ROADWORKS SUMMARY
St. Vincent Close, NOTTINGHAM, NG10 1GF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Vincent Close, NG10 1GF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Vincent Close, NOTTINGHAM, NG10 1GF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Vincent Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Footpath L67a

Leicestershire County Council are carrying out Highway improvement works on Footpath L67a, Kegworth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2023 at 15:47 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Aug 2024 at 15:56.

Severn Trent Water logo
LONG TERM
Between
10 Mar 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Oakleys Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oakleys Road, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2024 and could run through until 14 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 15:11.

Leicestershire County Council logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Footpath L73

Leicestershire County Council are carrying out Highway improvement works on Footpath L73, Lockington-hemington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 10:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Sep 2024 at 13:06.

Derbyshire County Council logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Lows Lane

Derbyshire County Council are carrying out Highway improvement works on Lows Lane, Stanton By Dale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 10:30 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 20 Nov 2024 at 11:07.

National Highways logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Long Lane

National Highways are carrying out Works for road purposes on Long Lane, Kegworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2024 at 13:03 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Jun 2024 at 15:06.

National Highways logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Wollaton Vale

National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Aug 2024 at 10:42.

National Highways logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Ashby Road

National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 20:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Nov 2024 at 14:02.

National Highways logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Ashby Road

National Highways are proposing to carry out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 28 Mar 2024 at 13:37.

Nottingham City Council logo
LONG TERM
Between
30 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 19 Aug 2024 at 15:06.

Electricity Network Company logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 9 Jul 2024 at 11:35.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Nottingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nottingham Road, Stapleford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 12:28.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Herald Close

Nottinghamshire County Council are carrying out Highway improvement works on Herald Close, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:25.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Templar Road

Nottinghamshire County Council are carrying out Highway improvement works on Templar Road, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:25.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Footpath L65

Cadent Gas are proposing to carry out Utility asset works on Footpath L65, Kegworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 15:36.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Clifton Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Road, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 4 Nov 2024 at 11:38.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hallam Fields Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hallam Fields Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Aug 2024 at 15:27.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hallam Fields Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hallam Fields Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:17.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Aug 2024 at 07:40.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Granville Avenue

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Granville Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Aug 2024 at 11:23.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Granville Avenue

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Granville Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:40.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
King Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on King Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Aug 2024 at 11:24.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
King Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on King Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:52.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Lane

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Lane, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 16:52.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Follow
Howitt Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Howitt Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2024 at 10:54.

Nottinghamshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Clifton Lane

Nottinghamshire County Council are carrying out Highway repair and maintenance works on Clifton Lane, Ruddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 13 Nov 2024 at 15:37.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Lane

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Lane, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Sep 2024 at 14:16.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Clifton Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Road, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Sep 2024 at 14:17.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Road, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 16:52.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
College Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on College Street, Long Eaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Aug 2024 at 12:00.

Severn Trent Water logo
Between
27 Nov and 2 Dec 2024
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Lockington-hemington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Sep 2024 at 09:23.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 07:56.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 08:03.

Severn Trent Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Prospect Place

Severn Trent Water were proposing to carry out New service connection on Prospect Place, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:02.

Severn Trent Water logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Barton Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Barton Lane, Barton In Fabis.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 15:00.

Nottinghamshire County Council logo
Between
6 and 16 Dec 2024
Details
View Map
Share
Claremont Avenue

Nottinghamshire County Council were proposing to carry out Works for road purposes on Claremont Avenue, Bramcote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:56.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Alexandra Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alexandra Street, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:31.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Thoresby Crescent

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Thoresby Crescent, Draycott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:16.

Nottinghamshire County Council logo
LONG TERM
Between
5 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Swiney Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Swiney Way, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 31 Oct 2024 at 10:22.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Attenborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Swiney Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Swiney Way, Chilwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Barton Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Barton Lane, Attenborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Nottinghamshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Kilburn Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kilburn Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 11:36.

Nottinghamshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Kilburn Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kilburn Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 14:42.

Network Rail logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marle Pit Hill

Network Rail are proposing to carry out Works for Rail Purposes on Marle Pit Hill, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 13:52.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Melton Lane

Severn Trent Water were proposing to carry out New service connection on Melton Lane, Sutton Bonington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 07:52.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
South Street

Severn Trent Water are proposing to carry out Disconnection or alteration of supply on South Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 16:45.

