ROADWORKS SUMMARY
Grange Road, LONDON, NW10 2QY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Grange Road, NW10 2QY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Grange Road, LONDON, NW10 2QY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Grange Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
31 Jan 2026
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 28 May 2025 at 11:16.

Thames Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:11.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

Transport for London (TfL) logo
LONG TERM
Until
27 Aug 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Feb 2025 at 17:35.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Haringey logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are carrying out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 June 2024 at 00:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 15 May 2025 at 13:43.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct 2024 and 9 Jan 2026
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 9 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:26.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Finishing
Today
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

Network Rail logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

Thames Water logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:14.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2025 at 10:11.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.

London Borough Of Camden logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 16:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Jan 2025 at 16:48.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tempelhof Avenue

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tilling Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Claremont Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:53.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Dec 2024 at 12:37.

London Borough Of Ealing logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Freeland Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Freeland Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 16 Jan 2025 at 15:21.

London Borough Of Ealing logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Freeland Road

London Borough Of Ealing are carrying out Highway improvement works on Freeland Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 00:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 29 May 2025 at 12:22.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

LONG TERM
Between
3 Feb and 3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 29 Jan 2025 at 15:52.

LONG TERM
Until
3 Aug 2025
Details
View Map
Share
Follow
Kew Green

London Borough Of Richmond Upon Thames are carrying out Section 50 on Kew Green, Kew.

These works are categorised as Major.

The works started on 3 February 2025 at 08:00 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 26 Feb 2025 at 10:22.

UK Power Networks Eastern & London logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 15:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Feb 2025 at 12:14.

London Borough Of Camden logo
LONG TERM
Between
16 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Feb 2025 at 10:40.

Transport for London (TfL) logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 22:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 13:31.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:37.

London Borough Of Brent logo
LONG TERM
Between
17 Feb and 20 Jun 2025
Details
View Map
Share
Chamberlayne Road

London Borough Of Brent were proposing to carry out Highway repair and maintenance works on Chamberlayne Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 30 Apr 2025 at 11:38.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:41.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 13:15.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 09:18.

Thames Water logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 15:26.

City Of Westminster logo
LONG TERM
Until
23 Jul 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are carrying out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 11:00 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 May 2025 at 12:54.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 31 Dec 2024 at 15:53.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:10.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:13.

London Borough Of Ealing logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Acton Lane

London Borough Of Ealing were proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2025 at 10:18.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

London Borough Of Brent logo
LONG TERM
Between
3 Mar and 31 Aug 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 29 Jan 2025 at 11:57.

Affinity Water logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 11:19.

Thames Water logo
LONG TERM
Between
10 Mar and 6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

City Of Westminster logo
LONG TERM
Between
14 Mar and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

London Borough Of Ealing logo
LONG TERM
Between
17 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 16 Dec 2024 at 11:58.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are carrying out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 08:23.

Thames Water logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 08:00.

City Of Westminster logo
LONG TERM
Between
24 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.

London Borough Of Ealing logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 28 Feb 2025 at 16:09.

London Borough Of Barnet logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Hendon Lane

London Borough Of Barnet are carrying out Highway improvement works on Hendon Lane, Finchley, London.

These works are categorised as Major.

The works started on 25 March 2025 at 10:25 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 12:28.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are carrying out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 16:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:44.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
31 Mar and 24 Oct 2025
Details
View Map
Share
Eaton Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 6 May 2025 at 10:52.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 13 Feb 2025 at 12:08.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:56.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 13 Mar 2025 at 20:49.

London Borough Of Camden logo
LONG TERM
Until
14 Jun 2025
Details
View Map
Share
Follow
Camden Gardens

London Borough Of Camden are carrying out Highway improvement works on Camden Gardens, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 17:56.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:51.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Shorts Gardens

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:00.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Shorts Gardens

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:07.

London Borough Of Barnet logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:00.

London Borough Of Barnet logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 31 Mar 2025 at 15:43.

London Borough Of Barnet logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are carrying out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 09:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:29.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:35.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
New Quebec Street

Thames Water are carrying out Utility asset works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 12:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:47.

Thames Water logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Park Avenue

Thames Water are carrying out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 08:09.

Thames Water logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are carrying out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 11:00 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:25.

London Borough Of Camden logo
LONG TERM
Between
6 Apr and 31 Dec 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.

London Borough Of Ealing logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are carrying out Highway improvement works on Park Royal Road, Park Royal.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2025 at 16:49.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Gray's Inn Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:57.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Swinton Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Swinton Street, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:49.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Denzil Road

Thames Water were proposing to carry out Utility asset works on Denzil Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:24.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.

National Highways logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are carrying out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 10 Aug 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 15:58.

Thames Water logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out New service connection on Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 11:43 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:30.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 15:00 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kew Bridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Kew Bridge Road, Brentford.

The works started on 15 April 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:17.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:48 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 12 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 10:09.

Thames Water logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 10:54.

Thames Water logo
LONG TERM
Between
22 Apr and 14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 18:54.

London Borough Of Camden logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 08:27.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Feb 2025 at 12:23.

Thames Water logo
LONG TERM
Between
28 Apr and 3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are carrying out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 10:30 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 11:05.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 10:05 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 12:38.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:44.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Waldeck Road

Cadent Gas are proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:16.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:41.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Berkeley Mews

Thames Water are carrying out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 13:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 15:36.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are carrying out Highway improvement works on Great North Road, East Finchley, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 May 2025 at 08:00.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are carrying out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

The works started on 1 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by London Borough Of Barnet on 1 May 2025 at 08:01.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
5 May and 29 Jun 2025
Details
View Map
Share
Follow
New Brent Street

London Borough Of Barnet are proposing to carry out Highway improvement works on New Brent Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:38.

London Borough Of Barnet logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
New Brent Street

London Borough Of Barnet are carrying out Highway improvement works on New Brent Street, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 May 2025 at 10:04.

London Borough Of Ealing logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
The Common

London Borough Of Ealing are carrying out Highway improvement works on The Common, Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 13:30 and could run through until 10 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 15:26.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Bayley Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 11:41.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 18:56.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 12:20.

Electricity Network Company logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are carrying out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 16:30.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Permanent reinstatement on Shepherd's Bush Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 May 2025 at 08:05.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Apr 2025 at 13:11.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 May 2025 at 16:12.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
6 May and 17 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Permanent reinstatement on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 17 June 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Apr 2025 at 17:04.

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Madeley Road

Thames Water are carrying out Utility asset works on Madeley Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 09:04.

Thames Water logo
LONG TERM
Between
6 May and 20 Jul 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

Thames Water logo
LONG TERM
Between
6 May and 23 Jun 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are proposing to carry out Utility asset works on Bloomfield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are carrying out Utility asset works on Bloomfield Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 13:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 14:10.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are carrying out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 13:30 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Leythe Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Leythe Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 May 2025 at 13:05.

London Borough Of Barnet logo
LONG TERM
Between
11 May and 11 Jun 2025
Details
View Map
Share
Follow
Beechwood Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Beechwood Avenue, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.

London Borough Of Barnet logo
LONG TERM
Between
11 May and 11 Jun 2025
Details
View Map
Share
Follow
Edge Hill Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Edge Hill Avenue, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.

Eunetworks logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Follow
Tanfield Avenue

Eunetworks are proposing to carry out Utility asset works on Tanfield Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:56.

