ROADWORKS SUMMARY
St. Ronans Road, WHITLEY BAY, NE25 8AX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Ronans Road, NE25 8AX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Ronans Road, WHITLEY BAY, NE25 8AX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Ronans Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Tyne Street

North Tyneside Council are carrying out Section 50 on Tyne Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2022 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:31.

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Bell Street

North Tyneside Council are carrying out Section 50 on Bell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2022 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:32.

North Tyneside Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Liddell Street

North Tyneside Council are carrying out Section 50 on Liddell Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 September 2022 at 07:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 13 May 2024 at 08:17.

South Tyneside Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Coast Road

South Tyneside Council are carrying out Highway repair and maintenance works on Coast Road, South Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 2 Sep 2024 at 09:46.

North Tyneside Council logo
LONG TERM
Between
15 Jul 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Wallsend Bus Station

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Jun 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Church Road

North Tyneside Council are carrying out Section 50 on Church Road, Backworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Oct 2024 at 09:22.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2024 at 11:57.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.

LONG TERM
Between
2 Sep and 9 Dec 2024
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northumberland County Council are proposing to carry out Section 50 on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumberland County Council on 6 Aug 2024 at 17:14.

North Tyneside Council logo
LONG TERM
Between
16 Sep 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Buddle Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Street, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 18 Jun 2024 at 14:19.

North Tyneside Council logo
LONG TERM
Between
16 Sep 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Wooley Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wooley Street, Wallsend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 19 Jun 2024 at 09:45.

North Tyneside Council logo
LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Wallsend Bus Station

North Tyneside Council are carrying out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 09:00 and could run through until 21 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 17 Sep 2024 at 10:20.

North Tyneside Council logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Buddle Street

North Tyneside Council are carrying out Highway repair and maintenance works on Buddle Street, Wallsend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 23 Sep 2024 at 09:25.

North Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 20 May 2025
Details
View Map
Share
Follow
Wallsend Bus Station

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 1 Jul 2024 at 13:01.

North Tyneside Council logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Atkinson Street

North Tyneside Council are carrying out Highway repair and maintenance works on Atkinson Street, Wallsend.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 23 Sep 2024 at 09:24.

Northern Gas Networks logo
LONG TERM
Between
23 Sep 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 10:58.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Churchill Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Churchill Street, Wallsend.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 14:41.

North Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Aug 2024 at 09:48.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.

North Tyneside Council logo
LONG TERM
Until
14 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Promenade

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Park Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.

Northern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Red House Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Red House Drive, Red House Farm, Whitley Bay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 10:58 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 12:15.

North Tyneside Council logo
LONG TERM
Between
4 Oct 2024 and 2 Oct 2025
Details
View Map
Share
The Links

North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.

Northern Powergrid (Northeast) logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Holystone Industrial Estate

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Holystone Industrial Estate, Hebburn.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Nov 2024 at 15:20.

North Tyneside Council logo
LONG TERM
Until
18 Aug 2026
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Beverley Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent North

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Promontory Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:41.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Between
17 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.

Northern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Seghill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2024 at 13:03.

Northern Gas Networks logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Seghill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 09:29.

Until
3 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Stanhope Road, South Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Nov 2024 at 08:47.

South Tyneside Council logo
Finishing
Today
Details
View Map
Share
Follow
Belsay Avenue

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Belsay Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 1 May 2024 at 08:24.

South Tyneside Council logo
Finishing
Today
Details
View Map
Share
Follow
Belsay Avenue

South Tyneside Council are carrying out Highway repair and maintenance works on Belsay Avenue, South Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Nov 2024 at 08:06.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
West Farm Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on West Farm Road, Wallsend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 12:22.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
Follow
West Farm Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on West Farm Road, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 10:21.

Northern Powergrid (Northeast) logo
Until
2 Dec 2024
Details
View Map
Share
Follow
West Farm Road

Northern Powergrid (Northeast) are carrying out Utility asset works on West Farm Road, Wallsend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:40 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 19 Nov 2024 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 16:23.

