ROADWORKS SUMMARY
Hackworth Way, NORTH SHIELDS, NE29 6XS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hackworth Way, NE29 6XS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hackworth Way, NORTH SHIELDS, NE29 6XS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hackworth Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.

South Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are proposing to carry out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 21 Jun 2024 at 09:47.

South Tyneside Council logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are carrying out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 07:00 and could run through until 20 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 23 Sep 2024 at 07:56.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.

North Tyneside Council logo
LONG TERM
Until
14 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Promenade

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Park Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.

North Tyneside Council logo
LONG TERM
Between
4 Oct 2024 and 2 Oct 2025
Details
View Map
Share
The Links

North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.

North Tyneside Council logo
LONG TERM
Until
18 Aug 2026
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Beverley Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent North

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Promontory Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:02.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:01.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:04.

North Tyneside Council logo
LONG TERM
Between
17 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Wellington Street

North Tyneside Council are carrying out Highway repair and maintenance works on Wellington Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 11:01.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are carrying out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are carrying out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are carrying out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 27 Nov 2024 at 12:48.

South Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Albert Road Flyover

South Tyneside Council are carrying out Highway repair and maintenance works on Albert Road Flyover, Jarrow.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 18:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 24 Apr 2025 at 09:08.

North Tyneside Council logo
LONG TERM
Between
18 Dec 2024 and 21 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Saville Street West

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jan 2025 at 13:19.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Saville Street

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jan 2025 at 12:59.

South Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Broughton Road

South Tyneside Council are carrying out Highway repair and maintenance works on Broughton Road, South Shields.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 24 Apr 2025 at 08:56.

North Tyneside Council logo
LONG TERM
Between
24 Feb and 4 Aug 2025
Details
View Map
Share
Saville Street West

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 12:46.

North Tyneside Council logo
LONG TERM
Between
24 Feb and 4 Aug 2025
Details
View Map
Share
Saville Street

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 12:34.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Gainers Terrace

Northern Powergrid (Northeast) are carrying out Utility asset works on Gainers Terrace, Wallsend.

These works are categorised as Major.

The works started on 3 March 2025 at 10:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Mar 2025 at 11:10.

North Tyneside Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Tanners Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Tanners Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

North Tyneside Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

Northern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Dame Flora Robson Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Dame Flora Robson Avenue, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 08:45 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 08:52.

North Tyneside Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Trevor Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Trevor Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:42.

North Tyneside Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Linskill Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Linskill Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:43.

Northern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Lambton Terrace

Northern Gas Networks are carrying out Utility repair and maintenance works on Lambton Terrace, Jarrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 07:30 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 12:13.

Northern Gas Networks logo
LONG TERM
Between
30 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Grosvenor Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 10:59.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Tynemouth Road

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Tynemouth Road, North Shields.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 17:30 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 15:38.

North Tyneside Council logo
LONG TERM
Between
16 May and 17 Nov 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 15:53.

North Tyneside Council logo
LONG TERM
Between
16 May and 20 Oct 2025
Details
View Map
Share
Follow
Saville Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 15:53.

Northern Gas Networks logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Grosvenor Road, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:36.

Northern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Whitley Road

Northern Gas Networks are carrying out Highway repair and maintenance works on Whitley Road, Holystone.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 May 2025 at 09:00 and could run through until 10 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 15:32.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 26 May 2025 and could run through until 4 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 12 May 2025 at 10:40.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 26 May 2025 and could run through until 4 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 13 May 2025 at 11:25.

North Tyneside Council logo
LONG TERM
Between
26 May and 17 Nov 2025
Details
View Map
Share
Saville Street West

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 17 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 23 May 2025 at 15:41.

North Tyneside Council logo
LONG TERM
Between
26 May and 20 Oct 2025
Details
View Map
Share
Saville Street

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 23 May 2025 at 15:41.

BT logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Western Approach

BT were proposing to carry out Utility asset works on Western Approach, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Feb 2025 at 10:16.

Northern Powergrid (Northeast) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mayfield Gardens

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Mayfield Gardens, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Feb 2025 at 12:05.

Northern Powergrid (Northeast) logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Mayfield Gardens

Northern Powergrid (Northeast) are carrying out Utility asset works on Mayfield Gardens, Jarrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:15 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 May 2025 at 12:00.

