ROADWORKS SUMMARY
St. Marys Island, WHITLEY BAY, NE26 4RS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Marys Island, NE26 4RS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Marys Island, WHITLEY BAY, NE26 4RS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Marys Island are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2024 at 11:57.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.

North Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Aug 2024 at 09:48.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.

North Tyneside Council logo
LONG TERM
Until
14 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Promenade

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Park Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.

North Tyneside Council logo
LONG TERM
Between
4 Oct 2024 and 2 Oct 2025
Details
View Map
Share
The Links

North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.

North Tyneside Council logo
LONG TERM
Until
18 Aug 2026
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Beverley Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent North

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Promontory Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:02.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:01.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:04.

North Tyneside Council logo
LONG TERM
Between
17 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.

North Tyneside Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
The Silverlink North

North Tyneside Council are carrying out Section 50 on The Silverlink North, Wallsend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 16:59.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.

LONG TERM
Between
16 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Bridge Street

Northumberland County Council were proposing to carry out Works for road purposes on Bridge Street, Blyth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 23 Oct 2024 at 08:33.

Northern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Seghill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 12:03.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Wellington Street

North Tyneside Council are carrying out Highway repair and maintenance works on Wellington Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 11:01.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are carrying out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are carrying out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.

North Tyneside Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are carrying out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 27 Nov 2024 at 12:48.

LONG TERM
Between
30 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Percy Street

Northumberland County Council were proposing to carry out Works for road purposes on Percy Street, Blyth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 23 Oct 2024 at 08:34.

LONG TERM
Between
30 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Bridge Street

Northumberland County Council are proposing to carry out Works for road purposes on Bridge Street, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 17 Sep 2024 at 14:09.

LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Bridge Street

Northumberland County Council are carrying out Works for road purposes on Bridge Street, Blyth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 11:19.

LONG TERM
Between
30 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Percy Street

Northumberland County Council are proposing to carry out Works for road purposes on Percy Street, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 17 Sep 2024 at 14:10.

LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Percy Street

Northumberland County Council are carrying out Works for road purposes on Percy Street, Blyth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 4 Dec 2024 at 11:17.

North Tyneside Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Wark Avenue

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 17 Dec 2024 at 10:21.

North Tyneside Council logo
LONG TERM
Between
18 Dec 2024 and 21 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
West Percy Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Bird Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bird Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Brewhouse Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Brewhouse Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Marine Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marine Avenue, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Park View

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park View, Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Ilfracombe Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ilfracombe Gardens, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.

Northern Gas Networks logo
LONG TERM
Between
3 Jan and 20 Feb 2025
Details
View Map
Share
Northcott Gardens

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.

North Tyneside Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Tyne Street

North Tyneside Council are carrying out Section 50 on Tyne Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 21 Jan 2025 at 13:57.

North Tyneside Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Howard Street

North Tyneside Council are carrying out Section 50 on Howard Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 21 Jan 2025 at 13:57.

LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Bridge Street

Northumberland County Council were proposing to carry out Works for road purposes on Bridge Street, Blyth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 9 Jan 2025 at 08:41.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Saville Street West

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jan 2025 at 13:19.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Saville Street

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jan 2025 at 12:59.

Northern Gas Networks logo
LONG TERM
Between
21 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Village Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 12:51.

Northern Gas Networks logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Village Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 07:30 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Jan 2025 at 07:30.

North Tyneside Council logo
LONG TERM
Between
27 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Marden Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marden Avenue, Cullercoats.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 24 Jan 2025 at 13:54.

North Tyneside Council logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Marden Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Marden Avenue, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 15:00 and could run through until 4 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 28 Jan 2025 at 15:15.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Barrass Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrass Avenue, Seghill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:20.

Northern Gas Networks logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Barrass Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Barrass Avenue, Seghill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 14:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 12:01.

Until
20 Feb 2025
Details
View Map
Share
Follow
Avenue Road

GTC Pipelines are carrying out Utility asset works on Avenue Road, Seaton Delaval.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 09:30 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 12 Feb 2025 at 14:55.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
U9510 Craster Close Budle Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Craster Close Budle Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:02.