Eunetworks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Tanfield Avenue

Eunetworks are carrying out Utility asset works on Tanfield Avenue, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:15 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 12 May 2025 at 10:28.

Thames Water logo
LONG TERM
Between
12 May and 13 Jul 2025
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 18:06.

Eunetworks logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Follow
Crest Road

Eunetworks are proposing to carry out Utility asset works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:57.

Eunetworks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Crest Road

Eunetworks are carrying out Utility asset works on Crest Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 May 2025 at 08:19.

London Borough Of Haringey logo
LONG TERM
Between
12 May and 12 Aug 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 13 May 2025 at 08:11.

Thames Water logo
Today
Details
View Map
Share
Abingdon Road

Thames Water carried out Utility repair and maintenance works on Abingdon Road, London.

The road was closed for some or all of the period.

The works were originally planned between 12 May 2025 and 3 Jun 2025 and were actually completed between 12 May 2025 (10:20) and 3 Jun 2025 (13:50). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:53.

Transport for London (TfL) logo
LONG TERM
Between
12 May and 22 Aug 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:33.

London Borough Of Camden logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 09:17.

Cadent Gas logo
Finishing
Saturday
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:46.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
Finishing
Saturday
Details
View Map
Share
Scrubs Lane

Cadent Gas were proposing to carry out Utility asset works on Scrubs Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 7 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Southampton Row

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:55.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 13:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 10:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 09:25.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Apr 2025 at 14:03.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 11:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 11:46.

London Borough Of Camden logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are carrying out Highway improvement works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:03.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Haverstock Hill

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Haverstock Hill, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 16:10.

Thames Water logo
LONG TERM
Until
10 Jul 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are carrying out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 08:00 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:00.

Eunetworks logo
LONG TERM
Between
12 May and 12 Jun 2025
Details
View Map
Share
Tanfield Avenue

Eunetworks were proposing to carry out Utility asset works on Tanfield Avenue, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 09:32.

Cadent Gas logo
LONG TERM
Between
13 May and 16 Jul 2025
Details
View Map
Share
Follow
St Stephens Road

Cadent Gas are proposing to carry out Utility asset works on St Stephens Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:16.

London Borough Of Barnet logo
Between
14 May and 12 Jun 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:06.

London Borough Of Barnet logo
Between
14 May and 12 Jun 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Utility repair and maintenance works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 12 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:27.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sudbury Court Drive

Cadent Gas are carrying out Utility repair and maintenance works on Sudbury Court Drive, Harrow.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 15:46 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:21.

Scottish Hydro Electric Power Dis logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodhouse Avenue

Scottish Hydro Electric Power Dis are carrying out New service connection on Woodhouse Avenue, Perivale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:30 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 09:49.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:29.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.

City Of Westminster logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 May 2025 at 08:58.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Eton Avenue, Belsize, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 09:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 12:27.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Seymour Street

Thames Water are carrying out Utility asset works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cloister Road

Thames Water are carrying out New service connection on Cloister Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 09:01.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 16:42.

Transport for London (TfL) logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are carrying out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 14:57.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:21.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 14:26.

LONG TERM
Between
19 May and 7 Aug 2025
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are proposing to carry out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 13:03.

London Borough Of Ealing logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are carrying out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 10:10.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 10:12.

London Borough Of Camden logo
Between
19 May and 14 Jun 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 May 2025 at 16:20.

London Borough Of Camden logo
Until
14 Jun 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.

London Borough Of Camden logo
LONG TERM
Between
19 May and 23 Jun 2025
Details
View Map
Share
Follow
Market Road

London Borough Of Camden are proposing to carry out Highway improvement works on Market Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 24 Apr 2025 at 07:24.

London Borough Of Camden logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Market Road

London Borough Of Camden are carrying out Highway improvement works on Market Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.

Thames Water logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Chantry Crescent

Thames Water are proposing to carry out Utility asset works on Chantry Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 12:27.

London Borough Of Barnet logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are carrying out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:30.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 19 May 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:31.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Woodcock Hill

Thames Water are carrying out Utility repair and maintenance works on Woodcock Hill, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 11:23.

London Borough Of Barnet logo
Until
10 Jun 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are carrying out Highway improvement works on The Ridgeway, Mill Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 00:00 and could run through until 10 June 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 11:37.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Wildwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wildwood Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Feb 2025 at 13:37.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Wildwood Road

Thames Water are carrying out Utility repair and maintenance works on Wildwood Road, Golders Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:30 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 14:53.

London Borough Of Barnet logo
LONG TERM
Between
21 May and 14 Jul 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:23.

London Borough Of Barnet logo
LONG TERM
Between
21 May and 14 Jul 2025
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:58.

Electricity Network Company logo
Between
21 May and 18 Jun 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 12 Feb 2025 at 10:47.

Electricity Network Company logo
Between
21 May and 10 Jun 2025
Details
View Map
Share
Heybourne Crescent

Electricity Network Company carried out Utility asset works on Heybourne Crescent, Colindale, London.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 21 May 2025 and 10 Jun 2025 and were actually completed between 21 May 2025 (08:00) and 3 Jun 2025 (11:00). The works impacted the footway, carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 11:05.

London Borough Of Barnet logo
Between
21 May and 11 Jun 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:52.

London Borough Of Barnet logo
Between
21 May and 11 Jun 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:55.

London Borough Of Barnet logo
Until
11 Jun 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are carrying out Highway improvement works on High Road, North Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 20:00 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 08:30.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Carlton Gardens

UK Power Networks Eastern & London are carrying out New service connection on Carlton Gardens, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 09:31 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 07:17.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are carrying out Utility repair and maintenance works on Offord Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 09:40 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:35.

Virgin Media logo
Finishing
Thursday
Details
View Map
Share
Ealing Road

Virgin Media were proposing to carry out Utility asset works on Ealing Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Feb 2025 at 09:14.

Eunetworks logo
Finishing
Monday
Details
View Map
Share
Follow
Sidmouth Road

Eunetworks are carrying out Utility asset works on Sidmouth Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 28 May 2025 at 12:12.

UK Power Networks Eastern & London logo
Between
23 May and 17 Jun 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 09:17.

Thames Water logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are carrying out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 12:30 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:46.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Belgrave Place

City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 08:59.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Belgrave Place

City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 17 Mar 2025 at 11:18.

Thames Water logo
LONG TERM
Between
24 May and 7 Jul 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are proposing to carry out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:04.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Coningham Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Coningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 09:15.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Frith Street

Cadent Gas are carrying out Utility asset works on Frith Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:28 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:42.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Balfour Road

Thames Water are proposing to carry out Utility asset works on Balfour Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 12:26.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Balfour Road

Thames Water are proposing to carry out Utility asset works on Balfour Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 12:21.

Thames Water logo
LONG TERM
Between
26 May and 6 Jul 2025
Details
View Map
Share
Wales Farm Road

Thames Water were proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:23.

Thames Water logo
Between
26 May and 22 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 13:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 15:13.

UK Power Networks Eastern & London logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are carrying out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 08:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 06:56.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Hanger Lane

Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 8 Apr 2025 at 15:36.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 Apr 2025 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 18 Jul 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 15:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 25 Jun 2025
Details
View Map
Share
Follow
Brentfield Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:31.

