ROADWORKS SUMMARY
Canterbury Street, GILLINGHAM, ME7 5LH
Introduction
View current and future planned roadworks and road closures for Canterbury Street, ME7 5LH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Canterbury Street, GILLINGHAM, ME7 5LH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Canterbury Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Jun 2026
Southern Water are carrying out Utility repair and maintenance works on Maidstone Road, Chatham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2023 at 08:40 and could run through until 25 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 26 Jun 2023 at 07:53.
12 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Toronto Road, Gillingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 09:15 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:54.
5 Aug and 2 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jul 2024 at 16:13.
5 Aug and 2 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jul 2024 at 10:48.
5 Aug and 2 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on City Way, Rochester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 2 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Aug 2024 at 14:20.
16 Sep and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 15:00.
20 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on City Way, Rochester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 15:24.
19 Oct and 1 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brompton Lane, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 12:48.
21 Oct and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 6 Sep 2024 at 12:00.
25 Oct and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on St Williams Way, Rochester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Jun 2024 at 08:19.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 08:43.
2 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on The Street, Bredhurst.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 23:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:41.
11 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Aug 2024 at 13:50.
11 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Sep 2024 at 09:19.
11 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Sep 2024 at 09:29.
11 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 09:20.
11 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 13:49.
13 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Beacon Road, Chatham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 10:24.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Strood, Rochester.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 22:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:57.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Whitehouse Crescent, Burham, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 16:40 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:55.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Rochester Road, Burham, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 16:40 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:21.
18 Nov and 18 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:49.
18 Nov and 18 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:01.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Old Pattens Lane, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jul 2024 at 16:57.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Old Pattens Lane, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 10:55.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Old Pattens Lane, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 14:16.
Friday
UK Power Networks South Eastern are carrying out New service connection on Old Pattens Lane, Rochester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 10:46.
6 Dec 2024
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Cecil Road, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:17 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 10:05.
Saturday
National Highways are carrying out Highway repair and maintenance works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 20:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 11:44.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:45 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:04.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Strood, Rochester.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 09:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:54.
Today
Medway Council are carrying out Highway improvement works on Main Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 10:08 and could run through until 24 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Medway Council on 21 Nov 2024 at 12:46.
23 Nov and 1 Dec 2024
National Highways are proposing to carry out Highway improvement works on Watling Street, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Oct 2024 at 13:26.
Wednesday
Medway Council are proposing to carry out Highway improvement works on Durham Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 14 Nov 2024 at 08:37.
Wednesday
Medway Council are proposing to carry out Highway improvement works on Durham Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 20 Nov 2024 at 11:07.
25 Nov and 19 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Toronto Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:45.
25 Nov and 13 Dec 2024
Southern Water were proposing to carry out Permanent reinstatement on High Street, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Sep 2024 at 14:29.
25 Nov and 13 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Gundulph Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Sep 2024 at 15:58.
25 Nov and 13 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Sep 2024 at 15:58.
25 Nov and 13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 31 Oct 2024 at 15:31.
Friday
Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 21 Aug 2024 at 12:49.
Friday
Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 21 Oct 2024 at 10:35.
2 Dec 2024 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jul 2024 at 16:57.
2 Dec 2024 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Boundary Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:21.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Aug 2024 at 13:11.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Frederick Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 29 Oct 2024 at 09:16.
2 and 7 Dec 2024
Medway Council are proposing to carry out Highway improvement works on Medway Tunnel, Chatham Maritime, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 7 Mar 2024 at 09:48.
2 and 7 Dec 2024
Medway Council are proposing to carry out Utility asset works on Medway Tunnel, Chatham Maritime, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 17 Jan 2024 at 11:21.
3 Dec 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:39.
9 and 19 Dec 2024
Southern Gas Networks were proposing to carry out Disconnection or alteration of supply on Star Mill Lane, Darland, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:39.
9 and 13 Dec 2024
National Highways are proposing to carry out Highway repair and maintenance works on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Nov 2024 at 12:05.
9 and 14 Dec 2024
National Highways are proposing to carry out Highway repair and maintenance works on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 08:31.
9 and 13 Dec 2024
National Highways were proposing to carry out Highway repair and maintenance works on Cuxton Road, Strood, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Nov 2024 at 14:50.
9 and 13 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Sep 2024 at 12:58.
