ROADWORKS SUMMARY
Meadow Road, NOTTINGHAM, NG9 1JP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Meadow Road, NG9 1JP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Meadow Road, NOTTINGHAM, NG9 1JP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meadow Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottingham City Council logo
LONG TERM
Between
26 Apr 2023 and 30 May 2024
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2023 and could run through until 30 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 21 Feb 2023 at 14:34.

Nottingham City Council logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Lower Parliament Street

Nottingham City Council are carrying out Highway improvement works on Lower Parliament Street, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 00:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 7 Dec 2023 at 14:39.

Nottingham City Council logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Fisher Gate

Nottingham City Council are carrying out Highway improvement works on Fisher Gate, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 00:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 7 Dec 2023 at 14:39.

Nottingham City Council logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Bellar Gate

Nottingham City Council are carrying out Highway improvement works on Bellar Gate, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 00:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 7 Dec 2023 at 14:39.

Nottingham City Council logo
LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Follow
Western Boulevard

Nottingham City Council are carrying out Highway improvement works on Western Boulevard, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 00:00 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 Mar 2024 at 11:34.

Cadent Gas logo
LONG TERM
Until
13 May 2024
Details
View Map
Share
Follow
Western Boulevard

Cadent Gas are carrying out Utility asset works on Western Boulevard, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 February 2024 at 15:09 and could run through until 13 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Feb 2024 at 15:10.

Severn Trent Water logo
LONG TERM
Until
12 May 2024
Details
View Map
Share
Follow
Woodhouse Way

Severn Trent Water are carrying out Utility asset works on Woodhouse Way, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 06:00 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 11:56.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mount Street

Nottingham City Council are proposing to carry out Highway improvement works on Mount Street, City Centre, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:03.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Maid Marian Way

Nottingham City Council are proposing to carry out Highway improvement works on Maid Marian Way, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:02.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Upper Parliament Street

Nottingham City Council are proposing to carry out Highway improvement works on Upper Parliament Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:04.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Derby Road

Nottingham City Council are proposing to carry out Highway improvement works on Derby Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:04.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Tollhouse Hill

Nottingham City Council are proposing to carry out Highway improvement works on Tollhouse Hill, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:04.

Nottingham City Council logo
LONG TERM
Between
31 Mar 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Clarendon Street

Nottingham City Council are proposing to carry out Highway improvement works on Clarendon Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 28 Nov 2023 at 10:03.

Derbyshire County Council logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Wilsthorpe Road

Derbyshire County Council are carrying out Highway repair and maintenance works on Wilsthorpe Road, Long Eaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 25 Apr 2024 at 11:26.

Nottingham City Council logo
LONG TERM
Between
1 Apr 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 9 Feb 2024 at 14:28.

Severn Trent Water logo
LONG TERM
Between
2 Apr and 24 May 2024
Details
View Map
Share
Follow
Bull Close Road

Severn Trent Water are proposing to carry out Utility asset works on Bull Close Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Mar 2024 at 13:10.

Nottinghamshire County Council logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Chilwell Lane

Nottinghamshire County Council are carrying out Works for road purposes on Chilwell Lane, Bramcote.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 April 2024 at 10:36 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Apr 2024 at 12:15.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Bar Lane

Cadent Gas are carrying out Utility asset works on Bar Lane, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 11:20 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 13:06.

Severn Trent Water logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Sawley Road

Severn Trent Water are carrying out Utility asset works on Sawley Road, Breaston, Derby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 08:49 and could run through until 17 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 8 Apr 2024 at 08:49.

Nottinghamshire County Council logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Toton Lane

Nottinghamshire County Council are carrying out Works for road purposes on Toton Lane, Stapleford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 07:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 8 Apr 2024 at 14:33.

National Highways logo
Until
8 May 2024
Details
View Map
Share
Follow
Melton Road

National Highways are carrying out Highway improvement works on Melton Road, Tollerton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 19:00 and could run through until 8 May 2024. The works will impact the verge only.

This roadwork event was last updated by National Highways on 10 Apr 2024 at 12:29.

Nottinghamshire County Council logo
LONG TERM
Between
15 Apr and 14 Aug 2024
Details
View Map
Share
Follow
Fox Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Fox Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 14 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 13 Feb 2024 at 12:15.

