ROADWORKS SUMMARY
Bradford Road, PUDSEY, LS28 6EF
Introduction

View current and future planned roadworks and road closures for Bradford Road, LS28 6EF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bradford Road, PUDSEY, LS28 6EF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bradford Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Jun 2025
Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2022 at 00:01 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 21 May 2025 at 07:42.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.
13 Jun 2025
Leeds City Council are carrying out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:05.
17 Jul 2024 and 17 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Daleside Road, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 17 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:27.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Street, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:38.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Whitelands Road, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:07.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dockfield Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 11:47.
22 Aug 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 16:30 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 11:18.
12 Sep 2025
Leeds City Council are carrying out Highway improvement works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Leeds City Council on 27 Mar 2025 at 15:00.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.
12 Jun 2026
Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 00:00 and could run through until 12 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 07:45.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:29.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.
6 Jan and 20 Dec 2025
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.
7 Jan and 12 Dec 2025
Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 12:59.
Friday
City Of Bradford Metropolitan District Council are carrying out Section 50 on Great Horton Road, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 07:00 and could run through until 6 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:52.
3 Feb and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:37.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 11:56.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bolling Road, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:43.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firethorn Close, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:46.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Selborne Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:08.
11 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 15:00 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 15:28.
13 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Scott Green, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 March 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 13:20.
Sunday
Leeds City Council are carrying out roadworks on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:30 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:22.
Sunday
Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 19:00 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:25.
7 Mar and 19 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on George Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Dec 2024 at 15:51.
27 Aug 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 March 2025 at 08:00 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Mar 2025 at 10:03.
22 Jun 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Moorside Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 08:00 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Apr 2025 at 16:30.
31 Mar and 22 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moorside Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 17 Jan 2025 at 14:55.
31 Mar and 22 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moorside Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 09:32.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.
31 Mar 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
10 Sep 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2025 at 08:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Apr 2025 at 09:36.
7 Apr and 20 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosse Street, Girlington, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 4 Apr 2025 at 11:06.
28 Apr and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Peace Street, Laisterdyke, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:26.
28 Apr and 8 Aug 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Peace Street, Laisterdyke, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:55.
28 Apr and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawson Street, Laisterdyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:35.
28 Apr and 8 Aug 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Pawson Street, Laisterdyke, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:55.
28 Apr and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:17.
28 Apr and 8 Aug 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:54.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Tong, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 17:35.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Inmoor Road, Tong, Bradford.
These works were categorised as Major.
The works were originally planned to start 1 May 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Feb 2025 at 12:19.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westgate Hill Street, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 14:38.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hatton Close, Odsal, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 15:16.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hyne Avenue, Bierley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:43.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Newhall Way, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Avenue, Odsal, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 15:24.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bude Road, West Bowling, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:17.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mayo Drive, West Bowling, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:46.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mayo Crescent, West Bowling, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mayo Road, West Bowling, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Lane, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jan 2025 at 08:23.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Withins Close, Little Horton, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 14:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Lane, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 16:11.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Lane, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 13:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Smith Road, Little Horton, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Dec 2024 at 15:28.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Oakwell Close, Little Horton, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:20.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tong Lane, Tong, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 07:57.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Aberdeen Place, Lidget Green, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:23.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Northside Road, Lidget Green, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jan 2025 at 16:20.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Archibald Street, Listerhills, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:25.
1 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Carr Crofts, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on St Thomas's Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:37.
