Section 50 on Kew Green, Kew.
These works are categorised as Major.
The works started on 3 February 2025 at 08:00 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 26 Feb 2025 at 10:22.
16 Jun 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 15:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 12:14.
Sunday
Cadent Gas are carrying out Utility repair and maintenance works on Great Peter Street, St James's, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2025 at 20:16 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:15.
16 Feb and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
3 Jul 2025
London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2025 at 09:00 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Feb 2025 at 10:40.
23 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 22:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 13:31.
30 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:37.
17 Feb and 20 Jun 2025
London Borough Of Brent were proposing to carry out Highway repair and maintenance works on Chamberlayne Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 30 Apr 2025 at 11:38.
19 Feb and 25 Jun 2025
Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.
19 Feb and 25 Jun 2025
Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.
Friday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:30.
Friday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:31.
30 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:41.
30 Jun 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 13:15.
30 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 09:18.
29 Aug 2025
Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:50 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 15:26.
23 Jul 2025
City Of Westminster are carrying out Highway repair and maintenance works on White Horse Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 11:00 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 May 2025 at 12:54.
28 Feb and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.
28 Feb and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:10.
28 Feb and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:06.
28 Feb and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:13.
Friday
London Borough Of Ealing were proposing to carry out Highway improvement works on Acton Lane, Park Royal.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2025 at 10:18.
3 Mar and 31 Aug 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Brent on 29 Jan 2025 at 11:57.
10 Mar and 6 Oct 2025
Thames Water are proposing to carry out Utility asset works on High Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.
14 Mar and 18 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.
17 Mar and 30 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Ealing on 16 Dec 2024 at 11:58.
Tomorrow
London Borough Of Islington are carrying out Highway improvement works on Freeling Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 08:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 08:23.
6 Oct 2025
Thames Water are carrying out Utility asset works on High Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 April 2025 at 10:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 08:00.
19 Mar and 29 Jun 2025
Thames Water are proposing to carry out Utility asset works on Chadwell Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:02.
24 Mar and 18 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:44.
Tomorrow
Cadent Gas are carrying out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:35 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.
24 Mar and 28 Nov 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.
28 Nov 2025
City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.
Saturday
London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Ealing on 28 Feb 2025 at 16:09.
8 Jul 2025
Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2025 at 08:45 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:52.
Thursday
London Borough Of Barnet are carrying out Highway improvement works on Hendon Lane, Finchley, London.
These works are categorised as Major.
The works started on 25 March 2025 at 10:25 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 12:28.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Ballogie Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 16:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 13:44.
31 Mar and 24 Oct 2025
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 6 May 2025 at 10:52.
31 Mar and 1 Jul 2025
London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 13 Feb 2025 at 12:08.
31 Mar and 1 Jul 2025
London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:56.
31 Mar and 1 Jul 2025
London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 13 Mar 2025 at 20:49.
14 Jun 2025
London Borough Of Camden are carrying out Highway improvement works on Camden Gardens, Camden Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 17:56.
1 Apr and 27 Jun 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:51.
1 Apr and 27 Jun 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:00.
1 Apr and 27 Jun 2025
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:07.
1 Apr and 30 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:00.
1 Apr and 30 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 31 Mar 2025 at 15:43.
30 Jun 2025
London Borough Of Barnet are carrying out Highway improvement works on The Vale, Childs Hill, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 09:22.
13 Jun 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:29.
13 Jun 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:35.
Friday
Thames Water are carrying out Utility asset works on New Quebec Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 12:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 11:47.
11 Jun 2025
Thames Water are carrying out Utility asset works on Park Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 April 2025 at 10:00 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 May 2025 at 08:09.
24 Jun 2025
Thames Water are carrying out Utility asset works on Southview Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 11:00 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:25.
6 Apr and 31 Dec 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.
Monday
Thames Water were proposing to carry out Utility asset works on Denzil Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:24.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.
15 Jun 2025
National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.
30 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on Park Royal Road, Park Royal.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 09:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2025 at 16:49.
7 Apr and 14 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:57.
7 Apr and 14 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Swinton Street, King's Cross, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:49.
10 Apr and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:29.
10 Apr and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:12.
10 Apr and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:31.
10 Apr and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:11.
14 Jul 2025
Thames Water are carrying out Utility asset works on Villiers Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.
3 Jul 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 15:00 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.
14 Apr and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Catherine Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 17 Feb 2025 at 14:52.
14 Apr and 10 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 15:58.
13 Jul 2025
Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 10:05 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 17:10.
8 Jul 2025
Thames Water are carrying out New service connection on Abbey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 11:43 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Kew Bridge Road, Brentford.
The works started on 15 April 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:17.
3 Jul 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 09:48 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.
21 Apr and 12 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 10:09.
21 Apr and 31 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.
21 Apr and 31 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:53.
22 Apr and 16 Jun 2025
Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Feb 2025 at 10:54.
22 Apr and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Villiers Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.
23 Jun 2025
Thames Water are carrying out Utility asset works on Catherine Place, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2025 at 11:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 11:08.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Peterborough Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 10:27 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:30.
Friday
Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 18:54.
27 Jul 2025
London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 08:27.
28 Apr and 25 Jul 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 26 Feb 2025 at 12:23.
28 Apr and 3 Nov 2025
Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.
3 Nov 2025
Thames Water are carrying out Utility asset works on Bishopswood Road, Hornsey, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 10:30 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Apr 2025 at 11:05.
30 Jun 2025
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 10:05 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 12:38.
Monday
Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:44.
Monday
Cadent Gas are proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.
Monday
Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:16.
30 Apr and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.
30 Apr and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:41.
Monday
Thames Water are carrying out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 April 2025 at 13:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 15:36.
Friday
London Borough Of Barnet are carrying out Highway improvement works on Great North Road, East Finchley, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 May 2025 at 08:00.
Friday
London Borough Of Barnet are carrying out Highway improvement works on High Road, East Finchley, London.
These works are categorised as Major.
The works started on 1 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 1 May 2025 at 08:01.
3 May and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.
3 May and 31 Oct 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.
Saturday
London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 18:56.
Saturday
London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 12:20.
5 May and 29 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on New Brent Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:38.
29 Jun 2025
London Borough Of Barnet are carrying out Highway improvement works on New Brent Street, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 May 2025 at 10:04.
5 May and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.
5 May and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 06:23.
5 May and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.
10 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on The Common, Ealing.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2025 at 13:30 and could run through until 10 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 15:26.
5 May and 18 Jul 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.
5 May and 18 Jul 2025
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 11:41.
5 May and 28 Jul 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:38.
5 May and 28 Jul 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:46.
5 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 07:45.
5 May and 28 Jul 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:40.
5 May and 8 Aug 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:40.
12 Jun 2025
Electricity Network Company are carrying out Utility asset works on Pellant Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 16:30.
6 May and 17 Jun 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Shepherd's Bush Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.
17 Jun 2025
London Borough Of Hammersmith & Fulham are carrying out Permanent reinstatement on Shepherd's Bush Green, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 17 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 May 2025 at 08:05.
6 May and 17 Jun 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.
6 May and 17 Jun 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 May 2025 at 16:12.
6 May and 17 Jun 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Apr 2025 at 17:04.
Saturday
Thames Water are carrying out Utility asset works on Madeley Road, Ealing.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 09:04.
