ROADWORKS SUMMARY
Promenade, NE26 2BN
Introduction
View current and future planned roadworks and road closures for Promenade, NE26 2BN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Promenade, NE26 2BN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Promenade are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Tyne Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2022 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:31.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Bell Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2022 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:32.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Liddell Street, North Shields.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 September 2022 at 07:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 13 May 2024 at 08:17.
13 Dec 2024
South Tyneside Council are carrying out Highway repair and maintenance works on Coast Road, South Shields.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Tyneside Council on 2 Sep 2024 at 09:46.
25 Nov 2024
North Tyneside Council are carrying out Section 50 on Church Road, Backworth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 22 Oct 2024 at 09:22.
2 Sep 2024 and 4 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 16 Jul 2024 at 11:57.
2 Sep 2024 and 30 Sep 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.
2 Sep and 9 Dec 2024
Northumberland County Council are proposing to carry out Section 50 on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northumberland County Council on 6 Aug 2024 at 17:14.
23 Sep 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Street, Wallsend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 10:58.
24 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Churchill Street, Wallsend.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 14:41.
23 Sep 2024 and 2 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 28 Aug 2024 at 09:48.
29 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.
16 Oct 2025
North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.
14 Jan 2026
North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.
2 Oct 2024 and 30 Sep 2025
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.
2 Oct 2024 and 30 Sep 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.
4 Oct 2024 and 2 Oct 2025
North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.
Tuesday
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Great Lime Road, Palmersville, Forest Hall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Aug 2024 at 11:01.
Tuesday
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Great Lime Road, Palmersville, Forest Hall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Sep 2024 at 15:28.
Tuesday
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Great Lime Road, Palmersville, Forest Hall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Sep 2024 at 10:07.
Tuesday
Northern Powergrid (Northeast) are carrying out Utility asset works on Great Lime Road, Palmersville, Forest Hall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 13:00 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 14:38.
Tuesday
Northern Powergrid (Northeast) are proposing to carry out Diversionary works on Kelvin Place, Forest Hall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Aug 2024 at 12:48.
Tuesday
Northern Powergrid (Northeast) were proposing to carry out Diversionary works on Kelvin Place, Forest Hall.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 October 2024 and run through until 12 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Aug 2024 at 10:12.
18 Aug 2026
North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.
29 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.
29 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.
29 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.
29 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:41.
30 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.
30 Sep 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.
16 Oct 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.
17 Oct 2024 and 15 Oct 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Prim 10, Jarrow.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 25 October 2024 at 07:30 and could run through until 14 November 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 08:14.
Wednesday
Northumbrian Water are carrying out Utility repair and maintenance works on Percy Street Lane At Rear Of 1-47, Wallsend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 October 2024 at 13:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 15:51.
Wednesday
Grain Communications (formerly Solway Communications) are carrying out Statutory Infrastructure Works on Albion Road, North Shields.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 October 2024 at 08:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Nov 2024 at 13:37.
Friday
North Tyneside Council are carrying out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 28 Oct 2024 at 08:51.
28 Oct and 22 Nov 2024
North Tyneside Council are proposing to carry out Section 50 on St Peters Road North, Wallsend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 5 Aug 2024 at 09:46.
Tomorrow
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Lane, Shiremoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 11 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 31 May 2024 at 13:32.
Wednesday
North Tyneside Council are carrying out Highway repair and maintenance works on Charlotte Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 09:46 and could run through until 13 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Nov 2024 at 09:46.
Wednesday
North Tyneside Council are carrying out Highway repair and maintenance works on Stephenson Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 09:45 and could run through until 13 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Nov 2024 at 09:45.
Tomorrow
North Tyneside Council are carrying out Highway repair and maintenance works on Park Lane, Shiremoor.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 11 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Nov 2024 at 08:41.
4 Nov 2024 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Seghill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Jun 2024 at 13:03.
10 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Seghill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:29.
6 and 19 Nov 2024
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Prudhoe Street, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 16:00.
6 and 19 Nov 2024
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Borough Road, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 16:00.
6 and 19 Nov 2024
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 16:00.
6 and 19 Nov 2024
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Borough Road North, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 19 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 16:00.
7 and 23 Nov 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Charlotte Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 11 Jul 2024 at 11:55.
7 and 23 Nov 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Stephenson Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 11 Jul 2024 at 11:54.
20 Nov 2024
North Tyneside Council are carrying out Highway repair and maintenance works on Rotary Road, Backworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 16:04 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 7 Nov 2024 at 16:04.
20 Nov 2024
North Tyneside Council are carrying out Highway repair and maintenance works on Rotary Road, Backworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 16:04 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 7 Nov 2024 at 16:05.
8 and 25 Nov 2024
South Tyneside Council are proposing to carry out Highway repair and maintenance works on Belsay Avenue, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 1 May 2024 at 08:24.
25 Nov 2024
South Tyneside Council are carrying out Highway repair and maintenance works on Belsay Avenue, South Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 8 Nov 2024 at 08:06.
8 Nov 2024 and 16 Oct 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.
8 Nov 2024 and 16 Oct 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.
Friday
South Tyneside Council are proposing to carry out Highway repair and maintenance works on Mile End Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 20 Aug 2024 at 11:30.
Friday
South Tyneside Council are proposing to carry out Highway repair and maintenance works on Mile End Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 3 Oct 2024 at 15:26.
11 Nov 2024 and 31 Jul 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wellington Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 12:32.
11 Nov 2024 and 31 Jul 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 12:32.
11 Nov 2024 and 31 Jul 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 12:32.
11 and 22 Nov 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 30 Oct 2024 at 11:20.
13 and 21 Nov 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 5 Nov 2024 at 12:45.