Thames Water logo
LONG TERM
Between
26 May and 27 Jul 2025
Details
View Map
Share
Follow
St Pauls Avenue

Thames Water are proposing to carry out Utility asset works on St Pauls Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:07.

London Borough Of Barnet logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Edge Hill Avenue

London Borough Of Barnet were proposing to carry out Highway improvement works on Edge Hill Avenue, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 10:57.

London Borough Of Barnet logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Beechwood Avenue

London Borough Of Barnet were proposing to carry out Highway improvement works on Beechwood Avenue, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 10:57.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
The Park

Thames Water are carrying out Utility asset works on The Park, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:20 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 07:21.

Thames Water logo
LONG TERM
Between
27 May and 28 Jul 2025
Details
View Map
Share
Follow
The Park

Thames Water are proposing to carry out Utility asset works on The Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 09:42.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Westside

London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:23.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Westside

London Borough Of Barnet are carrying out Highway improvement works on Westside, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 08:43.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Christchurch Avenue

London Borough Of Barnet were proposing to carry out Highway improvement works on Christchurch Avenue, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:22.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

National Highways logo
Finishing
Today
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:47.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are carrying out Utility repair and maintenance works on Hogarth Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:30 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:40.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Cadogan Place

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Cadogan Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 19:03 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 15:03.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:06.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:08.

Thames Water logo
LONG TERM
Until
16 Jul 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:12.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sloane Street

Thames Water are carrying out New service connection on Sloane Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:31.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cadogan Place

Thames Water are carrying out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:09.

Thames Water logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Halkin Street

Thames Water are carrying out Utility repair and maintenance works on Halkin Street, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 13:34.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Oct 2024 at 09:30.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 07:57.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 May 2025 at 12:40.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 07:40.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Charles Ii Street

Thames Water were proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:38.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Feb 2025 at 14:26.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:09.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are carrying out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:29 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:47.

UK Power Networks Eastern & London logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 13:40.

UK Power Networks Eastern & London logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:22.

UK Power Networks Eastern & London logo
Between
27 May and 11 Jun 2025
Details
View Map
Share
Maddox Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Maddox Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 10:26.

UK Power Networks Eastern & London logo
Between
27 May and 11 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Edgware Road

Thames Water are carrying out Utility repair and maintenance works on Edgware Road, Hyde Park, London.

The works started on 27 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:35.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Greville Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 May 2025 at 09:32.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chalk Farm Road

Cadent Gas are carrying out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 12:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:12.

Thames Water logo
LONG TERM
Between
27 May and 20 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are proposing to carry out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

Thames Water logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Camera Place

Thames Water are carrying out Utility repair and maintenance works on Camera Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:06.

Transport for London (TfL) logo
Between
28 May and 25 Jun 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:31.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Greville Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 15:12.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are carrying out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 10:50 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:32.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Hay's Mews

Cadent Gas are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 11:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:19.

UK Power Networks Eastern & London logo
Between
29 May and 16 Jun 2025
Details
View Map
Share
Follow
Lexington Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 09:47.

UK Power Networks Eastern & London logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Lexington Street

UK Power Networks Eastern & London are carrying out Utility asset works on Lexington Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:45.

London Borough Of Ealing logo
Until
25 Jun 2025
Details
View Map
Share
Follow
West Gate

London Borough Of Ealing are carrying out Remedial works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 15:49 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 29 May 2025 at 15:56.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prince Of Wales Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:47.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Fulham Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Fulham Road, London.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 18:44.

BT logo
Tomorrow
Details
View Map
Share
South Audley Street

BT carried out Utility repair and maintenance works on South Audley Street, West End, London.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 31 May 2025 and 4 Jun 2025 and were actually completed between 31 May 2025 (08:00) and 3 Jun 2025 (08:14). The works impacted the carriageway only.

This roadwork event was last updated by BT on 3 Jun 2025 at 10:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cork Street

Thames Water are carrying out Utility repair and maintenance works on Cork Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 07:54 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:18.

Thames Water logo
LONG TERM
Until
2 Aug 2025
Details
View Map
Share
Follow
St Pauls Avenue

Thames Water are carrying out Utility asset works on St Pauls Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:10 and could run through until 2 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:13.

Cadent Gas logo
Between
1 and 27 Jun 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 13:58.

Cadent Gas logo
Between
1 and 27 Jun 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.

Cadent Gas logo
Between
1 and 27 Jun 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 16:12.

Cadent Gas logo
Between
1 and 27 Jun 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.

Thames Water logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Lonsdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:15.

London Borough Of Hammersmith & Fulham logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Butterwick

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Butterwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 11:36.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:48.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are carrying out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:34.

London Borough Of Ealing logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Queen Annes Gardens

London Borough Of Ealing are carrying out Utility asset works on Queen Annes Gardens, Chiswick.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 16:25 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Jun 2025 at 16:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are proposing to carry out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:38.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are carrying out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:20.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bloemfontein Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bloemfontein Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Bloemfontein Avenue

UK Power Networks Eastern & London are carrying out Utility asset works on Bloemfontein Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 May 2025 at 13:30.

Thames Water logo
Today
Details
View Map
Share
Willcott Road

Thames Water carried out Utility repair and maintenance works on Willcott Road, Acton.

The road was closed for some or all of the period.

The works were originally planned between 2 Jun 2025 and 3 Jun 2025 and were actually completed between 2 Jun 2025 (21:00) and 3 Jun 2025 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:25.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jermyn Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:25.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jermyn Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:31.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jermyn Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:58.

ESP Electricity logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
High Street

ESP Electricity are proposing to carry out New service connection on High Street, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 28 Apr 2025 at 17:11.

ESP Electricity logo
Until
16 Jun 2025
Details
View Map
Share
Follow
High Street

ESP Electricity are carrying out New service connection on High Street, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:55 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 2 Jun 2025 at 10:16.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:18.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 16:02.

Cadent Gas logo
Until
15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are carrying out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:18 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:16.

London Borough Of Ealing logo
Finishing
Saturday
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:00.

London Borough Of Ealing logo
Finishing
Saturday
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 20 Mar 2025 at 16:03.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Great Marlborough Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 09:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Great Russell Street

Thames Water were proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:08.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 10:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carburton Street

Thames Water are carrying out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:29.

Cadent Gas logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Eversholt Street

Cadent Gas are carrying out Utility repair and maintenance works on Eversholt Street, St Pancras And Somers Town, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:43 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:02.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Apr 2025 at 10:29.

UK Power Networks Eastern & London logo
Until
21 Jun 2025
Details
View Map
Share
Follow
Winchelsea Road

UK Power Networks Eastern & London are carrying out Utility asset works on Winchelsea Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:14.

BT logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Feb 2025 at 16:56.

BT logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.

BT logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 May 2025 at 09:06.

BT logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Adelaide Road

BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:56.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Maygrove Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Maygrove Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 07:42.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Shoot Up Hill

Cadent Gas are carrying out Utility repair and maintenance works on Shoot Up Hill, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:23.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Shoot-up Hill

Cadent Gas are carrying out Utility repair and maintenance works on Shoot-up Hill, Fortune Green, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:22.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Park Avenue

Thames Water are proposing to carry out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 08:06.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Park Avenue

Thames Water are carrying out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:10 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:46.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Rugby Avenue

Affinity Water were proposing to carry out Utility asset works on Rugby Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:35.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 16:43.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Harrow Road

Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wembley Hill Road

Cadent Gas are carrying out Utility repair and maintenance works on Wembley Hill Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 12:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:29.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.