Northern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Front Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Seghill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:53.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
U9532 Laurel Terrace Mortimer Terrace Back Lane

Northumbrian Water are carrying out Utility repair and maintenance works on U9532 Laurel Terrace Mortimer Terrace Back Lane, Holywell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:18 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Nov 2024 at 10:24.

Northumbrian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rear Of St Aidans Road

Northumbrian Water are carrying out Utility repair and maintenance works on Rear Of St Aidans Road, South Shields.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:02 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 22 Nov 2024 at 14:44.

North Tyneside Council logo
Between
20 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Preston Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 29 Aug 2024 at 10:52.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Western Way

Northern Gas Networks are carrying out Utility repair and maintenance works on Western Way, Whitley Bay.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 14:57 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:18.

Northern Powergrid (Northeast) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Park View Lane At Rear Of 1-16

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Park View Lane At Rear Of 1-16, Wallsend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 12:34.

Northern Powergrid (Northeast) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Park View Lane At Rear Of 1-16

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Park View Lane At Rear Of 1-16, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 15:13.

Northern Powergrid (Northeast) logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Park View Lane At Rear Of 1-16

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Park View Lane At Rear Of 1-16, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Oct 2024 at 13:34.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bbnts 32

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Northern Gas Networks on 26 Jun 2024 at 09:21.

Northern Gas Networks logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
South Shields Footpath 413

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Jun 2024 at 09:49.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ridley Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Oct 2024 at 09:12.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ridley Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ridley Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 08:52.

North Tyneside Council logo
LONG TERM
Between
25 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Wellington Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wellington Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:37.

North Tyneside Council logo
LONG TERM
Between
25 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:39.

North Tyneside Council logo
LONG TERM
Between
25 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:37.

Finishing
Friday
Details
View Map
Share
Follow
Church Road

Northumberland County Council are proposing to carry out Works for road purposes on Church Road, Backworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 9 Oct 2024 at 12:58.

Finishing
Friday
Details
View Map
Share
Follow
Church Road

Northumberland County Council are proposing to carry out Works for road purposes on Church Road, Backworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 29 Oct 2024 at 16:10.

Finishing
Thursday
Details
View Map
Share
Follow
Tillmouth Avenue

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Tillmouth Avenue, Seaton Delaval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 19 Aug 2024 at 13:46.

Finishing
Thursday
Details
View Map
Share
Follow
Tillmouth Avenue

Northumberland County Council are proposing to carry out Highway repair and maintenance works on Tillmouth Avenue, Seaton Delaval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumberland County Council on 21 Nov 2024 at 15:04.

North Tyneside Council logo
LONG TERM
Between
26 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Percy Park Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Percy Park Road, Tynemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:32.

North Tyneside Council logo
LONG TERM
Between
26 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 9 January 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 4 Sep 2024 at 10:30.

North Tyneside Council logo
LONG TERM
Between
27 Nov 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:50.

North Tyneside Council logo
Between
28 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Drumoyne Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Drumoyne Gardens, West Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 08:09.

Northern Powergrid (Northeast) logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Park Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Park Road, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 13:39.

Northern Powergrid (Northeast) logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Park Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Park Road, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Nov 2024 at 14:43.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
High Street West Lane At Side And Rear Of 92-118

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street West Lane At Side And Rear Of 92-118, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 9 Sep 2024 at 11:25.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Bbnts 32

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 32, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:20.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
South Shields Footpath 413

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Shields Footpath 413, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:22.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Northcott Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:19.

Between
2 and 11 Dec 2024
Details
View Map
Share
Follow
Elsdon Avenue

Northumberland County Council are proposing to carry out Works for road purposes on Elsdon Avenue, Seaton Delaval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 25 Oct 2024 at 15:05.