Northern Gas Networks logo
Until
21 Feb 2025
Details
View Map
Share
Follow
U9510 Craster Close Budle Close Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9510 Craster Close Budle Close Footway, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 27 January 2025 at 07:30 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 08:16.

Northern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
U9510 Budle Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9510 Budle Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 12:03.

Until
20 Feb 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

GTC Pipelines are carrying out New service connection on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 09:30 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 12 Feb 2025 at 14:59.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Turnberry Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:04.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
U9562 Footway Outside 77-104 Thirston Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:57.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
U9562 Footway Outside 77-104 Thirston Drive

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:21.

Northern Gas Networks logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Hodgsons Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hodgsons Road, Blyth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 10:39.

Northumbrian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Princes Street Lane At Side And Rear Of 52-78

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princes Street Lane At Side And Rear Of 52-78, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Dec 2024 at 11:03.

Northumbrian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Princes Street Lane At Side And Rear Of 52-78

Northumbrian Water are carrying out Utility repair and maintenance works on Princes Street Lane At Side And Rear Of 52-78, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 08:10 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Feb 2025 at 08:21.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Garth Twenty Four

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Twenty Four, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:53.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cranham Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Cranham Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:55.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Alderley Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Alderley Drive, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ashley Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ashley Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Blyth Valley Footpath 123

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Blyth Valley Footpath 123, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:59.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Mayfield Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Avenue, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:09.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
U9517 Norham Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9517 Norham Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 15:10.

Northern Gas Networks logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
U9517 Norham Close Footway

Northern Gas Networks are carrying out Utility repair and maintenance works on U9517 Norham Close Footway, Blyth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 10 February 2025 at 08:30 and could run through until 21 March 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 09:50.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Walton Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Walton Avenue, Blyth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:03.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Railway Terrace Lane At Rear Of 35-public House

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Terrace Lane At Rear Of 35-public House, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 15:24.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Railway Terrace Lane At Rear Of 35-public House

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Terrace Lane At Rear Of 35-public House, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 08:28.

North Tyneside Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Tanners Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Tanners Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Jan 2025 at 12:35.

Northumbrian Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Holyfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holyfields, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 09:21.

Northumbrian Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Holyfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holyfields, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 09:17.

Northern Powergrid (Northeast) logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Monkseaton Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 15:50.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Turnberry Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:14.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Mayfield Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Avenue, Mayfield Grange, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:17.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Follow
B1505 Sea View Villas To Shankhouse

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on B1505 Sea View Villas To Shankhouse, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:23.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Follow
B1505 Sea View Villas To Shankhouse

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on B1505 Sea View Villas To Shankhouse, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 13:38.

LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Princess Louise Road

Northumberland County Council are proposing to carry out Works for road purposes on Princess Louise Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 7 Feb 2025 at 10:07.

LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Princess Louise Road

Northumberland County Council are proposing to carry out Works for road purposes on Princess Louise Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 7 Feb 2025 at 11:58.

LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Broadway Circle

Northumberland County Council are proposing to carry out Works for road purposes on Broadway Circle, Blyth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 7 Feb 2025 at 10:21.

LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Broadway Circle

Northumberland County Council were proposing to carry out Works for road purposes on Broadway Circle, Blyth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 7 Feb 2025 at 08:24.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
U9517 Norham Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9517 Norham Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 13:05.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
U9517 Norham Close Footway

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9517 Norham Close Footway, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 15:11.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Disraeli Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Disraeli Street, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:20.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cowpen Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:05.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Lilac Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lilac Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:02.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Laburnum Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 14:00.

North Tyneside Council logo
Between
19 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Feb 2025 at 12:58.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Saville Street West

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:46.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Saville Street West

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:54.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Little Bedford Street Lane At Side And Rear Of Warehouses

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 February 2025 and run through until 9 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:51.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Little Bedford Street Lane At Side And Rear Of Warehouses

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Dec 2024 at 15:52.

Northumbrian Water logo
Between
23 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Little Bedford Street Lane At Side And Rear Of Warehouses

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 08:20.

North Tyneside Council logo
LONG TERM
Between
24 Feb and 4 Aug 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:56.

