ROADWORKS SUMMARY
Hillary Avenue, NEWCASTLE UPON TYNE, NE12 9LS
Introduction
View current and future planned roadworks and road closures for Hillary Avenue, NE12 9LS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hillary Avenue, NEWCASTLE UPON TYNE, NE12 9LS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hillary Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Tyne Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2022 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:31.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Bell Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2022 at 08:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 18 Apr 2024 at 13:32.
31 Jan 2025
North Tyneside Council are carrying out Section 50 on Liddell Street, North Shields.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 September 2022 at 07:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 13 May 2024 at 08:17.
28 Mar 2025
Newcastle City Council are carrying out Highway improvement works on Pilgrim Street, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 June 2023 at 07:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 15 Oct 2024 at 11:39.
7 Nov 2025
Newcastle City Council are carrying out Highway repair and maintenance works on Saint Thomas Street, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:39.
7 Nov 2025
Newcastle City Council are carrying out Highway repair and maintenance works on Richardson Road, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 30 Apr 2024 at 10:36.
7 Nov 2025
Newcastle City Council are carrying out Highway repair and maintenance works on Queen Victoria Road, Spital Tongues, Newcastle Upon Tyne.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Newcastle City Council on 7 Mar 2024 at 11:59.
31 Mar 2025
Newcastle City Council are carrying out Highway repair and maintenance works on Brunswick Place, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 09:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 3 Jul 2024 at 14:23.
1 Jun 2028
Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Tyne Bridge, Gateshead Central, Gateshead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:04.
31 May 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Heath Court, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:12.
31 May 2028
Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 07:00 and could run through until 31 May 2028. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Newcastle City Council on 15 Jan 2024 at 14:11.
1 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Central Motorway East A167m, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway and verge.
This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:56.
1 Jun 2028
Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway To Askew Road And Quaysgate To Park Lane, Gateshead Central, Gateshead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 24 Jan 2024 at 21:07.
1 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Tyne Bridge, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:53.
1 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on City Road, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 21:00.
1 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on New Bridge Street, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 20:00 and could run through until 1 June 2028. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 24 Jan 2024 at 20:59.
7 Mar 2025
Gateshead Metropolitan Borough Council are carrying out Highway improvement works on Bottle Bank, Gateshead Central, Gateshead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 07:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 29 Jan 2024 at 14:45.
28 Feb 2025
Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Askew Road, Gateshead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:51 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 6 Dec 2024 at 12:30.
23 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Corbridge Street, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 10:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 14:34.
23 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Raby Street, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 10:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:31.
23 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Shields Road, Newcastle Upon Tyne.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 10:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 07:53.
Friday
North Tyneside Council are carrying out Highway repair and maintenance works on Coast Road, North Tyneside.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 15:38 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by North Tyneside Council on 20 Nov 2024 at 11:52.
15 Jul 2024 and 7 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 28 Jun 2024 at 08:40.
15 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:23.
15 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Lombard Street, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:30 and could run through until 15 June 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:24.
14 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Queen Street, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:25.
14 Jun 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Akenside Hill, City Centre, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:30 and could run through until 14 June 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 5 Aug 2024 at 12:26.
11 Aug 2024 and 20 Dec 2025
Newcastle City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.
11 Aug 2024 and 20 Dec 2025
Newcastle City Council are proposing to carry out Highway improvement works on Park Terrace, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.
11 Aug 2024 and 20 Dec 2025
Newcastle City Council are proposing to carry out Highway improvement works on Claremont Road, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2024 and could run through until 20 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 20 May 2024 at 13:48.
26 Aug 2024 and 10 Jul 2028
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2024 and could run through until 10 July 2028. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 1 Jul 2024 at 08:21.
1 Sep 2024 and 1 Sep 2026
Network Rail were proposing to carry out Works for Rail Purposes on Heaton Park Road, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Nov 2024 at 13:58.
2 Sep 2024 and 4 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Russell Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 16 Jul 2024 at 11:57.
21 Jul 2028
Newcastle City Council are carrying out Highway repair and maintenance works on Quayside, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2024 at 20:00 and could run through until 21 July 2028. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 9 Sep 2024 at 09:13.
16 Sep 2024 and 7 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 18 Jun 2024 at 14:19.
16 Sep 2024 and 7 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wooley Street, Wallsend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 19 Jun 2024 at 09:45.