Nottingham City Council logo
LONG TERM
Until
23 May 2024
Details
View Map
Share
Follow
Colwick Road

Nottingham City Council are carrying out Highway repair and maintenance works on Colwick Road, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:30 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottingham City Council on 22 Apr 2024 at 13:14.

Cadent Gas logo
LONG TERM
Until
9 Jun 2024
Details
View Map
Share
Follow
Draycott Road

Cadent Gas are carrying out Utility asset works on Draycott Road, Sawley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 09:46 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 10:00.

Finishing
Friday
Details
View Map
Share
Follow
Lenton Lane

UK Power Distribution are carrying out Utility asset works on Lenton Lane, Nottingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:30 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Distribution on 22 Apr 2024 at 09:14.

Nottingham City Council logo
Between
22 Apr and 19 May 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 20 Mar 2024 at 09:38.

Cadent Gas logo
Between
22 Apr and 13 May 2024
Details
View Map
Share
Follow
Exbourne Road

Cadent Gas are proposing to carry out Utility asset works on Exbourne Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Feb 2024 at 11:44.

Nottinghamshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
West End

Nottinghamshire County Council are carrying out Works for road purposes on West End, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 08:40 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2024 at 09:41.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harrow Road

Cadent Gas are carrying out Utility repair and maintenance works on Harrow Road, Nottingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 08:15 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 08:30.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are carrying out Utility repair and maintenance works on Nottingham Road, Nuthall.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 11:36 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 09:34.

Murphy Power Distribution logo
Until
12 May 2024
Details
View Map
Share
Follow
Howard Street

Murphy Power Distribution are carrying out Utility asset works on Howard Street, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2024 at 08:01 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 27 Apr 2024 at 08:02.

Cadent Gas logo
Between
28 Apr and 19 May 2024
Details
View Map
Share
Follow
Repton Road

Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:55.

Cadent Gas logo
Between
28 Apr and 26 May 2024
Details
View Map
Share
Follow
Wyvern Avenue

Cadent Gas are proposing to carry out Utility asset works on Wyvern Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2023 at 08:28.

Nottinghamshire County Council logo
LONG TERM
Between
29 Apr and 11 Oct 2024
Details
View Map
Share
Follow
Loughborough Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Loughborough Road, Ruddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 25 Jan 2024 at 16:18.

Severn Trent Water logo
Between
29 Apr and 10 May 2024
Details
View Map
Share
Follow
Lawson Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lawson Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Feb 2024 at 11:36.

Nottingham City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Whitemoor Road

Nottingham City Council are proposing to carry out Highway improvement works on Whitemoor Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 31 Jan 2024 at 12:40.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stapleford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Stapleford Road, Trowell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2024 at 07:35.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Alpine Street

Nottingham City Council are proposing to carry out Highway improvement works on Alpine Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 31 Jan 2024 at 12:39.

Nottingham City Council logo
Between
2 and 4 May 2024
Details
View Map
Share
Follow
Percy Street

Nottingham City Council are proposing to carry out Highway improvement works on Percy Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 31 Jan 2024 at 12:39.

Cadent Gas logo
Between
5 and 20 May 2024
Details
View Map
Share
Follow
Beresford Road

Cadent Gas are proposing to carry out Utility asset works on Beresford Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:57.

Nottinghamshire County Council logo
Between
6 and 31 May 2024
Details
View Map
Share
Follow
Barton Lane

Nottinghamshire County Council are proposing to carry out Highway improvement works on Barton Lane, Attenborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 20 Mar 2024 at 08:49.

Nottinghamshire County Council logo
Between
7 and 15 May 2024
Details
View Map
Share
Follow
School Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on School Lane, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Apr 2024 at 10:13.

National Highways logo
LONG TERM
Between
7 May 2024 and 7 May 2025
Details
View Map
Share
Follow
Middleton Boulevard

National Highways are proposing to carry out Works for road purposes on Middleton Boulevard, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Apr 2024 at 08:42.

Cadent Gas logo
Between
8 May and 5 Jun 2024
Details
View Map
Share
Follow
Whiting Avenue

Cadent Gas are proposing to carry out Utility asset works on Whiting Avenue, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 08:06.