18 and 20 Nov 2024
South Tyneside Council are proposing to carry out Highway repair and maintenance works on Salem Street, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 20 Aug 2024 at 11:24.
18 and 20 Nov 2024
South Tyneside Council are proposing to carry out Highway repair and maintenance works on Salem Street, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 22 Oct 2024 at 11:24.
18 and 29 Nov 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on West Farm Road, Wallsend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 12:22.
18 and 29 Nov 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on West Farm Road, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 10:21.
18 and 29 Nov 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on West Farm Road, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 10:09.
18 and 25 Nov 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ridley Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 7 Nov 2024 at 08:12.
18 Nov 2024 and 31 Jul 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 11:44.
18 Nov 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 16:23.
18 Nov 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 10:32.
20 Nov and 3 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 29 Aug 2024 at 10:52.
21 Nov 2024
South Tyneside Council are proposing to carry out roadworks on King Street, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 21 November 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 29 Oct 2024 at 09:47.
25 Nov and 13 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Northern Gas Networks on 26 Jun 2024 at 09:21.
25 Nov and 13 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 26 Jun 2024 at 09:49.
25 and 29 Nov 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 8 Oct 2024 at 09:12.
25 and 29 Nov 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 08:52.
25 and 29 Nov 2024
Northumberland County Council are proposing to carry out Works for road purposes on Church Road, Backworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 9 Oct 2024 at 12:58.
25 and 29 Nov 2024
Northumberland County Council are proposing to carry out Works for road purposes on Church Road, Backworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 29 Oct 2024 at 16:10.
25 and 28 Nov 2024
Northumberland County Council are proposing to carry out Highway repair and maintenance works on Tillmouth Avenue, Seaton Delaval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumberland County Council on 19 Aug 2024 at 13:46.
26 Nov 2024 and 9 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Percy Park Road, Tynemouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:32.
26 Nov 2024 and 9 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:30.
28 Nov and 4 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Drumoyne Gardens, West Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 08:09.
2 and 20 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:20.
2 and 20 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:22.
2 Dec 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.
2 and 11 Dec 2024
Northumberland County Council are proposing to carry out Works for road purposes on Elsdon Avenue, Seaton Delaval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 25 Oct 2024 at 15:05.
2 and 11 Dec 2024
Northumberland County Council are proposing to carry out Works for road purposes on Elsdon Avenue, Seaton Delaval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumberland County Council on 29 Oct 2024 at 12:02.
3 and 6 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 7 Nov 2024 at 10:19.
4 Dec 2024 and 8 Jan 2025
North Tyneside Council are proposing to carry out Section 50 on New York Road, New York, North Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 14:48.
9 Dec 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:09.
9 Dec 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:36.
9 and 13 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 24 Sep 2024 at 09:13.
9 and 13 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 25 Sep 2024 at 11:22.
12 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Houxty Road, Wellfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.
12 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kielder Place, Wellfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.
13 Dec 2024 and 20 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 20 Sep 2024 at 12:17.
16 and 20 Dec 2024
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Reading Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Oct 2024 at 08:54.
16 and 20 Dec 2024
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Birchington Avenue, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Oct 2024 at 08:55.
16 and 20 Dec 2024
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Sep 2024 at 08:40.
16 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ridley Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:42.
16 and 20 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:08.
16 and 20 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Holystone Drive, Holystone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:29.
16 and 24 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:30.
17 Dec 2024 and 2 Jan 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Mortimer Road, South Shields.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 14:56.
17 Dec 2024 and 2 Jan 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Mortimer Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 15:18.
18 Dec 2024 and 21 Jan 2026
North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.
This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.
24 Dec 2024 and 9 Jan 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Milner Street, South Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 December 2024 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 08:08.
26 Dec 2024 and 3 Jan 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:31.
26 Dec 2024 and 3 Jan 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:40.
26 Dec 2024 and 3 Jan 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:26.
26 Dec 2024 and 3 Jan 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:38.
27 Dec 2024 and 30 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:08.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dene Crescent, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:15.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Mullen Road, High Farm, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Coast Road, North Tyneside.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:07.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bird Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Brewhouse Bank, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on East Bailey, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Sixteen, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:24.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marine Avenue, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park View, Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ilfracombe Gardens, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.
3 Jan and 20 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.
6 Jan and 12 Feb 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Stanhope Road, South Shields.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Oct 2024 at 09:42.
6 Jan and 12 Feb 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:02.
6 Jan and 12 Feb 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:37.
6 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 11, South Shields.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:08.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:23.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 11:49.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:24.
6 and 24 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 10:14.
6 and 24 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 15:35.
7 and 11 Jan 2025
Northumbrian Water are proposing to carry out Permanent reinstatement on Rear Of Vespasian Avenue And Julian Avenue, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:07.
7 and 11 Jan 2025
Northumbrian Water are proposing to carry out Remedial works on Rear Of Vespasian Avenue And Julian Avenue, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:05.
8 and 10 Jan 2025
Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 14:59.
15 and 21 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Earsdon Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 30 Oct 2024 at 09:06.
20 Jan and 20 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.
20 Jan and 20 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.
29 Jan and 3 Feb 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 13:14.
29 and 31 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Shiremoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 6 Nov 2024 at 13:03.
3 and 5 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 12:52.
3 and 5 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 14:02.
4 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Campville Lane At Side And Rear Of 1-23, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 11:52.
Roadworks Map near to Promenade, NE26 2BN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Promenade, NE26 2BN (31 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Oct 2024 - 16 Oct 2025)
(Scheduled: 4 Nov 2024 - 11 Nov 2024)
(Scheduled: 14 Oct 2024 - 30 Sep 2025)
(Scheduled: 14 Oct 2024 - 30 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.