ROADWORKS SUMMARY
Highbury Road, NOTTINGHAM, NG6 9DU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Highbury Road, NG6 9DU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Highbury Road, NOTTINGHAM, NG6 9DU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Highbury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Mount Street

Nottingham City Council are carrying out Highway improvement works on Mount Street, City Centre, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 11:40.

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Maid Marian Way

Nottingham City Council are carrying out Highway improvement works on Maid Marian Way, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 11:40.

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Upper Parliament Street

Nottingham City Council are carrying out Highway improvement works on Upper Parliament Street, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 11:40.

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Derby Road

Nottingham City Council are carrying out Highway improvement works on Derby Road, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 11:40.

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Tollhouse Hill

Nottingham City Council are carrying out Highway improvement works on Tollhouse Hill, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 11:40.

Nottingham City Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Clarendon Street

Nottingham City Council are carrying out Highway improvement works on Clarendon Street, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 May 2024 at 12:42.

National Highways logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Wollaton Vale

National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Aug 2024 at 10:42.

National Highways logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Middleton Boulevard

National Highways are carrying out Works for road purposes on Middleton Boulevard, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Oct 2024 at 10:33.

Nottinghamshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Watnall Road

Nottinghamshire County Council are carrying out Works for road purposes on Watnall Road, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 25 Oct 2024 at 16:20.

Nottinghamshire County Council logo
LONG TERM
Between
12 Aug 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Shilo Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Shilo Way, Cossall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 24 Jul 2024 at 12:30.

National Highways logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Abbey Street

National Highways are carrying out Works for road purposes on Abbey Street, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 20:00 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 09:49.

Nottingham City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Abbotsford Drive

Nottingham City Council are carrying out Highway improvement works on Abbotsford Drive, Nottingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Aug 2024 at 09:56.

Cadent Gas logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are carrying out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:04.

Nottingham City Council logo
LONG TERM
Between
30 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 19 Aug 2024 at 15:06.

Cadent Gas logo
LONG TERM
Between
30 Sep and 1 Dec 2024
Details
View Map
Share
Follow
Elmswood Gardens

Cadent Gas are proposing to carry out Utility asset works on Elmswood Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:35.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Elmswood Gardens

Cadent Gas are carrying out Utility asset works on Elmswood Gardens, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:50.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Woodthorpe Drive

Cadent Gas are carrying out Utility asset works on Woodthorpe Drive, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:01.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are carrying out Utility asset works on Mansfield Road, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:44.

Nottingham City Council logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are carrying out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 22 Oct 2024 at 09:09.

Electricity Network Company logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 9 Jul 2024 at 11:35.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Woodthorpe Drive

Cadent Gas are proposing to carry out Utility asset works on Woodthorpe Drive, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:51.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 08:35.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are proposing to carry out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:04.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are proposing to carry out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are proposing to carry out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 12:55.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:06.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
14 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Oxclose Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Oxclose Lane, Arnold.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Oct 2024 at 11:48.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Oxclose Lane

Western Power Distribution (East Midlands) are carrying out Utility asset works on Oxclose Lane, Arnold.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:48 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 Oct 2024 at 11:11.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 10:32.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Nursery Close

Cadent Gas are carrying out Utility asset works on Nursery Close, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:19 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Templar Road

Nottinghamshire County Council are carrying out Highway improvement works on Templar Road, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:25.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Herald Close

Nottinghamshire County Council are carrying out Highway improvement works on Herald Close, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:25.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Sandringham Place

Nottinghamshire County Council are carrying out Highway improvement works on Sandringham Place, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:10.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windsor Close

Nottinghamshire County Council are carrying out Highway improvement works on Windsor Close, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:11.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Buckingham Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Buckingham Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:10.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Balmoral Grove

Nottinghamshire County Council are carrying out Highway improvement works on Balmoral Grove, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:11.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
William Street

Nottinghamshire County Council are carrying out Highway improvement works on William Street, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:05.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windmill Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Windmill Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:05.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windmill Grove

Nottinghamshire County Council are carrying out Highway improvement works on Windmill Grove, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:06.