Cadent Gas logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Wilne Road

Cadent Gas are proposing to carry out Utility asset works on Wilne Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:34.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Repton Road

Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:32.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Wilne Lane

Cadent Gas are proposing to carry out Utility asset works on Wilne Lane, Sawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:33.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Deddington Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 14:56.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Deddington Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 31 Oct 2024 at 15:14.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Eastcote Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Eastcote Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 14:55.

Nottinghamshire County Council logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Eastcote Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Eastcote Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 31 Oct 2024 at 15:14.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Cockington Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Cockington Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 14:53.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Marle Pit Hill

Network Rail are proposing to carry out Works for Rail Purposes on Marle Pit Hill, Sutton Bonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 14:29.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Station Road

Severn Trent Water were proposing to carry out Disconnection or alteration of supply on Station Road, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 09:47.

Severn Trent Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Lawrence Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lawrence Street, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 09:27.

Electricity Network Company logo
LONG TERM
Between
29 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 Nov 2024 at 13:13.

Nottinghamshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
Follow
School Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on School Lane, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Oct 2024 at 07:50.

Nottinghamshire County Council logo
Between
29 Jan and 6 Feb 2025
Details
View Map
Share
School Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on School Lane, Chilwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 15:20.

Electricity Network Company logo
LONG TERM
Between
30 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Nov 2024 at 08:59.

Network Rail logo
Between
2 and 4 Feb 2025
Details
View Map
Share
Follow
Attenborough Lane

Network Rail are proposing to carry out Works for Rail Purposes on Attenborough Lane, Attenborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 17 Nov 2023 at 12:56.

Network Rail logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Sawley Road

Network Rail are proposing to carry out Works for Rail Purposes on Sawley Road, Breaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 14:58.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Woodside Road

Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:12.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Chapel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 16:24.

Leicestershire County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Leicestershire County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Bosworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Bosworth Road, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Network Rail logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Sawley Road

Network Rail are proposing to carry out Works for Rail Purposes on Sawley Road, Breaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 14:56.

Nottingham City Council logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
St James's Terrace

Nottingham City Council are proposing to carry out Highway improvement works on St James's Terrace, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Lockington-hemington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 09:54.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Green

Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Severn Trent Water logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Wollaton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wollaton Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 11:02.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Alexandra Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alexandra Street, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 15:06.


Roadworks Map near to St. Vincent Close, NOTTINGHAM, NG10 1GF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 05:57
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Vincent Close, NOTTINGHAM, NG10 1GF (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CORNWALLIS CLOSE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 20 Nov 2024 - 22 Nov 2024
0.2
Details
Share
Follow
2
Cadent Gas logo
URGENT
  
ACTON ROAD 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Footpath - Some carriageway incursion
In Progress
Since: 14 Nov 2024 18:42
(Scheduled: 14 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
Follow
3
Severn Trent Water logo
MAJOR
  
OAKLEYS ROAD 
(0.3 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 10 Mar 2024 - 14 Mar 2025
0.3
Details
Share
Follow
4
Severn Trent Water logo
MAJOR
  
HOWITT STREET 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 22 Nov 2024
0.4
Details
Share
Follow
5
Severn Trent Water logo
MAJOR
  
HOWITT STREET 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
11 Nov 2024 11:45 - 20 Nov 2024 07:03
0.4
Details
Share
6
Severn Trent Water logo
HOWITT STREET 
(0.4 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 11 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
7
Derbyshire County Council logo
MAJOR
  
HIGH STREET 
(0.5 miles)
Derbyshire County Council
Core Sampling - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 12 Nov 2024 - 6 Dec 2024
0.5
Details
Share
Follow
8
Derbyshire County Council logo
MAJOR
  
HIGH STREET 
(0.5 miles)
Derbyshire County Council
Core Sampling - Footway, Carriageway - Some carriageway incursion
Complete
12 Nov 2024 07:30 - 15 Nov 2024 14:00
0.5
Details
Share
9
Derbyshire County Council logo
MAJOR
  
TAMWORTH ROAD 
(0.5 miles)
Derbyshire County Council
Core Sampling - Footway - Multi-way signals
Planned
Scheduled: 12 Nov 2024 - 22 Nov 2024
0.5
Details
Share
Follow
10
Derbyshire County Council logo
MAJOR
  
LIME GROVE 
(0.7 miles)
Derbyshire County Council
Highway repair and maintenance works - Carriageway - No carriageway incursion
Planned
Scheduled: 11 Nov 2024 - 22 Nov 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.