BT logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Templetown

BT were proposing to carry out Utility asset works on Templetown, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Feb 2025 at 10:17.

Northern Powergrid (Northeast) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Beach Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Beach Road, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Apr 2025 at 09:22.

Northern Powergrid (Northeast) logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Beach Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Beach Road, North Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 08:52.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Percy Street Lane At Rear Of 60-77

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Percy Street Lane At Rear Of 60-77, Tynemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Mar 2025 at 11:29.

Northern Gas Networks logo
Tomorrow
Details
View Map
Share
Percy Street Lane At Rear Of 60-77

Northern Gas Networks carried out Utility repair and maintenance works on Percy Street Lane At Rear Of 60-77, Tynemouth.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 27 May 2025 and 4 Jun 2025 and were actually completed between 28 May 2025 (09:01) and 3 Jun 2025 (09:33). The works impacted the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:40.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 13:35.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Apr 2025 at 09:23.

Northumbrian Water logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Clifford Road

Northumbrian Water are carrying out Utility repair and maintenance works on Clifford Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 14:45 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 14:50.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Apr 2025 at 15:46.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 Apr 2025 at 11:53.

Northumbrian Water logo
LONG TERM
Between
28 May and 1 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 12:30.

Northumbrian Water logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Ayton Street

Northumbrian Water are carrying out Utility repair and maintenance works on Ayton Street, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:50 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:50.

Northern Gas Networks logo
LONG TERM
Between
28 May and 8 Aug 2025
Details
View Map
Share
Harton Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harton Lane, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 08:33.

Northern Gas Networks logo
LONG TERM
Between
28 May and 27 Jun 2025
Details
View Map
Share
Follow
Highfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Highfield Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 11:01.

Northern Gas Networks logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Highfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Highfield Road, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 12:01 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 12:01.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Coast Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Coast Road, North Tyneside.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 13:35 and could run through until 6 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 14:42.

North Tyneside Council logo
Between
29 May and 20 Jun 2025
Details
View Map
Share
Follow
Buddle Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Street, Wallsend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 29 Apr 2025 at 11:57.

North Tyneside Council logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Buddle Street

North Tyneside Council are carrying out Highway repair and maintenance works on Buddle Street, Wallsend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 29 May 2025 at 08:40.

Northern Gas Networks logo
LONG TERM
Between
29 May and 23 Jul 2025
Details
View Map
Share
Bbnts 10

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 23 July 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 13:54.

Northern Gas Networks logo
Until
26 Jun 2025
Details
View Map
Share
Follow
Clive Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Clive Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 09:50 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 09:52.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cleveland Road Lane At Rear Of 50-62

Northumbrian Water are carrying out Utility repair and maintenance works on Cleveland Road Lane At Rear Of 50-62, North Shields.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 09:09 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 15:35.

Until
21 Jun 2025
Details
View Map
Share
Follow
A19 From J A1290 To J A1231 S

Sunderland City Council are carrying out Highway repair and maintenance works on A19 From J A1290 To J A1231 S, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 23:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Jun 2025 at 07:59.

Until
21 Jun 2025
Details
View Map
Share
Follow
A19 J A1290 Join S

Sunderland City Council are carrying out Highway repair and maintenance works on A19 J A1290 Join S, South Tyneside.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 23:00 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Jun 2025 at 07:59.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princess Street Nos 1 To 21 And Queen Victoria Street Nos 12 To 30 Back, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 5 Mar 2025 at 13:56.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 19 Feb 2025 at 10:20.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Staple Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Staple Road, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Feb 2025 at 12:33.

Newcastle City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chillingham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 15:30.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 11:53.

Newcastle City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sackville Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sackville Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 5 Feb 2025 at 15:26.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Blenkinsop Street Lane At Rear Of 1-11

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Blenkinsop Street Lane At Rear Of 1-11, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Apr 2025 at 14:07.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Blenkinsop Street Lane At Rear Of 1-11

Northumbrian Water are carrying out Utility repair and maintenance works on Blenkinsop Street Lane At Rear Of 1-11, Wallsend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 10:59.

Northern Powergrid (Northeast) logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Waterloo Square

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Waterloo Square, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 14:40.