North Tyneside Council logo
LONG TERM
Between
24 Feb and 4 Aug 2025
Details
View Map
Share
Follow
Saville Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:56.

North Tyneside Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Marine Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marine Avenue, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 7 Feb 2025 at 10:37.

Northern Powergrid (Northeast) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Monkseaton Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jan 2025 at 09:08.

Northern Powergrid (Northeast) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
The Chesters

Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Feb 2025 at 09:25.

Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Newsham Road

Northumberland County Council are proposing to carry out Works for road purposes on Newsham Road, Blyth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 12 Feb 2025 at 08:19.

LONG TERM
Between
24 Feb and 24 Oct 2025
Details
View Map
Share
Follow
Quay Road

Northumberland County Council are proposing to carry out Works for road purposes on Quay Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 9 Dec 2024 at 15:56.

LONG TERM
Between
24 Feb and 24 Oct 2025
Details
View Map
Share
Follow
Quay Road

Northumberland County Council are proposing to carry out Works for road purposes on Quay Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 29 Jan 2025 at 14:42.

Northumbrian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
U9511 Princess Louise Road Back Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on U9511 Princess Louise Road Back Lane, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 16:14.

Northumbrian Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
U9511 Princess Louise Road Back Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on U9511 Princess Louise Road Back Lane, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Feb 2025 at 15:13.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Disraeli Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Disraeli Street, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 13:39.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Lilac Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lilac Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:10.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 8 May 2025
Details
View Map
Share
Follow
Hodgsons Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hodgsons Road, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 16:15.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 12 Jun 2025
Details
View Map
Share
Follow
Cowpen Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 13:55.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Cowpen Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cowpen Road, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:13.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Laburnum Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:08.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Limes Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Limes Avenue, Blyth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 11:09.

South Tyneside Council logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Rear Of Baring Street And Salmon Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Rear Of Baring Street And Salmon Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 27 Nov 2024 at 11:37.

South Tyneside Council logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Rear Of Baring Street And Salmon Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Rear Of Baring Street And Salmon Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 27 Jan 2025 at 08:44.

North Tyneside Council logo
Between
4 and 17 Mar 2025
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Feb 2025 at 12:58.

North Tyneside Council logo
LONG TERM
Between
6 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Tanners Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Tanners Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

North Tyneside Council logo
LONG TERM
Between
6 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.

North Tyneside Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Trevor Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Trevor Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Feb 2025 at 12:41.

North Tyneside Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Linskill Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Linskill Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Feb 2025 at 12:52.

Northumbrian Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Links Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Links Avenue, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 13:47.

Northumbrian Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Broadway

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 14:40.

Northern Powergrid (Northeast) logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Jan 2025 at 13:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Jan 2025 at 16:24.

Northern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Dunsdale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunsdale Drive, Eastfield Vale, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:35.

Northumbrian Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
The Broadway

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 19 Dec 2024 at 11:20.

Northumbrian Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Cauldwell Lane Lane At Rear Of 2-74

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cauldwell Lane Lane At Rear Of 2-74, West Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 15:00.

Northumbrian Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
St Ronans Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on St Ronans Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 19 Dec 2024 at 10:51.

Northern Powergrid (Northeast) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Whitley Road Lane At Rear Of 279-301

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Whitley Road Lane At Rear Of 279-301, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Feb 2025 at 08:56.

Northern Powergrid (Northeast) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Whitley Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Whitley Road, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Feb 2025 at 12:07.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dunsdale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunsdale Drive, Eastfield Vale, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 09:14.

Northern Gas Networks logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
U9517 Bamburgh Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9517 Bamburgh Close Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2024 at 13:45.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Walton Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Walton Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 16:18.

Northumbrian Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Lesbury Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lesbury Avenue, Shiremoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 15:10.

Northumbrian Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Earsdon Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Earsdon Road, Shiremoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 11:50.

Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Maddison Street

Northumberland County Council are proposing to carry out Works for road purposes on Maddison Street, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 16:06.

Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Gatacre Street

Northumberland County Council are proposing to carry out Works for road purposes on Gatacre Street, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 17 Jan 2025 at 16:11.