6 May and 20 Jul 2025
Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.
6 May and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Bloomfield Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.
23 Jun 2025
Thames Water are carrying out Utility asset works on Bloomfield Road, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 13:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 14:10.
23 Jun 2025
Thames Water are carrying out Utility asset works on Kingsmill Terrace, Abbey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 May 2025 at 13:30 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.
Monday
Scottish Hydro Electric Power Dis are carrying out Utility asset works on Leythe Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 May 2025 at 13:05.
11 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Beechwood Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.
11 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Edge Hill Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.
12 May and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 10:53.
12 May and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 09:25.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Bewdley Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:33.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Islington Park Street, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 17:05.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 09:15.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:24.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Liverpool Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 15:25.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 09:22.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:09.
Friday
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 29 Apr 2025 at 14:03.
Friday
London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 11:30 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 11:46.
Tomorrow
London Borough Of Camden are carrying out Highway improvement works on Eton Road, Haverstock, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:03.
Friday
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Haverstock Hill, Haverstock, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 16:10.
10 Jul 2025
Thames Water are carrying out Utility repair and maintenance works on Clifford Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 08:00 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 08:00.
12 May and 12 Jun 2025
Eunetworks were proposing to carry out Utility asset works on Tanfield Avenue, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 09:32.
12 May and 15 Jun 2025
Eunetworks are proposing to carry out Utility asset works on Tanfield Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:56.
15 Jun 2025
Eunetworks are carrying out Utility asset works on Tanfield Avenue, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 10:15 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 12 May 2025 at 10:28.
12 May and 13 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Ballogie Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 18:06.
12 May and 15 Jun 2025
Eunetworks are proposing to carry out Utility asset works on Crest Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:57.
15 Jun 2025
Eunetworks are carrying out Utility asset works on Crest Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 May 2025 at 08:19.
12 May and 12 Aug 2025
London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 13 May 2025 at 08:11.
Thames Water carried out Utility repair and maintenance works on Abingdon Road, London.
The road was closed for some or all of the period.
The works were originally planned between 12 May 2025 and 3 Jun 2025 and were actually completed between 12 May 2025 (10:20) and 3 Jun 2025 (13:50). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:53.
12 May and 22 Aug 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:33.
25 Jul 2025
London Borough Of Camden are carrying out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 09:17.
Saturday
Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:46.
Monday
Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.
Monday
Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.
Saturday
Cadent Gas were proposing to carry out Utility asset works on Scrubs Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:05.
12 May and 15 Jun 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:55.
Sunday
Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 13:22.
13 May and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Stephens Road, West Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:16.
14 May and 12 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:06.
14 May and 12 Jun 2025
London Borough Of Barnet were proposing to carry out Utility repair and maintenance works on The Vale, Childs Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:27.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Sudbury Court Drive, Harrow.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 15:46 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:21.
Tomorrow
Scottish Hydro Electric Power Dis are carrying out New service connection on Woodhouse Avenue, Perivale.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 09:30 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 09:49.
16 May and 18 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:29.
16 May and 18 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.
18 Jul 2025
City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:00 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 May 2025 at 08:58.
16 May and 18 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.
23 Jun 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Eton Avenue, Belsize, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 09:28.
16 May and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 12:27.
Friday
Thames Water are carrying out Utility asset works on Seymour Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 09:43.
Friday
Thames Water are carrying out New service connection on Cloister Road, Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 09:01.
19 May and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Elverton Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Mar 2025 at 06:34.
14 Jul 2025
Thames Water are carrying out Utility asset works on Elverton Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 14:00 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 15:08.
19 May and 18 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 15:45.
19 May and 18 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 16:42.
18 Sep 2025
Transport for London (TfL) are carrying out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 08:44.
19 May and 18 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 14:57.
19 May and 18 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:21.
Friday
Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 14:26.
Friday
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Eagle Street, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:25.
19 May and 7 Aug 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Freeling Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:56.
19 May and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 13:03.
20 Jun 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 10:12.
19 May and 14 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 May 2025 at 16:20.
14 Jun 2025
London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.
19 May and 23 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Market Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 24 Apr 2025 at 07:24.
14 Jun 2025
London Borough Of Camden are carrying out Highway improvement works on Market Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.
19 May and 30 Jun 2025
Thames Water are proposing to carry out Utility asset works on Chantry Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.
19 May and 30 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 12:27.
15 Aug 2025
London Borough Of Barnet are carrying out Highway improvement works on Geron Way, Cricklewood, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:30 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:30.
19 May and 12 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.
12 Sep 2025
London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 19 May 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:31.
Monday
Thames Water are carrying out Utility repair and maintenance works on Woodcock Hill, Harrow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 10:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 11:23.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Wildwood Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Feb 2025 at 13:37.
Today
Thames Water are carrying out Utility repair and maintenance works on Wildwood Road, Golders Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 13:30 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 May 2025 at 14:53.
Thursday
BT are carrying out Utility repair and maintenance works on Strand, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 09:00 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 30 May 2025 at 12:18.
Thursday
UK Power Networks Eastern & London are carrying out New service connection on Carlton Gardens, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 09:31 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 07:17.
Thursday
UK Power Networks Eastern & London are carrying out New service connection on Carlton House Terrace, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 09:30 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 07:17.
11 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Offord Road, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 09:40 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:35.
Thursday
Virgin Media were proposing to carry out Utility asset works on Ealing Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 7 Feb 2025 at 09:14.
Monday
Eunetworks are carrying out Utility asset works on Sidmouth Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 28 May 2025 at 12:12.
21 May and 14 Jul 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:23.
21 May and 14 Jul 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:58.
21 May and 18 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Feb 2025 at 10:47.
21 May and 10 Jun 2025
Electricity Network Company carried out Utility asset works on Heybourne Crescent, Colindale, London.
These works were categorised as Major.
Two-way signals were in place for some or all of the period.
The works were originally planned between 21 May 2025 and 10 Jun 2025 and were actually completed between 21 May 2025 (08:00) and 3 Jun 2025 (11:00). The works impacted the footway, carriageway and footpath.
This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 11:05.
21 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:52.
21 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:55.
11 Jun 2025
London Borough Of Barnet are carrying out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 20:00 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 08:30.
18 Jul 2025
Thames Water are carrying out Utility asset works on Westview Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 May 2025 at 12:30 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 May 2025 at 12:46.
23 May and 17 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 09:17.
24 May and 11 Jun 2025
City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 08:59.
24 May and 11 Jun 2025
City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 17 Mar 2025 at 11:18.
24 May and 7 Jul 2025
Thames Water are proposing to carry out Utility asset works on Kingsmill Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:04.
26 May and 4 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 22 Jan 2025 at 08:36.
26 May and 4 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 17 Feb 2025 at 09:26.
26 May and 4 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 May 2025 at 11:41.
26 May and 4 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 8 May 2025 at 09:22.
Tomorrow
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Coningham Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:15.
Thursday
UK Power Networks Eastern & London are carrying out Utility asset works on Savoy Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 10:10.
Friday
Cadent Gas are carrying out Utility asset works on Frith Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:28 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:42.