Northern Powergrid (Northeast) logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Waterloo Square

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Waterloo Square, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 15:22.

Northern Powergrid (Northeast) logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Waterloo Square

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Waterloo Square, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 May 2025 at 08:20.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Margaret Road Lane At Side And Rear Of 1-55

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Margaret Road Lane At Side And Rear Of 1-55, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 7 Apr 2025 at 14:06.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Margaret Road Lane At Side And Rear Of 1-55

Northumbrian Water are carrying out Utility repair and maintenance works on Margaret Road Lane At Side And Rear Of 1-55, Whitley Bay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:50 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 10:53.

Northern Gas Networks logo
LONG TERM
Between
4 Jun and 15 Jul 2025
Details
View Map
Share
Ashley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ashley Road, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 08:25.

North Tyneside Council logo
LONG TERM
Between
5 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Rotary Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rotary Road, Backworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:40.

Northumbrian Water logo
Until
1 Aug 2025
Details
View Map
Share
Follow
North Terrace

Northumbrian Water are carrying out Remedial works on North Terrace, Wallsend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 09:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 09:00.

South Tyneside Council logo
Between
8 and 10 Jun 2025
Details
View Map
Share
Follow
North Farm Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on North Farm Road, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Feb 2025 at 14:12.

South Tyneside Council logo
Between
8 and 10 Jun 2025
Details
View Map
Share
Follow
North Farm Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on North Farm Road, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 24 Apr 2025 at 08:55.

Northern Powergrid (Northeast) logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 May 2025 at 09:25.

Newcastle City Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Welbeck Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Welbeck Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 07:01.

Northern Gas Networks logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Clive Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clive Street, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 11:49.

North Tyneside Council logo
LONG TERM
Between
10 Jun and 3 Sep 2025
Details
View Map
Share
Follow
Rotary Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rotary Road, Backworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:40.

Northern Powergrid (Northeast) logo
Between
12 Jun and 7 Jul 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 May 2025 at 07:00.

Newcastle City Council logo
Between
12 and 23 Jun 2025
Details
View Map
Share
Follow
Alexandra Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 06:28.

Newcastle City Council logo
Between
12 and 23 Jun 2025
Details
View Map
Share
Follow
Sackville Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sackville Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Mar 2025 at 07:01.

Between
12 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Westcott Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Westcott Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 12:29.

Northern Gas Networks logo
LONG TERM
Between
12 Jun and 16 Jul 2025
Details
View Map
Share
Bbnts 11

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Bbnts 11, South Shields.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 16 July 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 13:53.

North Tyneside Council logo
LONG TERM
Between
13 Jun and 8 Sep 2025
Details
View Map
Share
Follow
North Tyneside Boundary To Earsdon Road Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on North Tyneside Boundary To Earsdon Road Roundabout, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:39.

North Tyneside Council logo
LONG TERM
Between
13 Jun and 8 Sep 2025
Details
View Map
Share
Follow
North Tyneside Boundary To Earsdon Road Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on North Tyneside Boundary To Earsdon Road Roundabout, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:38.

Northern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashley Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 15:11.

Northern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashley Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 12:25.

Northern Gas Networks logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashley Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 08:14.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
St Anselm Road

Northumbrian Water were proposing to carry out Utility asset works on St Anselm Road, Moor Park, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 May 2025 at 09:00.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
St Anselm Road

Northumbrian Water are proposing to carry out Utility asset works on St Anselm Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 May 2025 at 08:51.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
St Anselm Road

Northumbrian Water are proposing to carry out Utility asset works on St Anselm Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 May 2025 at 12:50.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
St Anselm Road

Northumbrian Water are proposing to carry out Utility asset works on St Anselm Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:45.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Moorhouses Road

Northumbrian Water are proposing to carry out Utility asset works on Moorhouses Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 May 2025 at 08:50.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Moorhouses Road

Northumbrian Water are proposing to carry out Utility asset works on Moorhouses Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 May 2025 at 12:27.

Northumbrian Water logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Moorhouses Road

Northumbrian Water are proposing to carry out Utility asset works on Moorhouses Road, Moor Park, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:45.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:34.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:29.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:37.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:30.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Blyth Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Blyth Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:36.