Thames Water logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are carrying out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 15:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:35.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:19.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:42.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Dudden Hill Lane

Cadent Gas were proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:07.

Thames Water logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Balnacraig Avenue

Thames Water are proposing to carry out Utility asset works on Balnacraig Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:10.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Balnacraig Avenue

Thames Water are carrying out Utility asset works on Balnacraig Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 15:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:18.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Elthorne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Mar 2025 at 12:20.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Elthorne Road

Affinity Water are carrying out Utility repair and maintenance works on Elthorne Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:41 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 08:42.

London Borough Of Barnet logo
LONG TERM
Between
2 Jun and 21 Sep 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.

London Borough Of Barnet logo
Between
2 and 25 Jun 2025
Details
View Map
Share
Follow
Watling Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Watling Avenue, Burnt Oak, Edgware.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2025 at 15:45.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 15:00.

National Highways logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Mar 2025 at 10:31.

National Highways logo
Between
3 and 10 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Apr 2025 at 09:44.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:32.

Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
White Horse Street

Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 22 May 2025 at 14:29.

Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
White Horse Street

Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 2 Jun 2025 at 15:45.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 12:23.

UK Power Networks Eastern & London logo
Between
3 and 13 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 09:52.

UK Power Networks Eastern & London logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are carrying out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:11 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:11.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wardour Street

Thames Water are carrying out Remedial works on Wardour Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:09 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:43.

Cadent Gas logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are carrying out Utility repair and maintenance works on Uxbridge Road, Ealing.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 07:28 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 07:30.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:41.

City Of London Telecomms logo
Between
4 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Eccleston Street

City Of London Telecomms are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 09:03.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:34.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:16.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 11:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:14.

UK Power Networks Eastern & London logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:47.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Back Lane

Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:54.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Midholm Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Midholm Close, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Church Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:26.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Church Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 12:41.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 15:03.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Jan 2025 at 15:22.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 13:42.

UK Power Networks Eastern & London logo
Between
5 and 20 Jun 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
5 and 20 Jun 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:55.

Between
5 and 24 Jun 2025
Details
View Map
Share
Follow
Carnoustie Drive

London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:57.

Between
5 and 24 Jun 2025
Details
View Map
Share
Follow
Carnoustie Drive

London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 29 May 2025 at 06:58.

London Borough Of Camden logo
Between
5 and 21 Jun 2025
Details
View Map
Share
Follow
Steele's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.

London Borough Of Camden logo
Between
5 and 28 Jun 2025
Details
View Map
Share
Follow
Steele's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:42.

London Borough Of Camden logo
Between
5 and 21 Jun 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:28.

London Borough Of Camden logo
Between
5 and 28 Jun 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 13:49.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 12:27.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 09:10.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 May 2025 at 16:19.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 12:45.

UK Power Networks Eastern & London logo
Between
7 and 20 Jun 2025
Details
View Map
Share
Follow
Coningham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:40.

UK Power Networks Eastern & London logo
Between
7 and 20 Jun 2025
Details
View Map
Share
Follow
Coningham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 15:06.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
New Oxford Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 28 May 2025 at 14:18.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
Bloomsbury Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 2 Jun 2025 at 16:30.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
Bloomsbury Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 3 Jun 2025 at 09:43.

London Borough Of Barnet logo
Between
7 and 13 Jun 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 15:14.

Network Rail logo
Between
8 and 12 Jun 2025
Details
View Map
Share
North Circular Road

Network Rail were proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 May 2025 at 10:38.

Network Rail logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Jun 2025 at 11:44.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Hollywood Road

Thames Water were proposing to carry out Utility asset works on Hollywood Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:06.

Thames Water logo
Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 12:41.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:36.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hebron Road

Thames Water are proposing to carry out Utility asset works on Hebron Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hebron Road

Thames Water are proposing to carry out Utility asset works on Hebron Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:25.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility asset works on Iffley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 10:04.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility asset works on Iffley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 09:30.

UK Power Networks Eastern & London logo
Between
9 and 19 Jun 2025
Details
View Map
Share
Follow
Stafford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:46.

UK Power Networks Eastern & London logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:02.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bourdon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:49.

Between
9 and 11 Jun 2025
Details
View Map
Share
Brook Street

Abovenet Communications UK were proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 29 Apr 2025 at 09:15.

Thames Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 16:11.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:22.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 09:30.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Berners Mews

Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:17.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Portobello Road

Thames Water were proposing to carry out New service connection on Portobello Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:48.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Portobello Road

Thames Water are proposing to carry out New service connection on Portobello Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:22.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Portobello Road

Thames Water are proposing to carry out New service connection on Portobello Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:19.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crowndale Road

London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crowndale Road

London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:06.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Bayham Street

London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Bayham Street

London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:07.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:57.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:53.

Thames Water logo
LONG TERM
Between
9 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Richmond Avenue

Thames Water are proposing to carry out Utility asset works on Richmond Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 13:18.

Thames Water logo
LONG TERM
Between
9 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Richmond Avenue

Thames Water are proposing to carry out Utility asset works on Richmond Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 16:27.

Thames Water logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:57.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Mar 2025 at 16:19.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:25.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Winnington Road

BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 May 2025 at 14:42.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Winnington Road

BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:30.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hampstead Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Lane, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 10:04.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Hampstead Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Lane, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 14:16.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Ossulton Way

BT were proposing to carry out Utility asset works on Ossulton Way, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Mar 2025 at 14:34.

Electricity Network Company logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 13:58.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Garrick Drive

BT are proposing to carry out Utility asset works on Garrick Drive, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 6 Jan 2025 at 08:06.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Garrick Drive

BT were proposing to carry out Utility asset works on Garrick Drive, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 May 2025 at 08:06.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Garrick Drive

BT are proposing to carry out Utility asset works on Garrick Drive, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 May 2025 at 08:27.

UK Power Networks Eastern & London logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Mayfield Avenue

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Mayfield Avenue, Kenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2025 at 10:19.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:28.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 5 Mar 2025 at 21:30.

London Borough Of Ealing logo
Between
10 and 24 Jun 2025
Details
View Map
Share
Osborne Road

London Borough Of Ealing were proposing to carry out Utility asset works on Osborne Road, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 7 Mar 2025 at 09:23.

City Of Westminster logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 09:44.

City Of Westminster logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 May 2025 at 10:07.

City Of Westminster logo
LONG TERM
Between
10 Jun and 23 Jul 2025
Details
View Map
Share
Mozart Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Mozart Street, Queen's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 14:57.

City Of Westminster logo
Between
10 and 23 Jun 2025
Details
View Map
Share
Follow
Mozart Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mozart Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 14:58.

Thames Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Carlton Vale

Thames Water are proposing to carry out New service connection on Carlton Vale, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:54.

Thames Water logo
Between
11 and 19 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:07.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:16.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:17.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
South Audley Street

BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 May 2025 at 12:14.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 May 2025 at 12:13.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hermitage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 16:01.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hermitage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:38.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Montrose Crescent

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Montrose Crescent, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:17.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Woodberry Gardens

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Gardens, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 09:44.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Moss Hall Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 09:44.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Christchurch Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:17.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:17.