1 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wesley Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:53.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Maple Avenue, Thornbury, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:10.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Canal Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 14:34.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cornwall Terrace, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:29.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Holywell Ash Lane, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:33.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lister View, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Libbey Street, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:35.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Springcliffe, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:37.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 14:43.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farcliffe Road, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:30.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farcliffe Terrace, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:32.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:27.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Clifton Villas, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:28.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Lilycroft Road, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:41.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:32.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 13:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:47.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Queens Road, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 13:59.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blakehill Terrace, Undercliffe, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:55.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:03.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Falsgrave Avenue, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:05.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flaxton Green, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:30.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Avenue, Manningham, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flawith Drive, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:29.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flinton Grove, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:31.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farleton Drive, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firbank Green, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fencote Crescent, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:28.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Highgate, Heaton, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 15:03.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Canal Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 07:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Heaton Grove, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:34.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Frizinghall Road, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Sep 2024 at 15:13.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stony Lane, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:49.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Aireville Road, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:34.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Acre Drive, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ashfield Drive, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:25.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Crescent, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shipley Fields Road, Frizinghall, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:08.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 16:56.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Festival Avenue, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wrose Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2024 at 15:01.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Snowden Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:01.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Marion Drive, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Evesham Grove, Idle, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:18.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:15.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Avenue, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:13.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Drive, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on The Holt, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Sep 2024 at 13:50.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dock Lane, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2024 at 15:46.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thackley Old Road, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 13:59.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Apperley Road, Apperley Bridge, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:19.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Baildon Road, Baildon.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Oct 2024 at 14:21.
13 Jun 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on City Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 May 2025 at 07:00 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 May 2025 at 14:03.
Monday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Bierley Lane, Bierley, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 13:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Jun 2025 at 08:51.
12 May and 30 Sep 2025
Kirklees Council are proposing to carry out Highway improvement works on Station Lane, Birkenshaw, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:19.
30 Sep 2025
Kirklees Council are carrying out Highway improvement works on Station Lane, Birkenshaw, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 13 May 2025 at 12:02.
12 May and 21 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Armley Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 21 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:25.
30 Jun 2025
Leeds City Council are carrying out Highway improvement works on Armley Road, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 15:27 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 27 May 2025 at 16:19.
7 Dec 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.
Saturday
Northern Gas Networks are carrying out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 12:25 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 09:42.
15 May and 14 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Kent Road, Pudsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:31.
14 Jun 2025
Leeds City Council are carrying out Highway improvement works on Kent Road, Pudsey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 12:06.
15 May and 21 Jun 2025
Leeds City Council are proposing to carry out Section 50 on Kent Road, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 14 May 2025 at 15:34.
21 Jun 2025
Leeds City Council are carrying out Section 50 on Kent Road, Pudsey.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:30 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 15 May 2025 at 12:40.
15 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Marsh, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:46.
21 Sep 2025
Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:00 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Yorkshire Water on 16 May 2025 at 09:41.
23 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 13:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 13:31.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 08:48.
Friday
City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Rooley Crescent, Odsal, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 May 2025 at 11:44.
Friday
City Of Bradford Metropolitan District Council are carrying out Section 50 on Rooley Crescent, Odsal, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 13:10.
Friday
City Of Bradford Metropolitan District Council are proposing to carry out Core Sampling on Wakefield Road, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 May 2025 at 09:46.
Friday
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on City Road, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 07:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:00.
19 May and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.
19 May and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility asset works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 09:50.
Tomorrow
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 13:01.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 12:40.
19 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Highgate, Heaton, Bradford.
These works are categorised as Major.
The works will start on or after 19 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 15:38.
12 Jun 2025
Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Murgatroyd Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 09:15 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 12:58.
Sunday
Electricity Network Company are proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 11:40.
Sunday
Electricity Network Company are carrying out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 08:53.
Sunday
Independent Water Networks are proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 7 Apr 2025 at 11:40.
Sunday
Independent Water Networks are carrying out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 27 May 2025 at 08:56.
Sunday
GTC Pipelines are proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 7 Apr 2025 at 11:39.
Sunday
GTC Pipelines are carrying out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 27 May 2025 at 08:56.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.
23 Jun 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:43.
26 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.
23 Jun 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Argie Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.
30 Jun 2025
Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Parkside Road, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 May 2025 at 08:37.
27 May and 13 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Fitzwilliam Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Mar 2025 at 10:46.
Tomorrow
Leeds City Council are carrying out Highway repair and maintenance works on Church Road, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:38.
19 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Heights Lane, Armley, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:38.
Saturday
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Thornton Road, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 7 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 May 2025 at 10:12.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Park Street, Armley, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:00 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 13:36.
20 Jul 2025
Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 08:59.
27 May and 23 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:36.
Friday
Leeds City Council are carrying out Highway improvement works on Ash Grove, Hyde Park, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 27 May 2025 at 09:01.