North Tyneside Council logo
LONG TERM
Between
16 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Blyth Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Blyth Road, Whitley Bay.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:28.

Northern Powergrid (Northeast) logo
Between
17 Jun and 10 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 13:59.

North Tyneside Council logo
LONG TERM
Between
18 Jun and 11 Sep 2025
Details
View Map
Share
Follow
The Broadway

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Mar 2025 at 07:55.

North Tyneside Council logo
LONG TERM
Between
18 Jun and 11 Sep 2025
Details
View Map
Share
Follow
The Broadway

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The works will start on or after 18 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Mar 2025 at 07:55.

Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
A19 J A1290 Leave N

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A19 J A1290 Leave N, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northern Powergrid (Northeast) logo
Between
23 Jun and 16 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 13:59.

Northern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Mcanany Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Mcanany Avenue, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 08:31.

Northumbrian Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Rear Of Birchington Avenue And Reading Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Mar 2025 at 08:19.

South Tyneside Council logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Tadema Road

South Tyneside Council are proposing to carry out Highway improvement works on Tadema Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 14:04.

South Tyneside Council logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Tadema Road

South Tyneside Council are proposing to carry out Highway improvement works on Tadema Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 1 May 2025 at 14:40.

Northern Powergrid (Northeast) logo
Between
24 Jun and 11 Jul 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Northern Powergrid (Northeast) logo
Between
25 Jun and 24 Jul 2025
Details
View Map
Share
North Farm Road

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on North Farm Road, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

South Tyneside Council logo
Between
27 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Finchale Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Finchale Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 14:06.

Northern Powergrid (Northeast) logo
LONG TERM
Between
27 Jun and 28 Jul 2025
Details
View Map
Share
Glen Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Glen Street, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 28 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Northern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Newcastle Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newcastle Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 09:11.

Northern Powergrid (Northeast) logo
LONG TERM
Between
30 Jun and 31 Jul 2025
Details
View Map
Share
Bell Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Bell Street, Hebburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Apr 2025 at 14:00.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Staple Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Staple Road, Jarrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 14:53.

Northumbrian Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Kings Road North Lane At Rear Of 1-rising Sun Ph

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kings Road North Lane At Rear Of 1-rising Sun Ph, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 26 Mar 2025 at 09:22.

Northumbrian Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rising Sun Villas

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rising Sun Villas, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 26 Mar 2025 at 10:25.

BT logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Fulwell Avenue

BT were proposing to carry out Utility asset works on Fulwell Avenue, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 3 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 10 Apr 2025 at 12:15.

BT logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Fulwell Avenue

BT are proposing to carry out Utility asset works on Fulwell Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 9 Apr 2025 at 15:13.

BT logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Fulwell Avenue

BT are proposing to carry out Utility asset works on Fulwell Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:28.

Newcastle City Council logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Chillingham Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Heaton, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 17 Mar 2025 at 08:31.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
South Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:44.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
South Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 14:34.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
Cleb 23

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 23, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:46.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
Cleb 23

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 23, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 14:08.

Northern Gas Networks logo
LONG TERM
Between
2 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Bridle Path

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Path, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:48.

Northern Gas Networks logo
LONG TERM
Between
2 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Bridle Path

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Path, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 13:51.

Northern Gas Networks logo
Between
2 and 22 Jul 2025
Details
View Map
Share
Follow
Dean Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 14:29.

South Tyneside Council logo
On
5 Jul 2025
Details
View Map
Share
Follow
King Street

South Tyneside Council are proposing to carry out roadworks on King Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 5 July 2025 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 13 May 2025 at 10:27.

Northern Gas Networks logo
LONG TERM
Between
7 Jul and 22 Aug 2025
Details
View Map
Share
Ashley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ashley Road, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 14:18.

Northern Powergrid (Northeast) logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Argyle Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Argyle Street, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:24.

Northern Powergrid (Northeast) logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Argyle Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Argyle Street, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 14:19.

South Tyneside Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Prim 25

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Prim 25, Jarrow.

These works are categorised as Major.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South Tyneside Council on 14 May 2025 at 14:13.

Northern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Elsdon Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsdon Street, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:20.

North Tyneside Council logo
LONG TERM
Between
10 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:53.