London Borough Of Barnet logo
Between
12 and 21 Jun 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:17.

UK Power Networks Eastern & London logo
Between
12 and 18 Jun 2025
Details
View Map
Share
Follow
Bourdon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 11:32.

Murphy Gas Networks logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Bollo Lane

Murphy Gas Networks are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 19 Mar 2025 at 15:20.

London Borough Of Ealing logo
Between
13 and 27 Jun 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Mar 2025 at 12:22.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:26.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:24.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:32.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:33.

National Highways logo
Between
14 and 16 Jun 2025
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Jun 2025 at 13:18.

Electricity Network Company logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are proposing to carry out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:49.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Averill Street

Thames Water are proposing to carry out New service connection on Averill Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:46.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 09:33.

Thames Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 08:57.

UK Power Networks Eastern & London logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:17.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Caxton Road

Thames Water are proposing to carry out New service connection on Caxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 10:36.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:08.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:39.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:15.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 7 Mar 2025 at 11:45.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 16 May 2025 at 08:50.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:33.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Wales Farm Road

Thames Water are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 09:37.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Wales Farm Road

Thames Water are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 09:37.

Thames Water logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Belsize Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 16:35.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Belsize Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:39.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Strathcona Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Strathcona Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
The Mount

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on The Mount, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Tudor Close

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Tudor Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Greenhill Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

London Borough Of Barnet logo
Between
16 and 17 Jun 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Glenwood Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Glenwood Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Conway Gardens

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Conway Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Waltham Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Waltham Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Nash Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nash Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:43.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Princes Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:38.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Stag Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.

Cadent Gas logo
Between
16 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:28.

Thames Water logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Pyrmont Road

Thames Water are proposing to carry out New service connection on Pyrmont Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 08:42.

UK Power Networks Eastern & London logo
Between
17 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:18.

Thames Water logo
Between
17 and 24 Jun 2025
Details
View Map
Share
Long Drive

Thames Water were proposing to carry out Utility asset works on Long Drive, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:19.

City Of London Telecomms logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Eaton Square

City Of London Telecomms are proposing to carry out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 14 Apr 2025 at 09:15.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 13:34.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 15:13.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
South Audley Street

BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Apr 2025 at 13:30.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Apr 2025 at 13:31.

London Borough Of Barnet logo
LONG TERM
Between
18 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

Thames Water logo
Between
18 and 23 Jun 2025
Details
View Map
Share
Follow
Southern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southern Road, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:31.

Thames Water logo
Between
18 and 23 Jun 2025
Details
View Map
Share
Follow
Southern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southern Road, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:24.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:33.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Church Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Church Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Kenton Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kenton Road, Harrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Cumberland Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Cumberland Road, Stanmore.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 12 May 2025 at 09:41.

UK Power Networks Eastern & London logo
Between
20 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:27.

Sky UK logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 16 Apr 2025 at 08:01.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Walm Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Walm Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:37.

Cadent Gas logo
Between
22 Jun and 20 Jul 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:29.

Cadent Gas logo
Between
22 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Scrubs Lane

Cadent Gas are proposing to carry out Utility asset works on Scrubs Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:17.

Cadent Gas logo
Between
22 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Kentwode Green

Thames Water are proposing to carry out New service connection on Kentwode Green, Barnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 13:43.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Markham Street

Thames Water are proposing to carry out New service connection on Markham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 15:04.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Great Church Lane

Thames Water are proposing to carry out New service connection on Great Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:09.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Great Church Lane

Thames Water are proposing to carry out New service connection on Great Church Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 14:09.

Thames Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are proposing to carry out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 14:48.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Little Ealing Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Little Ealing Lane, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:31.

UK Power Networks Eastern & London logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 12:34.

Cadent Gas logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meon Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Meon Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 13:01.

City Of Westminster logo
LONG TERM
Between
23 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:01.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 09:04.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 May 2025 at 15:06.

UK Power Networks Eastern & London logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:42.

UK Power Networks Eastern & London logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2025 at 09:50.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:25.

London Borough Of Ealing logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Drayton Green Road

London Borough Of Ealing are proposing to carry out Utility asset works on Drayton Green Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 22 May 2025 at 13:16.

City Of Westminster logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ingestre Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ingestre Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Jan 2025 at 14:50.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 13 Mar 2025 at 10:16.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 29 May 2025 at 08:14.

Electricity Network Company logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 15:02.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marylebone Lane

Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:38.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marylebone Lane

Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:16.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:41.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 11:15.

Thames Water logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Little Portland Street

Thames Water are proposing to carry out New service connection on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 11:20.

Virgin Media logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 11 Mar 2025 at 12:21.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Long Drive

Thames Water are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:51.

UK Power Networks Eastern & London logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 09:35.

London Borough Of Brent logo
LONG TERM
Between
23 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:33.

London Borough Of Brent logo
LONG TERM
Between
23 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:53.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:45.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:52.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Hadley Street

London Borough Of Camden are proposing to carry out Highway improvement works on Hadley Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 2 Jun 2025 at 15:10.

London Borough Of Camden logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:27.

London Borough Of Camden logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:43.

London Borough Of Camden logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Antrim Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.

London Borough Of Camden logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Antrim Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 May 2025 at 17:00.

Thames Water logo
LONG TERM
Between
23 Jun and 14 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 16:44.

Affinity Water logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Elton Avenue

Affinity Water are proposing to carry out Utility asset works on Elton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Thames Water logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Northview Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 16:43.

Thames Water logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 07:58.

Thames Water logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:20.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Heathfield Gardens

Thames Water are proposing to carry out New service connection on Heathfield Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 14:59.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Heathfield Gardens

Thames Water are proposing to carry out New service connection on Heathfield Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 13:52.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Junction Road

Thames Water are proposing to carry out Utility repair and maintenance works on Junction Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:43.

Thames Water logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Upbrook Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:07.

Thames Water logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Upbrook Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:49.

City Of Westminster logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 10:44.

City Of Westminster logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Park Crescent Mews West

City Of Westminster are proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:13.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:26.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

Transport for London (TfL) logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:32.

National Highways logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 May 2025 at 13:25.

National Highways logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 May 2025 at 08:32.

City Of Westminster logo
Between
26 Jun and 9 Jul 2025
Details
View Map
Share
Park Crescent Mews West

City Of Westminster were proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:11.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 15:17.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:10.

London Borough Of Brent logo
Between
27 Jun and 26 Jul 2025
Details
View Map
Share
Follow
St Andrews Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 28 Mar 2025 at 08:55.

Thames Water logo
LONG TERM
Between
30 Jun 2025 and 26 Jan 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:53.

Thames Water logo
LONG TERM
Between
30 Jun and 4 Aug 2025
Details
View Map
Share
Bisham Gardens

Thames Water were proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:03.

Thames Water logo
LONG TERM
Between
30 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Bisham Gardens

Thames Water are proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 20:56.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:59.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:05.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 16 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 16 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 12:03.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:00.

London Borough Of Barnet logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Lanacre Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:00.

London Borough Of Barnet logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Lanacre Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 09:30.

London Borough Of Hammersmith & Fulham logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Dunsany Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Dunsany Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:42.

City Of Westminster logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:24.

UK Power Networks Eastern & London logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 13:41.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:54.

UK Power Networks Eastern & London logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Marshall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 16:09.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:48.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:19.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:22.

