ROADWORKS SUMMARY
Burnopfield, NEWCASTLE UPON TYNE, NE16 6DL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for NE16 6DL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Burnopfield, NEWCASTLE UPON TYNE, NE16 6DL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Road Leading To Hamsterley Hall

Durham County Council are carrying out Highway repair and maintenance works on Road Leading To Hamsterley Hall, Hamsterley Mill.

The works should not impact the carriageway.

The works started on 5 February 2021 at 09:00 and could run through until 31 December 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Durham County Council on 3 Dec 2024 at 08:55.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Sycamore Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Sycamore Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 13 Nov 2024 at 14:37.

Northern Gas Networks logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Whickham Highway

Northern Gas Networks are carrying out Utility repair and maintenance works on Whickham Highway, Whickham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 10:15 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 12:47.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Kingsway South

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Kingsway South, Team Valley, Gateshead.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 08:04 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 28 Jan 2025 at 12:23.

Northern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Armstrong Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Armstrong Road, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:00 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 16:11.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Benwell Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 07:58.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Benwell Lane

Northern Powergrid (Northeast) were proposing to carry out New service connection on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Nov 2024 at 14:17.

Northern Powergrid (Northeast) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Benwell Lane

Northern Powergrid (Northeast) were proposing to carry out New service connection on Benwell Lane, Newcastle Upon Tyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 09:50.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Stanley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2024 at 15:32.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2024 at 13:46.

Northern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
A692 From North Road To Syke Road

Northern Gas Networks are carrying out Utility repair and maintenance works on A692 From North Road To Syke Road, Burnopfield.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 13:43 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 09:38.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:00 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 6 Jan 2025 at 10:00.

Newcastle City Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Riversdale Way

Newcastle City Council are carrying out Highway repair and maintenance works on Riversdale Way, Newburn Haugh Industrial Estate, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 19:00 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 27 Jan 2025 at 10:33.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Birch Road

Gateshead Metropolitan Borough Council are carrying out Section 50 on Birch Road, Bleach Green, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 9 Jan 2025 at 07:38.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:15.

Northern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Hole Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Hole Lane, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 09:30 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Jan 2025 at 09:44.

Newcastle City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:14.

Newcastle City Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are carrying out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 20:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 14 Jan 2025 at 09:27.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:56.

Northumbrian Water logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 09:15 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 21 Jan 2025 at 11:04.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 11:29.

Northumbrian Water logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 09:15 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 21 Jan 2025 at 11:04.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are carrying out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 13:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Jan 2025 at 14:48.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 13:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Jan 2025 at 14:48.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A694 From Sherburn Terrace To Hamsterley

Northern Gas Networks are carrying out Utility repair and maintenance works on A694 From Sherburn Terrace To Hamsterley, Low Westwood.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 09:49 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 11:57.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Hole Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hole Lane, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 13:17.

Northern Gas Networks logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Woodburn Gardens

Northern Gas Networks are carrying out Utility repair and maintenance works on Woodburn Gardens, Dunston Hill, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 11:15 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 11:27.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 12:50 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 14:39.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 12:50 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 14:44.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:39.

Northumbrian Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 09:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 Jan 2025 at 09:07.

Northern Gas Networks logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 14 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 07:57.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Northumbrian Water logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 15:15 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Feb 2025 at 15:15.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Northumbrian Water logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 15:15 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Feb 2025 at 15:15.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 15:05 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Feb 2025 at 16:01.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Sunniside Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 18 Dec 2024 at 15:35.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Holmside Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Holmside Avenue, Dunston, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 14:58.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Ellison Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ellison Road, Dunston, Gateshead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Jan 2025 at 14:56.

Northern Powergrid (Northeast) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Burn Road

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:26.

Northern Powergrid (Northeast) logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Burn Road

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Feb 2025 at 14:00.

Northern Powergrid (Northeast) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Twizell Avenue Access Track To Electricity Sub-station

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Twizell Avenue Access Track To Electricity Sub-station, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:15.

Newcastle City Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 28 Jan 2025 at 11:11.

Newcastle City Council logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are carrying out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 20:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 4 Feb 2025 at 11:25.

Northern Gas Networks logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Clara Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Clara Street, Benwell, Newcastle Upon Tyne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 13:38 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 12:55.

Northern Powergrid (Northeast) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Twizzell Avenue Back

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:16.