Between
2 and 11 Dec 2024
Details
View Map
Share
Follow
Elsdon Avenue

Northumberland County Council are proposing to carry out Works for road purposes on Elsdon Avenue, Seaton Delaval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumberland County Council on 29 Oct 2024 at 12:02.

Northern Powergrid (Northeast) logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
The Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Nov 2024 at 14:25.

North Tyneside Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Eastfield Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 7 Nov 2024 at 10:19.

North Tyneside Council logo
LONG TERM
Between
4 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
New York Road

North Tyneside Council are proposing to carry out Section 50 on New York Road, New York, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 14:48.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Bbnts 10

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:09.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Bbnts 10

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 09:36.

Northumbrian Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
East Parade Lane At Rear Of 6-26

Northumbrian Water are proposing to carry out Utility repair and maintenance works on East Parade Lane At Rear Of 6-26, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Nov 2024 at 11:40.

Northumbrian Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
East Parade

Northumbrian Water are proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 08:22.

Northumbrian Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
East Parade

Northumbrian Water were proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Nov 2024 at 11:28.

Northumbrian Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
East Parade

Northumbrian Water are proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 24 Sep 2024 at 09:13.

Northumbrian Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
East Parade

Northumbrian Water were proposing to carry out Utility repair and maintenance works on East Parade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 14:00.

North Tyneside Council logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Houxty Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Houxty Road, Wellfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.

North Tyneside Council logo
Between
12 and 27 Dec 2024
Details
View Map
Share
Follow
Kielder Place

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kielder Place, Wellfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.

North Tyneside Council logo
LONG TERM
Between
13 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 20 Sep 2024 at 12:17.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Reading Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Oct 2024 at 08:54.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Birchington Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Birchington Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Oct 2024 at 08:55.

Northumbrian Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Bewicke Road Lane At Rear Of 2-32

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Sep 2024 at 08:40.

North Tyneside Council logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Ridley Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ridley Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:42.

North Tyneside Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Whitehouse Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:08.

North Tyneside Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holystone Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Holystone Drive, Holystone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:29.

North Tyneside Council logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Follow
Eastfield Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:30.

Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Mortimer Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Mortimer Road, South Shields.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 14:56.

Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Mortimer Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Mortimer Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Sep 2024 at 15:18.

North Tyneside Council logo
LONG TERM
Between
18 Dec 2024 and 21 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.

This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.

Between
24 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Milner Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Milner Street, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 December 2024 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 08:08.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Reading Road

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:31.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Reading Road

Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Reading Road, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:40.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Birchington Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 14:26.

Between
26 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Birchington Avenue

Grain Communications (formerly Solway Communications) were proposing to carry out Statutory Infrastructure Works on Birchington Avenue, South Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Sep 2024 at 15:38.

North Tyneside Council logo
LONG TERM
Between
27 Dec 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:08.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Hadrian Road Road Giving Access To Works

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Hadrian Road Road Giving Access To Works, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:13.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Dene Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dene Crescent, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:15.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 May 2025
Details
View Map
Share
Follow
Station Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Station Road North, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:14.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Mullen Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Mullen Road, High Farm, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Coast Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Coast Road, North Tyneside.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
West Percy Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Bird Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bird Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Brewhouse Bank

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Brewhouse Bank, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
South Croft

North Tyneside Council are proposing to carry out Highway repair and maintenance works on South Croft, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
East Bailey

North Tyneside Council are proposing to carry out Highway repair and maintenance works on East Bailey, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Garth Sixteen

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Sixteen, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:24.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Marine Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marine Avenue, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Park View

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park View, Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Ilfracombe Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ilfracombe Gardens, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Dudley To Fordley Link Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dudley To Fordley Link Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:22.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Link Road Between B1505 Roundabout And A189 Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Link Road Between B1505 Roundabout And A189 Roundabout, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.

North Tyneside Council logo
LONG TERM
Between
1 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Front Street, Annitsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.

Northern Gas Networks logo
LONG TERM
Between
3 Jan and 20 Feb 2025
Details
View Map
Share
Northcott Gardens

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Stanhope Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 14 Oct 2024 at 09:42.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Stanhope Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:02.

LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Stanhope Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Stanhope Road, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 Oct 2024 at 11:37.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bbnts 11

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 11, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:08.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Monkseaton Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:23.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Monkseaton Drive

Northern Powergrid (Northeast) were proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 11:49.

Northern Powergrid (Northeast) logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
The Chesters

Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:24.

Northumbrian Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 10:14.

Northumbrian Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
A190 Seghill To Avenue Road Seaton Delaval

Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 15:35.

Northumbrian Water logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Rear Of Vespasian Avenue And Julian Avenue

Northumbrian Water are proposing to carry out Permanent reinstatement on Rear Of Vespasian Avenue And Julian Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:07.

Northumbrian Water logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Follow
Rear Of Vespasian Avenue And Julian Avenue

Northumbrian Water are proposing to carry out Remedial works on Rear Of Vespasian Avenue And Julian Avenue, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:05.

Virgin Media logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
York Road

Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 14:59.

North Tyneside Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Earsdon Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Earsdon Road, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 30 Oct 2024 at 09:06.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.

North Tyneside Council logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Saville Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.

North Tyneside Council logo
Between
29 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wark Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 13 Nov 2024 at 10:21.

North Tyneside Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Stanton Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Shiremoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 12 Nov 2024 at 10:48.

Northumbrian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Rear Of Birchington Avenue And Reading Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 12:52.

Northumbrian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Rear Of Birchington Avenue And Reading Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Birchington Avenue And Reading Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 14:02.

Northumbrian Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Campville Lane At Side And Rear Of 1-23

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Campville Lane At Side And Rear Of 1-23, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 11:52.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Western Approach

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Approach, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 10:58.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:06.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Garth Twenty Four

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Twenty Four, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:53.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:25.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
West Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:05.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cranham Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Cranham Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:55.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Alderley Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Alderley Drive, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

North Tyneside Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ashley Close

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ashley Close, Ashdown Manor, Killingworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Blyth Valley Footpath 123

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Blyth Valley Footpath 123, Blyth.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:59.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Railway Terrace Lane At Rear Of 35-public House

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Terrace Lane At Rear Of 35-public House, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 15:24.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Young Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Young Road, Forest Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Nov 2024 at 09:21.


Roadworks Map near to St. Ronans Road, WHITLEY BAY, NE25 8AX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Nov 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Ronans Road, WHITLEY BAY, NE25 8AX (41 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
DENEHOLM, MONKSEATON 
(0.3 miles)
BT
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.3
Details
Share
Follow
2
BT logo
LANGDALE, MONKSEATON 
(0.3 miles)
BT
New service connection - Footway, Carriageway - Give and take
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.3
Details
Share
Follow
3
North Tyneside Council logo
MAJOR
  
THE AVENUE 
(0.4 miles)
North Tyneside Council
Highway repair and maintenance works - Footway, Footpath - Road closure
In Progress
Since: 14 Nov 2024 07:45
(Scheduled: 4 Nov 2024 - 6 Dec 2024)
0.4
Details
Share
Follow
4
North Tyneside Council logo
HILLHEADS ROAD 
(0.4 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.4
Details
Share
Follow
5
Northern Powergrid (Northeast) logo
URGENT
  
PARK VIEW, MONKSEATON 
(0.4 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
19 Nov 2024 17:00 - 22 Nov 2024 11:00
0.4
Details
Share
6
North Tyneside Council logo
LOVAINE AVENUE 
(0.4 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.4
Details
Share
Follow
7
North Tyneside Council logo
HILLHEADS ROAD 
(0.5 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.5
Details
Share
Follow
8
North Tyneside Council logo
LOVAINE AVENUE 
(0.5 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.5
Details
Share
Follow
9
North Tyneside Council logo
MARDEN ROAD SOUTH 
(0.5 miles)
North Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 09:23
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
0.5
Details
Share
Follow
10
Northumbrian Water logo
HOLLY AVENUE 
(0.5 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.