ROADWORKS SUMMARY
Grange Terrace, LEEDS, LS7 4EF
Introduction

View current and future planned roadworks and road closures for Grange Terrace, LS7 4EF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Grange Terrace, LEEDS, LS7 4EF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Grange Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Jun 2025
Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2022 at 00:01 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 21 May 2025 at 07:42.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.
30 Jun 2025
Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 17 Apr 2025 at 13:21.
13 Jun 2025
Leeds City Council are carrying out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:05.
29 Jul 2024 and 30 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.
22 Aug 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 16:30 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 11:18.
12 Sep 2025
Leeds City Council are carrying out Highway improvement works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Leeds City Council on 27 Mar 2025 at 15:00.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.
12 Jun 2026
Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 00:00 and could run through until 12 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 07:45.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:29.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.
6 Jan 2025 and 9 Jan 2026
Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.
6 Jan 2025 and 9 Jan 2026
Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.
7 Jan and 12 Dec 2025
Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 12:59.
11 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 15:00 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 15:28.
Sunday
Leeds City Council are carrying out roadworks on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:30 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:22.
Sunday
Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 19:00 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:25.
3 Mar and 30 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 08:29.
16 Jun 2025
Leeds City Council are carrying out Highway improvement works on Mill Hill, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 08:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 12:55.
31 Mar and 25 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 10 Jan 2025 at 11:26.
25 Nov 2025
Network Rail are carrying out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 01:00 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 31 Mar 2025 at 08:45.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.
31 Mar 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
28 Apr and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
The works will start on or after 28 April 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 3 Feb 2025 at 12:31.
27 Jun 2025
Leeds City Council are carrying out Highway repair and maintenance works on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
The works started on 28 April 2025 at 09:20 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 28 Apr 2025 at 09:25.
28 Apr and 10 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:50.
28 Apr and 15 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:36.
28 Apr and 15 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:53.
1 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Carr Crofts, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:45.
1 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wesley Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:53.
Today
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Gipton Wood Road, Gipton, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Apr 2025 at 16:03.
Today
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Gipton Wood Road, Gipton, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Apr 2025 at 13:32.
16 Jun 2025
Yorkshire Water are carrying out Utility repair and maintenance works on The Oval, Seacroft, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 May 2025 at 12:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 13:45.
12 May and 21 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Armley Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 21 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:25.
30 Jun 2025
Leeds City Council are carrying out Highway improvement works on Armley Road, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 15:27 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 27 May 2025 at 16:19.
12 May and 23 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:06.
12 May and 16 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.
18 Jun 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 17:00 and could run through until 18 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 17 May 2025 at 12:21.
Monday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stainmore Place, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:28.
Tomorrow
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 13:01.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 12:40.
23 May and 20 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 14:25.
23 May and 13 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Guru Nanak Way, Chapeltown, Leeds.
These works were categorised as Major.
The works were originally planned to start 23 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 13:23.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.
23 Jun 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:43.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.
23 Jun 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.
Sunday
Yorkshire Water are proposing to carry out Remedial works on Stainmore Place, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:17.
Tomorrow
Leeds City Council are carrying out Highway repair and maintenance works on Church Road, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:38.
19 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Heights Lane, Armley, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:38.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Park Street, Armley, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:00 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 11:37.
27 May 2025 and 28 Jul 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 28 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 11:41.
27 May and 28 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 08:28.
Thursday
Leeds City Council are proposing to carry out Highway repair and maintenance works on Harehills Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Leeds City Council on 1 Apr 2025 at 11:55.
27 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:36.
Friday
Leeds City Council are carrying out Highway improvement works on Ash Grove, Hyde Park, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 27 May 2025 at 09:01.
Sunday
Leeds City Council are proposing to carry out Section 50 on Simpson Grove, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 1 May 2025 at 12:34.
Sunday
Leeds City Council are carrying out Section 50 on Simpson Grove, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 11:05.