Northern Powergrid (Northeast) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Twizzell Avenue Back

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 07:00 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Feb 2025 at 07:25.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Shibdon Bank

Northern Gas Networks are carrying out Utility repair and maintenance works on Shibdon Bank, Blaydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 09:23 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 14:15.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:27.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 08:24.

Northumbrian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Barcus Close Lane

Northumbrian Water are carrying out Utility repair and maintenance works on Barcus Close Lane, Tanfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:03 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 10 Feb 2025 at 11:11.

Northern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Sunniside Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 13:43.

Gateshead Metropolitan Borough Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Princesway Central

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Princesway Central, Team Valley, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 4 Feb 2025 at 07:51.

Gateshead Metropolitan Borough Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Princesway Central

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Princesway Central, Team Valley, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 4 Feb 2025 at 08:31.

Gateshead Metropolitan Borough Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Centralway

Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Centralway, Team Valley, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 4 Feb 2025 at 07:46.

Gateshead Metropolitan Borough Council logo
Until
2 Mar 2025
Details
View Map
Share
Follow
Centralway

Gateshead Metropolitan Borough Council are carrying out Section 50 on Centralway, Team Valley, Gateshead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 10 Feb 2025 at 12:47.

Newcastle City Council logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 12:47.

Northumbrian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Duckpool Lane

Northumbrian Water are carrying out Utility repair and maintenance works on Duckpool Lane, Whickham Central, Whickham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 08:58 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Feb 2025 at 14:11.

Northern Powergrid (Northeast) logo
Until
4 Mar 2025
Details
View Map
Share
Follow
North Street

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 09:20 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Feb 2025 at 09:33.

Northern Powergrid (Northeast) logo
Between
15 Feb and 7 Mar 2025
Details
View Map
Share
Follow
North Street

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Dec 2024 at 12:17.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Laverick Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Laverick Terrace (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:10.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Durham Road, Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road (Side), Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:13.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 23 May 2025
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 10:29.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Padstow Gardens Nos 1 To 17 Footpaths

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Padstow Gardens Nos 1 To 17 Footpaths, Chowdene, Gateshead.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 14:53.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chowdene Bank From Durham Road To Hertford

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chowdene Bank From Durham Road To Hertford, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 10:23.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Sunniside Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:52.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
William Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on William Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:50.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Welsh Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Welsh Terrace, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:51.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Mary Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mary Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:48.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Thomas Street (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Thomas Street (Side), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Elizabeth Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Elizabeth Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Newcastle City Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Scotswood Road

Newcastle City Council are proposing to carry out Highway improvement works on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 10:22.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jan 2025 at 14:42.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Feb 2025 at 11:16.

LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Benwell Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Benwell Lane, Benwell, Newcastle Upon Tyne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Feb 2025 at 08:22.

Gateshead Metropolitan Borough Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 23 Jan 2025 at 14:20.

Gateshead Metropolitan Borough Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 27 Jan 2025 at 15:15.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Dartmouth Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dartmouth Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 11:07.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Padstow Gardens Nos 1 To 17 Footpaths

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Padstow Gardens Nos 1 To 17 Footpaths, Chowdene, Gateshead.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 08:35.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Chowdene Bank From Durham Road To Hertford

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chowdene Bank From Durham Road To Hertford, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:32.

Northumbrian Water logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Sunniside Road

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 20 Jan 2025 at 10:33.

Gateshead Metropolitan Borough Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 23 Jan 2025 at 14:25.

Gateshead Metropolitan Borough Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Coach Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coach Road, Lobley Hill, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 27 Jan 2025 at 15:16.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Sandgate

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandgate, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:13.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Eden Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Eden Terrace, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:13.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Palmer Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Palmer Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:11.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Stanley Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:12.

Gateshead Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Lamesley Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lamesley Road, Lamesley, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 14:34.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 23 May 2025
Details
View Map
Share
Follow
Cromer Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromer Avenue, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 12:00.

Durham County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Oakwood

Durham County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:57.

Durham County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Fines Park

Durham County Council are proposing to carry out Highway repair and maintenance works on Fines Park, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 13:00.

Northumbrian Water logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
King Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on King Terrace (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:10.

Northumbrian Water logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
Rose Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rose Avenue (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:11.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Holmside Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmside Avenue, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 08:42.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Ellison Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Dunston, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 08:42.

Northern Gas Networks logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Teams Village Access Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Teams Village Access Road, Teams, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 10:58.

