ROADWORKS SUMMARY
Salt Lane, ROCHESTER, ME3 7ST
Introduction

View current and future planned roadworks and road closures for Salt Lane, ME3 7ST and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Salt Lane, ROCHESTER, ME3 7ST
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Salt Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
13 Jan 2024 and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2024 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:33.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Crooked Lane, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:24.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Queen Street, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:25.
10 Oct 2025
Thurrock Council are carrying out Highway improvement works on Civic Square, Tilbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 10 Mar 2025 at 10:26.
13 Jan and 10 Oct 2025
Thurrock Council are proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thurrock Council on 18 Sep 2024 at 09:14.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 14:01.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:28.
4 Apr 2025
Southern Water are carrying out Utility repair and maintenance works on Peninsula Way, Hoo St Werburgh, Rochester.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 07:29 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 11 Feb 2025 at 08:07.
10 Feb and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Peninsula Way, Hoo St Werburgh, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Water on 6 Feb 2025 at 12:20.
Friday
Southern Water were proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:38.
Sunday
UK Power Networks South Eastern are carrying out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Mar 2025 at 14:18.
3 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on East Milton Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Jan 2025 at 11:07.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Stanhope Road, Strood, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 March 2025 at 18:15 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 16:31.
Wednesday
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Dec 2024 at 14:48.
Wednesday
Medway Council are proposing to carry out Highway improvement works on Seagull Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Medway Council on 10 Feb 2025 at 19:15.
Tomorrow
Southern Water are carrying out Utility repair and maintenance works on Longley Road, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 08:31 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 13 Mar 2025 at 12:27.
Wednesday
Southern Water are carrying out Utility repair and maintenance works on Wilberforce Way, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2025 at 05:45 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Mar 2025 at 12:27.
Thursday
Southern Water are carrying out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 March 2025 at 00:18 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Mar 2025 at 11:22.
16 and 30 Mar 2025
Medway Council are proposing to carry out Highway improvement works on Corporation Street, Rochester.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 6 Feb 2025 at 14:28.
Friday
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 14:22.
17 and 28 Mar 2025
Southern Water are proposing to carry out Highway repair and maintenance works on High Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Feb 2025 at 13:18.
17 and 28 Mar 2025
BT were proposing to carry out Utility asset works on Station Road, Thurrock, East Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 11 Feb 2025 at 15:16.
19 and 25 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Dec 2024 at 13:39.
19 and 25 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 20 Feb 2025 at 13:14.
24 Mar and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Killick Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 16:55.
24 Mar and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 16:55.
24 and 28 Mar 2025
Southern Water are proposing to carry out New service connection on Roach Street, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 13 Mar 2025 at 12:48.
24 and 28 Mar 2025
Southern Water are proposing to carry out New service connection on Roach Street, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 5 Feb 2025 at 09:07.
24 and 28 Mar 2025
Southern Water are proposing to carry out New service connection on Roach Street, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Feb 2025 at 13:40.
31 Mar and 19 Dec 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on The Manorway, Coryton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 09:20.
31 Mar and 9 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Drive, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 14:57.
31 Mar and 9 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Drive, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jan 2025 at 10:25.
31 Mar and 9 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Halt Drive, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jan 2025 at 11:00.
31 Mar and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 30 Dec 2024 at 12:31.
31 Mar and 4 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Blue Anchor Lane, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Feb 2025 at 10:51.
7 and 16 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Feb 2025 at 13:38.
7 and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Road, Cliffe Woods, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 12:16.
7 and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Road, Cliffe Woods, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 12:21.
7 and 11 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 13:21.
7 and 11 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 12:18.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 26 Feb 2025 at 14:55.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 25 Feb 2025 at 16:30.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 8 Jan 2025 at 16:03.
7 and 17 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Mar 2025 at 15:48.
7 and 16 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Mar 2025 at 14:20.
7 and 16 Apr 2025
Southern Water were proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Feb 2025 at 10:22.
7 and 16 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 13 Dec 2024 at 10:34.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 25 Feb 2025 at 14:02.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 13 Jan 2025 at 14:16.
14 and 25 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Mar 2025 at 10:12.
14 and 22 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Wrotham Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 12:22.
