ROADWORKS SUMMARY
Pinkham Way, LONDON, N11 2UU
Introduction
View current and future planned roadworks and road closures for Pinkham Way, N11 2UU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Pinkham Way, LONDON, N11 2UU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pinkham Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 May 2027
Transport for London (TfL) are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 00:01 and could run through until 31 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 16:32.
29 Nov 2025 and 28 May 2027
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2025 and could run through until 28 May 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 23 Oct 2025 at 11:55.
2 Nov 2026
Thames Water are carrying out Utility repair and maintenance works on Crouch Hill, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 February 2026 at 08:00 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Feb 2026 at 08:46.
30 Sep 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on King Henry's Walk, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 March 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 4 Sep 2026 at 07:53.
30 Sep 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on Queen Margaret's Grove, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 March 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Sep 2026 at 07:53.
27 Sep 2026
London Borough Of Haringey are carrying out Highway improvement works on Caxton Road, Wood Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 5 May 2026 at 08:25.
18 Dec 2026
Thames Water are carrying out Utility asset works on Hampstead Way, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2026 at 13:00 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 14:40.
29 Nov 2026
HS2 are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 April 2026 at 00:01 and could run through until 29 November 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.
This roadwork event was last updated by HS2 on 16 Sep 2026 at 10:55.
30 Sep 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on King Henry's Walk, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2026 at 07:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Sep 2026 at 07:55.
3 Oct 2026
London Borough Of Enfield are carrying out Highway improvement works on Watermead Way, Tottenham, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 3 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 5 May 2026 at 09:13.
3 Oct 2026
London Borough Of Enfield are carrying out Highway improvement works on Leeside Road, Tottenham, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 3 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 5 May 2026 at 09:13.
3 Oct 2026
London Borough Of Enfield are carrying out Highway improvement works on Meridian Way, Edmonton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 3 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 5 May 2026 at 09:13.
27 Sep 2026
London Borough Of Haringey are carrying out Highway repair and maintenance works on Mayes Road, Wood Green, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 5 May 2026 at 08:17.
27 Sep 2026
London Borough Of Haringey are carrying out Highway repair and maintenance works on Brook Road, Wood Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 5 May 2026 at 08:18.
31 Oct 2026
London Borough Of Enfield are carrying out Highway repair and maintenance works on London Road, Enfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 May 2026 at 06:20 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 23 Jun 2026 at 08:25.
Sunday
London Borough Of Enfield are carrying out Section 50 on Cuckoo Hall Lane, Edmonton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 May 2026 at 08:01 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 24 Aug 2026 at 08:48.
18 Jan 2027
Thames Water are carrying out Utility asset works on Croyland Road, Edmonton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2026 at 08:00 and could run through until 18 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jun 2026 at 08:55.
2 Jun 2027
London Borough Of Barnet are carrying out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2026 at 10:00 and could run through until 2 June 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2026 at 14:50.
20 Oct 2026
Thames Water are carrying out Utility asset works on Chalfont Road, Edmonton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 June 2026 at 08:00 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:11.
31 Jan 2027
Thames Water are carrying out Utility asset works on Carpenter Gardens, Southgate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 June 2026 at 07:04 and could run through until 31 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Jun 2026 at 07:04.
27 May 2027
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Penshurst Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 June 2026 at 09:00 and could run through until 27 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 15:39.
15 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on White Hart Lane, Tottenham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 June 2026 at 17:30 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 11:56.
26 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 2 July 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2026 at 09:08.
26 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 2 July 2026 at 08:00 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2026 at 09:08.
16 Oct 2026
Thames Water are carrying out Utility repair and maintenance works on Wargrave Avenue, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 July 2026 at 11:00 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jul 2026 at 12:32.
25 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Crowland Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 July 2026 at 11:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:40.
24 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 08:00 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 08:11.
24 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 08:00 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 08:12.
24 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Woodberry Grove, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 08:00 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 08:10.
24 Oct 2026
Transport for London (TfL) are carrying out Highway improvement works on Woodberry Grove, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 08:00 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 08:10.
2 Nov 2026
Thames Water are carrying out Utility asset works on Highbury Grove, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 08:00 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 07:30.
20 Jul and 28 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Aberdeen Lane, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 29 Jun 2026 at 15:27.
27 Sep 2026
Thames Water are carrying out Utility asset works on Aberdeen Lane, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 July 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Jul 2026 at 08:35.
25 Oct 2026
Thames Water are carrying out Utility asset works on Firs Park Avenue, Southgate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2026 at 12:06 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2026 at 12:44.
21 Oct 2026
London Borough Of Barnet are carrying out Highway improvement works on Limes Avenue, Golders Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 July 2026 at 08:00 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2026 at 11:47.
27 Jul and 11 Oct 2026
Thames Water are proposing to carry out Statutory Infrastructure Works on Hadley Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 17 Jun 2026 at 14:28.
Today
London Borough Of Camden are carrying out Highway repair and maintenance works on King Henry's Road, Swiss Cottage, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Sep 2026 at 17:43.
3 Aug 2026 and 2 Aug 2027
Transport for London (TfL) are proposing to carry out roadworks on Avenue Road, Swiss Cottage, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 August 2026 and could run through until 2 August 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 10:37.
Monday
London Borough Of Haringey are carrying out Remedial works on The Broadway, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 09:43 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 1 Sep 2026 at 12:49.
Monday
London Borough Of Haringey are carrying out Highway repair and maintenance works on The Broadway, Hornsey, London.
These works are categorised as Major.
The works started on 3 August 2026 at 08:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 1 Sep 2026 at 12:49.
3 Aug and 22 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Grove, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2026 and could run through until 22 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2026 at 15:12.
3 Aug and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nether Street, Dollis Road To Ballards Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 August 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2026 at 15:12.