Cadent Gas logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
St Johns Crescent

Cadent Gas are carrying out Utility asset works on St Johns Crescent, Hucknall.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:38 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 08:45.

Cadent Gas logo
LONG TERM
Between
30 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are proposing to carry out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 15:31.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Hartington Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Hartington Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:01.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Castleton Close

Nottinghamshire County Council are carrying out Highway improvement works on Castleton Close, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:02.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Belper Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Belper Avenue, Carlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:30 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 09:31.

Nottingham City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 17 Sep 2024 at 09:54.

Nottingham City Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are carrying out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:17 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Nov 2024 at 08:54.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Boden Street

Cadent Gas are proposing to carry out Utility asset works on Boden Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 12:42.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Boden Street

Cadent Gas are carrying out Utility asset works on Boden Street, Nottingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:53 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:14.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Mansfield Street

Cadent Gas were proposing to carry out Utility asset works on Mansfield Street, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:04.

Cadent Gas logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
St Johns Crescent

Cadent Gas are proposing to carry out Utility asset works on St Johns Crescent, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 13:30.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 10:53.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 12:28.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 14:41.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 15:16.

Nottinghamshire County Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are carrying out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 4 Nov 2024 at 07:38.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are carrying out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:33 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:39.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Bartholomews Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Bartholomews Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:45.

Cadent Gas logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Sherwood Vale

Cadent Gas were proposing to carry out Utility asset works on Sherwood Vale, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:18.

Nottinghamshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
High Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on High Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Sep 2024 at 13:49.

Nottinghamshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
High Street

Nottinghamshire County Council are carrying out Works for road purposes on High Street, Arnold.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 20:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 08:20.

Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Lynncroft

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Aug 2024 at 07:37.

Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Lynncroft

Last Mile Gas are proposing to carry out Permanent reinstatement on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 21 Aug 2024 at 07:38.

Severn Trent Water logo
Between
14 and 29 Nov 2024
Details
View Map
Share
Follow
Foxhill Road Central

Severn Trent Water are proposing to carry out Utility asset works on Foxhill Road Central, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 16:12.

Severn Trent Water logo
Between
14 and 29 Nov 2024
Details
View Map
Share
Foxhill Road Central

Severn Trent Water were proposing to carry out Utility asset works on Foxhill Road Central, Carlton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:10.

Severn Trent Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Foxhill Road Central

Severn Trent Water are carrying out Utility asset works on Foxhill Road Central, Carlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:54.

Western Power Distribution (East Midlands) logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Follow
Forester Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forester Grove, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 11:41.

Western Power Distribution (East Midlands) logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Forester Grove

Western Power Distribution (East Midlands) are carrying out Utility asset works on Forester Grove, Carlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:55 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Nov 2024 at 15:13.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prospect Place

Severn Trent Water are carrying out New service connection on Prospect Place, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:56 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 08:56.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Forester Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Forester Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Oct 2024 at 11:30.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Forester Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forester Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 09:54.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Forester Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Forester Road, Carlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:55 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 09:20.

Nottingham City Council logo
Finishing
Today
Details
View Map
Share
Follow
Deepdene Way

Nottingham City Council are carrying out Highway improvement works on Deepdene Way, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:52 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 09:46.

Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lynncroft

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Aug 2024 at 09:00.

Until
6 Dec 2024
Details
View Map
Share
Follow
Lynncroft

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Nov 2024 at 09:36.

Until
6 Dec 2024
Details
View Map
Share
Follow
Lynncroft

Last Mile Gas are carrying out Permanent reinstatement on Lynncroft, Eastwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 18 Nov 2024 at 09:40.

Nottinghamshire County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lynncroft

Nottinghamshire County Council are proposing to carry out Section 50 on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 16 Oct 2024 at 11:10.

Nottinghamshire County Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Lynncroft

Nottinghamshire County Council are carrying out Section 50 on Lynncroft, Eastwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 14:23.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Alfred Street North

Severn Trent Water are carrying out New service connection on Alfred Street North, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 06:40 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 06:41.

Severn Trent Water logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Orston Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orston Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Aug 2024 at 11:24.

Severn Trent Water logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Orston Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orston Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 14:06.