Durham County Council logo
Between
18 and 29 Mar 2025
Details
View Map
Share
Follow
Oakwood Court

Durham County Council are proposing to carry out Highway repair and maintenance works on Oakwood Court, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:57.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Lees Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lees Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:02.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Mona Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mona Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:05.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street, Stanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:08.

BT logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Dunston Road Back The New Collingwood Ph

BT are proposing to carry out Utility asset works on Dunston Road Back The New Collingwood Ph, Dunston, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jan 2025 at 09:53.

Northumbrian Water logo
LONG TERM
Between
31 Mar and 23 May 2025
Details
View Map
Share
Follow
Beaconsfield Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Beaconsfield Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:00.

Northumbrian Water logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Sunniside Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sunniside Road, Sunniside, Whickham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Jan 2025 at 08:10.

Northern Powergrid (Northeast) logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Twizell Avenue Access Track To Electricity Sub-station

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Twizell Avenue Access Track To Electricity Sub-station, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 11:25.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Southfields

Durham County Council are proposing to carry out Highway repair and maintenance works on Southfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 11:03.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Charles Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Charles Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 11:10.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Road Adjacent To Fire Station

Durham County Council are proposing to carry out Highway repair and maintenance works on Road Adjacent To Fire Station, High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:19.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Greens Bank

Durham County Council are proposing to carry out Highway repair and maintenance works on Greens Bank, West Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:06.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout), Chester-le-street.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:31.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
C4 (From A693 To County Boundary At Urpeth Forge)

Durham County Council are proposing to carry out Highway repair and maintenance works on C4 (From A693 To County Boundary At Urpeth Forge), High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 15:19.

Northern Powergrid (Northeast) logo
Between
3 and 16 Apr 2025
Details
View Map
Share
Twizzell Avenue Back

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Twizzell Avenue Back, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 11:36.

Northumbrian Water logo
LONG TERM
Between
7 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Eastfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Eastfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 13:34.

Northumbrian Water logo
LONG TERM
Between
7 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Westfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Westfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 14:55.

Northumbrian Water logo
Between
8 and 12 Apr 2025
Details
View Map
Share
Follow
Whinney Leas

Northumbrian Water are proposing to carry out Permanent reinstatement on Whinney Leas, Chopwell South, Chopwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 Jan 2025 at 09:21.

Northern Powergrid (Northeast) logo
Between
12 Apr and 2 May 2025
Details
View Map
Share
North Street

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on North Street, Winlaton, Blaydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 12:23.

Northern Gas Networks logo
Between
12 and 30 Apr 2025
Details
View Map
Share
Follow
Stella Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stella Road, Ryton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Jan 2025 at 13:22.

Newcastle City Council logo
Between
17 and 24 Apr 2025
Details
View Map
Share
Follow
Axwell Park View

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Axwell Park View, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 17 Jan 2025 at 09:50.

Newcastle City Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Scotswood Bridge

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Scotswood Bridge, Scotswood, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Newcastle City Council on 23 Jan 2025 at 14:15.

Northern Powergrid (Northeast) logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Burn Road

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Burn Road, Blaydon Burn, Blaydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 9 Dec 2024 at 12:27.

Newcastle City Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out roadworks on Scotswood Road, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 8 Jan 2025 at 09:05.

Newcastle City Council logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Scotswood Road

Newcastle City Council were proposing to carry out roadworks on Scotswood Road, Lemington, Newcastle Upon Tyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 8 Jan 2025 at 08:42.

Newcastle City Council logo
Between
5 and 8 May 2025
Details
View Map
Share
Follow
William Armstrong Drive

Newcastle City Council are proposing to carry out Highway repair and maintenance works on William Armstrong Drive, Newcastle Business Park, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 3 Feb 2025 at 16:19.

Northumbrian Water logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Plantation View

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Plantation View, West Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 07:49.

Northern Gas Networks logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Frome Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Frome Gardens, Chowdene, Gateshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:42.


Roadworks Map near to Burnopfield, NEWCASTLE UPON TYNE, NE16 6DL (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 14:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Burnopfield, NEWCASTLE UPON TYNE, NE16 6DL (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northumbrian Water logo
EMERGENCY
  
BARCUS CLOSE LANE 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway, Verge - Two-way signals
In Progress
Since: 10 Feb 2025 11:03
(Scheduled: 10 Feb 2025 - 17 Feb 2025)
0.7
Details
Share
Follow
2
Northumbrian Water logo
NEW ROAD 
(0.8 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 14 Feb 2025
0.8
Details
Share
Follow