15 Oct 2026
Thames Water are carrying out Utility repair and maintenance works on Crouch Hill, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2026 at 08:08 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Aug 2026 at 08:17.
3 Oct 2026
London Borough Of Haringey are carrying out Highway repair and maintenance works on St Anns Road, Tottenham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 08:00 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 3 Sep 2026 at 12:04.
26 Nov 2026
Thames Water are carrying out Utility asset works on Lopen Road, Edmonton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2026 at 11:45 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 11:39.
25 Oct 2026
Thames Water are carrying out Utility asset works on Halstead Gardens, Southgate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 11:15 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 11:19.
Friday
Thames Water are carrying out Utility repair and maintenance works on Lockmead Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 August 2026 at 11:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 12:04.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Fleet Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 14:10.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Mansfield Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 14:10.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Southampton Road, Haverstock, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 14:11.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Agincourt Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 14:11.
17 Aug and 15 Oct 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Ella Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 August 2026 and run through until 15 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:43.
23 Dec 2026
Thames Water are carrying out Utility asset works on Farrer Road, Hornsey, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 15:30 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:57.
Sunday
Thames Water are proposing to carry out Statutory Infrastructure Works on Watermead Way, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 17:00.
Sunday
Thames Water are proposing to carry out Statutory Infrastructure Works on Leeside Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 17:01.
13 Oct 2026
Thames Water are carrying out Utility asset works on Etheldene Avenue, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2026 at 08:18 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 08:18.
25 Sep 2026
London Borough Of Camden are carrying out Highway repair and maintenance works on Harley Road, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 24 Aug 2026 at 08:06.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Churchill Road, Highgate, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2026 at 20:55 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 10:06.
27 Aug and 15 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Ella Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Aug 2026 at 15:41.
29 Nov 2026
Thames Water are carrying out Utility asset works on Meadway, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 11:30 and could run through until 29 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:22.
2 Oct 2026
Thames Water are carrying out Utility asset works on The Mount Square, Hampstead Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:28.
1 Sep and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2026 at 11:57.
1 Sep and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Finsbury Park Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 May 2026 at 11:11.
1 Sep and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Wilberforce Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2026 at 14:17.
1 Sep and 11 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2026 at 11:56.
2 Nov 2026
Thames Water are carrying out Utility asset works on Jacksons Lane, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 12:00 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 13:52.
28 Sep 2026
Thames Water are carrying out Utility asset works on Southwood Lawn Road, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 08:37.
1 Sep and 22 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Grahame Park Way, Grahame Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2026 at 15:02.
26 Nov 2026
Thames Water are carrying out Utility asset works on Tregaron Avenue, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 14:45 and could run through until 26 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 14:46.
19 Oct 2026
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Oakthorpe Road, Southgate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 13:00 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 12:05.
6 Nov 2026
Thames Water are carrying out Utility asset works on Sweet Briar Grove, Edmonton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 08:00 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 08:01.
4 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Grayling Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 11:34.
24 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Grayling Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 10:30 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:20.
8 Oct 2026
Thames Water are carrying out Utility repair and maintenance works on Granville Road, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 08:40 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:41.
7 Sep and 17 Oct 2026
London Borough Of Hackney were proposing to carry out Highway repair and maintenance works on Arcola Street, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 September 2026 and run through until 17 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 1 Sep 2026 at 14:49.
Saturday
Thames Water are carrying out Utility repair and maintenance works on York Rise, Highgate, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:20 and could run through until 19 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 09:07.
5 Oct 2026
Thames Water are carrying out Utility asset works on The Mount, Hampstead Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:28.
25 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Stamford Hill, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Sep 2026 at 09:53.
5 Oct 2026
Cadent Gas are carrying out Utility asset works on Sunnyside Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 09:05 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:07.
30 Nov 2026
Thames Water are carrying out Utility asset works on Stormont Road, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 11:00 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 11:14.
7 and 25 Sep 2026
Cadent Gas were proposing to carry out Utility asset works on Havelock Road, Tottenham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:22.
7 Sep and 11 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on High Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2026 at 18:40.
29 Nov 2026
London Borough Of Enfield are carrying out Section 50 on The Green, Edmonton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:00 and could run through until 29 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 8 Sep 2026 at 15:48.
5 Oct 2026
UK Power Distribution are carrying out New service connection on Goodwin Road, Edmonton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 11:41 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Distribution on 7 Sep 2026 at 12:18.
27 Sep 2026
London Borough Of Enfield are carrying out Section 50 on High Street, Enfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:01 and could run through until 27 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 7 Sep 2026 at 09:40.
Sunday
Thames Water are proposing to carry out Utility repair and maintenance works on Uplands Park Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 14:27.
13 Dec 2026
London Borough Of Enfield are carrying out Section 50 on Church Street, Edmonton.
These works are categorised as Major.
The works started on 8 September 2026 at 08:01 and could run through until 13 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 8 Sep 2026 at 15:51.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Charteris Road, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 09:36 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 08:14.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Tilney Gardens, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 07:25 and could run through until 18 September 2026. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:24.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Cathcart Street, Kentish Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 11:31 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 18:19.
Today
Thames Water are carrying out Utility repair and maintenance works on Sotheby Road, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:16 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:26.
23 Sep 2026
Thames Water are carrying out Utility repair and maintenance works on Casimir Road, Hackney, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 09:50 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 10:41.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Hornsey Road, Islington, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:54 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:06.
Today
Thames Water are carrying out Utility repair and maintenance works on Cromwell Avenue, Hornsey, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:45 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 07:56.
25 Sep 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on Dalmeny Avenue, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 08:01.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:26.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:24.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:26.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:28.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:24.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:23.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Wolstonbury, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:21.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Cissbury Ring South, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:14.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Offham Slope, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:19.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Cissbury Ring North, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:22.
11 Sep and 19 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Rodmell Slope, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 September 2026 and run through until 19 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:20.