Cadent Gas logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Denman Street East

Cadent Gas are proposing to carry out Utility asset works on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 12:42.

Cadent Gas logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Denman Street East

Cadent Gas are proposing to carry out Utility asset works on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 07:23.

Western Power Distribution (East Midlands) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Thorneywood Rise

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thorneywood Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:45.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Standhill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Standhill Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 14:25.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Standhill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Standhill Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 11:12.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Besecar Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Besecar Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 09:54.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Besecar Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Besecar Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 11:59.

Nottinghamshire County Council logo
Between
25 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Low Wood Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Low Wood Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Oct 2024 at 11:37.

Nottinghamshire County Council logo
Between
25 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Low Wood Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Low Wood Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 4 Nov 2024 at 09:55.

Severn Trent Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Keys Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Keys Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:39.

Severn Trent Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Gawthorne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gawthorne Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Aug 2024 at 11:25.

Severn Trent Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Gawthorne Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gawthorne Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Sep 2024 at 14:02.

Western Power Distribution (East Midlands) logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Thorneywood Mount

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thorneywood Mount, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:43.

Nottingham City Council logo
Between
29 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Birdcage Walk

Nottingham City Council are proposing to carry out Highway improvement works on Birdcage Walk, Nottingham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 08:51.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 07:56.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 08:03.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Arnot Hill Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 15:15.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Arnot Hill Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 16:34.

Nottingham City Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Muriel Street

Nottingham City Council are proposing to carry out Highway improvement works on Muriel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 13:46.

Nottingham City Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Muriel Street

Nottingham City Council are proposing to carry out Highway improvement works on Muriel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:12.

Nottingham City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Lime Street

Nottingham City Council are proposing to carry out Highway improvement works on Lime Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 13:47.

Nottingham City Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Lime Street

Nottingham City Council are proposing to carry out Highway improvement works on Lime Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:14.

Severn Trent Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Prospect Place

Severn Trent Water are proposing to carry out New service connection on Prospect Place, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:46.

Nottinghamshire County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Dale Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Jul 2024 at 10:20.

Nottinghamshire County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Dale Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Dale Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 14:15.

Western Power Distribution (East Midlands) logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Thorneywood Rise

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Thorneywood Rise, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:16.

Western Power Distribution (East Midlands) logo
Between
5 and 18 Dec 2024
Details
View Map
Share
St Bartholomews Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on St Bartholomews Road, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:14.

Western Power Distribution (East Midlands) logo
Between
5 and 11 Dec 2024
Details
View Map
Share
Buntings Lane

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Buntings Lane, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Sep 2024 at 14:25.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
5 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Thorneywood Mount

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Thorneywood Mount, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:10.

Nottinghamshire County Council logo
Between
6 and 16 Dec 2024
Details
View Map
Share
Claremont Avenue

Nottinghamshire County Council were proposing to carry out Works for road purposes on Claremont Avenue, Bramcote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:56.

Nottingham City Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Newland Close

Nottingham City Council are proposing to carry out Highway improvement works on Newland Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 14:51.

Nottingham City Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Newland Close

Nottingham City Council are proposing to carry out Highway improvement works on Newland Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:13.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Peveril Street

Severn Trent Water were proposing to carry out New service connection on Peveril Street, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:58.

Western Power Distribution (East Midlands) logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Carnarvon Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carnarvon Grove, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 11:32.

Western Power Distribution (East Midlands) logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Carnarvon Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carnarvon Grove, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 13:05.

Nottingham City Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Broadhurst Avenue

Nottingham City Council are proposing to carry out Highway improvement works on Broadhurst Avenue, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 13 Nov 2024 at 12:04.

Severn Trent Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Arnot Hill Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 12:58.

Severn Trent Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
George Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on George Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 12:58.

Nottinghamshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Dale Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Jul 2024 at 11:10.

Nottinghamshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Dale Avenue

Nottinghamshire County Council were proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 12:47.

Severn Trent Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Hucknall Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hucknall Lane, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 13:11.

Nottinghamshire County Council logo
Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Trent Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Trent Drive, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Aug 2024 at 17:02.

Nottinghamshire County Council logo
Between
11 and 18 Dec 2024
Details
View Map
Share
Trent Drive

Nottinghamshire County Council were proposing to carry out Works for road purposes on Trent Drive, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:16.

Nottinghamshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Ranmoor Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Sep 2024 at 17:11.

Nottinghamshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Ranmoor Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:48.

Nottingham City Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Broadhurst Avenue

Nottingham City Council are proposing to carry out Highway improvement works on Broadhurst Avenue, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 30 Oct 2024 at 12:28.

Nottingham City Council logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Follow
Whatton Rise

Nottingham City Council are proposing to carry out Highway improvement works on Whatton Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 14:51.

Nottingham City Council logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Follow
Whatton Rise

Nottingham City Council are proposing to carry out Highway improvement works on Whatton Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:13.

Nottingham City Council logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Follow
Bradmore Rise

Nottingham City Council are proposing to carry out Highway improvement works on Bradmore Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 14:51.

Nottingham City Council logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Follow
Bradmore Rise

Nottingham City Council are proposing to carry out Highway improvement works on Bradmore Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:11.

Cadent Gas logo
Between
17 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Caunton Avenue

Cadent Gas are proposing to carry out Utility asset works on Caunton Avenue, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:42.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:46.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 08:48.

Telefonica UK logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Peel Street

Telefonica UK are proposing to carry out Utility asset works on Peel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 19 Nov 2024 at 10:15.

Telefonica UK logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Peel Street

Telefonica UK are proposing to carry out Utility asset works on Peel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 20 Nov 2024 at 12:23.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Oct 2024 at 10:07.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Oct 2024 at 13:22.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carlton Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carlton Hill, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 11:59.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carlton Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carlton Hill, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:49.

Western Power Distribution (East Midlands) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Arnold Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Arnold Lane, Gedling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 09:02.

Nottingham City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whatton Rise

Nottingham City Council are proposing to carry out Highway improvement works on Whatton Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 13:52.

Nottingham City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bradmore Rise

Nottingham City Council are proposing to carry out Highway improvement works on Bradmore Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 13:52.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are proposing to carry out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are proposing to carry out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are proposing to carry out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:30.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Albans Road

Cadent Gas are proposing to carry out New service connection on St Albans Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 14:32.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Albans Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on St Albans Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:05.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Mapperley Plains

Nottinghamshire County Council are proposing to carry out Works for road purposes on Mapperley Plains, Arnold.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Nottinghamshire County Council on 13 Nov 2024 at 08:12.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:07.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Hucknall Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hucknall Lane, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 11:48.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Hucknall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hucknall Lane, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 14:50.

Severn Trent Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Cliff Road

Severn Trent Water are proposing to carry out New service connection on Cliff Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 14:51.

Severn Trent Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Hounds Gate

Severn Trent Water are proposing to carry out New service connection on Hounds Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 13:15.

Nottinghamshire County Council logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Follow
Norman Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Norman Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Sep 2024 at 14:02.

Nottinghamshire County Council logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Norman Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Norman Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:34.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Rushcliffe Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 09:42.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rushcliffe Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:48.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rushcliffe Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 11:44.

Nottinghamshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Kilburn Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kilburn Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 14:42.

Nottinghamshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Kilburn Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kilburn Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 11:36.

Cadent Gas logo
Between
10 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 20:40.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 08:46.

Nottingham City Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Tiverton Close

Nottingham City Council are proposing to carry out Highway improvement works on Tiverton Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 13:52.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Oxclose Lane

Nottingham City Council are proposing to carry out Highway improvement works on Oxclose Lane, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Arnold Road

Nottingham City Council are proposing to carry out Highway improvement works on Arnold Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Edwards Lane

Nottingham City Council are proposing to carry out Highway improvement works on Edwards Lane, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Keys Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Keys Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 09:40.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Cross Street

Severn Trent Water were proposing to carry out Remedial works on Cross Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 13:24.

Severn Trent Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Alfred Street North

Severn Trent Water are proposing to carry out New service connection on Alfred Street North, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 11:43.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Eastcote Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Eastcote Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 31 Oct 2024 at 15:14.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Eastcote Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Eastcote Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 14:55.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Deddington Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 31 Oct 2024 at 15:14.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Deddington Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 14:56.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Station Road

Severn Trent Water were proposing to carry out Disconnection or alteration of supply on Station Road, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 09:47.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Cockington Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Cockington Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 14:53.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 13:08.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Emmanuel Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Emmanuel Avenue, Mapperley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 12:46.

