ROADWORKS SUMMARY
Parsonage Stocks Road, FAVERSHAM, ME13 0PN
Introduction
View current and future planned roadworks and road closures for Parsonage Stocks Road, ME13 0PN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Parsonage Stocks Road, FAVERSHAM, ME13 0PN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Parsonage Stocks Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Jul 2027
Kent County Council are carrying out Works for road purposes on Staple Street Road, Graveney.
These works are categorised as Major.
The works started on 10 July 2023 at 07:00 and could run through until 30 July 2027. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 10 Jul 2023 at 12:14.
Tuesday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplestreet Road, Hernhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:52.
Tuesday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dawes Road, Dunkirk.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:56.
18 Nov 2024 and 21 Jan 2025
National Highways were proposing to carry out Works for road purposes on Champion Court Road, Newnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 21 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by National Highways on 22 Nov 2024 at 14:01.
18 Nov 2024 and 21 Jan 2025
National Highways are proposing to carry out Works for road purposes on Sharsted Hill, Newnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 21 May 2024 at 15:48.
Tuesday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staple Street, Hernhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 17:56.
31 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Staple Street, Hernhill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 16:45 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:50.
26 Nov 2024 and 31 Jan 2025
National Highways are proposing to carry out Works for road purposes on Vicarage Lane, Ospringe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Nov 2024 at 13:24.
26 Nov 2024 and 31 Jan 2025
National Highways are proposing to carry out Works for road purposes on Vicarage Lane, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Nov 2024 at 13:35.
Sunday
Kent County Council are proposing to carry out Highway improvement works on Tanners Street, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 24 Oct 2024 at 14:08.
Sunday
Kent County Council are carrying out Highway improvement works on Tanners Street, Faversham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:34 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 9 Dec 2024 at 09:38.
9 Dec 2024 and 26 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Charing Hill, Charing.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 5 Dec 2024 at 18:37.
Sunday
Kent County Council are carrying out Highway improvement works on Newnham Lane, Newnham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 12:08 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 16 Dec 2024 at 12:43.
2 Jan and 7 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Homestall Lane, Graveney.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:52.
2 Jan and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:04.
2 Jan and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:57.
6 Jan and 21 Feb 2025
National Highways are proposing to carry out Works for road purposes on Water Lane, Ospringe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 15:33.
6 Jan and 12 Feb 2025
National Highways are proposing to carry out Works for road purposes on Brogdale Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 21 May 2024 at 15:50.
6 Jan and 2 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.
6 and 19 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:34.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bagham Road, Chilham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:29.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bagham Road, Chilham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:29.
10 Jan 2025
Kent County Council were proposing to carry out Highway improvement works on Pett Lane, Charing.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 10 January 2025 The works were due to impact the carriageway only.
This roadwork event was last updated by Kent County Council on 4 Dec 2024 at 11:46.
13 and 17 Jan 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Kit Hill, Selling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 15 Nov 2024 at 09:15.
13 and 17 Jan 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Kit Hill, Selling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 17:18.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:36.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homestall Lane, Graveney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:35.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 17:36.
13 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitstable Road, Goodnestone, Faversham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 16:15.
16 Jan and 12 Feb 2025
National Highways are proposing to carry out Works for road purposes on Brogdale Road, Ospringe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 21 May 2024 at 15:50.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Graveney Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:57.
27 and 29 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:35.
27 and 29 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on William Street, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 8 Nov 2024 at 17:51.
3 and 16 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on St Johns Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:35.
3 and 16 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on St Johns Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.
4 and 11 Feb 2025
South East Water are proposing to carry out New service connection on Bowl Road, Charing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Dec 2024 at 09:51.
15 and 23 Feb 2025
South East Water are proposing to carry out Utility repair and maintenance works on Ashford Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 23 Apr 2024 at 18:01.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Station Road, Teynham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 22 Oct 2024 at 14:15.
17 Feb and 2 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on St Marys Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:00.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Station Road, Teynham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 27 Nov 2024 at 14:39.
17 and 28 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on St Marys Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 15:36.
17 and 21 Feb 2025
Kent County Council were proposing to carry out Highway improvement works on Station Road, Teynham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Kent County Council on 21 Oct 2024 at 15:51.
17 and 21 Feb 2025
South East Water are proposing to carry out New service connection on The Hill, Charing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Dec 2024 at 13:08.
17 and 21 Feb 2025
South East Water are proposing to carry out New service connection on The Hill, Charing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 12 Dec 2024 at 16:58.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Colegates Close, Oare.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Dec 2024 at 17:12.
24 Feb and 28 Mar 2025
National Highways are proposing to carry out Works for road purposes on Brogdale Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 30 Oct 2024 at 10:45.
24 Feb and 28 Mar 2025
National Highways are proposing to carry out Works for road purposes on Brogdale Road, Ospringe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 30 Oct 2024 at 10:45.
3 and 23 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Newton Road, Faversham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 28 Nov 2024 at 17:38.
3 and 23 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Newton Road, Faversham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 12:08.
3 and 15 Mar 2025
National Highways were proposing to carry out Highway repair and maintenance works on London Road, Boughton Under Blean.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 9 Dec 2024 at 09:57.
3 and 15 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Brenley Lane, Boughton Under Blean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 15:35.
3 and 6 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Long Hill, Chilham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Dec 2024 at 16:45.
3 and 6 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Long Hill, Chilham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 2 Dec 2024 at 13:04.
17 and 21 Mar 2025
South East Water are proposing to carry out Utility asset works on Lynsted Lane, Lynsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 13 Dec 2024 at 09:12.
17 and 28 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Hill, Charing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 09:42.
17 and 28 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Hill, Charing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 15:05.
Roadworks Map near to Parsonage Stocks Road, FAVERSHAM, ME13 0PN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Parsonage Stocks Road, FAVERSHAM, ME13 0PN (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.