Western Power Distribution (East Midlands) logo
Between
10 and 15 May 2024
Details
View Map
Share
Follow
Mellors Way

Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Mellors Way, Nottingham.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2024 and could run through until 15 May 2024. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2024 at 11:26.

Cadent Gas logo
Between
12 May and 6 Jun 2024
Details
View Map
Share
Follow
Meynell Road

Cadent Gas are proposing to carry out Utility asset works on Meynell Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.

Cadent Gas logo
LONG TERM
Between
12 May and 16 Jun 2024
Details
View Map
Share
Follow
Private Road

Cadent Gas are proposing to carry out Utility asset works on Private Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 12:30.

Cadent Gas logo
Between
12 and 29 May 2024
Details
View Map
Share
Follow
Bladon Close

Cadent Gas are proposing to carry out Utility asset works on Bladon Close, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 11:43.

Cadent Gas logo
Between
12 and 29 May 2024
Details
View Map
Share
Follow
Gordon Rise

Cadent Gas are proposing to carry out Utility asset works on Gordon Rise, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 11:44.

Derbyshire County Council logo
Between
13 and 24 May 2024
Details
View Map
Share
Follow
Corporation Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Corporation Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 19 Mar 2024 at 10:03.

ESP Electricity logo
Between
13 and 24 May 2024
Details
View Map
Share
Follow
Beck Street

ESP Electricity are proposing to carry out New service connection on Beck Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 26 Apr 2024 at 10:57.

Cadent Gas logo
LONG TERM
Between
15 May and 10 Jul 2024
Details
View Map
Share
Follow
Carrfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Carrfield Avenue, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 08:04.

Cadent Gas logo
Between
19 May and 16 Jun 2024
Details
View Map
Share
Follow
Repton Road

Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 14:01.

Cadent Gas logo
LONG TERM
Between
19 May and 20 Jun 2024
Details
View Map
Share
Follow
Lynden Avenue

Cadent Gas are proposing to carry out Utility asset works on Lynden Avenue, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Nov 2023 at 15:49.

Severn Trent Water logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Conway Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Conway Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 06:46.

Nottinghamshire County Council logo
Between
20 and 25 May 2024
Details
View Map
Share
Follow
Bye Pass Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bye Pass Road, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Mar 2024 at 15:16.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 May and 28 Jun 2024
Details
View Map
Share
Follow
Sandon Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandon Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Mar 2024 at 10:31.

Western Power Distribution (East Midlands) logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Central Avenue

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Central Avenue, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Mar 2024 at 10:31.

Cadent Gas logo
Between
21 May and 18 Jun 2024
Details
View Map
Share
Follow
Twyford Road

Cadent Gas are proposing to carry out Utility asset works on Twyford Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:43.

National Highways logo
LONG TERM
Between
21 May and 6 Oct 2024
Details
View Map
Share
Follow
Wollaton Vale

National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Mar 2024 at 10:32.

Severn Trent Water logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Parkyns Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parkyns Street, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Feb 2024 at 11:29.

Severn Trent Water logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Feb 2024 at 12:31.

Network Rail logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
David Lane

Network Rail are proposing to carry out Works for Rail Purposes on David Lane, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Apr 2024 at 15:51.

Cadent Gas logo
Between
25 May and 2 Jun 2024
Details
View Map
Share
Follow
Nuthall Road

Cadent Gas are proposing to carry out Utility asset works on Nuthall Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Feb 2024 at 10:03.

Cadent Gas logo
LONG TERM
Between
26 May and 28 Jul 2024
Details
View Map
Share
Follow
Ingleby Road

Cadent Gas are proposing to carry out Utility asset works on Ingleby Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 13:44.

Nottingham City Council logo
Between
26 and 31 May 2024
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 24 Apr 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Jul 2024
Details
View Map
Share
Follow
Woodborough Road

Cadent Gas are proposing to carry out Utility asset works on Woodborough Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 11:44.

Severn Trent Water logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
Woodley Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodley Street, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Apr 2024 at 08:44.

Cadent Gas logo
Between
27 May and 12 Jun 2024
Details
View Map
Share
Follow
Clifton Lane

Cadent Gas are proposing to carry out Utility asset works on Clifton Lane, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 12 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 12 Feb 2024 at 14:52.