Friday
Thames Water are proposing to carry out Utility asset works on Balfour Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 12:26.
Friday
Thames Water are proposing to carry out Utility asset works on Balfour Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 12:21.
26 May and 6 Jul 2025
Thames Water were proposing to carry out Utility asset works on Wales Farm Road, Acton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:23.
26 May and 22 Jun 2025
Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 13:00.
26 May and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 15:13.
1 Jul 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Barretts Green Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 May 2025 at 08:00 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 06:56.
26 May and 15 Jul 2025
Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 8 Apr 2025 at 15:36.
26 May and 15 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 Apr 2025 at 10:41.
26 May and 18 Jul 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 15:47.
26 May and 25 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:31.
26 May and 27 Jul 2025
Thames Water are proposing to carry out Utility asset works on St Pauls Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:07.
26 May and 20 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Edge Hill Avenue, Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 10:57.
26 May and 20 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Beechwood Avenue, Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 10:57.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 12:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:12.
27 May and 20 Jul 2025
Thames Water are proposing to carry out Utility asset works on Westview Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.
28 Jul 2025
Thames Water are carrying out Utility asset works on The Park, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:20 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 07:21.
27 May and 28 Jul 2025
Thames Water are proposing to carry out Utility asset works on The Park, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 09:42.
27 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.
Today
London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:23.
Today
London Borough Of Barnet are carrying out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 08:43.
4 Jul 2025
Electricity Network Company are carrying out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:30 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 08:54.
Today
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.
Today
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:47.
11 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Hogarth Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:30 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 13:40.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Cadogan Place, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 19:03 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 15:03.
Today
Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:06.
Today
Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:08.
16 Jul 2025
Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 08:12.
Tomorrow
Thames Water are carrying out New service connection on Sloane Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 12:31.
Tomorrow
Thames Water are carrying out Utility asset works on Cadogan Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 12:09.
16 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Halkin Street, Knightsbridge & Belgravia, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:00 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 13:34.
27 May and 30 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 7 Oct 2024 at 09:30.
27 May and 30 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 07:57.
27 May and 30 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 May 2025 at 12:40.
Tomorrow
Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 07:40.
Tomorrow
Thames Water were proposing to carry out New service connection on Charles Ii Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 15:38.
Monday
UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Feb 2025 at 14:26.
Monday
Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:09.
Monday
Cadent Gas are carrying out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:29 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:47.
27 May and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 13:40.
27 May and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:22.
27 May and 11 Jun 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Maddox Street, West End, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 10:26.
27 May and 11 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:22.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 17 Mar 2025 at 08:34.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 18 Mar 2025 at 06:28.
Friday
Thames Water are carrying out Utility repair and maintenance works on Edgware Road, Hyde Park, London.
The works started on 27 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 12:35.
Monday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 May 2025 at 09:32.
17 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Camera Place, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 10:06.
28 May and 25 Jun 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:31.
Monday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 May 2025 at 15:12.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Bovingdon Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 06:47 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:05.
Today
Thames Water are carrying out New service connection on Sloane Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 10:50 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 12:32.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 11:54 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:19.
29 May and 16 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 09:47.
16 Jun 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:00 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:45.
Thames Water carried out Utility repair and maintenance works on Phoenix Place, King's Cross, London.
The road was closed for some or all of the period.
The works were originally planned between 29 May 2025 and 4 Jun 2025 and were actually completed between 29 May 2025 (18:00) and 3 Jun 2025 (12:39). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:28.
25 Jun 2025
London Borough Of Ealing are carrying out Remedial works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 15:49 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 29 May 2025 at 15:56.
Tomorrow
London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:47.
Thursday
Cadent Gas were proposing to carry out Utility repair and maintenance works on Fulham Road, London.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 18:44.
BT carried out Utility repair and maintenance works on South Audley Street, West End, London.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 31 May 2025 and 4 Jun 2025 and were actually completed between 31 May 2025 (08:00) and 3 Jun 2025 (08:14). The works impacted the carriageway only.
This roadwork event was last updated by BT on 3 Jun 2025 at 10:09.
Friday
Thames Water are carrying out Utility repair and maintenance works on Cork Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 May 2025 at 07:54 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:18.
2 Aug 2025
Thames Water are carrying out Utility asset works on St Pauls Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:10 and could run through until 2 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:13.
Monday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Burlington Avenue, Kew.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 14:07 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 10:20.
Monday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Burlington Avenue, Kew.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 14:07 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 12:28.
1 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:58.
1 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.
1 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 16:12.
1 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.
2 Jun and 18 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway only.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 13:25.
2 and 22 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:15.
Tomorrow
Transport for London (TfL) are carrying out Highway repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 20:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 09:46.
Tomorrow
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Butterwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.
Friday
Thames Water are carrying out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 07:12 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:39.
2 Jun and 17 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 15:50.
28 Nov 2025
Cadent Gas are carrying out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:30 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:46.
2 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Cope Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2025 at 11:36.
2 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Cope Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:48.
20 Jun 2025
Thames Water are carrying out Utility asset works on Cope Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:30 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:34.
16 Jun 2025
London Borough Of Ealing are carrying out Utility asset works on Queen Annes Gardens, Chiswick.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 16:25 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 2 Jun 2025 at 16:37.
2 and 23 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.
23 Jun 2025
City Of Westminster are carrying out Highway repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 08:56.
2 and 23 Jun 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 Jan 2025 at 14:59.
Friday
Thames Water are proposing to carry out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:38.
Friday
Thames Water are carrying out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:20.
Friday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bloemfontein Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Bloemfontein Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.
2 and 23 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 30 May 2025 at 13:30.
Thames Water carried out Utility repair and maintenance works on Willcott Road, Acton.
The road was closed for some or all of the period.
The works were originally planned between 2 Jun 2025 and 3 Jun 2025 and were actually completed between 2 Jun 2025 (21:00) and 3 Jun 2025 (05:00). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:25.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:25.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:31.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 May 2025 at 10:58.
2 and 16 Jun 2025
ESP Electricity are proposing to carry out New service connection on High Street, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 28 Apr 2025 at 17:11.
16 Jun 2025
ESP Electricity are carrying out New service connection on High Street, Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:55 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 2 Jun 2025 at 10:16.
2 and 15 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:18.
2 and 15 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 16:02.
15 Jun 2025
Cadent Gas are carrying out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:18 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:16.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2025 at 07:55.
Saturday
London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:00.
Saturday
London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 20 Mar 2025 at 16:03.
2 Jun 2025 and 31 Jan 2026
City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.
2 Jun 2025 and 31 Jan 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.
2 Jun 2025 and 31 Jan 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 May 2025 at 09:45.
Friday
Thames Water were proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 10:08.
Friday
Thames Water are proposing to carry out New service connection on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Mar 2025 at 10:45.
Friday
Thames Water are carrying out New service connection on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:29.
10 Jun 2025
Cadent Gas are carrying out Utility repair and maintenance works on Eversholt Street, St Pancras And Somers Town, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 11:43 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:02.
Tomorrow
City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Apr 2025 at 10:29.
21 Jun 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Winchelsea Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:14.
2 Jun and 1 Jul 2025
BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Feb 2025 at 16:56.