Friday
Thames Water are carrying out Utility repair and maintenance works on Sturgess Avenue, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 11:11 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:00.
Friday
Thames Water are carrying out Utility repair and maintenance works on Shrewsbury Road, Southgate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 08:27 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 09:42.
Friday
Thames Water are carrying out Utility repair and maintenance works on Kingdon Road, West Hampstead, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 10:50.
Friday
Thames Water are carrying out Utility repair and maintenance works on Park Drive, Golders Green, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 09:58 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.
Friday
Thames Water are carrying out Utility repair and maintenance works on Cholmeley Park, Hornsey, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2026 at 11:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:01.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on The Ridgeway, Enfield.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:53.
14 Sep and 18 Dec 2026
London Borough Of Camden are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Sep 2026 at 15:39.
Today
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Oseney Crescent, Kentish Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 13 Aug 2026 at 22:02.
Today
London Borough Of Camden are carrying out Highway repair and maintenance works on Oseney Crescent, Kentish Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Sep 2026 at 08:06.
14 and 25 Sep 2026
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Belsize Avenue, Belsize, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 25 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 7 Sep 2026 at 08:51.
14 Sep and 9 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2026 at 15:33.
14 Sep and 3 Oct 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Whitehall Park, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 20 Jul 2026 at 10:42.
5 Oct 2026
London Borough Of Islington are carrying out Highway repair and maintenance works on Whitehall Park, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 14 Sep 2026 at 08:00.
14 Sep and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 08:27.
14 Sep and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 10:29.
14 Sep and 7 Dec 2026
Thames Water were proposing to carry out Utility asset works on View Road, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 7 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:35.
14 Sep and 7 Dec 2026
Thames Water were proposing to carry out Utility asset works on View Close, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 7 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:39.
25 Sep 2026
London Borough Of Haringey are carrying out Highway improvement works on Hatherley Gardens, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:03 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 14 Sep 2026 at 08:12.
Friday
London Borough Of Barnet are proposing to carry out Highway improvement works on South Square, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2026 at 14:47.
Friday
London Borough Of Barnet are proposing to carry out Highway improvement works on South Square, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2026 at 14:04.
Friday
London Borough Of Barnet are carrying out Highway improvement works on South Square, Golders Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:43 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 08:43.
London Borough Of Haringey carried out Highway repair and maintenance works on Ferry Lane, Tottenham, London.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 15 Sep 2026 (08:00) and 16 Sep 2026 (07:16). The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2026 at 07:16.
London Borough Of Haringey carried out Diversionary works on Ferry Lane, Tottenham, London.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 15 Sep 2026 (08:00) and 16 Sep 2026 (07:17). The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2026 at 07:17.
14 Sep and 10 Oct 2026
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Priors Croft, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 10 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 4 Sep 2026 at 16:01.
Friday
Cornerstone Telecommunications Infrastructure are carrying out Utility asset works on White Hart Lane, Tottenham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Sep 2026 at 10:55.
14 Sep and 18 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on High Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 12:12.
Monday
Thames Water are proposing to carry out New service connection on Pevensey Avenue, Southgate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2026 at 11:34.
Monday
Thames Water are carrying out New service connection on Pevensey Avenue, Southgate.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 15:37 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:49.
14 Sep and 20 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Church Street, Edmonton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 15:41.
Tomorrow
London Borough Of Barnet are proposing to carry out Highway improvement works on Oakleigh Park North, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2026 at 13:57.
Friday
Thames Water are carrying out Utility asset works on Scotland Green Road, Enfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 10:40 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:49.
14 Sep and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Ladysmith Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jul 2026 at 11:14.
14 Sep and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Ladysmith Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:01.
14 and 25 Sep 2026
Transport for London (TfL) were proposing to carry out Highway improvement works on Windmill Hill, Enfield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2026 at 11:12.
Today
BT are proposing to carry out Remedial works on Drapers Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Jul 2026 at 10:07.
Today
BT are proposing to carry out Remedial works on Drapers Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 24 Jun 2026 at 14:51.
Monday
Affinity Water are carrying out Utility repair and maintenance works on Arden Road, Finchley, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:29 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 11:21.
15 Sep and 12 Oct 2026
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Priors Croft, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 15 Sep 2026 at 15:41.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Japan Crescent, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 08:18 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 08:57.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Bull Lane, Edmonton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 09:50 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 09:52.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Sidney Avenue, Southgate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 09:28 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 10:03.
25 Sep 2026
Transport for London (TfL) are carrying out Highway improvement works on Windmill Hill, Enfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:48.
17 Sep and 9 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Bridport Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Aug 2026 at 10:15.
18 Sep and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Riverside Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 10:15.
18 Sep and 13 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Riverside Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:29.
Tuesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Aug 2026 at 14:52.
Tuesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 15:36.
Tuesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:58.
Monday
London Borough Of Haringey are proposing to carry out Highway improvement works on Princes Avenue, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 8 Jul 2026 at 13:15.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:08.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:25.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:00.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:25.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:08.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2026 at 14:54.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:00.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:17.
18 and 28 Sep 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 10:06.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:00.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:25.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 14:08.
Monday
London Borough Of Barnet are proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:25.
Monday
London Borough Of Haringey are proposing to carry out Highway improvement works on Muswell Hill Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 19 Jun 2026 at 12:13.
Monday
London Borough Of Haringey are proposing to carry out Highway improvement works on Downhills Way, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 24 Jun 2026 at 18:54.
Monday
London Borough Of Haringey are proposing to carry out Highway improvement works on Bruce Castle Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 22 Jun 2026 at 11:54.
Tuesday
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Page Street, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2026 and run through until 22 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:26.
19 and 29 Sep 2026
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way Service Road To Numbers 418-432, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 12:49.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Fleet Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 09:57.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Mansfield Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 09:50.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Southampton Road, Haverstock, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 09:50.