Tomorrow
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knowsthorpe Lane, Cross Green, Leeds.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 30 May 2025 at 09:55.
10 Jun 2025
Yorkshire Water are carrying out Utility asset works on Stainmore Place, Seacroft, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 09:00.
2 and 11 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Sharp Lane, Robin Hood, Wakefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 13:16.
2 and 17 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Sharp Lane, Robin Hood, Wakefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 May 2025 at 14:30.
2 and 17 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Sharp Lane, Robin Hood, Wakefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 May 2025 at 13:11.
Friday
Leeds City Council are proposing to carry out Highway improvement works on Congress Street, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Apr 2025 at 12:43.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nowell Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Apr 2025 at 11:46.
Friday
Yorkshire Water are carrying out Utility repair and maintenance works on Nowell Lane, Harehills, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 08:00.
2 Jun and 19 Sep 2025
Leeds City Council are proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:32.
19 Sep 2025
Leeds City Council are carrying out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:40.
Tomorrow
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 12:15.
Tomorrow
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 15:57.
Yorkshire Water carried out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.
The road was closed for some or all of the period.
The works were originally planned between 2 Jun 2025 and 9 Jun 2025 and were actually completed between 2 Jun 2025 (19:37) and 3 Jun 2025 (08:37). The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 09:01.
Yorkshire Water carried out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.
The road was closed for some or all of the period.
The works were originally planned between 2 Jun 2025 and 9 Jun 2025 and were actually completed between 2 Jun 2025 (19:00) and 3 Jun 2025 (13:00). The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 13:11.
Yorkshire Water carried out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.
The road was closed for some or all of the period.
The works were originally planned between 2 Jun 2025 and 9 Jun 2025 and were actually completed between 2 Jun 2025 (19:53) and 3 Jun 2025 (08:37). The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 08:59.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Otley Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 15:14.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out New service connection on Otley Road, Adel, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Dec 2024 at 09:30.
2 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 10:54.
27 Jun 2025
Leeds City Council are carrying out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:34.
Thursday
Leeds City Council were proposing to carry out Permanent reinstatement on Mill Hill, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 15:14.
Thursday
Leeds City Council are proposing to carry out Permanent reinstatement on Mill Hill, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 15:44.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 30 Apr 2025 at 13:39.
Friday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 14:14.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 8 May 2025 at 13:57.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 22 May 2025 at 15:15.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 8 May 2025 at 14:01.
Sunday
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 May 2025 at 15:18.
5 and 11 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 15:32.
5 and 11 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:35.
5 Jun 2025 and 26 Mar 2026
Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 26 March 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 13:00.
9 and 18 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 May 2025 at 15:10.
9 and 18 Jun 2025
National Highways are proposing to carry out Highway repair and maintenance works on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Dec 2024 at 12:52.
9 and 20 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 12:58.
9 and 15 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:34.
9 and 15 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 15:09.
9 and 22 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:33.
9 and 22 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:54.
9 and 15 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Mar 2025 at 12:57.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 16 May 2025 at 16:37.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:47.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 28 May 2025 at 12:10.
9 Jun and 14 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:47.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:37.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:32.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 17:05.
9 and 27 Jun 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:24.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 11:17.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:17.
11 and 24 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 10:18.
12 and 16 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Jan 2025 at 10:04.
12 and 16 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Apr 2025 at 08:07.
16 and 20 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Halton Moor Road, Halton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Apr 2025 at 08:33.
16 and 20 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Halton Moor Road, Halton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 May 2025 at 09:09.
16 Jun and 26 Sep 2025
Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:32.
16 Jun and 26 Sep 2025
Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 12:26.
16 Jun and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:17.
16 Jun and 6 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 09:09.
16 Jun and 6 Jul 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 11:46.
16 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Apr 2025 at 11:31.
16 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:10.
16 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 13:49.