1 Jul 2025
BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.
2 and 27 Jun 2025
BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 May 2025 at 09:06.
27 Jun 2025
BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Jun 2025 at 09:56.
Thursday
Thames Water are proposing to carry out Disconnection or alteration of supply on Maygrove Road, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Mar 2025 at 07:42.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Shoot Up Hill, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:23.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Shoot-up Hill, Fortune Green, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:22.
2 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Park Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 08:06.
20 Jun 2025
Thames Water are carrying out Utility asset works on Park Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:10 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:13.
2 Jun and 1 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:46.
2 Jun and 12 Dec 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.
2 and 30 Jun 2025
Affinity Water were proposing to carry out Utility asset works on Rugby Avenue, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.
2 and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:35.
2 and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 16:43.
2 Jun and 24 Nov 2025
Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Wembley Hill Road, Wembley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 12:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:29.
2 and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.
23 Jun 2025
Thames Water are carrying out Utility asset works on Midstrath Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 15:00 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:35.
2 and 14 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:19.
2 and 14 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:42.
2 and 14 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Dudden Hill Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:07.
2 Jun and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Balnacraig Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:10.
14 Jul 2025
Thames Water are carrying out Utility asset works on Balnacraig Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 15:00 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:18.
Tomorrow
Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Mar 2025 at 12:20.
Tomorrow
Affinity Water are carrying out Utility repair and maintenance works on Elthorne Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:41 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 08:42.
2 Jun and 21 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.
2 and 25 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Watling Avenue, Burnt Oak, Edgware.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2025 at 15:45.
3 and 10 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.
3 and 10 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:44.
Thursday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:32.
3 and 16 Jun 2025
Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 22 May 2025 at 14:29.
3 and 16 Jun 2025
Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 2 Jun 2025 at 15:45.
Thursday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:23.
3 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 09:52.
13 Jun 2025
UK Power Networks Eastern & London are carrying out New service connection on Denman Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:11 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:11.
Friday
Thames Water are carrying out Remedial works on Wardour Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:09 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:43.
11 Jun 2025
Cadent Gas are carrying out Utility repair and maintenance works on Uxbridge Road, Ealing.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 07:28 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 07:30.
Monday
Thames Water are carrying out Utility repair and maintenance works on Farringdon Road, Islington, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:15 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:05.
Friday
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.
Friday
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:41.
4 Jun and 2 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:11.
4 Jun and 3 Jul 2025
City Of London Telecomms are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 09:03.
4 Jun and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:12.
4 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Perkin's Rents, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:11.
4 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:34.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:16.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:37.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:14.
4 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:47.
Friday
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.
Friday
Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.
Friday
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.
5 and 21 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.
5 and 28 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:42.
5 and 21 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:28.
5 and 28 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 13:49.
Sunday
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 12:27.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Midholm Close, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:26.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 12:41.
Saturday
London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 15:03.
Saturday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 Jan 2025 at 15:22.
Saturday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 13:42.
5 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:44.
5 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:55.
5 and 24 Jun 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:57.
5 and 24 Jun 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 29 May 2025 at 06:58.
Sunday
Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 May 2025 at 09:10.
Monday
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 May 2025 at 16:19.
Monday
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:45.
7 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.
7 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 15:06.
7 and 23 Jun 2025
Its Technology Group are proposing to carry out Utility repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Its Technology Group on 28 May 2025 at 14:18.
7 and 23 Jun 2025
Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Its Technology Group on 2 Jun 2025 at 16:30.
7 and 23 Jun 2025
Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Its Technology Group on 3 Jun 2025 at 09:43.
7 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 15:14.
8 and 12 Jun 2025
Network Rail were proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 May 2025 at 10:38.
8 and 12 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Jun 2025 at 11:44.
9 Jun and 16 Aug 2025
London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:57.
9 Jun and 16 Aug 2025
London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:53.
9 Jun and 27 Jul 2025
Thames Water are proposing to carry out Utility asset works on Richmond Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 May 2025 at 13:18.
9 Jun and 27 Jul 2025
Thames Water are proposing to carry out Utility asset works on Richmond Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 16:27.
9 Jun and 4 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:57.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Mar 2025 at 16:19.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:25.
9 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 May 2025 at 14:42.
9 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Mar 2025 at 11:30.
9 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Lane, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 10:04.
9 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Lane, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 14:16.
9 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Ossulton Way, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Mar 2025 at 14:34.
9 and 12 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 13:58.
9 and 12 Jun 2025
BT are proposing to carry out Utility asset works on Garrick Drive, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 08:06.
9 and 12 Jun 2025
BT were proposing to carry out Utility asset works on Garrick Drive, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 30 May 2025 at 08:06.
9 and 12 Jun 2025
BT are proposing to carry out Utility asset works on Garrick Drive, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 30 May 2025 at 08:27.
9 and 13 Jun 2025
Thames Water are proposing to carry out Remedial works on Lyric Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 15:59.
9 and 12 Jun 2025
Thames Water were proposing to carry out Utility asset works on Hollywood Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:06.
9 and 17 Jun 2025
Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 May 2025 at 12:41.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:36.
9 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Hebron Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.
9 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Hebron Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 10:25.
9 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Iffley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 May 2025 at 10:04.
9 and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Iffley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.
9 and 27 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.
9 and 27 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:11.
9 and 27 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.
9 and 27 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:28.
9 and 19 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Stafford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 12:48.
9 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:46.
9 and 12 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:02.
9 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:49.
9 and 14 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:20.
9 and 13 Jun 2025
Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:29.
9 and 13 Jun 2025
Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 06:34.
9 and 11 Jun 2025
Abovenet Communications UK were proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 29 Apr 2025 at 09:15.
9 and 22 Jun 2025
Thames Water are proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 16:11.
9 Jun and 9 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:22.
9 Jun and 9 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Sussex Gardens, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 09:30.
9 and 13 Jun 2025
Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2025 at 13:37.
9 Jun and 9 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:17.
9 and 13 Jun 2025
Thames Water were proposing to carry out New service connection on Portobello Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:48.
9 and 12 Jun 2025
Thames Water are proposing to carry out New service connection on Portobello Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:22.
9 and 12 Jun 2025
Thames Water are proposing to carry out New service connection on Portobello Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 15:19.
9 Jun and 1 Dec 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.
9 Jun and 11 Dec 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 22 May 2025 at 06:52.
9 and 11 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.
9 and 11 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:06.
9 and 11 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.
9 and 11 Jun 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:07.
10 and 12 Jun 2025
BT are proposing to carry out Utility asset works on Rysbrack Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Mar 2025 at 11:28.
10 and 24 Jun 2025
London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 5 Mar 2025 at 21:30.
10 and 24 Jun 2025
London Borough Of Ealing were proposing to carry out Utility asset works on Osborne Road, Acton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 7 Mar 2025 at 09:23.
10 and 13 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 09:44.
10 and 13 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 May 2025 at 10:07.
10 Jun and 23 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Mozart Street, Queen's Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 14:57.
10 and 23 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Mozart Street, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 14:58.
10 and 13 Jun 2025
Thames Water are proposing to carry out New service connection on Carlton Vale, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:54.