North Tyneside Council logo
LONG TERM
Between
10 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Battle Hill Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Battle Hill Drive, Battle Hill, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:53.

North Tyneside Council logo
LONG TERM
Between
10 Jul and 31 Oct 2025
Details
View Map
Share
Follow
South Croft

North Tyneside Council are proposing to carry out Highway repair and maintenance works on South Croft, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:49.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 12:35.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Apr 2025 at 13:06.

Northern Powergrid (Northeast) logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Portland Street Nos 7 - 41 And 10 - 44

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Portland Street Nos 7 - 41 And 10 - 44, Pelaw, Felling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:07.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Rear Of Northbourne Road

Northumbrian Water were proposing to carry out Remedial works on Rear Of Northbourne Road, Jarrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Apr 2025 at 10:39.

Northumbrian Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Stanwick Street Lane At Rear Of 1-9

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanwick Street Lane At Rear Of 1-9, Tynemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 16 Apr 2025 at 10:23.

North Tyneside Council logo
LONG TERM
Between
15 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Camberley Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Camberley Road, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:48.

North Tyneside Council logo
LONG TERM
Between
15 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Kendal Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kendal Gardens, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:54.

Northern Gas Networks logo
Between
16 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Cleb 16

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 16, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 16 July 2025 and could run through until 12 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:49.

Northern Gas Networks logo
Between
16 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Cleb 3

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleb 3, East Boldon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 16 July 2025 and could run through until 5 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 10:51.

Northern Gas Networks logo
Between
17 Jul and 13 Aug 2025
Details
View Map
Share
Western Approach

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Western Approach, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 13 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 13:52.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Harton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harton Lane, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 08:57.

Northern Gas Networks logo
Between
18 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Brightman Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brightman Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 16:22.

T-Mobile (UK) logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Sunderland Road

T-Mobile (UK) were proposing to carry out Utility asset works on Sunderland Road, Cleadon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 3 Jun 2025 at 13:06.

Northern Powergrid (Northeast) logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Shields Road From Heworth Roundabout To Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shields Road From Heworth Roundabout To Victoria Road West, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Apr 2025 at 12:03.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:27.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 14:29.

South Tyneside Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Ashley Road

South Tyneside Council are proposing to carry out Highway improvement works on Ashley Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Feb 2025 at 14:04.

South Tyneside Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Ashley Road

South Tyneside Council are proposing to carry out Highway improvement works on Ashley Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Jun 2025 at 13:22.

South Tyneside Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Stanhope Road

South Tyneside Council are proposing to carry out Highway improvement works on Stanhope Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 3 Feb 2025 at 14:12.

South Tyneside Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Stanhope Road

South Tyneside Council are proposing to carry out Highway improvement works on Stanhope Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 3 Jun 2025 at 13:24.

South Tyneside Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Cauldwell Avenue

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Cauldwell Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Feb 2025 at 14:24.

South Tyneside Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Cauldwell Avenue

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Cauldwell Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Jun 2025 at 13:29.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Waterville Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Waterville Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:44.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
The Silverlink

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Silverlink, Silverlink Industrial Park, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:42.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Deneholm

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Deneholm, Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:43.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Station Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Station Road, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 May 2025 at 12:10.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Laygate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Laygate, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 09:37.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 11 Sep 2025
Details
View Map
Share
Follow
Howdon Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howdon Road, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2025 at 15:01.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Brightman Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brightman Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 12:51.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Avon Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Avon Avenue, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Ripley Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ripley Avenue, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:05.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Prudhoe Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Prudhoe Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:02.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Borough Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:10.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Borough Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road North, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
West Percy Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:08.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:03.

Northern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Mcanany Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mcanany Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 08:59.

Northern Gas Networks logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Dipe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dipe Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 11:54.

Northern Gas Networks logo
LONG TERM
Between
8 Aug and 12 Sep 2025
Details
View Map
Share
Albion Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Albion Road, North Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 10:26.

Northern Powergrid (Northeast) logo
Between
11 and 27 Aug 2025
Details
View Map
Share
Follow
Rear Of Westoe Street And Romilly Street

Northern Powergrid (Northeast) are proposing to carry out New service connection on Rear Of Westoe Street And Romilly Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 May 2025 at 07:42.