16 Jun and 13 Jul 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:58.
16 Jun and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 14:43.
16 Jun and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 17:01.
16 Jun and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 12:07.
17 Jun and 1 Jul 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Tower Lane, Armley, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 14:41.
17 and 19 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Apr 2025 at 16:27.
17 and 19 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 May 2025 at 12:56.
19 Jun and 30 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 14:57.
19 Jun and 30 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:49.
19 Jun and 2 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:47.
20 Jun and 21 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:23.
20 Jun and 10 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:49.
23 and 28 Jun 2025
Leeds City Council are proposing to carry out roadworks on Top Moor Side, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:52.
23 Jun and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:25.
23 Jun and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Torre Road, Burmantofts, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 May 2025 at 11:21.
23 Jun and 11 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:36.
23 Jun and 7 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:05.
23 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on St Marks Street, Woodhouse, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:17.
23 Jun and 20 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:31.
23 Jun and 10 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:51.
23 Jun and 20 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:15.
25 Jun and 12 Jul 2025
National Highways are proposing to carry out roadworks on Lakeside Way, Skelton Gate, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Jun 2024 at 08:46.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:12.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:14.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:59.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:57.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:10.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:32.
25 Jun and 18 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:13.
30 Jun 2025 and 26 Jun 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Beeston, Beeston, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 June 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Leeds City Council on 19 Jul 2024 at 12:59.
30 Jun and 4 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Autumn Street, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:26.
30 Jun and 27 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:13.
30 Jun and 12 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:44.
30 Jun and 27 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:03.
30 Jun and 6 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 10:02.
30 Jun and 2 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:50.
30 Jun and 2 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:32.
30 Jun and 11 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Broadlea Hill, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 10 Apr 2025 at 14:40.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 15:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 16:22.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:00.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:58.
30 Jun and 27 Jul 2025
Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Avenue, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:28.
30 Jun and 25 Jul 2025
Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Avenue, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 11:19.
1 and 21 Jul 2025
Yorkshire Water are proposing to carry out Remedial works on Stainmore Place, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:52.
1 and 21 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 15:02.
1 and 21 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:50.
3 and 7 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Jan 2025 at 10:06.
3 and 7 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 21 May 2025 at 09:44.
4 and 18 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 15:53.
6 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cross Chapel Street, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 14:43.
7 Jul and 18 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:46.
7 Jul and 18 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:56.
7 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 May 2025 at 14:41.
7 and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Nice Avenue, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:13.
7 and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Nice Avenue, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 07:46.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:49.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:33.
9 and 14 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Rothwell, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 08:54.
10 and 16 Jul 2025
Yorkshire Water are proposing to carry out New service connection on Wakefield Road, Rothwell, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 13:24.
14 and 29 Jul 2025
National Highways are proposing to carry out roadworks on Leeds Road To Pontefract Road Link, Stourton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Jun 2024 at 14:21.
14 and 29 Jul 2025
National Highways are proposing to carry out roadworks on Leeds Road To Pontefract Road Link, Stourton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 27 Jun 2024 at 14:32.
14 and 29 Jul 2025
National Highways are proposing to carry out roadworks on Pontefract Road, Stourton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Jul 2024 at 15:59.
14 and 18 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Linden Road, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:13.
14 and 27 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 16:30.
14 Jul and 11 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:13.
14 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Back Nice View, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:14.
14 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Back Nice View, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 07:46.
14 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Rossall Grove, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:14.
14 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Rossall Grove, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 16:18.
14 and 25 Jul 2025
Yorkshire Water were proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 13:37.
14 and 25 Jul 2025
Yorkshire Water were proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 28 May 2025 at 10:57.
14 and 20 Jul 2025
Yorkshire Water are proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 30 May 2025 at 11:02.
14 and 28 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:55.
14 and 28 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 15:43.
14 Jul and 3 Aug 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:57.
14 Jul and 3 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 13:32.
14 Jul and 3 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 14:21.
16 Jul and 19 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 10:00.
18 Jul and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:34.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:14.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:02.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:32.