11 Jun and 25 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:26.
11 Jun and 25 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:32.
11 Jun and 25 Sep 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 10:29.
11 and 19 Jun 2025
Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:07.
11 and 16 Jun 2025
Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:16.
11 and 16 Jun 2025
Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:17.
11 and 13 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 May 2025 at 12:14.
11 and 13 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 May 2025 at 12:13.
11 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 16:01.
11 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:38.
12 and 18 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 11:32.
13 and 16 Jun 2025
Murphy Gas Networks are proposing to carry out New service connection on Bollo Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Gas Networks on 19 Mar 2025 at 15:20.
13 and 27 Jun 2025
London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:22.
13 Jun and 4 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:26.
13 Jun and 4 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:24.
13 Jun and 4 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Street, Hyde Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:32.
13 Jun and 4 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:33.
14 and 16 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jun 2025 at 13:18.
16 Jun and 7 Jul 2025
Murphy Power Distribution are proposing to carry out New service connection on Emden Street, London.
These works are categorised as Major.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 2 Jun 2025 at 14:25.
16 Jun and 18 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 2 May 2025 at 09:54.
16 Jun and 18 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.
These works are categorised as Major.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 13 May 2025 at 09:13.
16 Jun and 7 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Pellant Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:49.
16 and 18 Jun 2025
Thames Water are proposing to carry out New service connection on Averill Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:46.
16 and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 15:07.
16 and 18 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 10:21.
16 and 20 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.
This roadwork event was last updated by City Of Westminster on 31 Dec 2024 at 07:06.
16 and 20 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.
This roadwork event was last updated by City Of Westminster on 19 Feb 2025 at 11:00.
16 Jun and 6 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Mar 2025 at 09:33.
16 Jun and 6 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Mar 2025 at 08:57.
16 and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:17.
16 and 20 Jun 2025
Thames Water are proposing to carry out New service connection on Caxton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 10:36.
16 and 20 Jun 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 09:30.
16 and 20 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:08.
16 and 20 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:39.
16 and 20 Jun 2025
Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:15.
16 and 18 Jun 2025
Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 7 Mar 2025 at 11:45.
16 and 18 Jun 2025
Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 16 May 2025 at 08:50.
16 and 20 Jun 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:33.
16 Jun and 25 Jul 2025
Thames Water are proposing to carry out Utility asset works on Wales Farm Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 09:37.
16 Jun and 25 Jul 2025
Thames Water are proposing to carry out Utility asset works on Wales Farm Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.
16 and 20 Jun 2025
Thames Water are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 May 2025 at 14:56.
16 Jun and 25 Jul 2025
Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 09:37.
16 Jun and 25 Jul 2025
Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.
16 and 20 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belsize Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 16:35.
16 and 20 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belsize Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:39.
16 Jun and 25 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Strathcona Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on The Mount, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Tudor Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 and 30 Jun 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Greenhill Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.
16 and 17 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Glenwood Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Conway Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Waltham Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hay Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:43.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:38.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.
16 Jun and 10 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:28.
17 and 20 Jun 2025
Thames Water are proposing to carry out New service connection on Pyrmont Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Mar 2025 at 08:42.
17 and 19 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 May 2025 at 08:13.
17 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Broadwick Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:18.
17 and 24 Jun 2025
Thames Water were proposing to carry out Utility asset works on Long Drive, Acton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 11:19.
18 and 20 Jun 2025
City Of London Telecomms are proposing to carry out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 14 Apr 2025 at 09:15.
18 and 20 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Apr 2025 at 13:34.
18 and 20 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Apr 2025 at 15:13.
18 and 20 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Apr 2025 at 13:30.
18 and 20 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Apr 2025 at 13:31.
18 Jun and 18 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.
18 and 23 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Southern Road, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:31.
18 and 23 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Southern Road, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 12:24.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Walm Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:37.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:33.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Church Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kenton Road, Harrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Cumberland Road, Stanmore.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 12 May 2025 at 09:41.
20 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Wood Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:27.
20 and 23 Jun 2025
Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sky UK on 16 Apr 2025 at 08:01.
20 Jun and 8 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:12.
22 Jun and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:29.
22 Jun and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:17.
22 Jun and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:17.
22 Jun and 22 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.
22 Jun and 22 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.
23 and 30 Jun 2025
Thames Water are proposing to carry out New service connection on Kentwode Green, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 13 Mar 2025 at 13:43.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Markham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 15:04.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Great Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:09.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Great Church Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 14:09.
23 and 26 Jun 2025
Thames Water are proposing to carry out New service connection on Sloane Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 14:48.
23 Jun and 18 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Belgrave Road, Warwick, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 07:53.
23 Jun and 18 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gillingham Street, Warwick, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 07:45.
23 and 25 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Little Ealing Lane, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 15:31.
23 Jun and 14 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.
23 Jun and 12 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 14 Mar 2025 at 08:03.
23 Jun and 11 Aug 2025
Thames Water are proposing to carry out Utility asset works on Wilfred Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 07:57.
23 Jun and 11 Aug 2025
Thames Water are proposing to carry out Utility asset works on Wilfred Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 08:56.
23 Jun and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 12:34.
23 and 27 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Meon Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 13:01.
23 Jun and 24 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:01.
23 and 26 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Apr 2025 at 09:04.
23 and 26 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 May 2025 at 15:06.
23 Jun and 8 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:42.
23 Jun and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2025 at 09:50.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:25.
23 Jun and 7 Jul 2025
London Borough Of Ealing are proposing to carry out Utility asset works on Drayton Green Road, West Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 22 May 2025 at 13:16.
23 and 27 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Ingestre Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 17 Jan 2025 at 14:50.
23 and 25 Jun 2025
Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 13 Mar 2025 at 10:16.
23 and 25 Jun 2025
Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 29 May 2025 at 08:14.
23 Jun and 18 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 15:02.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:38.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 12:16.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 13:41.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 May 2025 at 11:15.
23 and 28 Jun 2025
Thames Water are proposing to carry out New service connection on Little Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 11:20.
23 and 25 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 11 Mar 2025 at 12:21.
23 and 30 Jun 2025
Thames Water are proposing to carry out Utility asset works on Long Drive, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 12:51.
23 Jun and 11 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 09:35.
23 Jun and 5 Sep 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:33.
23 Jun and 5 Sep 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:53.
23 Jun and 2 Aug 2025
London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:45.
23 Jun and 2 Aug 2025
London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:52.
23 Jun and 1 Aug 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Hadley Street, Camden Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 2 Jun 2025 at 15:10.
23 Jun and 7 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:27.
23 Jun and 14 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:43.
23 Jun and 7 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.
23 Jun and 14 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 23 May 2025 at 17:00.
23 Jun and 14 Sep 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 16:44.
23 Jun and 4 Aug 2025
Affinity Water are proposing to carry out Utility asset works on Elton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.
23 Jun and 21 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 16:43.
23 Jun and 18 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 07:58.
23 Jun and 18 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 15:20.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Heathfield Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 14:59.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Heathfield Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 13:52.
24 and 26 Jun 2025
Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:11.
24 and 26 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Junction Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 15:43.
24 Jun and 7 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:07.
24 Jun and 7 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:49.
24 and 27 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 10:44.
24 Jun and 7 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:13.
25 Jun and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:26.
25 Jun and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.
25 and 27 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:03.