21 May 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 09:00 and could run through until 21 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 17 Sep 2024 at 10:20.
23 Sep 2024 and 20 Mar 2026
South Tyneside Council are proposing to carry out Highway improvement works on St Rollox Street, Hebburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 March 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Tyneside Council on 21 Jun 2024 at 09:47.
20 Mar 2026
South Tyneside Council are carrying out Highway improvement works on St Rollox Street, Hebburn.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 07:00 and could run through until 20 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by South Tyneside Council on 23 Sep 2024 at 07:56.
7 Mar 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Buddle Street, Wallsend.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 23 Sep 2024 at 09:25.
23 Sep 2024 and 20 May 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wallsend Bus Station, Wallsend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 1 Jul 2024 at 13:01.
7 Mar 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Atkinson Street, Wallsend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 23 Sep 2024 at 09:24.
23 Sep 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchill Street, Wallsend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 10:58.
24 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Churchill Street, Wallsend.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 14:41.
23 Sep 2024 and 2 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bedford Street, North Shields.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 28 Aug 2024 at 09:48.
16 Oct 2025
North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.
14 Jan 2026
North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.
2 Oct 2024 and 30 Sep 2025
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.
2 Oct 2024 and 30 Sep 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.
4 Oct 2024 and 2 Oct 2025
North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.
Friday
Newcastle City Council are proposing to carry out Section 50 on Benfield Road, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 18 Sep 2024 at 10:39.
16 Oct 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.
19 Oct 2024 and 13 Feb 2025
Newcastle City Council are proposing to carry out Highway improvement works on City Road, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 13 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Newcastle City Council on 8 Oct 2024 at 10:35.
14 Mar 2025
North Tyneside Council are carrying out Section 50 on The Silverlink North, Wallsend.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 16:59.
Friday
Newcastle City Council are carrying out Section 50 on Benfield Road, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Newcastle City Council on 12 Nov 2024 at 10:03.
4 Nov 2024 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Seghill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 18 Jun 2024 at 13:03.
8 Nov 2024 and 16 Oct 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.
8 Nov 2024 and 16 Oct 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.
11 Nov 2024 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chirton Wynd, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 09:42.
Friday
Gateshead Metropolitan Borough Council are proposing to carry out Section 50 on Jonadab Street, Pelaw, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 31 Oct 2024 at 14:57.
18 Nov 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Seghill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 16:23.
25 Nov 2024 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chirton Wynd, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 08:35.
28 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Chirton Wynd, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 12:00 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 12:57.
31 Jul 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Wellington Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 11:01.
31 Jul 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Bedford Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.
31 Jul 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Russell Street, North Shields.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 25 Nov 2024 at 10:54.
31 Jul 2025
North Tyneside Council are carrying out Highway repair and maintenance works on Nile Street, North Shields.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 12:00 and could run through until 31 July 2025. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by North Tyneside Council on 27 Nov 2024 at 12:48.
Friday
Northumbrian Water are carrying out Utility repair and maintenance works on Abinger Street, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 09:40.
Friday
Northumbrian Water are carrying out Utility repair and maintenance works on Mansfield Street, Arthurs Hill, Newcastle Upon Tyne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 09:39.
2 Dec 2024 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:19.
Friday
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on The Avenue, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Nov 2024 at 14:25.
Friday
Northern Powergrid (Northeast) are carrying out Utility asset works on The Avenue, Seaton Delaval.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:10 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Dec 2024 at 12:56.
4 Dec 2024 and 8 Jan 2025
North Tyneside Council are proposing to carry out Section 50 on New York Road, New York, North Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Tyneside Council on 11 Sep 2024 at 14:48.
10 Jan 2025
South Tyneside Council are carrying out Highway repair and maintenance works on Albert Road Flyover, Jarrow.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 18:00 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Tyneside Council on 6 Dec 2024 at 08:38.
6 Dec 2024 and 22 Apr 2025
Newcastle City Council are proposing to carry out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 22 April 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Newcastle City Council on 13 Sep 2024 at 09:46.
Tuesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Monkseaton, Whitley Bay.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 10:41 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 13:37.