21 Sep and 6 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Agincourt Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 09:50.
21 Sep and 24 Dec 2026
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on South End Road, Hampstead Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 24 December 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:34.
21 Sep and 16 Oct 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fleet Road, Gospel Oak, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:32.
21 Sep and 19 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on St John's Way, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:51.
21 Sep and 5 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Hazellville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:00.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2026 at 15:11.
21 and 24 Sep 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:58.
21 Sep and 9 Oct 2026
Cadent Gas were proposing to carry out Utility asset works on Carew Road, Tottenham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:20.
21 Sep and 9 Oct 2026
Cadent Gas were proposing to carry out Utility asset works on Park View Road, Tottenham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:21.
21 Sep and 9 Oct 2026
Cadent Gas were proposing to carry out Utility asset works on Dowsett Road, Tottenham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:21.
21 and 25 Sep 2026
Cadent Gas are proposing to carry out New service connection on Watford Way Service Road To Numbers 418-432, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 08:58.
21 and 25 Sep 2026
Cadent Gas are proposing to carry out New service connection on Watford Way Service Road To Numbers 418-432, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:45.
21 Sep and 9 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on High Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2026 at 16:53.
21 Sep and 10 Oct 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Bounds Green Road, Bounds Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 13 Aug 2026 at 08:50.
21 and 25 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Road, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 15:35.
21 and 25 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Warwick Road, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 13:06.
21 Sep and 10 Oct 2026
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Powys Lane, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Aug 2026 at 14:58.
21 Sep and 29 Nov 2026
Thames Water are proposing to carry out Statutory Infrastructure Works on Upton Road, Edmonton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 14:05.
21 Sep and 2 Oct 2026
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Arnold Gardens, Southgate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2026 at 12:39.
21 Sep and 9 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on The Green, Southgate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 09:53.
21 Sep and 16 Oct 2026
Thames Water are proposing to carry out Utility asset works on Beechwood Mews, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Aug 2026 at 12:06.
21 Sep and 24 Oct 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Russell Lane, Whetstone, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2026 at 09:54.
21 Sep 2026 and 19 Apr 2027
Thames Water are proposing to carry out Utility asset works on Winchester Road, Edmonton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 19 April 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 15:09.
21 Sep and 3 Nov 2026
Thames Water are proposing to carry out Utility asset works on Darley Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 12:43.
21 and 23 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Galley Lane, Arkley Barnet Section, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 12:40.
21 Sep and 2 Oct 2026
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on The Crescent, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 12:31.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Browning Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 12:51.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Browning Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:22.
22 and 24 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Pelham Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jul 2026 at 13:26.
22 and 25 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Bedford Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2026 at 17:29.
22 and 25 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Bedford Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 13:12.
23 and 29 Sep 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Marshalls Close, New Southgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2026 at 08:01.
23 and 25 Sep 2026
BT are proposing to carry out Utility asset works on Carlton Avenue, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Aug 2026 at 09:54.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 12:12.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 16:31.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Spalding Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:04.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:12.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 12:14.
24 and 30 Sep 2026
Thames Water are proposing to carry out Utility asset works on Ridge Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:58.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Road, West Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:40.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Elliot Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:40.
24 and 26 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Graham Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:29.
24 and 26 Sep 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Mayes Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 12 Aug 2026 at 15:59.
25 Sep and 21 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:18.
25 Sep and 21 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:18.
25 Sep 2026 and 29 Mar 2027
Thames Water are proposing to carry out Utility repair and maintenance works on Gladesmore Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 29 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 10:15.
25 Sep 2026 and 29 Mar 2027
Thames Water are proposing to carry out Utility repair and maintenance works on Gladesmore Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 29 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 10:01.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:14.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:38.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:14.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:23.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:14.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:30.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:14.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:29.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:05.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:34.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:14.
25 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 10:32.
25 and 28 Sep 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2026 and run through until 28 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 06:41.
26 Sep and 13 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way, Mill Hill, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 13 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 12:55.
26 Sep and 13 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way, Mill Hill, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 13 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 09:50.
27 Sep and 13 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on The Chine, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2026 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:49.
28 Sep and 9 Oct 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Wadham Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Jun 2026 at 07:38.
28 Sep and 9 Oct 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Wadham Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2026 at 16:56.
28 Sep and 23 Oct 2026
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Pond Street, Hampstead Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:34.
28 Sep and 23 Oct 2026
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Fleet Road, Gospel Oak, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 23 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 4 Sep 2026 at 11:32.
28 Sep and 16 Oct 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Dalmeny Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 9 Jul 2026 at 07:13.
28 Sep and 19 Oct 2026
Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:20.
28 Sep and 19 Oct 2026
Thames Water were proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 19 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 11:52.
28 Sep and 19 Oct 2026
Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2026 at 18:25.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brentfield Gardens, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:02.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way On Slip Southbound From Brentfield Gardens Junction With Woodville Gardens, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 09:26.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Woodville Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:09.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Highfield Avenue, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:09.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:20.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:19.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Haley Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:53.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:53.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Denehurst Gardens, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:45.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Gardens, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:37.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:30.
28 and 30 Sep 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:19.
28 Sep and 13 Dec 2026
London Borough Of Enfield are proposing to carry out Section 50 on High Street, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 19 Aug 2026 at 09:31.
28 Sep and 16 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Anglesey Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:16.
28 Sep and 16 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Anglesey Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:16.
29 Sep and 9 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.
These works are categorised as Major.
The works will start on or after 29 September 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 30 Jul 2026 at 12:04.
29 Sep and 11 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:36.
29 Sep and 2 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:33.
29 Sep and 6 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Watermead Way, Tottenham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2026 at 11:18.
29 Sep and 6 Dec 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 6 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 11:12.
29 Sep and 12 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:13.
29 Sep and 12 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 11:58.
29 Sep and 12 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:43.
29 Sep 2026 and 26 Feb 2027
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 26 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:53.