Cadent Gas logo
Between
27 May and 11 Jun 2024
Details
View Map
Share
Follow
Rectory Mews

Cadent Gas are proposing to carry out Utility asset works on Rectory Mews, Nottingham.

These works are categorised as Major.

The works will start on or after 27 May 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2024 at 16:30.

Severn Trent Water logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Bramcote Avenue

Severn Trent Water are proposing to carry out New service connection on Bramcote Avenue, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Feb 2024 at 11:43.

Nottinghamshire County Council logo
Between
27 May and 1 Jun 2024
Details
View Map
Share
Follow
Wilford Lane

Nottinghamshire County Council are proposing to carry out Section 50 on Wilford Lane, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 18 Apr 2024 at 11:17.

Nottinghamshire County Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Toton Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Toton Lane, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 15 Mar 2024 at 09:45.

Western Power Distribution (East Midlands) logo
Between
28 May and 2 Jun 2024
Details
View Map
Share
Follow
Peache Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Peache Way, Bramcote.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Feb 2024 at 08:47.

Western Power Distribution (East Midlands) logo
Between
28 May and 2 Jun 2024
Details
View Map
Share
Follow
Chilwell Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Chilwell Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Feb 2024 at 08:30.

Cadent Gas logo
Between
2 and 16 Jun 2024
Details
View Map
Share
Follow
St Judes Avenue

Cadent Gas are proposing to carry out Utility asset works on St Judes Avenue, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 11:45.

Severn Trent Water logo
Between
3 and 6 Jun 2024
Details
View Map
Share
Follow
Bramcote Avenue

Severn Trent Water are proposing to carry out New service connection on Bramcote Avenue, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Feb 2024 at 11:05.

Severn Trent Water logo
LONG TERM
Between
3 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Nottingham Road

Severn Trent Water are proposing to carry out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 8 Mar 2024 at 07:38.

BT logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Sawley Road

BT are proposing to carry out Utility asset works on Sawley Road, Breaston, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Apr 2024 at 11:44.

Severn Trent Water logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Lenton Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lenton Lane, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Mar 2024 at 15:01.

Western Power Distribution (East Midlands) logo
Between
9 and 15 Jun 2024
Details
View Map
Share
Follow
Chapel Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Chapel Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 15 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Apr 2024 at 13:52.

Severn Trent Water logo
Between
9 and 11 Jun 2024
Details
View Map
Share
Follow
Warser Gate

Severn Trent Water are proposing to carry out New service connection on Warser Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Mar 2024 at 13:23.

Severn Trent Water logo
Between
9 and 11 Jun 2024
Details
View Map
Share
Follow
Warser Gate

Severn Trent Water are proposing to carry out New service connection on Warser Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Mar 2024 at 16:01.

Cadent Gas logo
Between
9 and 23 Jun 2024
Details
View Map
Share
Follow
Mapperley Hall Drive

Cadent Gas are proposing to carry out Utility asset works on Mapperley Hall Drive, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 12:37.

Cadent Gas logo
Between
9 and 23 Jun 2024
Details
View Map
Share
Follow
Lucknow Drive

Cadent Gas are proposing to carry out Utility asset works on Lucknow Drive, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 12:36.

Western Power Distribution (East Midlands) logo
Between
10 and 17 Jun 2024
Details
View Map
Share
Follow
Barton Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barton Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Mar 2024 at 07:43.

Severn Trent Water logo
Between
10 and 13 Jun 2024
Details
View Map
Share
Follow
Grove Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grove Avenue, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Feb 2024 at 12:02.

Cadent Gas logo
Between
10 Jun and 8 Jul 2024
Details
View Map
Share
Follow
Beeston Road

Cadent Gas are proposing to carry out Utility asset works on Beeston Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:18.

Cadent Gas logo
Between
10 and 12 Jun 2024
Details
View Map
Share
Follow
Hounds Gate

Cadent Gas are proposing to carry out Utility asset works on Hounds Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 10:30.

Nottinghamshire County Council logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Inham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Inham Road, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Apr 2024 at 07:28.