Tomorrow
Northumbrian Water are carrying out Utility repair and maintenance works on East Parade Lane At Rear Of 6-26, Whitley Bay.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:51 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 15:31.
10 Dec 2024 and 14 Feb 2025
North Tyneside Council were proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 17 Dec 2024 at 10:21.
12 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Houxty Road, Wellfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.
12 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kielder Place, Wellfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 08:52.
Tomorrow
Northumbrian Water are carrying out Utility repair and maintenance works on Coatsworth Road Nos 35 To 83 And Hillfield Street Nos 2 To 50 Back, Bensham, Gateshead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 09:50 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 10:06.
15 Jan 2025
Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Lower Level - Park Lane To Sunderland Road Roundabout, Gateshead Central, Gateshead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 15:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 08:16.
15 Jan 2025
Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gateshead Highway Upper Level, Gateshead Central, Gateshead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 15:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Dec 2024 at 08:05.
27 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Westfield Drive, Gosforth, Newcastle Upon Tyne.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 21:20 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 14:33.
13 Dec 2024 and 20 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 20 Sep 2024 at 12:17.
30 Apr 2025
Newcastle City Council are carrying out Highway improvement works on Grainger Park Road, Elswick, Newcastle Upon Tyne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 08:21.
Friday
Newcastle City Council are proposing to carry out Highway improvement works on Ninth Avenue, Heaton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 11:30.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Sep 2024 at 08:40.
Friday
Northumbrian Water are carrying out Utility repair and maintenance works on Bewicke Road Lane At Rear Of 2-32, Willington Quay, Wallsend.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 09:06 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 09:06.
16 and 27 Dec 2024
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ridley Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:42.
Friday
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:08.
Friday
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Holystone Drive, Holystone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 10:29.
Tuesday
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Eastfield Avenue, West Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 24 Sep 2024 at 12:30.
Tuesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Elmfield Road, Gosforth, Newcastle Upon Tyne.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 11:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 15:01.
Tuesday
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Walter Terrace, Arthurs Hill, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 19 Sep 2024 at 14:40.
18 Dec 2024 and 21 Jan 2026
North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.
This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.
Friday
Newcastle City Council are proposing to carry out Highway improvement works on Ninth Avenue, Heaton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 4 Dec 2024 at 07:54.
27 Dec 2024 and 30 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:08.
27 Dec 2024 and 3 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 09:20.
27 Dec 2024 and 10 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Benton Lane, Longbenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 09:20.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Hadrian Road Road Giving Access To Works, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:13.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dene Crescent, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:15.
1 Jan and 31 May 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Station Road North, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:14.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Mullen Road, High Farm, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Coast Road, North Tyneside.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:07.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:19.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Bird Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Brewhouse Bank, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:06.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on South Croft, Forest Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on East Bailey, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Sixteen, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:24.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Beacon Drive, Wideopen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 28 Oct 2024 at 09:10.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Marine Avenue, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park View, Monkseaton, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:11.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ilfracombe Gardens, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:12.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rayleigh Drive, Wideopen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:08.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Dudley To Fordley Link Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:22.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Link Road Between B1505 Roundabout And A189 Roundabout, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 08:23.
1 Jan and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Front Street, Annitsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 4 Oct 2024 at 09:05.
2 Jan and 12 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunderland Road From Shields Road To Dual Carriageway Link To Sunderland Road A167 Roundabout, Gateshead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:10.
3 Jan and 20 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Northcott Gardens, Seghill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 14:04.
6 and 31 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Watermill Lane Nos 13 - 36 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 11:25.
6 and 31 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Highbury Nos 4 To 12 And The Drive Nos 4 To 12 And The Green Nos 4 To 11 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 11:26.
6 and 10 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Camborne Grove And Prince Consort Road Nos 191 To 243 Back, Shipcote, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 11:13.
6 and 10 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Camborne Grove And Prince Consort Road Nos 191 To 243 Back, Shipcote, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 07:37.
6 Jan and 14 Mar 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Jackson Street, Gateshead Central, Gateshead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 15 Aug 2024 at 15:30.
6 Jan and 14 Mar 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Jackson Street, Gateshead Central, Gateshead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 16 Aug 2024 at 07:54.
6 and 9 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Lancefield Avenue, Walker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:58.
6 and 10 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 30 Sep 2024 at 11:22.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Glen Street, Hebburn.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:19.