29 Sep 2026 and 26 Feb 2027
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 26 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:18.
30 Sep and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:41.
30 Sep 2026 and 29 Jan 2027
Thames Water are proposing to carry out Utility repair and maintenance works on Nelson Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 10:18.
30 Sep 2026 and 29 Jan 2027
Thames Water are proposing to carry out Utility repair and maintenance works on Nelson Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Sep 2026 at 12:45.
1 and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:49.
1 and 29 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:37.
1 and 29 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:34.
1 and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.
1 and 3 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:44.
2 and 5 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring South, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:37.
2 and 5 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Wolstonbury, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:37.
2 and 5 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring North, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:37.
2 and 5 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:30.
5 and 30 Oct 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 4 Sep 2026 at 10:19.
5 and 24 Oct 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Arcola Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 1 Sep 2026 at 15:48.
5 Oct and 14 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Matthias Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 14 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 7 Aug 2026 at 15:46.
5 and 26 Oct 2026
Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 21:02.
5 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Mulkern Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 09:12.
5 Oct and 16 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2026 at 15:12.
5 and 10 Oct 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Coburg Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 10 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 13:33.
5 and 12 Oct 2026
Thames Water are proposing to carry out Utility asset works on Coppetts Road, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2026 at 14:29.
5 and 9 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 26 Aug 2026 at 16:10.
5 Oct and 1 Nov 2026
Murphy Gas Networks are proposing to carry out Utility asset works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Gas Networks on 9 Sep 2026 at 12:28.
5 and 23 Oct 2026
Aurora Utilities Limited are proposing to carry out Utility asset works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Aurora Utilities Limited on 3 Sep 2026 at 15:35.
5 and 12 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on King Edwards Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2026 at 12:54.
5 and 16 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Cardiff Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:01.
5 and 20 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Slades Hill, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Jul 2026 at 13:24.
5 and 20 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Slades Hill, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 09:55.
5 and 9 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Sebright Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Aug 2026 at 11:11.
6 and 10 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Dunstan Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2026 at 15:12.
6 Oct and 21 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 21 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2026 at 11:47.
6 and 30 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2026 at 14:12.
7 and 9 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Eastside Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2026 at 15:30.
7 and 9 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Eastside Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:56.
8 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Quakers Course, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2026 at 10:11.
9 and 11 Oct 2026
Thames Water are proposing to carry out Utility asset works on Royal College Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 12:44.
9 and 12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:53.
9 and 12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring South, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:53.
9 and 12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Offham Slope, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:53.
9 and 12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring North, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:53.
9 and 12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Rodmell Slope, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 13:53.
10 Oct and 14 Dec 2026
Thames Water are proposing to carry out Utility asset works on Cranley Gardens, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 10:29.
12 and 15 Oct 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on King Henry's Walk, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 14 Aug 2026 at 08:48.
12 and 15 Oct 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on King Henry's Walk, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 26 Aug 2026 at 15:06.
12 Oct and 22 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Albion Road, Hackney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 09:59.
12 Oct and 22 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Albion Grove, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 12:53.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Clissold Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 12:58.
12 and 16 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Cranwich Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 11:16.
12 Oct and 6 Nov 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Hatherley Gardens, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 2 Sep 2026 at 10:50.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Woodside Avenue, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 17:29.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Woodside Avenue, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 12:37.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lanchester Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 17:20.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lanchester Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 16:49.
12 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Fordington Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 14:15.
12 and 14 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Hampden Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2026 at 10:19.
12 Oct and 7 Nov 2026
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Thorpe Crescent, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 30 Jun 2026 at 13:59.
12 and 19 Oct 2026
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Powys Lane, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 1 Sep 2026 at 03:14.
12 and 23 Oct 2026
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wauthier Close, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Sep 2026 at 15:47.
12 Oct and 20 Nov 2026
London Borough Of Barnet are proposing to carry out roadworks on Friern Watch Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2026 at 14:21.
12 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on York Way, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 12 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2026 at 08:31.
12 Oct and 6 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Aberdare Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:23.
12 Oct and 30 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Ladysmith Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 18:40.
12 and 16 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:16.
12 and 16 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 11:59.
12 and 16 Oct 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:38.
13 and 16 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:38.
13 and 16 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:40.
13 and 16 Oct 2026
Thames Water are proposing to carry out New service connection on Fortis Green, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2026 at 12:48.
14 and 16 Oct 2026
BT are proposing to carry out Utility asset works on Cheviot Gardens, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Jul 2026 at 10:28.
14 and 16 Oct 2026
BT are proposing to carry out Utility asset works on Cheviot Gardens, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Sep 2026 at 14:02.
15 and 17 Oct 2026
London Borough Of Islington were proposing to carry out Highway repair and maintenance works on Eburne Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2026 and run through until 17 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 11:59.
15 and 20 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2026 at 11:05.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Walmington Fold, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:27.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Sussex Ring, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 08:00.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Argyle Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:18.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:22.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Chanctonbury Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:30.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Singleton Scarp, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:33.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Wolstonbury, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:43.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring South, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:40.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Offham Slope, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:49.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Cissbury Ring North, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:37.
16 and 19 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Rodmell Slope, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Sep 2026 at 07:46.
16 Oct and 6 Dec 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 6 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:21.
16 Oct and 6 Dec 2026
Thames Water are proposing to carry out Utility asset works on Fairgreen, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 6 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 15:14.
18 Oct and 2 Nov 2026
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on High Road, East Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2026 at 09:52.
18 Oct and 2 Nov 2026
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on High Road, North Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2026 at 09:50.
19 Oct and 19 Dec 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Gifford Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 19 December 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Islington on 17 Aug 2026 at 08:54.
19 Oct and 28 Nov 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Glenmore Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 28 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 15 Sep 2026 at 07:05.