UK Power Networks Eastern & London logo
Between
30 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Tottenham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2025 at 10:30.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:15.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Copenhagen Street

Thames Water were proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:27.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Frognal

Thames Water are proposing to carry out New service connection on Frognal, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 17:26.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Frognal

Thames Water are proposing to carry out New service connection on Frognal, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:59.

Thames Water logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:03.

City Of Westminster logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Newman Passage

City Of Westminster are proposing to carry out Highway repair and maintenance works on Newman Passage, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Apr 2025 at 10:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:10.

LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Frederica Street

London Borough Of Islington were proposing to carry out Highway improvement works on Frederica Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 9 Apr 2025 at 08:13.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 21:56.

Thames Water logo
Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Ingersoll Road

Thames Water are proposing to carry out New service connection on Ingersoll Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 17:04.

Thames Water logo
Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Ingersoll Road

Thames Water are proposing to carry out New service connection on Ingersoll Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out New service connection on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:40.

UK Power Networks Eastern & London logo
Between
3 and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 14:02.

Thames Water logo
Between
4 and 10 Jul 2025
Details
View Map
Share
Follow
Cale Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:57.

Thames Water logo
Between
4 and 9 Jul 2025
Details
View Map
Share
Follow
Goodwin Road

Thames Water are proposing to carry out New service connection on Goodwin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 10:26.

London Borough Of Ealing logo
LONG TERM
Between
5 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Strelley Way

London Borough Of Ealing are proposing to carry out Highway improvement works on Strelley Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 3 Apr 2025 at 14:47.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Sherbrooke Road

Virgin Media are proposing to carry out Utility asset works on Sherbrooke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Allestree Road

Virgin Media are proposing to carry out Utility asset works on Allestree Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
King Street

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the cycleway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 29 May 2025 at 13:01.

Thames Water logo
LONG TERM
Between
7 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 09:52.

City Of Westminster logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Belgrave Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 12:17.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Aldensley Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Aldensley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:53.

Thames Water logo
LONG TERM
Between
7 Jul and 23 Oct 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:59.

London Borough Of Hammersmith & Fulham logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Brackenbury Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Brackenbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 10 Apr 2025 at 09:47.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Macfarlane Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:27.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:07.

Electricity Network Company logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 May 2025 at 16:04.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:02.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Kendal Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kendal Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:09.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:49.

Thames Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Cleveland Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Cleveland Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 13:37.

Electricity Network Company logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Willen Field Road

Electricity Network Company are proposing to carry out Utility asset works on Willen Field Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 1 May 2025 at 08:55.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 15:50.

London Borough Of Camden logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:57.

London Borough Of Camden logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:18.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Holly Bush Vale

Thames Water are proposing to carry out New service connection on Holly Bush Vale, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 19:33.

London Borough Of Barnet logo
LONG TERM
Between
7 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.

Thames Water logo
LONG TERM
Between
7 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility asset works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Affinity Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Fourth Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 09:35.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Shooters Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shooters Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:07.

Sky UK logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 12 May 2025 at 11:33.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Porchester Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 May 2025 at 14:32.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Westbourne Terrace Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 May 2025 at 13:57.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Avenue Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:21.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 15 Apr 2025 at 18:18.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 19:36.

City Of Westminster logo
Between
9 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:55.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 22 May 2025 at 10:18.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
D'arcy Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Drive, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Culver Grove

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Apr 2025 at 10:56.

London Borough Of Barnet logo
Between
10 and 12 Jul 2025
Details
View Map
Share
Follow
Hertford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 11:58.

London Borough Of Barnet logo
Between
10 and 13 Jul 2025
Details
View Map
Share
Follow
Hertford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

UK Power Networks Eastern & London logo
Between
10 and 16 Jul 2025
Details
View Map
Share
Hale Drive

UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Drive, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 10:53.

UK Power Networks Eastern & London logo
Between
10 and 16 Jul 2025
Details
View Map
Share
Ashbourne Grove

UK Power Networks Eastern & London were proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 08:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
Between
11 and 13 Jul 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 13:31.

UK Power Networks Eastern & London logo
Between
11 and 13 Jul 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 11:19.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:15.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:03.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Iffley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Iffley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:23.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Cadogan Place

Thames Water are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:28.

Thames Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Hans Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 May 2025 at 12:33.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:37.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:59.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 May 2025 at 14:30.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:06.

Cadent Gas logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 07:02.

UK Power Networks Eastern & London logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 14:47.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 08:39.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
West Central Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 18:16.

Scottish Hydro Electric Power Dis logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Lucy Crescent

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Lucy Crescent, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 May 2025 at 08:19.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 May 2025 at 10:39.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:13.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Greenberry Street

Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:43.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:17.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:06.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenland Street

BT are proposing to carry out Utility repair and maintenance works on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 17:26.

UK Power Networks Eastern & London logo
Between
14 and 21 Jul 2025
Details
View Map
Share
Carey Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 15:02.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
First Way

Affinity Water are proposing to carry out Utility repair and maintenance works on First Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:24.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Platt's Lane

Thames Water are proposing to carry out New service connection on Platt's Lane, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:50.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Wayside

Thames Water are proposing to carry out New service connection on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 15:06.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Sunnyside Road

Thames Water are proposing to carry out New service connection on Sunnyside Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.

Cadent Gas logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way

Cadent Gas are proposing to carry out Utility asset works on Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.

London Borough Of Barnet logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:03.

London Borough Of Barnet logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

London Borough Of Barnet logo
Between
14 Jul and 12 Aug 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 25 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:54.

London Borough Of Barnet logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 12:55.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Montrose Crescent

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Montrose Crescent, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Woodberry Gardens

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Gardens, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Moss Hall Crescent

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Crescent, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Moss Hall Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Christchurch Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Alexandra Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Alexandra Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

Thames Water logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.

Cadent Gas logo
Between
17 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:54.

London Borough Of Ealing logo
Between
17 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 12:51.

London Borough Of Barnet logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:06.

London Borough Of Barnet logo
Between
17 and 20 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Belgrave Square

Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 13 May 2025 at 10:47.

Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Belgrave Square

Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 30 May 2025 at 17:06.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jul and 4 Sep 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:28.

Transport for London (TfL) logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out roadworks on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:52.

Thames Water logo
LONG TERM
Between
20 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 07:39.

Affinity Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Fourth Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 17:04.

Affinity Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:21.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:11.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Linden Road

Thames Water are proposing to carry out New service connection on Linden Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:07.

London Borough Of Barnet logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Baronsmere Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Baronsmere Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:10.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 14:28.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 09:23.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are proposing to carry out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:24.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Devonshire Road

BT were proposing to carry out Utility asset works on Devonshire Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Apr 2025 at 13:10.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Temple Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:01.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Temple Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:11.

London Borough Of Ealing logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Osborne Road

London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 15 May 2025 at 08:09.

Electricity Network Company logo
Between
21 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Gunnersbury Lane

Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 May 2025 at 13:30.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Shepherd Street

Thames Water were proposing to carry out New service connection on Shepherd Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 08:43.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Shepherd Street

Thames Water are proposing to carry out New service connection on Shepherd Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:30.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Wardour Street

Thames Water were proposing to carry out Permanent reinstatement on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:32.

Cadent Gas logo
Between
21 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 07:09.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Commonwealth Avenue

Thames Water were proposing to carry out New service connection on Commonwealth Avenue, White City Estate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 16:20.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Commonwealth Avenue

Thames Water are proposing to carry out New service connection on Commonwealth Avenue, White City Estate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:31.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Berwick Street

Thames Water are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 10:53.

