ROADWORKS SUMMARY
Bramcote Drive West, NOTTINGHAM, NG9 1DU
Introduction

View current and future planned roadworks and road closures for Bramcote Drive West, NG9 1DU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bramcote Drive West, NOTTINGHAM, NG9 1DU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bramcote Drive West are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Apr 2026
National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 20:00 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Mar 2025 at 15:54.
5 Aug 2025
National Highways are carrying out Works for road purposes on Middleton Boulevard, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 20:00 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Feb 2025 at 10:40.
5 Aug 2025
National Highways are carrying out Works for road purposes on Abbey Street, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 August 2024 at 20:00 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Dec 2024 at 08:32.
21 Oct 2024 and 23 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nottingham Road, Stapleford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 12:28.
10 Jun 2025
Electricity Network Company are carrying out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 11:07.
10 Jun 2025
Independent Water Networks are carrying out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 24 Mar 2025 at 10:10.
10 Jun 2025
Open Fibre Networks are carrying out New service connection on Thane Road, Nottingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Open Fibre Networks on 2 Jun 2025 at 11:06.
24 Mar and 10 Jul 2025
Severn Trent Water are proposing to carry out Utility asset works on Newtons Lane, Cossall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:06.
26 Jun 2025
Nottinghamshire County Council are carrying out Section 50 on Leake Road, Gotham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 07:30 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 27 May 2025 at 11:19.
27 May and 4 Jul 2025
Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 29 May 2025 at 10:24.
27 May and 4 Jul 2025
Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 29 May 2025 at 10:25.
27 May and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 17:00.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:27.
27 May and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Melbourne Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 13:30.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Melbourne Road, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 07:40.
27 May and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bar Lane, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 17:00.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Bar Lane, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 07:38.
Today
Cadent Gas are carrying out Utility repair and maintenance works on Alfred Street Central, Nottingham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 13:58 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:23.
28 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Denewood Crescent, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 15:36.
28 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Highwood Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 15:36.
28 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Fircroft Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:29.
28 May and 11 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Kingsbury Drive, Nottingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 16:00.
29 May and 12 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Broxtowe Lane, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Gregory Boulevard, Nottingham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 May 2025 at 10:06 and could run through until 6 June 2025. The works will impact the cycleway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:43.
2 and 30 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lows Lane, Stanton By Dale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Jan 2025 at 12:04.
30 Jun 2025
Western Power Distribution (East Midlands) are carrying out Utility asset works on Lows Lane, Stanton By Dale.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:04 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jun 2025 at 09:19.
Friday
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Peel Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Apr 2025 at 14:16.
Friday
Western Power Distribution (East Midlands) are carrying out Utility asset works on Peel Street, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:40 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jun 2025 at 09:41.
Thursday
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hobson Drive, Ilkeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 5 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Mar 2025 at 11:26.
2 Jun and 11 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Beechdale Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:29.
Friday
Severn Trent Water were proposing to carry out New service connection on Main Street, Kimberley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Mar 2025 at 14:44.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Risley Lane, Breaston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 10:39 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 15:18.
Friday
Severn Trent Water are proposing to carry out New service connection on St Marys Gate, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 13:52.
Friday
Severn Trent Water are proposing to carry out New service connection on St Marys Gate, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Mar 2025 at 07:50.
9 and 27 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Humber Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Feb 2025 at 09:19.
9 and 27 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Broadgate, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 10 Feb 2025 at 12:25.
9 and 12 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Broadgate, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 May 2025 at 12:32.
9 and 27 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Peveril Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 8 Apr 2025 at 12:10.
9 and 19 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Peveril Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 May 2025 at 12:43.
9 and 21 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Church Street, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Feb 2025 at 12:23.
9 and 21 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Church Street, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 18 Feb 2025 at 14:07.
9 and 11 Jun 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Upper Eldon Street, Nottingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Mar 2025 at 09:01.
9 and 30 Jun 2025
G2 Energy IDNO are proposing to carry out New service connection on Greens Lane, Kimberley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by G2 Energy IDNO on 11 Apr 2025 at 11:30.
9 and 30 Jun 2025
G2 Energy IDNO are proposing to carry out New service connection on Main Street, Kimberley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by G2 Energy IDNO on 11 Apr 2025 at 11:30.
12 and 19 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Humber Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 May 2025 at 12:32.
12 and 27 Jun 2025
Nottingham City Council are proposing to carry out Highway improvement works on Valley Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 30 May 2025 at 10:12.
13 and 23 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Bankfield Drive, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 12 Mar 2025 at 10:58.
14 Jun and 25 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Western Boulevard, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 11 Apr 2025 at 13:18.
14 Jun and 25 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 11 Apr 2025 at 13:10.
16 Jun and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Wilsthorpe Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 14:20.
16 and 23 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Bankfield Drive, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 7 May 2025 at 15:30.