19 Oct and 30 Nov 2026
Thames Water were proposing to carry out Utility asset works on The Grove, Highgate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2026 and run through until 30 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 12:09.
19 and 21 Oct 2026
London Borough Of Haringey are proposing to carry out roadworks on Station Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 31 Jul 2026 at 13:44.
19 and 21 Oct 2026
London Borough Of Haringey are proposing to carry out roadworks on Lordship Lane, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 31 Jul 2026 at 13:43.
19 Oct and 5 Nov 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Bounds Green Road, Wood Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 17 Aug 2026 at 12:00.
19 Oct and 3 Nov 2026
Thames Water are proposing to carry out Utility asset works on College Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2026 at 11:23.
19 Oct and 20 Nov 2026
London Borough Of Barnet are proposing to carry out roadworks on Mayfield Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2026 at 14:21.
19 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lambourne Gardens, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 08:24.
19 and 28 Oct 2026
Thames Water are proposing to carry out New service connection on Tudor Crescent, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 16:26.
19 and 25 Oct 2026
Cadent Gas are proposing to carry out New service connection on Brodie Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 15:36.
20 and 23 Oct 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2026 at 10:37.
20 and 25 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Culloden Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2026 at 13:52.
21 and 23 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Booth Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 30 Apr 2026 at 12:23.
22 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 16:31.
22 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:30.
22 Oct and 13 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:27.
23 Oct and 20 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Netherfield Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 3 Aug 2026 at 13:37.
23 Oct and 4 Dec 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Gainsborough Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 30 Jul 2026 at 10:29.
24 Oct and 1 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:55.
24 Oct and 2 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Station Road, Wood Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2026 at 14:07.
24 Oct and 1 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 16:15.
26 Oct and 5 Nov 2026
Thames Water are proposing to carry out Utility asset works on York Way, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 5 November 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Water on 5 Aug 2026 at 14:14.
26 and 30 Oct 2026
Hutchinson 3G are proposing to carry out Utility asset works on Weedington Road, Gospel Oak, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Hutchinson 3G on 19 Aug 2026 at 22:08.
26 Oct and 2 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Shelburne Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 4 Aug 2026 at 13:21.
26 Oct and 2 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Shelburne Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 28 Aug 2026 at 07:55.
26 Oct and 2 Nov 2026
London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Aug 2026 at 13:22.
26 Oct and 2 Nov 2026
London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 28 Aug 2026 at 07:56.
26 Oct and 8 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Barbauld Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2026 at 13:12.
26 Oct 2026 and 17 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 17 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 14:14.
26 Oct 2026 and 17 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 17 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 09:12.
26 Oct and 27 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:51.
26 Oct and 22 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on St John's Way, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 22 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:48.
26 Oct and 13 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Hazellville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:49.
26 Oct and 7 Dec 2026
Thames Water are proposing to carry out Utility asset works on The Grove, Highgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 12:11.
26 Oct and 7 Dec 2026
Thames Water are proposing to carry out Utility asset works on The Grove, Highgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 20:37.
26 Oct and 6 Nov 2026
Thames Water are proposing to carry out Utility asset works on Mount Pleasant Villas, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Sep 2026 at 12:33.
26 and 30 Oct 2026
London Borough Of Haringey are proposing to carry out Highway improvement works on Hermitage Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 11 Jun 2026 at 10:58.
26 and 29 Oct 2026
London Borough Of Haringey are proposing to carry out Highway improvement works on St Anns Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 17 Jul 2026 at 13:32.
26 and 28 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on High Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 12:43.
26 and 29 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Wroxham Gardens, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 18:10.
26 Oct and 6 Nov 2026
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Arnold Gardens, Southgate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Sep 2026 at 11:54.
26 and 28 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Percy Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2026 at 11:53.
26 and 30 Oct 2026
Thames Water are proposing to carry out New service connection on Barrowell Green, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:28.
26 Oct and 18 Dec 2026
Thames Water are proposing to carry out Utility asset works on Durham Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 14:57.
26 Oct and 28 Nov 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Pollard Road, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 28 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2026 at 09:54.
26 Oct and 30 Nov 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Oakleigh Road North, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 30 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2026 at 09:55.
26 and 30 Oct 2026
UK Power Networks Eastern & London were proposing to carry out New service connection on Oakleigh Park South, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 30 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2026 at 11:16.
26 and 31 Oct 2026
Thames Water are proposing to carry out New service connection on St Edmunds Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2026 at 13:55.
26 and 31 Oct 2026
Thames Water are proposing to carry out New service connection on St Edmunds Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:45.
26 Oct and 17 Nov 2026
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Chesterfield Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 17 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Sep 2026 at 11:22.
26 and 28 Oct 2026
BT are proposing to carry out New service connection on Newlands Place, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2026 at 11:42.
26 Oct and 6 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Anglesey Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:13.
26 Oct and 1 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Windmill Hill, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:55.
26 Oct and 1 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Bycullah Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Aug 2026 at 15:55.
26 and 30 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Churchbury Lane, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:43.
26 Oct and 9 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Herrongate Close, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 14:28.
26 and 28 Oct 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Holtwhites Hill, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 14:18.
26 and 28 Oct 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Holtwhites Hill, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 15:50.
26 and 30 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on The Ridgeway, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2026 at 10:00.
27 and 29 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Randolph Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Jul 2026 at 13:55.
27 and 29 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Randolph Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Sep 2026 at 13:17.
27 and 29 Oct 2026
Thames Water were proposing to carry out Utility repair and maintenance works on Sandbrook Road, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2026 and run through until 29 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 09:19.
27 Oct and 23 Dec 2026
Thames Water are proposing to carry out Utility asset works on Etheldene Avenue, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 12:34.
27 and 29 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Russell Avenue, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:42.
27 and 29 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Russell Avenue, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2026 at 10:04.
27 and 31 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Lindal Crescent, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:12.
27 and 31 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Lindal Crescent, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:08.