Cadent Gas logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Long Drive

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Long Drive, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:25.

Transport for London (TfL) logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:55.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Devonshire Row Mews

Thames Water were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:46.

Between
21 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barlby Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Barlby Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Apr 2025 at 16:10.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Gloucester Place

Thames Water are proposing to carry out New service connection on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 09:53.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Ivor Place

Thames Water are proposing to carry out New service connection on Ivor Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 08:26.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 13:54.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 11:37.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:53.

HS2 logo
LONG TERM
Between
21 Jul 2025 and 26 Jun 2026
Details
View Map
Share
Follow
College Crescent

HS2 are proposing to carry out Works for Rail Purposes on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 10 Mar 2025 at 16:30.

Thames Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Northview Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:32.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Carey Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 May 2025 at 09:41.

City Of Westminster logo
Between
22 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 13:50.

Cadent Gas logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 12:33.

Cadent Gas logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lonsdale Road

Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:35.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:27.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 09:10.

Cadent Gas logo
Between
23 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 12:36.

Cadent Gas logo
LONG TERM
Between
23 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Askew Road

Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:42.

Electricity Network Company logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Gunnersbury Lane

Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 15:22.

Electricity Network Company logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Gunnersbury Lane

Electricity Network Company are proposing to carry out Utility asset works on Gunnersbury Lane, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 15:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Winchelsea Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Winchelsea Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Winchelsea Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 2 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 08:34.

London Borough Of Barnet logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:12.

London Borough Of Barnet logo
Between
24 and 27 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hale Drive

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Drive, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:51.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hale Drive

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Drive, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:24.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashbourne Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashbourne Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Hale Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Hale Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 08:45.

UK Power Networks Eastern & London logo
Between
26 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Heriot Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Heriot Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 12:00.

Cadent Gas logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
East Lane

Cadent Gas are proposing to carry out Utility asset works on East Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 22:55.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
North Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on North Hill, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:42.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Aylmer Parade

Transport for London (TfL) are proposing to carry out Highway improvement works on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:32.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
The Hyde

Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 9 May 2025 at 08:33.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
The Hyde

Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 07:40.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
The Hyde

Murphy Power Distribution were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 9 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 6 May 2025 at 08:47.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 May 2025 at 12:16.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.

London Borough Of Barnet logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Utility asset works on High Road, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 12:09.

Cadent Gas logo
LONG TERM
Between
28 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 15:30.

Transport for London (TfL) logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Fishers Lane

Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Fishers Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 09:17.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 16:34.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ebury Street

Thames Water are proposing to carry out Utility asset works on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 07:56.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:38.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:27.

Cadent Gas logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Cadent Gas are proposing to carry out Utility asset works on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Boscombe Road

Cadent Gas are proposing to carry out Utility asset works on Boscombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Westville Road

Cadent Gas are proposing to carry out Utility asset works on Westville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.

Cadent Gas logo
LONG TERM
Between
28 Jul and 28 Sep 2025
Details
View Map
Share
Follow
Findon Road

Cadent Gas are proposing to carry out Utility asset works on Findon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:02.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:10.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ladbroke Walk

Thames Water are proposing to carry out New service connection on Ladbroke Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 15:27.

UK Power Networks Eastern & London logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:13.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ashfield Road

Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:52.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ashfield Road

Thames Water are proposing to carry out New service connection on Ashfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:12.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:56.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 15:13.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:17.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 09:51.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Eastbourne Avenue

Thames Water are proposing to carry out New service connection on Eastbourne Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 15:54.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Long Drive

Thames Water are proposing to carry out New service connection on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:41.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Long Drive

Thames Water are proposing to carry out New service connection on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:11.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 10:57.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 11:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:42.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Lynwood Road

Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:40.

Thames Water logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 13:25.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out Utility asset works on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 16:56.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out Utility asset works on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:33.

London Borough Of Barnet logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Depot Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Depot Approach, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 08:53.

London Borough Of Barnet logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 08:24.

Affinity Water logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Eversley Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eversley Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:53.

London Borough Of Barnet logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Edgware Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:37.

Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:29.

Thames Water logo
Between
30 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Aylmer Parade

Thames Water are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 09:52.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
York Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on York Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Feb 2025 at 10:42.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Feb 2025 at 13:13.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:12.

UK Power Networks Eastern & London logo
Between
30 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 13:14.

Thames Water logo
Between
31 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Seven Sisters Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 09:33.

London Borough Of Barnet logo
Between
31 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Corner Mead

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Corner Mead, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 22 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:35.

London Borough Of Barnet logo
LONG TERM
Between
1 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.

City Of Westminster logo
Between
1 and 15 Aug 2025
Details
View Map
Share
Follow
Davies Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Davies Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:19.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:44.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:45.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Midland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:37.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:47.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Goldhawk Road

Cadent Gas are proposing to carry out Utility asset works on Goldhawk Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Paddenswick Road

Cadent Gas are proposing to carry out Utility asset works on Paddenswick Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Greenside Road

Cadent Gas are proposing to carry out Utility asset works on Greenside Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
3 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Askew Road

Cadent Gas are proposing to carry out Utility asset works on Askew Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
3 Aug and 19 Sep 2025
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:38.

Cadent Gas logo
LONG TERM
Between
3 Aug and 19 Sep 2025
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Anselm Road

Thames Water are proposing to carry out New service connection on Anselm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 09:42.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Onslow Gardens

Cadent Gas are proposing to carry out Utility asset works on Onslow Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:28.

Thames Water logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:02.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 09:33.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Down Street

Thames Water are proposing to carry out Utility asset works on Down Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:30.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Farm Street

Thames Water are proposing to carry out New service connection on Farm Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:28.

Eunetworks logo
Between
4 and 14 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 28 Apr 2025 at 09:23.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 17:11.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Harewood Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Mar 2025 at 14:05.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Marylands Road

Thames Water are proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 10:23.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:56.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:36.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Station Approach

Affinity Water are proposing to carry out Utility asset works on Station Approach, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Transport for London (TfL) logo
Between
4 and 25 Aug 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:53.

Transport for London (TfL) logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Camden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Fishers Way

Affinity Water are proposing to carry out Utility asset works on Fishers Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Streatley Place

London Borough Of Camden are proposing to carry out roadworks on Streatley Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 1 June 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:12.

London Borough Of Barnet logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Brent Park Road

London Borough Of Barnet are proposing to carry out Remedial works on Brent Park Road, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway

Thames Water were proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:49.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:50.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway Close

Thames Water were proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 08:19.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 08:21.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Hill Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hill Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 09:57.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:32.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 12:48.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 10:29.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2025 at 11:06.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 11:10.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Fortis Green

London Borough Of Haringey were proposing to carry out Remedial works on Fortis Green, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 14:55.

City Of Westminster logo
Between
5 and 18 Aug 2025
Details
View Map
Share
Follow
Lyall Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lyall Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 15:37.

UK Power Networks Eastern & London logo
Between
5 and 24 Aug 2025
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:54.

City Of Westminster logo
Between
5 and 7 Aug 2025
Details
View Map
Share
George Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 14:39.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Offord Road

Thames Water were proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:19.

UK Power Networks Eastern & London logo
Between
5 and 9 Aug 2025
Details
View Map
Share
Follow
Carey Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Carey Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 07:01.