6 and 24 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Rear Of Glen Street, Hebburn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:19.
6 and 24 Jan 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Shields Road, Byker, Newcastle Upon Tyne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 19 Nov 2024 at 10:55.
6 and 9 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 11:15.
6 and 17 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 12:56.
6 and 17 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 08:29.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:23.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 5 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 11:49.
6 Jan and 5 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 09:24.
6 and 24 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 10:14.
6 and 24 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on A190 Seghill To Avenue Road Seaton Delaval, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 16:20.
6 and 24 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Avenue Road, Seaton Delaval.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 5 Dec 2024 at 16:16.
7 and 11 Jan 2025
Northumbrian Water are proposing to carry out Remedial works on Garden Drive, Hebburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 2 Oct 2024 at 09:30.
7 and 27 Jan 2025
Murphy Power Distribution are proposing to carry out New service connection on Shields Road, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 19 Nov 2024 at 11:53.
7 and 27 Jan 2025
Murphy Power Distribution were proposing to carry out New service connection on Shields Road, Byker, Newcastle Upon Tyne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 25 Nov 2024 at 11:58.
8 and 10 Jan 2025
Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 14:59.
8 and 10 Jan 2025
Virgin Media are proposing to carry out Utility asset works on York Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 17 Dec 2024 at 13:35.
9 and 15 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Sanderson Road, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 5 Dec 2024 at 09:11.
9 and 22 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Binswood Avenue, Blakelaw, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 07:33.
13 Jan and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Watermill Lane Nos 13 - 36 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 15:28.
13 Jan and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Highbury Nos 4 To 12 And The Drive Nos 4 To 12 And The Green Nos 4 To 11 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 15:28.
13 Jan and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bondene Avenue West And Rochester Terrace Back, Felling Central, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 11:23.
13 Jan and 9 Apr 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Gainers Terrace, Wallsend.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 28 Nov 2024 at 12:09.
13 and 17 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Whitefield Terrace, Heaton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 11:25.
13 Jan and 18 Apr 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Firfield Road, Blakelaw, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:54.
13 and 17 Jan 2025
Northumbrian Water are proposing to carry out Remedial works on Balmoral Terrace, South Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 24 Oct 2024 at 09:38.
13 and 17 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 15 Oct 2024 at 08:41.
13 and 31 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Hazeldene Avenue, Kenton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 25 Oct 2024 at 09:05.
13 and 15 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Broadway East, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 7 Oct 2024 at 10:51.
15 and 17 Jan 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Broadway East, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 22 Oct 2024 at 14:40.
15 and 21 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Earsdon Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 30 Oct 2024 at 09:06.
20 and 31 Jan 2025
Newcastle City Council are proposing to carry out Section 50 on Bolam Street, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 09:30.
20 and 31 Jan 2025
Newcastle City Council are proposing to carry out Section 50 on Bolam Street, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 25 Nov 2024 at 09:31.
20 and 31 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Chorley Place, Walker, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 13:34.
20 and 31 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Chorley Place, Walker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Oct 2024 at 06:56.
20 and 31 Jan 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Chorley Place, Walker, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Oct 2024 at 07:52.
20 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Street, Byker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:30.
20 Jan and 20 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.
20 Jan and 20 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by North Tyneside Council on 5 Sep 2024 at 13:28.
27 Jan and 21 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Watermill Lane Nos 13 - 36 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 11:37.
27 Jan and 21 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Heworth Burn Crescent Nos 3 To 31 And The Drive Nos 24 To 32 And The Green Nos 12 To 23 Back, Bog House Estate, Felling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 11:39.
27 and 31 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kingsley Terrace, Elswick, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 12:49.
27 Jan and 27 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Buddle Street, Wallsend.
These works are categorised as Major.
The works will start on or after 27 January 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Dec 2024 at 07:54.
27 Jan and 4 Feb 2025
BT are proposing to carry out roadworks on Laurel Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Nov 2024 at 13:08.
27 Jan and 4 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Laurel Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 5 Dec 2024 at 10:49.
27 and 31 Jan 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Bedford Avenue, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 26 Nov 2024 at 10:21.
27 and 31 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 17 Dec 2024 at 15:23.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrass Avenue, Seghill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 15:20.