16 Jun and 24 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Western Boulevard, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 12 Sep 2024 at 11:00.
16 Jun and 27 Jul 2025
Derbyshire County Council are proposing to carry out Highway improvement works on Quarry Hill Road, Ilkeston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Derbyshire County Council on 21 May 2025 at 13:34.
16 Jun and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Beechdale Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:32.
16 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Beech Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 13:16.
16 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Beech Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 15:50.
16 Jun and 24 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Nuthall Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 12 Sep 2024 at 10:59.
16 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodville Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Mar 2025 at 13:17.
16 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodville Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 May 2025 at 13:36.
16 Jun and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Irwin Drive, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 09:31.
16 Jun and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Irwin Drive, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:02.
23 Jun and 31 Jul 2025
National Highways are proposing to carry out Works for road purposes on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Apr 2025 at 11:52.
23 Jun and 31 Jul 2025
National Highways are proposing to carry out Works for road purposes on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 May 2025 at 11:18.
23 Jun and 31 Jul 2025
National Highways are proposing to carry out Works for road purposes on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Apr 2025 at 11:39.
23 Jun and 31 Jul 2025
National Highways are proposing to carry out Works for road purposes on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 May 2025 at 12:43.
23 and 27 Jun 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Derby Road, Stapleford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 10 Apr 2025 at 11:11.
23 and 27 Jun 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Station Road, Sandiacre.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 10 Apr 2025 at 11:34.
23 and 30 Jun 2025
Derbyshire County Council are proposing to carry out roadworks on Lows Lane, Stanton By Dale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 21 Mar 2025 at 16:08.
23 Jun and 27 Jul 2025
Derbyshire County Council are proposing to carry out Highway improvement works on Quarry Hill Road, Ilkeston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 July 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Derbyshire County Council on 21 May 2025 at 15:56.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Denewood Crescent, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 15:28.
23 Jun and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Apollo Drive, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 10:54.
25 and 27 Jun 2025
Severn Trent Water are proposing to carry out New service connection on Gladstone Street West, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Apr 2025 at 12:08.
25 and 27 Jun 2025
Severn Trent Water are proposing to carry out New service connection on Gladstone Street West, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 10:57.
30 Jun and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Wilsthorpe Road, Long Eaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 13:27.
30 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Highwood Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 15:29.
30 Jun and 25 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Bagnall Road, Nottingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:50.
5 and 8 Jul 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bulwell Lane, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 17 Mar 2025 at 10:10.
5 and 8 Jul 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bulwell Lane, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 18 Mar 2025 at 13:06.
7 and 13 Jul 2025
Severn Trent Water are proposing to carry out Utility asset works on Sawley Road, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 13 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 24 Apr 2025 at 14:58.
7 Jul and 29 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollies Drive, Edwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 9 Apr 2025 at 13:45.
7 Jul and 26 Sep 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollies Drive, Edwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 7 Apr 2025 at 11:45.
7 Jul and 20 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Lady Bay Bridge, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 21 May 2025 at 11:37.
7 Jul and 20 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Lady Bay Bridge, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 21 May 2025 at 14:09.
7 and 9 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stapleford Road, Trowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 19 Mar 2025 at 09:38.
7 and 9 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Stapleford Road, Trowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 May 2025 at 13:22.
7 and 11 Jul 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on St Marys Gate, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 15:11.
7 and 9 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woolpack Lane, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 13:13.
7 and 9 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woolpack Lane, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Apr 2025 at 10:55.
7 and 25 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Woodborough Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 28 Apr 2025 at 08:35.
7 and 25 Jul 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Woodborough Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 29 Apr 2025 at 10:30.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Fircroft Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 15:28.
7 and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Broxtowe Lane, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:33.
7 Jul and 8 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Cinderhill Road, Nottingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:41.
10 Jul and 5 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Ilkeston Road, Stapleford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 14 Apr 2025 at 11:04.
10 Jul and 5 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Ilkeston Road, Stapleford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 14 Apr 2025 at 11:32.
14 and 16 Jul 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Wilne Road, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 9 May 2025 at 16:29.
14 and 16 Jul 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Wilne Road, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 May 2025 at 12:09.
14 Jul and 1 Aug 2025
Severn Trent Water were proposing to carry out Utility asset works on Loughborough Road, Ruddington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Apr 2025 at 14:15.
14 and 18 Jul 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Festival Avenue, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 28 Apr 2025 at 13:44.
14 and 18 Jul 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hind Avenue, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 24 Apr 2025 at 15:36.
14 and 18 Jul 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Gregory Avenue, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 28 Apr 2025 at 13:45.
14 and 26 Jul 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Melton Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 25 Apr 2025 at 16:37.
14 and 26 Jul 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Melton Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 May 2025 at 11:49.
14 and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Chapel Street, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 10:49.