25 Jun and 11 Jul 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:32.
25 and 29 Jun 2025
Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2025 at 16:22.
25 Jun and 9 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 20:54.
25 Jun and 11 Jul 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 May 2025 at 13:25.
25 Jun and 11 Jul 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 May 2025 at 08:32.
26 Jun and 2 Jul 2025
Thames Water were proposing to carry out Highway improvement works on Maiden Lane, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 2 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:23.
26 Jun and 9 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:11.
26 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.
26 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 15:17.
26 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:10.
27 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on St Andrews Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 28 Mar 2025 at 08:55.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Frognal, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 17:26.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Frognal, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:59.
30 Jun and 1 Sep 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:03.
30 Jun 2025 and 26 Jan 2026
Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:53.
30 Jun and 4 Aug 2025
Thames Water were proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 11:03.
30 Jun and 4 Aug 2025
Thames Water are proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 20:56.
30 Jun and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:59.
30 Jun and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:05.
30 Jun and 16 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 16 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 12:03.
30 Jun and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:00.
30 Jun and 5 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:00.
30 Jun and 5 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 09:30.
30 Jun and 2 Jul 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Dunsany Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:42.
30 Jun and 3 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:24.
30 Jun and 11 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 13:41.
30 Jun and 1 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:52.
30 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:54.
30 Jun and 8 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 16:09.
30 Jun and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:48.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:19.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 15:22.
30 Jun and 17 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2025 at 10:30.
30 Jun and 8 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.
30 Jun and 8 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:17.
30 Jun and 8 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 10:15.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.
30 Jun and 2 Jul 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:27.
1 and 3 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Newman Passage, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 10 Apr 2025 at 10:46.
1 Jul and 5 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:10.
1 Jul and 1 Sep 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Frederica Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 9 Apr 2025 at 08:13.
2 Jul and 31 Oct 2025
London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.
2 Jul and 31 Oct 2025
London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 21:56.
3 and 9 Jul 2025
Thames Water are proposing to carry out New service connection on Ingersoll Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 17:04.
3 and 9 Jul 2025
Thames Water are proposing to carry out New service connection on Ingersoll Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 10:29.
3 Jul and 4 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:40.
3 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 14:02.
4 and 10 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cale Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:57.
4 and 9 Jul 2025
Thames Water are proposing to carry out New service connection on Goodwin Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 10:26.
5 Jul and 10 Aug 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Strelley Way, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 3 Apr 2025 at 14:47.
7 and 9 Jul 2025
Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.
7 and 9 Jul 2025
Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.
7 and 9 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Sherbrooke Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.
7 and 9 Jul 2025
Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.
7 and 9 Jul 2025
Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.
7 and 9 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Allestree Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.
7 and 11 Jul 2025
Thames Water are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 12:34.
7 Jul and 31 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.
7 Jul and 31 Oct 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the cycleway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.
7 Jul and 22 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 May 2025 at 09:52.
7 and 12 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Belgrave Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 12:17.
7 and 10 Jul 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Aldensley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:53.
7 and 11 Jul 2025
Thames Water were proposing to carry out New service connection on Victoria Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 10:28.
7 Jul and 23 Oct 2025
Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:59.
7 Jul and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Palmer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:15.
7 Jul and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Palmer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 08:13.
7 and 10 Jul 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Brackenbury Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Apr 2025 at 09:47.
7 Jul and 29 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Macfarlane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
7 Jul 2025 and 7 Jul 2026
City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.
7 and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:27.
7 and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:07.
7 Jul and 1 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 6 May 2025 at 16:04.
7 and 27 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:02.
7 and 27 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Kendal Street, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:09.
7 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 21:59.
7 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 18:06.
7 and 11 Jul 2025
Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 15:49.
7 and 10 Jul 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Cleveland Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 13:37.
7 and 18 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Willen Field Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 1 May 2025 at 08:55.
7 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 14:44.
7 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 15:50.
7 Jul and 1 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:57.
7 Jul and 1 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:18.
7 and 11 Jul 2025
Thames Water are proposing to carry out New service connection on Holly Bush Vale, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 May 2025 at 19:33.
7 Jul and 5 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.
7 Jul and 18 Aug 2025
Thames Water are proposing to carry out Utility asset works on Talbot Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.
8 and 29 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Murphy Power Distribution on 15 Apr 2025 at 18:18.
8 and 29 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 19:36.
8 and 10 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 09:35.
8 and 11 Jul 2025
Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sky UK on 12 May 2025 at 11:33.
8 and 21 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Road, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 May 2025 at 14:32.
8 and 21 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 May 2025 at 13:57.
8 and 21 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:21.
9 and 11 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:43.
9 and 11 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Spenser Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Feb 2025 at 10:22.
9 and 11 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Jan 2025 at 16:00.
9 Jul and 7 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:55.
9 and 11 Jul 2025
Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 22 May 2025 at 10:18.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Drive, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.
10 Jul and 29 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:11.
10 Jul and 1 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:56.
10 and 12 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 11:58.
10 and 13 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
11 and 13 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 13:31.
11 and 13 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 11:19.
14 and 21 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 15:02.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on First Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:24.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Platt's Lane, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 15:50.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Wayside, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 15:06.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Sunnyside Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.
14 Jul and 3 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way, Golders Green, London.
These works are categorised as Major.
The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.
14 and 16 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:03.
14 and 16 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
14 Jul and 12 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, East Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.
14 and 17 Jul 2025
Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:15.
14 Jul and 1 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 15:03.
14 Jul and 1 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 10:23.
14 and 18 Jul 2025
Thames Water were proposing to carry out New service connection on Victoria Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 16:40.
14 and 17 Jul 2025
Thames Water are proposing to carry out Utility asset works on Cadogan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 May 2025 at 16:28.
14 and 16 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hans Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 May 2025 at 12:33.
14 Jul and 29 Aug 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.
14 and 25 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:37.
14 and 25 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:59.
14 and 16 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 May 2025 at 14:30.
14 and 16 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:06.
14 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 07:02.
14 and 18 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 14:47.
14 and 18 Jul 2025
Thames Water are proposing to carry out Utility asset works on Broadwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 08:39.
14 and 18 Jul 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 18:16.
14 Jul and 1 Aug 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lucy Crescent, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 May 2025 at 08:19.
14 and 18 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 8 May 2025 at 10:39.
14 and 18 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:13.
14 and 18 Jul 2025
Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:43.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 May 2025 at 15:17.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:06.
14 and 18 Jul 2025
BT are proposing to carry out Utility repair and maintenance works on Greenland Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Apr 2025 at 17:26.
15 Jul and 26 Aug 2025
Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.
15 Jul and 25 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.
15 Jul and 25 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2025 and run through until 25 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:54.
15 Jul and 4 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 12:55.
15 Jul and 18 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.
17 and 19 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:06.
17 and 20 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
17 Jul and 13 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:54.
17 Jul and 11 Aug 2025
London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 12:51.
18 and 22 Jul 2025
Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 13 May 2025 at 10:47.
18 and 22 Jul 2025
Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 30 May 2025 at 17:06.
18 Jul and 15 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.
18 Jul and 15 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:23.
18 Jul and 4 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:28.
18 and 20 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on Euston Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:52.