UK Power Networks Eastern & London logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Bramber Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Bramber Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:07.

UK Power Networks Eastern & London logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
North End Road

UK Power Networks Eastern & London are proposing to carry out New service connection on North End Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:40.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Vereker Road

BT are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 May 2025 at 09:30.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 09:55.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 15:26.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
D'arcy Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Gardens, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:30.

London Borough Of Barnet logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Hampstead Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:38.

London Borough Of Barnet logo
Between
7 and 14 Aug 2025
Details
View Map
Share
Follow
Greyhound Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Greyhound Hill, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Culver Grove

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:45.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Summit Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Summit Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:36.

UK Power Networks Eastern & London logo
Between
7 and 17 Aug 2025
Details
View Map
Share
Follow
Beech Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Beech Walk, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
7 and 17 Aug 2025
Details
View Map
Share
Follow
Beech Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Beech Walk, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:24.

London Borough Of Barnet logo
Between
8 and 11 Aug 2025
Details
View Map
Share
Cricklewood Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:39.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 07:40.

Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:51.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:21.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Mollison Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:08.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:04.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:40.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:24.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:25.

Thames Water logo
Between
11 and 20 Aug 2025
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 14:43.

Scottish Hydro Electric Power Dis logo
Between
11 and 21 Aug 2025
Details
View Map
Share
Follow
Acton Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Acton Lane, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 12:04.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Hamilton Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Cranbourn Street

Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:25.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Charing Cross Road

Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:24.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:37.

Thames Water logo
Between
11 and 18 Aug 2025
Details
View Map
Share
New Bond Street

Thames Water were proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 15:40.

Cadent Gas logo
Between
11 Aug and 9 Sep 2025
Details
View Map
Share
Follow
North Pole Road

Cadent Gas are proposing to carry out Utility asset works on North Pole Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 12:16.

Transport for London (TfL) logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 17:10.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.

City Of Westminster logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:45.

UK Power Networks Eastern & London logo
Between
13 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:29.

Virgin Media logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 May 2025 at 11:31.

Between
13 and 16 Aug 2025
Details
View Map
Share
Follow
Northwick Park Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Northwick Park Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:51.

London Borough Of Barnet logo
Between
13 and 22 Aug 2025
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, East Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

London Borough Of Barnet logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Cricklewood Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.

London Borough Of Barnet logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Hampstead Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:59.

London Borough Of Barnet logo
Between
15 and 20 Aug 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:35.

Cadent Gas logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2025 at 07:28.

Thames Water logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Road

Thames Water are proposing to carry out Utility asset works on Bishops Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Thames Water logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Brent Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 08:56.

London Borough Of Barnet logo
Between
18 and 27 Aug 2025
Details
View Map
Share
Follow
Greyhound Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Greyhound Hill, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:22.

London Borough Of Barnet logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Pursley Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:37.

London Borough Of Barnet logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Pursley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Limes Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limes Avenue, The Hale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:51.

UK Power Networks Eastern & London logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Limes Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Limes Avenue, The Hale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 15:24.

UK Power Networks Eastern & London logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 13:38.

UK Power Networks Eastern & London logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:52.

Thames Water logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Connaught Street

Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 14:43.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:00.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:03.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 10:36.

UK Power Networks Eastern & London logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Foscote Mews

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 20:17.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Belgrove Street

Thames Water are proposing to carry out Utility repair and maintenance works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 18:29.

Thames Water logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Gaisford Street

Thames Water are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:42.

Thames Water logo
LONG TERM
Between
18 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:31.

City Of Westminster logo
Between
19 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 10:56.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 12 May 2025 at 08:31.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 15:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 16:30.

Thames Water logo
Between
22 and 31 Aug 2025
Details
View Map
Share
Sydney Street

Thames Water were proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 16:59.

Network Rail logo
Between
23 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Grove Park Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 May 2025 at 10:41.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Elizabeth Street

Thames Water were proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:34.

Scottish Hydro Electric Power Dis logo
Between
25 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Colville Road

Scottish Hydro Electric Power Dis are proposing to carry out Highway repair and maintenance works on Colville Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 09:45.

Thames Water logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Churchfield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 10:49.

Thames Water logo
Between
25 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Churchfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:39.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Follow
Bear Street

Thames Water are proposing to carry out New service connection on Bear Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:00.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

Electricity Network Company logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.

Electricity Network Company logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 08:40.

Virgin Media logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Yeoman's Row

Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 May 2025 at 16:02.

UK Power Networks Eastern & London logo
Between
26 Aug and 8 Sep 2025
Details
View Map
Share
Wood Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 11:25.

Thames Water logo
Between
26 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Churchfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Churchfield Road, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 14:27.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 06:33.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 08:03.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:22.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 14:57.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 14:50.

Affinity Water logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Vivian Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Vivian Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 26 May 2025 at 17:46.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Mansfield Mews

BT are proposing to carry out Utility asset works on Mansfield Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 09:39.

London Borough Of Barnet logo
Between
28 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Deansway

London Borough Of Barnet are proposing to carry out Highway improvement works on Deansway, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 14:25.

London Borough Of Barnet logo
Between
28 and 29 Aug 2025
Details
View Map
Share
Follow
Church Terrace

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 10:03.

Thames Water logo
Between
29 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:37.

Thames Water logo
Between
29 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 14:45.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Follow
Acton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 15:37.


Roadworks Map near to Grange Road, LONDON, NW10 2QY (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 14:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Grange Road, LONDON, NW10 2QY (54 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
POPLARS AVENUE, BRONDESBURY 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - No carriageway incursion
In Progress
Since: 21 May 2025 12:50
(Scheduled: 19 May 2025 - 17 Jun 2025)
0.2
Details
Share
Follow
2
Thames Water logo
MAJOR
  
PARK AVENUE 
(0.2 miles)
Thames Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 5 Apr 2025 10:00
(Scheduled: 5 Apr 2025 - 11 Jun 2025)
0.2
Details
Share
Follow
3
Thames Water logo
CHAMBERS LANE 
(0.2 miles)
Thames Water
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 3 Jun 2025
0.2
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
CHAPTER ROAD 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
12 May 2025 19:16 - 27 May 2025 23:00
0.2
Details
Share
5
Thames Water logo
MAJOR
  
ST PAULS AVENUE 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 2 Jun 2025 08:10
(Scheduled: 31 May 2025 - 2 Aug 2025)
0.2
Details
Share
Follow
6
Thames Water logo
MAJOR
  
ST PAULS AVENUE 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 26 May 2025 - 27 Jul 2025
0.2
Details
Share
Follow
7
Thames Water logo
MAJOR
  
HIGH ROAD 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 5 Apr 2025 10:00
(Scheduled: 17 Mar 2025 - 6 Oct 2025)
0.2
Details
Share
Follow
8
Thames Water logo
MAJOR
  
HIGH ROAD 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 10 Mar 2025 - 6 Oct 2025
0.2
Details
Share
Follow
9
Hyperoptic logo
GROVE ROAD 
(0.2 miles)
Hyperoptic
New service connection - Footway - Some carriageway incursion
Complete
30 May 2025 09:45 - 11:40
0.2
Details
Share
10
Thames Water logo
MAJOR
  
PARK AVENUE 
(0.2 miles)
Thames Water
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 2 Jun 2025 - 20 Jun 2025
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data