9 and 11 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Knight Avenue, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 2 Sep 2024 at 11:24.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on South Bush Lane, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Sep 2024 at 12:38.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on South Bush Lane, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 15 Nov 2024 at 09:56.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on South Bush Lane, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Oct 2024 at 16:09.
16 and 18 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on South Bush Lane, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 19 Nov 2024 at 11:40.
16 and 20 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 9 Sep 2024 at 09:38.
16 and 20 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Sep 2024 at 16:17.
16 and 18 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Chatham Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 10:32.
30 Dec 2024 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 1 Nov 2024 at 14:26.
6 and 10 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Maidstone Road, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Oct 2024 at 11:30.
6 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 23 Oct 2024 at 09:59.
6 and 8 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 24 Oct 2024 at 11:25.
6 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Oak Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Aug 2024 at 10:04.
6 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Oak Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Aug 2024 at 15:25.
6 and 10 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Telegraph Hill, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 Oct 2024 at 15:40.
7 and 11 Jan 2025
National Highways are proposing to carry out Works for road purposes on Matts Hill Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Oct 2024 at 13:21.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:42.
13 and 16 Jan 2025
National Highways are proposing to carry out Works for road purposes on A229 J3 Interchange A2045 Link, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
13 Jan and 13 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:37.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:55.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 11:10.
13 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bunters Hill Road, Wainscott, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 14:33.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 3 Oct 2024 at 13:21.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Nov 2024 at 15:04.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Beechwood Avenue, Darland, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 19 Nov 2024 at 09:56.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 3 Oct 2024 at 13:21.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 4 Nov 2024 at 15:04.
14 and 16 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Malvern Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 19 Nov 2024 at 09:56.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Taddington Wood Roundabout, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
16 and 19 Jan 2025
National Highways are proposing to carry out Works for road purposes on Bluebell Hill Slip Link Bridge, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:43.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on The Street, Bredhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Nov 2024 at 06:33.
20 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on Maidstone Road, Rainham, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Nov 2024 at 17:18.
20 and 24 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 11:54.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 10 Oct 2024 at 09:04.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on First Avenue, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 12:49.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Warden Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 28 Oct 2024 at 14:21.
20 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Junction Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:37.
20 Jan and 24 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Oct 2024 at 16:20.
20 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Oct 2024 at 10:51.
20 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:35.
27 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Breach Lane, Upchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 13:54.
27 and 31 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Beacon Hill, Luton, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 26 Sep 2024 at 15:23.
27 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Wetham Green, Upchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 14:21.
27 Jan and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 31 Oct 2024 at 14:22.
27 Jan and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 15:39.
27 Jan and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bells Lane, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 1 Nov 2024 at 10:04.
3 Feb and 25 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 12:34.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 12:05.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 13:40.
3 Feb and 9 May 2025
Electricity Network Company are proposing to carry out Utility asset works on North Dane Way, Lordswood, Chatham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 14:53.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Mill Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 09:24.
3 and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:19.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Camden Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:49.
3 and 21 Feb 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Berber Road, Strood, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 13:09.
5 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Breach Lane, Upchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 13:57.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Oct 2024 at 12:11.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Oct 2024 at 14:20.
10 Feb and 2 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 08:46.
10 Feb and 5 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 09:53.
10 Feb and 5 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:49.
10 and 12 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:23.
12 and 14 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Place Lane, Hartlip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 15 Nov 2024 at 18:16.
13 Feb and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:55.
13 Feb and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Gillingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:40.
15 and 23 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Nov 2024 at 10:45.
15 and 23 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Nov 2024 at 12:20.
15 and 23 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Bill Street Road, Medway, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Nov 2024 at 15:18.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Magpie Hall Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Sep 2024 at 13:15.
17 Feb and 21 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Onslow Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Magpie Hall Road, Chatham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 12:14.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Delce Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Nov 2024 at 14:27.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 09:24.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Jeffery Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 11:46.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Railway Street, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Sep 2024 at 14:46.
17 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:53.
17 and 28 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 14:16.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 19:10.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 11:33.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Arthurs Drive, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:49.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 21 Nov 2024 at 09:50.
18 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on King Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:42.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 Feb and 21 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:38.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:37.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
Roadworks Map near to Canterbury Street, GILLINGHAM, ME7 5LH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Canterbury Street, GILLINGHAM, ME7 5LH (48 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
(Scheduled: 11 Nov 2024 - 13 Dec 2024)