Cadent Gas logo
Between
17 and 20 Jun 2024
Details
View Map
Share
Follow
Rutland Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Rutland Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 14:54.

Western Power Distribution (East Midlands) logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Sandon Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandon Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Apr 2024 at 08:15.

Severn Trent Water logo
Between
18 and 20 Jun 2024
Details
View Map
Share
Follow
Pelham Road

Severn Trent Water are proposing to carry out New service connection on Pelham Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Apr 2024 at 14:51.

National Highways logo
LONG TERM
Between
19 Jun 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Abbey Street

National Highways are proposing to carry out Works for road purposes on Abbey Street, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Apr 2024 at 08:41.

Nottingham City Council logo
Between
23 and 27 Jun 2024
Details
View Map
Share
Follow
London Road

Nottingham City Council are proposing to carry out Utility repair and maintenance works on London Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 13 Mar 2024 at 10:07.

Severn Trent Water logo
Between
24 and 26 Jun 2024
Details
View Map
Share
Follow
Woodley Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodley Street, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Apr 2024 at 10:18.

Cadent Gas logo
Between
24 Jun and 22 Jul 2024
Details
View Map
Share
Follow
Montpelier Road

Cadent Gas are proposing to carry out Utility asset works on Montpelier Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 12:13.

BT logo
Between
24 and 25 Jun 2024
Details
View Map
Share
Follow
Postern Street

BT are proposing to carry out Utility asset works on Postern Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Apr 2024 at 15:30.

Cadent Gas logo
Between
26 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Marlborough Street

Cadent Gas are proposing to carry out Utility asset works on Marlborough Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:19.

Severn Trent Water logo
Between
27 and 29 Jun 2024
Details
View Map
Share
Follow
Marlborough Road

Severn Trent Water are proposing to carry out New service connection on Marlborough Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Mar 2024 at 12:07.

Severn Trent Water logo
Between
27 and 29 Jun 2024
Details
View Map
Share
Follow
Bridlesmith Gate

Severn Trent Water are proposing to carry out New service connection on Bridlesmith Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Apr 2024 at 13:18.

Cadent Gas logo
Between
30 Jun and 15 Jul 2024
Details
View Map
Share
Follow
Thoresby Court

Cadent Gas are proposing to carry out Utility asset works on Thoresby Court, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 15:24.

Cadent Gas logo
Between
30 Jun and 15 Jul 2024
Details
View Map
Share
Follow
Lucknow Drive

Cadent Gas are proposing to carry out Utility asset works on Lucknow Drive, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
1 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Acton Road

Cadent Gas are proposing to carry out Utility asset works on Acton Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 14:26.

Cadent Gas logo
Between
1 and 23 Jul 2024
Details
View Map
Share
Follow
Acton Street

Cadent Gas are proposing to carry out Utility asset works on Acton Street, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 23 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 14:19.

Cadent Gas logo
Between
1 and 17 Jul 2024
Details
View Map
Share
Follow
Claude Street

Cadent Gas are proposing to carry out Utility asset works on Claude Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:17.

Nottinghamshire County Council logo
Between
1 and 20 Jul 2024
Details
View Map
Share
Follow
Wollaton Vale

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 12:32.

Nottinghamshire County Council logo
Between
1 and 20 Jul 2024
Details
View Map
Share
Follow
Coventry Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Coventry Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:55.

Nottinghamshire County Council logo
Between
1 and 20 Jul 2024
Details
View Map
Share
Follow
Trowell Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Trowell Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 12:32.

Nottinghamshire County Council logo
Between
1 and 20 Jul 2024
Details
View Map
Share
Follow
Bilborough Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bilborough Road, Trowell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:54.

Nottinghamshire County Council logo
Between
1 and 20 Jul 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Trowell Moor, Trowell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2024 at 11:54.

Nottingham City Council logo
LONG TERM
Between
1 Jul and 25 Aug 2024
Details
View Map
Share
Follow
Nuthall Road

Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 25 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 22 Feb 2024 at 08:06.

Severn Trent Water logo
Between
3 and 8 Jul 2024
Details
View Map
Share
Follow
Charnwood Grove

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Charnwood Grove, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 10:18.