27 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirston Drive, Mayfield Dale, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:16.
27 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirston Drive, Mayfield Dale, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:28.
27 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:26.
27 Jan and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Road, Mayfield Grange, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:39.
28 and 30 Jan 2025
BT are proposing to carry out Utility asset works on Chandos Street And Raby Street Back, Shipcote, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 25 Oct 2024 at 15:39.
29 Jan and 3 Feb 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Wark Avenue, West Chirton, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 13 Nov 2024 at 10:21.
29 and 31 Jan 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Shiremoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 12 Nov 2024 at 10:48.
3 Feb and 14 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Heworth Lane, Heworth, Felling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 14:21.
3 Feb and 14 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sunderland Road From Laburnum Avenue To Shields Road, Heworth, Felling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 14:19.
3 and 5 Feb 2025
BT are proposing to carry out Utility asset works on Gladstone Terrace Nos 13 To 39 And Lincoln Street Back, Bensham, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 31 Oct 2024 at 09:39.
3 and 5 Feb 2025
BT are proposing to carry out Utility asset works on Prince Consort Road Nos 146 - 234 Back, Shipcote, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 31 Oct 2024 at 09:40.
3 Feb and 2 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Worswick Street, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Dec 2024 at 11:16.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Permanent reinstatement on Middle Street, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 14:49.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Benton Terrace, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 15 Oct 2024 at 07:25.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 08:44.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Remedial works on Mayfield Road, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 11:57.
3 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 11:39.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:04.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Turnberry Way, Mayfield Dale, Cramlington.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:30.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 08:57.
3 and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on U9562 Footway Outside 77-104 Thirston Drive, Cramlington.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Dec 2024 at 10:21.
4 and 7 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Campville Lane At Side And Rear Of 1-23, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 11:52.
5 and 9 Feb 2025
Northumbrian Water are proposing to carry out Permanent reinstatement on Portland Terrace, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 07:23.
5 and 9 Feb 2025
Northumbrian Water are proposing to carry out Permanent reinstatement on Portland Terrace, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 13:28.
5 and 9 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coach House Lane, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 11 Nov 2024 at 15:05.
6 and 10 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, Elswick, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 15 Nov 2024 at 14:51.
10 and 14 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saltmeadows Road, East Gateshead, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 10:06.
10 and 14 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Princes Street Lane At Side And Rear Of 52-78, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 12:19.
10 Feb and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Killingworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:06.
10 Feb and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Garth Twenty Four, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:53.
10 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:25.
10 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:05.
10 Feb and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Cranham Close, Ashdown Manor, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:55.
10 Feb and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Alderley Drive, Ashdown Manor, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.
10 Feb and 31 Mar 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ashley Close, Ashdown Manor, Killingworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 18 Nov 2024 at 15:54.
10 Feb and 7 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Blyth Valley Footpath 123, Blyth.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, verge, cycleway and footpath.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 09:59.
10 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Avenue, Mayfield Grange, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:09.
11 Feb and 25 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kings Road South, Wallsend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Nov 2024 at 09:18.
14 and 16 Feb 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Affleck Street And Claremont North Avenue Back, Bensham, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 09:49.
14 and 16 Feb 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Alexandra Road Nos 145 To 159 Back, Bensham, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 10:10.
14 and 16 Feb 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Affleck Street And Havelock Terrace Back Lane, Bensham, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 10:17.
15 and 17 Feb 2025
Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Claremont South Avenue, Bensham, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Sep 2024 at 09:10.
17 and 21 Feb 2025
Murphy Power Distribution were proposing to carry out New service connection on Blandford Square, Rye Hill, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 12:56.
17 and 21 Feb 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Blandford Square, Rye Hill, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 14 Nov 2024 at 15:12.
17 and 21 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Terrace Lane At Rear Of 35-public House, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 15:24.
17 and 21 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Young Road, Forest Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 13 Nov 2024 at 09:21.
17 Feb and 7 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Holyfields, West Allotment.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:57.
17 Feb and 21 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Monkseaton Drive, Whitley Bay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 5 Dec 2024 at 13:13.
17 Feb and 21 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on The Chesters, Beaumont Park, Whitley Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Dec 2024 at 09:30.