20 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 07:39.
21 Jul 2025 and 26 Jun 2026
HS2 are proposing to carry out Works for Rail Purposes on College Crescent, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 10 Mar 2025 at 16:30.
21 Jul and 17 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:32.
21 and 25 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 May 2025 at 09:41.
21 and 23 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 17:04.
21 and 23 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:21.
21 and 23 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 10:11.
21 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on Linden Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:07.
21 and 25 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Baronsmere Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.
21 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:10.
21 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
21 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 May 2025 at 14:28.
21 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 11:44.
21 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 May 2025 at 09:23.
21 and 25 Jul 2025
BT were proposing to carry out Utility asset works on Devonshire Road, Chiswick, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 24 Apr 2025 at 13:10.
21 and 25 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Greencoat Place, Vincent Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 13:59.
21 and 23 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 11:01.
21 and 23 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 12:11.
21 Jul and 15 Aug 2025
London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 15 May 2025 at 08:09.
21 Jul and 5 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 14 May 2025 at 13:30.
21 and 25 Jul 2025
Thames Water were proposing to carry out New service connection on Shepherd Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 08:43.
21 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on Shepherd Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 09:30.
21 and 25 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.
21 and 25 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 14:34.
21 and 25 Jul 2025
Thames Water were proposing to carry out Permanent reinstatement on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:32.
21 Jul and 6 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 07:09.
21 and 25 Jul 2025
Thames Water were proposing to carry out New service connection on Commonwealth Avenue, White City Estate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 16:20.
21 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on Commonwealth Avenue, White City Estate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 11:31.
21 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on Berwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 May 2025 at 10:53.
21 and 25 Jul 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Long Drive, Acton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:25.
21 Jul and 17 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:55.
21 and 25 Jul 2025
Thames Water are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 16:56.
21 and 25 Jul 2025
Thames Water were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 12:46.
21 Jul and 7 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Barlby Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Apr 2025 at 16:10.
21 and 24 Jul 2025
Thames Water are proposing to carry out New service connection on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 09:53.
21 and 24 Jul 2025
Thames Water are proposing to carry out New service connection on Ivor Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 08:26.
21 Jul and 28 Nov 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.
21 Jul and 28 Nov 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 29 May 2025 at 13:54.
21 and 23 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 11:37.
21 and 23 Jul 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:53.
22 Jul and 4 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 May 2025 at 13:50.
23 Jul and 31 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 12:33.
23 Jul and 31 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:35.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:27.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.
23 Jul and 19 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.
23 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:42.
23 Jul and 7 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 15:22.
23 Jul and 7 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 15:17.
23 and 25 Jul 2025
Thames Water are proposing to carry out Remedial works on Princeton Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Apr 2025 at 17:08.
23 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.
23 Jul and 2 Sep 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Winchelsea Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 2 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 08:34.
24 and 26 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:12.
24 and 27 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
26 Jul and 3 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Heriot Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 12:00.
28 and 30 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Ronalds Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 07:25.
28 Jul and 22 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 13:25.
28 Jul and 4 Aug 2025
Thames Water are proposing to carry out Utility asset works on Ashford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 16:56.
28 Jul and 4 Aug 2025
Thames Water are proposing to carry out Utility asset works on Ashford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 12:33.
28 Jul and 24 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Depot Approach, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 08:53.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on East Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 22:55.
28 Jul and 5 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on North Hill, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:42.
28 Jul and 5 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aylmer Parade, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:32.
28 Jul and 9 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 9 May 2025 at 08:33.
28 Jul and 9 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 07:40.
28 Jul and 9 Aug 2025
Murphy Power Distribution were proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 9 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 6 May 2025 at 08:47.
28 Jul and 29 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.
28 Jul and 29 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.
28 and 30 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
28 and 30 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:16.
28 Jul and 5 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.
28 Jul and 19 Aug 2025
London Borough Of Barnet are proposing to carry out Utility asset works on High Road, North Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 12:09.
28 and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Fishers Lane, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 09:17.
28 Jul and 10 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 16:34.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out Utility asset works on Ebury Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 07:56.
28 Jul and 10 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:38.
28 Jul and 10 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:27.
28 Jul and 10 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.
28 Jul and 28 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Boscombe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.
28 Jul and 28 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Westville Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.
28 Jul and 28 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Findon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 13:10.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Ladbroke Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 15:27.
28 Jul and 15 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:13.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 11:52.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 11:12.
28 Jul and 15 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:56.
28 Jul and 15 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 15:13.
28 Jul and 4 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:17.
28 Jul and 4 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2025 at 09:51.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Eastbourne Avenue, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2025 at 15:54.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Long Drive, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 11:41.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Long Drive, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 12:11.
28 Jul and 10 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 10:57.
28 Jul and 10 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 11:21.
28 Jul and 14 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:42.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:40.
29 Jul and 15 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 07:55.
29 Jul and 15 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 07:54.
29 Jul 2025 and 1 Jun 2026
Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:35.
29 Jul and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:55.
29 Jul and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:11.
29 Jul and 21 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.
29 Jul and 15 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 08:24.
29 Jul and 1 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Eversley Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:53.
29 Jul and 15 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:37.
30 Jul and 3 Aug 2025
Thames Water are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Apr 2025 at 09:52.
30 Jul and 1 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on York Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Feb 2025 at 10:42.
30 Jul and 1 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Feb 2025 at 13:13.
30 Jul and 1 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:12.
30 Jul and 13 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 13:14.
31 Jul and 3 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 May 2025 at 09:33.
31 Jul and 22 Aug 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Corner Mead, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 22 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:35.
1 Aug and 5 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.
1 and 15 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Davies Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:19.
1 and 5 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:44.
1 and 5 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.
1 and 5 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:45.
1 and 5 Aug 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.
1 and 3 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:37.
1 and 3 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:47.
3 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.
3 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.
3 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.
3 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.
3 Aug and 19 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:38.
3 Aug and 19 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.
4 and 8 Aug 2025
Thames Water are proposing to carry out New service connection on Anselm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 09:42.
4 and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Onslow Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:28.
4 and 13 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 11:02.
4 and 8 Aug 2025
Thames Water are proposing to carry out New service connection on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 16:42.
4 and 6 Aug 2025
Its Technology Group are proposing to carry out Utility repair and maintenance works on Great College Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Its Technology Group on 3 Jun 2025 at 07:44.
4 and 8 Aug 2025
Thames Water are proposing to carry out New service connection on Kensington Church Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 09:33.
4 and 8 Aug 2025
Thames Water are proposing to carry out Utility asset works on Down Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 12:30.
4 and 8 Aug 2025
Thames Water are proposing to carry out New service connection on Farm Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 15:28.
4 and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 06:26.
4 and 14 Aug 2025
Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Eunetworks on 28 Apr 2025 at 09:23.
4 and 26 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 17:11.
4 and 26 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 7 Mar 2025 at 14:05.
4 and 7 Aug 2025
Thames Water are proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 10:23.
4 Aug and 16 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:56.
4 Aug and 16 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:38.
4 Aug and 16 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:36.
4 Aug and 15 Sep 2025
Affinity Water are proposing to carry out Utility asset works on Station Approach, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.
