ROADWORKS SUMMARY
Cheyne Road, SHEERNESS, ME12 4BW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cheyne Road, ME12 4BW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cheyne Road, SHEERNESS, ME12 4BW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cheyne Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
St Katherine Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St Katherine Road, Minster-on-sea.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:15 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Halfway Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Halfway Road, Minster-on-sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Halfway Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Road, Minster-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 14:39.

Network Rail logo
LONG TERM
Between
24 Oct 2024 and 3 Nov 2025
Details
View Map
Share
Follow
Kingsferry Bridge

Network Rail are proposing to carry out Works for Rail Purposes on Kingsferry Bridge, Kingsferry Rbt To Kingsferry Bridge, Minster-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Aug 2024 at 13:40.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Halfway Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Halfway Road, Minster-on-sea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:48.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Halfway Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Road, Minster-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 15:39.

Southern Water logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Winstanley Road

Southern Water were proposing to carry out Utility repair and maintenance works on Winstanley Road, Sheerness.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Sep 2024 at 09:30.

Southern Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
High Street

Southern Water are carrying out Utility repair and maintenance works on High Street, Marine Town, Sheerness.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 10:08 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 21 Nov 2024 at 15:59.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Marine Parade

Southern Gas Networks are carrying out roadworks on Marine Parade, Sheerness.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:00 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:58.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Plough Road

Southern Gas Networks are proposing to carry out New service connection on Plough Road, Eastchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 08:51.

Kent County Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Queenborough Road

Kent County Council are proposing to carry out Remedial works on Queenborough Road, Halfway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 18 Oct 2024 at 17:56.

Kent County Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
Queenborough Road

Kent County Council are proposing to carry out Remedial works on Queenborough Road, Halfway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 30 Oct 2024 at 17:18.

Kent County Council logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Queenborough Road

Kent County Council were proposing to carry out Remedial works on Queenborough Road, Halfway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Oct 2024 at 14:57.

UK Power Networks South Eastern logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Alma Road

UK Power Networks South Eastern are proposing to carry out New service connection on Alma Road, Sheerness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 12:10.

UK Power Networks South Eastern logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Alma Road

UK Power Networks South Eastern are proposing to carry out New service connection on Alma Road, Sheerness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 17:20.

UK Power Networks South Eastern logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Minster Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Minster Road, Minster-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 15:42.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ashley Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashley Close, Halfway.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:05.

Southern Gas Networks logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Plough Road

Southern Gas Networks were proposing to carry out New service connection on Plough Road, Eastchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:43.

Kent County Council logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
The Crescent

Kent County Council are proposing to carry out Highway improvement works on The Crescent, Halfway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 3 Oct 2024 at 09:31.

Kent County Council logo
Between
13 and 25 Jan 2025
Details
View Map
Share
The Crescent

Kent County Council were proposing to carry out Highway improvement works on The Crescent, Halfway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 25 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 3 Oct 2024 at 08:31.

UK Power Networks South Eastern logo
LONG TERM
Between
22 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Queenborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 09:52.

UK Power Networks South Eastern logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Minster Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Minster Road, Minster-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 10:47.

UK Power Networks South Eastern logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Minster Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Minster Road, Minster-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Oct 2024 at 15:02.

Southern Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Danley Road

Southern Water are proposing to carry out Permanent reinstatement on Danley Road, Minster-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:07.


Roadworks Map near to Cheyne Road, SHEERNESS, ME12 4BW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 02:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cheyne Road, SHEERNESS, ME12 4BW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Water logo
URGENT
  
LOWER ROAD 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 21 Nov 2024 06:48
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.4
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
PLOUGH ROAD 
(0.5 miles)
Southern Gas Networks
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 25 Nov 2024
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.