Cadent Gas logo
Between
7 and 22 Jul 2024
Details
View Map
Share
Follow
Caunton Avenue

Cadent Gas are proposing to carry out Utility asset works on Caunton Avenue, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 12:36.

Cadent Gas logo
Between
7 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 12:37.

Cadent Gas logo
Between
7 and 24 Jul 2024
Details
View Map
Share
Follow
Mansfield Street

Cadent Gas are proposing to carry out Utility asset works on Mansfield Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 14:00.

Severn Trent Water logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Charnwood Grove

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Charnwood Grove, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Apr 2024 at 10:22.

Cadent Gas logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Stoney Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Stoney Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 12:00.

Severn Trent Water logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Handel Street

Severn Trent Water are proposing to carry out New service connection on Handel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Apr 2024 at 10:33.

Cadent Gas logo
Between
14 Jul and 11 Aug 2024
Details
View Map
Share
Follow
Banks Road

Cadent Gas are proposing to carry out Utility asset works on Banks Road, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.

Cadent Gas logo
Between
14 and 28 Jul 2024
Details
View Map
Share
Follow
Leyland Close

Cadent Gas are proposing to carry out Utility asset works on Leyland Close, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.

Cadent Gas logo
Between
14 and 28 Jul 2024
Details
View Map
Share
Follow
Seaburn Road

Cadent Gas are proposing to carry out Utility asset works on Seaburn Road, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:18.

Cadent Gas logo
Between
14 and 28 Jul 2024
Details
View Map
Share
Follow
Sandown Road

Cadent Gas are proposing to carry out Utility asset works on Sandown Road, Toton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:17.

Severn Trent Water logo
Between
15 and 17 Jul 2024
Details
View Map
Share
Follow
Parkyns Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parkyns Street, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Apr 2024 at 12:09.

Severn Trent Water logo
Between
15 and 19 Jul 2024
Details
View Map
Share
Follow
Hillside Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hillside Road, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 10:59.

Cadent Gas logo
Between
21 Jul and 6 Aug 2024
Details
View Map
Share
Follow
Denison Street

Cadent Gas are proposing to carry out Utility asset works on Denison Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 6 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:20.

Cadent Gas logo
LONG TERM
Between
21 Jul and 3 Nov 2024
Details
View Map
Share
Follow
Wollaton Road

Cadent Gas are proposing to carry out Utility asset works on Wollaton Road, Beeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 13:03.

Cadent Gas logo
Between
21 Jul and 11 Aug 2024
Details
View Map
Share
Follow
Sidney Road

Cadent Gas are proposing to carry out Utility asset works on Sidney Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:23.

Network Rail logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Mar 2024 at 10:46.

Severn Trent Water logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Evelyn Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Evelyn Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Apr 2024 at 12:19.

Cadent Gas logo
Between
22 Jul and 7 Aug 2024
Details
View Map
Share
Follow
Middleton Boulevard

Cadent Gas are proposing to carry out Utility asset works on Middleton Boulevard, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 7 August 2024. The works will impact the cycleway only.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 11:17.


Roadworks Map near to Meadow Road, NOTTINGHAM, NG9 1JP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 23:07
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Meadow Road, NOTTINGHAM, NG9 1JP (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
MAJOR
  
WEST END 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Road closure
In Progress
Since: 24 Apr 2024 08:40
(Scheduled: 24 Apr 2024 - 1 May 2024)
0.6
Details
Share
Follow
2
Western Power Distribution (East Midlands) logo
HIGH ROAD 
(0.7 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Lane closure
In Progress
Since: 23 Apr 2024 07:53
(Scheduled: 22 Apr 2024 - 29 Apr 2024)
0.7
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
MILLDALE CLOSE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 10 Apr 2024 09:40
(Scheduled: 7 Apr 2024 - 6 May 2024)
0.8
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
LEABROOK CLOSE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 22 Apr 2024 10:30
(Scheduled: 21 Apr 2024 - 7 May 2024)
0.8
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
GROVESIDE CRESCENT 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 7 Apr 2024 17:00
(Scheduled: 3 Apr 2024 - 28 May 2024)
0.8
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
VILLAGE ROAD 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 26 Mar 2024 08:45
(Scheduled: 25 Mar 2024 - 3 Jun 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.