4 and 25 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:53.
4 and 29 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Camden Road, Islington, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.
4 Aug and 15 Sep 2025
Affinity Water are proposing to carry out Utility asset works on Fishers Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.
4 Aug and 20 Sep 2025
London Borough Of Camden are proposing to carry out roadworks on Streatley Place, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.
4 Aug and 20 Sep 2025
London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.
4 Aug and 20 Sep 2025
London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.
4 Aug 2025 and 1 Jun 2026
Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 1 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 May 2025 at 12:12.
4 and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Remedial works on Brent Park Road, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 May 2025 at 16:32.
4 Aug and 8 Dec 2025
Thames Water were proposing to carry out Utility asset works on Meadway, Golders Green, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 May 2025 at 10:49.
4 Aug and 8 Dec 2025
Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 May 2025 at 10:50.
4 Aug and 8 Dec 2025
Thames Water were proposing to carry out Utility asset works on Meadway Close, Golders Green, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 May 2025 at 08:19.
4 Aug and 8 Dec 2025
Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 May 2025 at 08:21.
4 and 7 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:32.
4 and 7 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 12:48.
4 and 7 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 10:29.
4 and 7 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2025 at 11:06.
5 and 7 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:19.
5 and 9 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Carey Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 07:01.
5 Aug and 5 Nov 2025
London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 11:10.
5 Aug and 5 Nov 2025
London Borough Of Haringey were proposing to carry out Remedial works on Fortis Green, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 14:55.
5 and 18 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lyall Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 15:37.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:45.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:39.
5 and 24 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:54.
5 and 7 Aug 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 14:39.
6 and 27 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bramber Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:07.
6 and 27 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on North End Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:40.
6 and 8 Aug 2025
BT are proposing to carry out Utility asset works on Vereker Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 May 2025 at 09:30.
6 and 8 Aug 2025
BT are proposing to carry out Utility asset works on Perham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 May 2025 at 09:55.
6 and 8 Aug 2025
BT are proposing to carry out Utility asset works on Perham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 May 2025 at 15:26.
6 and 23 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Mar 2025 at 07:19.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Gardens, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:30.
7 and 11 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:38.
7 and 14 Aug 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Greyhound Hill, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.
8 and 10 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:24.
8 and 10 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:25.
8 and 11 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:39.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 07:40.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:08.
8 Aug and 18 Sep 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:04.
8 Aug and 18 Sep 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:40.
11 and 14 Aug 2025
Thames Water are proposing to carry out New service connection on Ashburnham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 14:15.
11 and 20 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 14:43.
11 and 21 Aug 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Acton Lane, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 12:04.
11 and 14 Aug 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Hamilton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.
11 and 18 Aug 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Maiden Lane, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 08:56.
11 and 19 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 08:07.
11 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:25.
11 and 29 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:24.
11 and 15 Aug 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:44.
11 and 15 Aug 2025
Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 08:37.
11 and 18 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 15:40.
11 Aug and 9 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.
11 Aug and 12 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 17:10.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.
12 and 14 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:45.
13 Aug and 4 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:29.
13 and 15 Aug 2025
Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 16 May 2025 at 11:31.
13 Aug and 5 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:42.
13 Aug and 15 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 12:03.
13 Aug and 5 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:13.
13 Aug and 5 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:46.
13 Aug and 5 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:17.
13 and 22 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, East Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.
15 and 18 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.
15 and 19 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:59.
15 and 20 Aug 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:35.
18 and 20 Aug 2025
Thames Water are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 15:42.
18 Aug and 28 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:31.
18 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Mar 2025 at 07:28.
18 Aug and 29 Sep 2025
Thames Water are proposing to carry out Utility asset works on Bishops Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.
18 and 23 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 08:56.
18 and 27 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Greyhound Hill, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:22.
18 and 22 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:37.
18 and 22 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.
18 and 29 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 13:38.
18 and 23 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:52.
18 and 26 Aug 2025
Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 14:43.
18 Aug and 13 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:00.
18 Aug and 13 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:03.
18 and 22 Aug 2025
Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 10:36.
18 and 25 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 20:17.
18 and 22 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Belgrove Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 May 2025 at 18:29.
19 Aug and 3 Sep 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 10:56.
19 Aug and 10 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.
19 Aug and 10 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 12 May 2025 at 08:31.
19 Aug and 10 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 15:52.
20 Aug and 19 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.
20 Aug and 19 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 16:30.
22 and 31 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Sydney Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 16:59.
23 Aug and 1 Sep 2025
Network Rail are proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 May 2025 at 10:41.
24 and 26 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Jan 2025 at 17:28.
25 and 28 Aug 2025
Thames Water were proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 May 2025 at 16:34.
25 Aug and 3 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Chadwick Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:36.
25 Aug and 5 Sep 2025
Scottish Hydro Electric Power Dis are proposing to carry out Highway repair and maintenance works on Colville Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 09:45.
25 Aug and 15 Sep 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 May 2025 at 10:49.
25 Aug and 15 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 12:39.
25 and 28 Aug 2025
Thames Water are proposing to carry out New service connection on Bear Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 May 2025 at 10:00.
25 Aug and 12 Dec 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.
25 Aug and 19 Sep 2025
Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.
25 and 29 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 08:40.
26 and 29 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Vivian Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 26 May 2025 at 17:46.
26 and 28 Aug 2025
Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 27 May 2025 at 16:02.
26 Aug and 8 Sep 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Wood Lane, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:25.
26 Aug and 16 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:27.
26 and 28 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 06:33.
26 and 28 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 08:03.
26 Aug and 10 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:22.
26 Aug and 10 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.
26 Aug and 7 Sep 2025
Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 14:57.
26 Aug and 7 Sep 2025
Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 14:50.
27 and 29 Aug 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 May 2025 at 08:07.
27 and 29 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Holborn, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 15:13.
27 and 29 Aug 2025
BT are proposing to carry out Utility asset works on Mansfield Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 30 May 2025 at 09:39.
28 Aug and 12 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Deansway, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 14:25.
28 and 29 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 10:03.
29 and 31 Aug 2025
Thames Water were proposing to carry out Utility asset works on Doria Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 May 2025 at 13:13.
29 and 31 Aug 2025
Thames Water are proposing to carry out Utility asset works on Doria Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 13:57.
29 Aug and 5 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Whitehead's Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 14:37.
29 Aug and 4 Sep 2025
Thames Water are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 14:45.
29 and 31 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 May 2025 at 15:37.
31 Aug and 15 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 15 September 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:25.
31 Aug and 4 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cremorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:58.
31 Aug and 4 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:22.
31 Aug and 4 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:20.
31 Aug and 4 Sep 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 16:31.
31 Aug and 2 Sep 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Bressenden Place, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 August 2025 and run through until 2 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 16:43.
Roadworks Map near to Mount Pleasant Road, LONDON, NW10 3EL (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mount Pleasant Road, LONDON, NW10 3EL (70 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 May 2025 - 9 Jun 2025)
(Scheduled: 30 May 2025 - 5 Jun 2025)
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
(Scheduled: 21 May 2025 - 9 Jun 2025)
(Scheduled: 6 May 2025 - 18 Jul 2025)
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data