28 and 30 Oct 2026
Thames Water are proposing to carry out Remedial works on Bowman's Place, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Jul 2026 at 11:25.
28 Oct and 18 Dec 2026
National Grid Electricity Transmission are proposing to carry out Utility asset works on Watermead Way, Tottenham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by National Grid Electricity Transmission on 13 Jul 2026 at 16:55.
28 and 30 Oct 2026
London Borough Of Enfield are proposing to carry out Highway improvement works on Mount Pleasant, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 21 Jul 2026 at 16:32.
29 Oct and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:26.
29 Oct and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:37.
29 Oct and 20 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:26.
29 and 31 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Chase Side, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:22.
30 Oct and 26 Nov 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 26 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 27 Aug 2026 at 11:07.
30 Oct and 11 Dec 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Arcola Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 27 Aug 2026 at 10:57.
31 Oct and 23 Dec 2026
Thames Water were proposing to carry out Utility asset works on Cranley Gardens, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 October 2026 and run through until 23 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 09:32.
2 and 27 Nov 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 27 Aug 2026 at 11:04.
2 and 27 Nov 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 4 Sep 2026 at 11:00.
2 and 6 Nov 2026
Thames Water are proposing to carry out New service connection on Streatley Place, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 21:18.
2 and 4 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Eburne Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 11 Sep 2026 at 15:41.
2 and 4 Nov 2026
London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Eburne Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 14 Sep 2026 at 08:12.
2 and 4 Nov 2026
Thames Water are proposing to carry out Disconnection or alteration of supply on Chester Road, Highgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:11.
2 Nov 2026 and 25 Jan 2027
Thames Water are proposing to carry out Utility asset works on Cholmeley Park, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 10:35.
2 and 6 Nov 2026
Thames Water are proposing to carry out New service connection on Garfield Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2026 at 14:35.
2 Nov and 4 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Brecon Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:32.
2 and 16 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Connaught Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 14:28.
2 and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Fillebrook Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 14:40.
2 and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Willow Road, Enfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 14:27.
3 Nov and 16 Dec 2026
Thames Water are proposing to carry out Utility asset works on Tranmere Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 12:43.
4 and 25 Nov 2026
Cadent Gas were proposing to carry out Utility asset works on Green Lanes, Hackney, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2026 and run through until 25 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:01.
4 and 6 Nov 2026
Thames Water are proposing to carry out Statutory Infrastructure Works on Bruce Castle Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2026 at 16:56.
4 and 18 Nov 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Bounds Green Road, Bounds Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 10 Aug 2026 at 14:58.
5 and 9 Nov 2026
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Ferry Lane, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 6 Aug 2026 at 19:37.
6 and 30 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Marigold Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2026 and could run through until 30 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2026 at 10:28.
9 and 13 Nov 2026
Network Rail were proposing to carry out Works for Rail Purposes on Stroud Green Road, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 08:47.
9 and 13 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Stroud Green Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 08:59.
9 Nov and 14 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Sussex Way, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:48.
9 Nov and 14 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Sussex Way, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:55.
9 and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:47.
9 and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Courtauld Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:47.
9 and 30 Nov 2026
Thames Water are proposing to carry out Utility asset works on Hampstead Lane, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:53.
9 and 23 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Queens Parade Close, New Southgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 11:51.
9 Nov and 21 Dec 2026
Thames Water are proposing to carry out Utility asset works on Findon Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2026 at 12:30.
9 and 20 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Tenby Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:32.
10 and 13 Nov 2026
Thames Water are proposing to carry out New service connection on Fraser Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2026 at 10:38.
10 and 13 Nov 2026
Thames Water are proposing to carry out New service connection on Fraser Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 20:13.
11 Nov and 18 Dec 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on South End Road, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Camden on 7 Sep 2026 at 14:56.
11 and 14 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:37.
11 and 17 Nov 2026
BT are proposing to carry out New service connection on Yew Tree Close, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Aug 2026 at 08:08.
12 and 14 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 08:45.
13 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Brentfield Gardens, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:25.
13 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:25.
13 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:20.
13 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:24.
13 and 17 Nov 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:18.
14 and 18 Nov 2026
London Borough Of Haringey are proposing to carry out Diversionary works on Forest Road, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 11 Sep 2026 at 10:37.
14 Nov and 4 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Taylors Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 4 Aug 2026 at 10:08.
14 Nov and 4 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Hadley Highstone, Dury Road To Great North Road, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Aug 2026 at 14:48.
14 Nov and 4 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Hadley Highstone, North West Section To Kitts End Rd, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 4 Aug 2026 at 10:10.
16 and 20 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 10:14.
16 and 19 Nov 2026
Network Rail were proposing to carry out Works for Rail Purposes on Stroud Green Road, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2026 and run through until 19 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Aug 2026 at 08:52.
16 and 19 Nov 2026
Network Rail were proposing to carry out Works for Rail Purposes on Stroud Green Road, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2026 and run through until 19 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Aug 2026 at 09:08.
16 and 19 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Stroud Green Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Network Rail on 24 Aug 2026 at 08:21.
16 and 27 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Church Street, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 13:46.
16 and 27 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Ridge Road, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 14:40.
16 Nov and 8 Dec 2026
Thames Water are proposing to carry out Utility asset works on Lawn Close, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jul 2026 at 16:04.
16 and 20 Nov 2026
Thames Water are proposing to carry out New service connection on Church Hill, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 12:37.
16 and 24 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wycherley Crescent, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2026 at 14:25.
16 and 24 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wycherley Crescent, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2026 at 11:12.
16 and 24 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wycherley Crescent, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2026 at 11:59.
16 and 25 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Chase Ridings, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 11:01.
16 and 25 Nov 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Chase Ridings, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:01.
16 and 30 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Lambourne Gardens, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 06:10.