14 Jul and 1 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Woodborough Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 11:51.
14 and 25 Jul 2025
GTC Pipelines are proposing to carry out New service connection on Kelham Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 17 Apr 2025 at 14:23.
14 and 25 Jul 2025
GTC Pipelines are proposing to carry out New service connection on Kelham Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 16 May 2025 at 12:55.
16 and 22 Jul 2025
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Acton Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 24 Apr 2025 at 15:07.
17 Jul and 18 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Arleston Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 11 Apr 2025 at 13:12.
21 Jul and 15 Aug 2025
Severn Trent Water are proposing to carry out Utility asset works on Sawley Road, Wilne Cross, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 May 2025 at 12:17.
21 Jul and 5 Sep 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Seaburn Road, Toton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 29 Apr 2025 at 14:00.
21 and 25 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Park Road, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 May 2025 at 13:05.
21 and 23 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harmston Rise, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Apr 2025 at 10:02.
21 and 23 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harmston Rise, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 May 2025 at 11:10.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Wrenthorpe Vale, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 10:17.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Blaise Close, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 10:17.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Saffron Gardens, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 09:12.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Beardsley Gardens, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 09:12.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Kelso Gardens, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 09:12.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on St Georges Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 09:11.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Silverdale Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 10:18.
22 Jul and 5 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Reigate Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Apr 2025 at 10:18.
24 Jul and 1 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Abbey Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Mar 2025 at 10:09.
24 Jul and 1 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Abbey Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 2 Apr 2025 at 10:42.
28 Jul and 24 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Dungannon Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 3 Apr 2025 at 14:04.
28 Jul and 2 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wilford Lane, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 25 Apr 2025 at 16:32.
28 Jul and 2 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wilford Lane, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 May 2025 at 11:53.
28 and 30 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Town Street, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 1 May 2025 at 12:36.
28 Jul and 8 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Chingford Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 17 Mar 2025 at 10:04.
28 Jul and 8 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Chingford Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 18 Mar 2025 at 13:05.
30 Jul and 18 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Dungannon Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 11 Apr 2025 at 13:22.
31 Jul and 9 Sep 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 2 Jun 2025 at 13:21.
1 and 31 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bobbers Mill Bridge, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 27 Mar 2025 at 13:05.
2 and 4 Aug 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Town Street, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 14:41.
4 and 8 Aug 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Kegworth Road, Gotham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 25 Apr 2025 at 11:41.
4 and 22 Aug 2025
Severn Trent Water were proposing to carry out Utility asset works on Loughborough Road, Ruddington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Apr 2025 at 14:21.
4 and 22 Aug 2025
Severn Trent Water are proposing to carry out Utility asset works on Loughborough Road, Ruddington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 May 2025 at 15:16.
4 and 15 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Middleton Street, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Apr 2025 at 10:26.
4 and 17 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Shakespeare Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 12 Sep 2024 at 11:00.
4 and 15 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Shakespeare Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 18 Mar 2025 at 13:04.
4 and 20 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bulwell Lane, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 07:58.
6 Aug and 3 Sep 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Unnamed Footpath From Bakewell Road To Fosbrooke Drive, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 3 September 2025. The works will impact the footway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Jun 2025 at 14:25.
6 and 8 Aug 2025
Virgin Media are proposing to carry out Utility asset works on Mansfield Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 6 May 2025 at 10:21.
11 and 29 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Arleston Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 17 Mar 2025 at 10:10.
11 and 29 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Wollaton Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 17 Mar 2025 at 10:08.
11 and 29 Aug 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bracebridge Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 26 Mar 2025 at 15:54.
12 Aug and 1 Sep 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Grove Avenue, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 20 May 2025 at 10:41.
12 Aug and 1 Sep 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Grove Avenue, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 20 May 2025 at 12:45.
14 and 16 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Leonard Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 May 2025 at 11:01.
14 and 16 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Leonard Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 14:13.
18 and 22 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Park Road, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 May 2025 at 08:22.
18 and 20 Aug 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Thurman Street, Ilkeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 20 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 15:45.
18 and 22 Aug 2025
Cadent Gas are proposing to carry out New service connection on Church Lane, Cossall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 08:32.
23 and 26 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Peters Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Jun 2025 at 11:39.
25 and 28 Aug 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Loughborough Road, West Bridgford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 May 2025 at 08:22.
26 and 28 Aug 2025
Severn Trent Water are proposing to carry out New service connection on North Sherwood Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 May 2025 at 11:03.
26 and 28 Aug 2025
Severn Trent Water are proposing to carry out New service connection on North Sherwood Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 11:40.
Roadworks Map near to Bramcote Drive West, NOTTINGHAM, NG9 1DU (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bramcote Drive West, NOTTINGHAM, NG9 1DU (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 7 Jul 2024 - 30 Apr 2026)
Contains public sector information licensed under the Open Government Licence v3.0.