Northumbrian Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Lindisfarne Terrace Lane At Side And Rear Of 1-45

Northumbrian Water are proposing to carry out Permanent reinstatement on Lindisfarne Terrace Lane At Side And Rear Of 1-45, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Dec 2024 at 08:56.

Northern Gas Networks logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Alderley Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderley Way, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:49.

Northern Powergrid (Northeast) logo
Between
2 and 8 Apr 2025
Details
View Map
Share
Follow
Clovelly Gardens Lane At Side And Rear Of 6-30

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Clovelly Gardens Lane At Side And Rear Of 6-30, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Feb 2025 at 13:12.

Northumbrian Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
U9511 Middleton Terrace Back Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on U9511 Middleton Terrace Back Lane, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Jan 2025 at 09:19.

Northern Gas Networks logo
Between
11 Apr and 6 May 2025
Details
View Map
Share
Follow
Barrass Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrass Avenue, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 15:03.

Northern Gas Networks logo
Between
14 Apr and 7 May 2025
Details
View Map
Share
Follow
Limes Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Limes Avenue, Blyth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 16:51.

LONG TERM
Between
15 Apr and 31 Oct 2025
Details
View Map
Share
Follow
A192 Seaton Delaval To Laverock Hall

Northumberland County Council are proposing to carry out Highway repair and maintenance works on A192 Seaton Delaval To Laverock Hall, Seaton Delaval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 12 Feb 2025 at 09:24.

North Tyneside Council logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:46.

North Tyneside Council logo
LONG TERM
Between
22 Apr and 3 Jun 2025
Details
View Map
Share
Follow
Trevor Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Trevor Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:42.

North Tyneside Council logo
LONG TERM
Between
22 Apr and 3 Jun 2025
Details
View Map
Share
Follow
Linskill Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Linskill Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 30 Jan 2025 at 15:43.

Northern Gas Networks logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
U9539 Burnside Close Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9539 Burnside Close Footway, Seghill.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 15:46.

Northern Gas Networks logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
Mill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 15:42.

Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Bondicar Terrace

Northumberland County Council are proposing to carry out Works for road purposes on Bondicar Terrace, Blyth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 11 Feb 2025 at 08:58.

Northern Gas Networks logo
Between
29 Apr and 20 May 2025
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 15:49.

Northern Gas Networks logo
Between
29 Apr and 20 May 2025
Details
View Map
Share
Follow
Maddison Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Maddison Gardens, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Jan 2025 at 13:36.

Northern Gas Networks logo
Between
6 May and 3 Jun 2025
Details
View Map
Share
Follow
Old Stone Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Stone Road, East Cramlington Industrial Estate, Cramlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 09:34.

Northern Gas Networks logo
LONG TERM
Between
6 May and 22 Jul 2025
Details
View Map
Share
Follow
B1326 Klondyke To Seaton Delaval

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on B1326 Klondyke To Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 09:23.

Northern Gas Networks logo
LONG TERM
Between
6 May and 22 Jul 2025
Details
View Map
Share
Follow
U9541 East Cramlington Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9541 East Cramlington Footway, Cramlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 May 2025 and could run through until 22 July 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 09:02.

Northern Gas Networks logo
Between
8 May and 5 Jun 2025
Details
View Map
Share
Follow
U9518 Druridge Drive Footway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9518 Druridge Drive Footway, Blyth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 8 May 2025 and could run through until 5 June 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 13:09.


Roadworks Map near to St. Marys Island, WHITLEY BAY, NE26 4RS (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Marys Island, WHITLEY BAY, NE26 4RS (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
URGENT
  
SIMONSIDE 
(0.9 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 10 Feb 2025 08:25
(Scheduled: 10 Feb 2025 - 14 Feb 2025)
0.9
Details
Share
Follow
2
North Tyneside Council logo
ASTLEY DRIVE 
(1.0 miles)
North Tyneside Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Feb 2025 - 18 Feb 2025
1.0
Details
Share
Follow
3
North Tyneside Council logo
MAJOR
  
THE LINKS 
(1.0 miles)
North Tyneside Council
Highway repair and maintenance works - Verge - Two-way signals
Planned
Scheduled: 18 Dec 2024 - 21 Jan 2026
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.