17 Feb and 29 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on B1505 Sea View Villas To Shankhouse, Cramlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:23.
19 Feb and 4 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Chorley Place, Walker, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 08:06.
19 Feb and 5 Mar 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on New Mills, Arthurs Hill, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 19 Nov 2024 at 13:24.
22 and 26 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saltmeadows Road, East Gateshead, Gateshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 11:18.
23 Feb and 9 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:46.
23 Feb and 9 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saville Street West, North Shields.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:54.
23 Feb and 9 Mar 2025
Northumbrian Water were proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 February 2025 and run through until 9 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 28 Nov 2024 at 14:51.
23 Feb and 9 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Little Bedford Street Lane At Side And Rear Of Warehouses, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 10 Dec 2024 at 15:52.
24 Feb and 4 Apr 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sunderland Road From Shields Road To Dual Carriageway Link To Sunderland Road A167 Roundabout, Gateshead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northumbrian Water on 7 Oct 2024 at 14:20.
24 Feb and 13 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 13:01.
24 Feb and 7 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.
24 Feb and 7 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Oct 2024 at 09:51.
24 Feb and 7 Mar 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Norham Road, Gosforth, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 13:47.
24 and 28 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Edwins Avenue South Lane At Rear Of 2-26, Forest Hall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:16.
28 Feb and 6 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:26.
28 Feb and 6 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Fern Avenue, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:31.
28 Feb and 6 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Manor House Road, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:28.
28 Feb and 6 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Queens Road, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:24.
28 Feb and 13 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Laurel Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Nov 2024 at 09:42.
3 Mar and 20 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Durham Road, Gateshead.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 09:33.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:09.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 07:45.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 08:09.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Grosvenor Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 08:10.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Nov 2024 at 18:24.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Salisbury Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 11:47.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 10:03.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Ripon Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 10:04.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Deuchar Street, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:16.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Kimberley Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:15.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 08:01.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 28 Nov 2024 at 12:06.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Holly Avenue, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:22.
3 and 7 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cartington Terrace, Heaton, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 21 Nov 2024 at 13:21.
3 and 14 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Gowan Terrace, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 09:13.
3 and 7 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Statutory Infrastructure Works on Buston Terrace, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Dec 2024 at 10:19.
3 and 17 Mar 2025
BT are proposing to carry out roadworks on Laurel Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Nov 2024 at 13:48.
3 and 17 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Laurel Street, Wallsend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Dec 2024 at 12:42.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Angus Close, Killingworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 07:57.
5 and 11 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Shortridge Terrace, Jesmond, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 5 Dec 2024 at 13:09.
6 Mar and 6 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Tanners Bank, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.
6 Mar and 6 Jun 2025
North Tyneside Council are proposing to carry out Highway repair and maintenance works on Preston Road, Preston, North Shields.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Tyneside Council on 12 Dec 2024 at 13:55.
10 Mar and 23 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunderland Road From Shields Road To Dual Carriageway Link To Sunderland Road A167 Roundabout, Gateshead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 23 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 16:09.
10 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Saint Nicholas Church Yard, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 13:35.
10 and 14 Mar 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Lansdowne Gardens, Sandyford, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 29 Nov 2024 at 11:20.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Graham Park Road, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:16.
10 Mar and 30 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Gosforth, Newcastle Upon Tyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:13.
10 and 14 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Links Avenue, Cullercoats.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 10:53.
10 and 14 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 17 Dec 2024 at 10:56.
17 and 26 Mar 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westmorland Road, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 17 Dec 2024 at 10:31.
17 and 28 Mar 2025
Newcastle City Council are proposing to carry out Highway repair and maintenance works on Westbourne Avenue, Walkergate, Newcastle Upon Tyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Newcastle City Council on 17 Dec 2024 at 10:20.
17 and 21 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Broadway, Cullercoats.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 11 Dec 2024 at 17:44.
17 Mar and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Bailey, Killingworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:17.
17 and 21 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on St Ronans Road, Whitley Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 09:42.
Roadworks Map near to Hillary Avenue, NEWCASTLE UPON TYNE, NE12 9LS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hillary Avenue, NEWCASTLE UPON TYNE, NE12 9LS (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 20 Dec 2024)
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
(Scheduled: 13 Dec 2024 - 20 Dec 2024)
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.