21 Nov and 4 Dec 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 30 Jul 2026 at 10:29.
23 and 27 Nov 2026
BT are proposing to carry out Utility asset works on Kelross Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Aug 2026 at 14:54.
23 Nov and 2 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Aug 2026 at 09:39.
23 Nov and 14 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Fairbridge Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 08:47.
23 Nov and 14 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Fairbridge Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:58.
23 Nov and 11 Dec 2026
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Archway Road, Hornsey, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 16 Sep 2026 at 09:50.
23 Nov and 11 Dec 2026
Transport for London (TfL) are proposing to carry out New service connection on Archway Road, Hornsey, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 09:49.
23 Nov 2026 and 16 Feb 2027
Affinity Water are proposing to carry out Utility asset works on Clayton Field, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 16 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 13:53.
23 Nov 2026 and 26 Feb 2027
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:55.
23 Nov 2026 and 26 Feb 2027
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:20.
23 Nov 2026 and 26 Feb 2027
Thames Water are proposing to carry out Utility asset works on Fairgreen East, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 14:27.
23 Nov and 7 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Herrongate Close, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 06:10.
23 and 26 Nov 2026
Network Rail are proposing to carry out Works for Rail Purposes on Holtwhites Hill, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Aug 2026 at 11:17.
24 Nov 2026 and 5 Mar 2027
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wightman Road, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2026 and could run through until 5 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Aug 2026 at 14:23.
26 Nov 2026 and 15 Jan 2027
Thames Water are proposing to carry out Utility asset works on Hewish Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 15 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2026 at 10:00.
26 Nov 2026 and 7 Jan 2027
Thames Water are proposing to carry out Utility asset works on Bury Street, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2026 at 13:45.
27 Nov and 14 Dec 2026
London Borough Of Haringey are proposing to carry out Highway improvement works on Hatherley Gardens, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 28 Aug 2026 at 08:27.
27 Nov 2026 and 6 Jan 2027
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Hatherley Gardens, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 6 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 28 Aug 2026 at 08:27.
30 Nov 2026 and 14 Feb 2027
HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 14 February 2027. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 16 Sep 2026 at 10:47.
30 Nov 2026 and 15 Jan 2027
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 15 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 26 Aug 2026 at 09:38.
30 Nov 2026 and 8 Jan 2027
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Cecilia Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 8 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 27 Aug 2026 at 10:59.
30 Nov 2026 and 8 Jan 2027
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Cecilia Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 8 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hackney on 4 Sep 2026 at 11:12.
30 Nov and 18 Dec 2026
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Mount Pleasant Hill, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 27 Aug 2026 at 17:02.
30 Nov and 11 Dec 2026
Thames Water are proposing to carry out Utility asset works on Mount Pleasant Villas, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2026 at 08:27.
30 Nov 2026 and 1 Feb 2027
Thames Water are proposing to carry out Utility asset works on View Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 1 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2026 at 10:24.
30 Nov and 13 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Temple Fortune Lane, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 17:00.
30 Nov and 8 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on St Marys Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 12:18.
30 Nov 2026 and 22 Feb 2027
Thames Water are proposing to carry out Utility asset works on Oak Avenue, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 22 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jul 2026 at 18:55.
30 Nov 2026 and 17 May 2027
Thames Water are proposing to carry out Utility asset works on Sheldon Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 17 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2026 at 16:49.
30 Nov 2026 and 11 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Southover, North Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 15:30.
30 Nov and 28 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Northiam, Southover To Arlington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 28 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 15:30.
30 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Little Bury Street, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2026 at 13:43.
30 Nov and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Connaught Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 21 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 06:10.
30 Nov and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Fillebrook Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 06:10.
30 Nov and 21 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Willow Road, Enfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 06:10.
1 Dec 2026 and 1 Feb 2027
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Marsh Lane, Tottenham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 1 February 2027. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2026 at 10:53.
1 and 2 Dec 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Russell Lane, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2026 and run through until 2 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2026 at 09:55.
1 and 24 Dec 2026
London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Church Street, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 16 Sep 2026 at 09:17.
2 Dec 2026 and 22 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 10:13.
2 Dec 2026 and 17 Feb 2027
Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2026 and run through until 17 February 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:35.
2 Dec 2026 and 22 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:51.
2 Dec 2026 and 22 Jan 2027
Transport for London (TfL) are proposing to carry out roadworks on Lyndale Avenue, Cricklewood, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 08:50.
2 and 4 Dec 2026
Virgin Media are proposing to carry out Utility asset works on Cowley Place, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 25 Aug 2026 at 15:11.
2 and 4 Dec 2026
London Borough Of Barnet were proposing to carry out Highway improvement works on Pollard Road, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2026 and run through until 4 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2026 at 09:57.
5 and 23 Dec 2026
Thames Water were proposing to carry out Utility asset works on Etheldene Avenue, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2026 and run through until 23 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 09:27.
7 and 11 Dec 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Wayside, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2026 at 09:07.
7 and 9 Dec 2026
Thames Water are proposing to carry out roadworks on Florence Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2026 at 10:30.
7 and 9 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Florence Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Aug 2026 at 10:57.
7 and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Swansea Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 12:21.
9 and 11 Dec 2026
Thames Water are proposing to carry out Statutory Infrastructure Works on Florence Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2026 at 08:54.
9 Dec 2026 and 16 Apr 2027
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Brantwood Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 16 April 2027. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2026 at 18:35.
14 and 18 Dec 2026
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Pond Street, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 11 Sep 2026 at 11:39.
14 and 23 Dec 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:17.
14 and 18 Dec 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2026 at 10:16.
Roadworks Map near to Pinkham Way, LONDON, N11 2UU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Pinkham Way, LONDON, N11 2UU (25 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 Sep 2026 - 18 Sep 2026)
(Scheduled: 16 Sep 2026 - 18 Sep 2026)
(Scheduled: 14 Sep 2026 - 21 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data