21 Jul and 17 Aug 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 4 Mar 2025 at 14:19.
21 Jul and 17 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:19.
21 Jul and 17 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:49.
21 Jul and 17 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 14:55.
21 Jul and 18 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 13:06.
22 Jul and 8 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 09:43.
22 Jul and 14 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heights Lane, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 14:24.
22 Jul and 29 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 16:32.
22 Jul and 29 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 16:03.
23 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:36.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 08:00.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 13:19.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 09:59.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 12:41.
23 Jul and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:41.
23 Jul and 6 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 17:22.
23 Jul and 7 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:39.
23 Jul and 7 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 10:21.
23 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jul 2024 at 13:27.
23 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 12:33.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:21.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 16:52.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 14:54.
24 Jul and 14 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Wilfrids Circus, Harehills, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:16.
28 Jul and 8 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 16 May 2025 at 14:14.
28 Jul and 3 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dufton Approach, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Mar 2025 at 08:08.
28 Jul and 15 Aug 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 12:54.
28 Jul and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 14:46.
28 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Avenue, Gledhow, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:08.
28 Jul and 3 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Road, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:55.
28 Jul and 3 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Road, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 14:45.
29 Jul and 11 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:43.
29 Jul and 3 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:52.
30 Jul and 6 Aug 2025
National Highways are proposing to carry out Highway repair and maintenance works on Leeds Road To Pontefract Road Link, Stourton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 10:01.
30 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:10.
30 Jul and 16 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 08:12.
30 Jul and 16 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 09:53.
30 Jul and 16 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 12:57.
30 Jul and 16 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 11:40.
31 Jul and 20 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.
31 Jul and 27 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 13:05.
31 Jul and 27 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 15:22.
1 Aug and 9 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 07:54.
1 and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knights Hill, Whitkirk, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 11:28.
4 and 8 Aug 2025
Leeds City Council are proposing to carry out Utility repair and maintenance works on Pontefract Road, Stourton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 14:25.
4 and 14 Aug 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Back Lodge Lane, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 10:21.
4 Aug and 12 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wellington Road, Holbeck, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 15 Jan 2024 at 16:30.
6 and 12 Aug 2025
National Highways are proposing to carry out Highway repair and maintenance works on Leeds Road To Pontefract Road Link, Stourton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 10:01.
6 and 20 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bentley Lane, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 15:20.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:36.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:26.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:06.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:09.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:13.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:39.
8 Aug and 31 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:52.
11 and 22 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:47.
11 Aug and 22 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:40.
11 and 17 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:43.
11 and 17 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:22.
12 and 27 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Martins View, Potternewton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:32.
12 and 27 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:26.
13 Aug and 16 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Mar 2025 at 11:52.
13 Aug and 16 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 09:22.
13 and 27 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knights Hill, Whitkirk, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 4 Mar 2025 at 12:29.
14 Aug and 14 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:08.
18 and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:16.
18 Aug and 1 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:02.
18 and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:25.
18 and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 14:56.
18 Aug and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denton Avenue, Gledhow, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:21.
18 and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:51.
18 and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:44.
20 Aug and 3 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:17.
20 Aug and 17 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 15:01.
21 Aug and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Tree Lane, Killingbeck, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.
21 Aug and 9 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Street, Chapeltown, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 16:01.
25 and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 14 Apr 2025 at 13:22.
25 Aug and 1 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Holmfield Drive, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:42.
25 Aug and 1 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Holmfield Drive, Lidgett Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 13:55.
26 Aug and 1 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:10.
26 Aug and 6 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Wilfrids Circus, Harehills, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:29.
29 Aug and 9 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Apr 2025 at 12:33.
29 Aug and 9 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:25.
Roadworks Map near to Grange Terrace, LEEDS, LS7 4EF (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Grange Terrace, LEEDS, LS7 4EF (26 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 27 May 2025 - 3 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.