16 and 18 Apr 2025
Trooli are proposing to carry out Utility asset works on Lower Rochester Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 20 Jan 2025 at 09:18.
21 Apr and 18 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Road East, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 08:28.
22 and 24 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on London Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 09:52.
28 Apr and 2 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cazeneuve Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 30 Jan 2025 at 17:17.
28 Apr and 2 May 2025
BT are proposing to carry out Utility repair and maintenance works on Blue Anchor Lane, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 26 Feb 2025 at 09:16.
28 Apr and 2 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Windmill Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Feb 2025 at 15:23.
28 Apr and 2 May 2025
BT are proposing to carry out Utility repair and maintenance works on Blue Anchor Lane, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Mar 2025 at 14:12.
28 Apr and 2 May 2025
BT are proposing to carry out Utility repair and maintenance works on Blue Anchor Lane, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Mar 2025 at 14:38.
1 and 3 May 2025
Medway Council are proposing to carry out Utility asset works on Star Hill, Rochester.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 3 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 26 Feb 2025 at 09:35.
4 May and 1 Jun 2025
Medway Council are proposing to carry out Utility asset works on Town Road, Cliffe Woods, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 4 Mar 2025 at 13:59.
5 May and 2 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcourt Street, Brompton, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 14:11.
5 and 17 May 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:48.
5 May and 2 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcourt Street, Brompton, Gillingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 12:48.
7 and 9 May 2025
BT are proposing to carry out Utility asset works on Waltons Hall Road, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Feb 2025 at 10:45.
9 and 12 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Lord Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Dec 2024 at 10:27.
14 and 17 May 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Cooling Common, Cliffe, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 18:09.
19 May and 5 Jun 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Feb 2025 at 14:21.
19 May and 6 Jun 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:53.
19 and 23 May 2025
BT are proposing to carry out Utility repair and maintenance works on Blue Anchor Lane, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 19 Feb 2025 at 09:35.
19 May and 5 Jun 2025
National Highways are proposing to carry out Highway improvement works on Three Crutches Slip Eastbound, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 11:06.
19 May and 5 Jun 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Forge Lane, High Halstow, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Feb 2025 at 20:50.
19 and 23 May 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Feb 2025 at 15:55.
19 and 21 May 2025
Southern Water are proposing to carry out New service connection on Cobham Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 24 Feb 2025 at 13:22.
19 and 23 May 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Feb 2025 at 10:11.
19 and 23 May 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Killick Road, Hoo St Werburgh, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Feb 2025 at 12:06.
21 and 23 May 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Darnley Lodge Lane, Cobham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 19 Feb 2025 at 09:15.
22 May and 23 Jun 2025
Network Rail are proposing to carry out roadworks on Harmer Street, Gravesend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 26 Feb 2025 at 15:45.
22 May and 23 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on East Milton Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Feb 2025 at 15:00.
27 and 30 May 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Mill Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 22 Jan 2025 at 14:08.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Northridge Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 6 Mar 2025 at 14:07.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 6 Mar 2025 at 15:54.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cazeneuve Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Feb 2025 at 09:14.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Smarts Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 6 Mar 2025 at 13:56.
27 and 30 May 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Mill Road, Gillingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 26 Feb 2025 at 09:26.
28 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Reed Street, Cliffe, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Mar 2025 at 13:28.
28 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Milton Hall Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 5 Mar 2025 at 12:23.
2 Jun and 27 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 08:54.
2 Jun and 27 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 13:35.
2 Jun and 18 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valley Drive, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 12:07.
2 and 4 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cliffe Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Mar 2025 at 12:22.
2 and 4 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 12 Mar 2025 at 10:23.
3 and 16 Jun 2025
BT were proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 16 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 19 Feb 2025 at 12:08.
4 and 6 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Mar 2025 at 15:47.
4 and 6 Jun 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Corporation Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Feb 2025 at 13:49.
5 and 18 Jun 2025
BT were proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 18 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2025 at 12:41.
5 and 11 Jun 2025
BT are proposing to carry out Utility asset works on Church Road, Thurrock, West Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 5 Mar 2025 at 09:57.
Roadworks Map near to Salt Lane, ROCHESTER, ME3 7ST
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Salt Lane, ROCHESTER, ME3 7ST (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.