Nottingham City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Fenwick Road

Nottingham City Council are proposing to carry out Highway improvement works on Fenwick Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 13:53.

Severn Trent Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Lascelles Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lascelles Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 13:31.

Severn Trent Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Lascelles Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lascelles Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:33.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Arnot Hill Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:48.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
George Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on George Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:47.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lynncroft

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 15:23.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lynncroft

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 09:56.

Cadent Gas logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wilford Crescent West

Cadent Gas are proposing to carry out New service connection on Wilford Crescent West, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:42.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Denman Street East

Severn Trent Water are proposing to carry out New service connection on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 14:51.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Denman Street East

Severn Trent Water are proposing to carry out New service connection on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 09:01.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Electricity Network Company logo
LONG TERM
Between
29 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 Nov 2024 at 13:13.

Electricity Network Company logo
LONG TERM
Between
30 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 08:59.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Woodside Road

Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:12.

Severn Trent Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Second Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Second Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 15:21.

Severn Trent Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Deepdene Way

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Deepdene Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 13:22.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Kimberley Road

Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:54.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Kimberley Road

Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:04.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:05.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Watnall Road

Cadent Gas are proposing to carry out Utility asset works on Watnall Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 07:57.

Nottingham City Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ridgeway

Nottingham City Council are proposing to carry out Highway improvement works on Ridgeway, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Nov 2024 at 15:34.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Cross Street

Severn Trent Water were proposing to carry out Remedial works on Cross Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 11:49.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Linby Road

Cadent Gas are proposing to carry out Utility asset works on Linby Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Nottingham City Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Newstead Grove

Nottingham City Council are proposing to carry out Highway improvement works on Newstead Grove, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Severn Trent Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 10:07.

Nottingham City Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Hadbury Road

Nottingham City Council are proposing to carry out Highway improvement works on Hadbury Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 08:13.

Severn Trent Water logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Woodthorpe Road

Severn Trent Water are proposing to carry out Utility asset works on Woodthorpe Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 14:00.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Hounds Gate

Severn Trent Water are proposing to carry out New service connection on Hounds Gate, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 14:43.

Western Power Distribution (East Midlands) logo
Between
15 and 20 Feb 2025
Details
View Map
Share
Follow
Mapperley Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Mapperley Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 09:55.

Nottingham City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Hawton Crescent

Nottingham City Council are proposing to carry out Highway improvement works on Hawton Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Severn Trent Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:32.

Nottingham City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Strelley Road

Nottingham City Council are proposing to carry out Highway improvement works on Strelley Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Nottingham City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mildenhall Crescent

Nottingham City Council are proposing to carry out Highway improvement works on Mildenhall Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:08.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 14:17.

Severn Trent Water logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Wollaton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wollaton Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 11:02.


Roadworks Map near to Highbury Road, NOTTINGHAM, NG6 9DU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Highbury Road, NOTTINGHAM, NG6 9DU (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
URGENT
  
WOODLAND AVENUE 
(0.1 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 15:33
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.1
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
OAKLEIGH STREET 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Nov 2024 13:27
(Scheduled: 15 Nov 2024 - 28 Nov 2024)
0.1
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
GABRIELLE CLOSE 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Nov 2024 09:15
(Scheduled: 15 Nov 2024 - 28 Nov 2024)
0.1
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
LAURISTON DRIVE 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 13:12
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
Follow
5
Severn Trent Water logo
GAYHURST ROAD 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024)
0.4
Details
Share
6
Severn Trent Water logo
BULWELL LANE 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
21 Nov 2024 08:04 - 09:05
0.4
Details
Share
7
BT logo
ROSEGARTH WALK 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
20 Nov 2024 12:30 - 21 Nov 2024 09:30
0.4
Details
Share
8
BT logo
PARK LANE 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
21 Nov 2024 13:30 - 15:15
0.4
Details
Share
9
Severn Trent Water logo
WALLIS STREET 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024)
0.4
Details
Share
10
BT logo
BAGNALL ROAD 
(0.5 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.