Northern Powergrid (Northeast) logo
Between
11 and 27 Aug 2025
Details
View Map
Share
Follow
Rear Of Westoe Street And Romilly Street

Northern Powergrid (Northeast) are proposing to carry out New service connection on Rear Of Westoe Street And Romilly Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 May 2025 at 08:11.

Northern Powergrid (Northeast) logo
LONG TERM
Between
15 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 May 2025 at 09:13.

South Tyneside Council logo
Between
15 and 26 Aug 2025
Details
View Map
Share
Follow
Cauldwell Villas

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Cauldwell Villas, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 20 Mar 2025 at 15:49.

North Tyneside Council logo
LONG TERM
Between
15 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Spencer Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Spencer Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:48.

North Tyneside Council logo
LONG TERM
Between
15 Aug and 31 Oct 2025
Details
View Map
Share
Follow
William Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on William Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:46.

South Tyneside Council logo
Between
18 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Tavistock Place

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Tavistock Place, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 09:27.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
St Vincent Street

Grain Communications (formerly Solway Communications) were proposing to carry out Remedial works on St Vincent Street, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 09:02.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Westcott Avenue

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Westcott Avenue, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 09:22.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Westcott Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Westcott Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 10:17.

Northern Powergrid (Northeast) logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Westoe Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Westoe Road, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 May 2025 at 14:52.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Albion Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:50.

Northern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Cecil Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cecil Street, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:47.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Brack Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:33.

Northern Gas Networks logo
Between
22 Aug and 12 Sep 2025
Details
View Map
Share
Cecil Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Cecil Street, North Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 10:29.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 May 2025 at 13:49.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:35.

Northern Gas Networks logo
Between
26 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Rear Of Beach Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rear Of Beach Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:03.

North Tyneside Council logo
LONG TERM
Between
26 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Buddle Terrace Lane At Rear Of 1-29

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Terrace Lane At Rear Of 1-29, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:44.

South Tyneside Council logo
Between
29 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Thornleigh Gardens

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Thornleigh Gardens, Cleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 10:38.

South Tyneside Council logo
Between
29 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Norham Avenue North

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Norham Avenue North, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 09:29.


Roadworks Map near to Hackworth Way, NORTH SHIELDS, NE29 6XS (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 21:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hackworth Way, NORTH SHIELDS, NE29 6XS (48 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
EARL GREY WAY 
(0.2 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Give and take
Complete
2 Jun 2025 11:00 - 11:33
0.2
Details
Share
2
Northern Gas Networks logo
BURDON MAIN ROW 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 10:42
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.4
Details
Share
Follow
3
North Tyneside Council logo
COACH LANE 
(0.6 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 2 Jun 2025 09:30
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.6
Details
Share
Follow
4
North Tyneside Council logo
FRONT STREET, CHIRTON 
(0.6 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
3 Jun 2025 08:35 - 09:00
0.6
Details
Share
5
Northern Gas Networks logo
MAJOR
  
CLIVE STREET 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 30 May 2025 09:50
(Scheduled: 29 May 2025 - 26 Jun 2025)
0.6
Details
Share
Follow
6
North Tyneside Council logo
MAJOR
  
SAVILLE STREET WEST 
(0.7 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 26 May 2025 - 17 Nov 2025)
0.7
Details
Share
7
North Tyneside Council logo
MAJOR
  
SAVILLE STREET WEST 
(0.7 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 24 Feb 2025 - 4 Aug 2025)
0.7
Details
Share
8
North Tyneside Council logo
MAJOR
  
SAVILLE STREET WEST 
(0.7 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 16 May 2025 - 17 Nov 2025
0.7
Details
Share
Follow
9
North Tyneside Council logo
MAJOR
  
SAVILLE STREET WEST 
(0.7 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Carriageway, Footpath - Lane closure
Cancelled
(Scheduled: 20 Jan 2025 - 20 Jun 2025)
0.7
Details
Share
10
North Tyneside Council logo
MAJOR
  
RAILWAY TERRACE 
(0.7 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Carriageway, Footpath - Some carriageway incursion
In Progress
Since: 27 Nov 2024 12:00
(Scheduled: 27 Nov 2024 - 31 Jul 2025)
0.7
Details
Share
Follow
  • ...