Monday
Quickline Commucations are proposing to carry out Utility asset works on Esholt Lane, Esholt, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 27 Mar 2025 at 15:50.
Monday
Quickline Commucations are carrying out Utility asset works on Esholt Lane, Esholt, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:04 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 27 May 2025 at 09:24.
Sunday
Leeds City Council are proposing to carry out Section 50 on Simpson Grove, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 1 May 2025 at 12:34.
Sunday
Leeds City Council are carrying out Section 50 on Simpson Grove, Armley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 11:05.
Thursday
Yorkshire Water are carrying out Utility repair and maintenance works on Plane Trees Close, Hunsworth, Cleckheaton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 08:36 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 13:10.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Frizinghall Road, Frizinghall, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.
These works are categorised as Major.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 15:53.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Baildon Road, Baildon.
These works are categorised as Major.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.
1 Jun and 1 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Avenue, Odsal, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:23.
1 Jun and 1 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Chase Way, West Bowling, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Apr 2025 at 14:58.
1 Jun and 1 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Lane, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:13.
1 Jun and 1 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rooley Lane, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:09.
2 and 27 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Mar 2025 at 08:31.
2 and 27 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 11:31.
2 and 27 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Mar 2025 at 11:29.
2 Jun and 25 Jul 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 May 2025 at 10:49.
Friday
Leeds City Council are proposing to carry out Highway improvement works on Congress Street, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Apr 2025 at 12:43.
2 Jun and 11 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Emm Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 16:10.
2 Jun and 19 Sep 2025
Leeds City Council are proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:32.
19 Sep 2025
Leeds City Council are carrying out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:40.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Otley Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 15:14.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out New service connection on Otley Road, Adel, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Dec 2024 at 09:30.
2 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 10:54.
2 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:14.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 30 Apr 2025 at 13:39.
Friday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 14:14.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 8 May 2025 at 13:57.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 22 May 2025 at 15:15.
Friday
Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 8 May 2025 at 14:01.
5 and 11 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 15:32.
5 and 11 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:35.
5 Jun 2025 and 26 Mar 2026
Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 26 March 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 13:00.
6 and 29 Jun 2025
Yorkshire Water were proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 29 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 12:09.
6 and 29 Jun 2025
Yorkshire Water are proposing to carry out roadworks on Rushton Avenue, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Feb 2025 at 15:53.
6 and 10 Jun 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 7 Apr 2025 at 13:05.
8 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blenheim Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:21.
8 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Branksome Court, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 08:24.
9 Jun and 15 Aug 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 14 May 2025 at 09:26.
9 and 13 Jun 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Apr 2025 at 15:14.
9 and 13 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Acres Hall Avenue, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 Dec 2024 at 08:52.
9 and 13 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Acres Hall Avenue, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 07:34.
9 and 18 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:42.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:34.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:54.
9 Jun and 26 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 12:29.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:35.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:53.
9 and 20 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkfield Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:07.
9 and 20 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkfield Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 14:28.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 16 May 2025 at 16:37.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:47.
9 Jun and 5 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 28 May 2025 at 12:10.
9 and 20 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 11:42.
9 and 20 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 15:59.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:37.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:32.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 17:05.
9 and 27 Jun 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:24.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 11:17.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:17.
11 and 13 Jun 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Mar 2025 at 10:54.
11 and 13 Jun 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Mar 2025 at 10:50.
11 and 13 Jun 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 15:56.
11 and 13 Jun 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Apr 2025 at 09:33.
13 Jun and 18 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:08.
13 Jun 2025 and 1 Jul 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rooley Lane, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 16:19.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Barnes Road, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 13:51.
16 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:08.
17 Jun and 1 Jul 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Tower Lane, Armley, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 14:41.
17 and 19 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Apr 2025 at 16:27.
17 and 19 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 May 2025 at 12:56.
19 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:45.
19 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 09:28.
20 Jun and 24 Jul 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Gaythorne Road, West Bowling, Bradford.
These works are categorised as Major.
The works will start on or after 20 June 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 24 Mar 2025 at 11:54.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bierley Lane, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:49.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manchester Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:24.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smiddles Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:15.
23 and 28 Jun 2025
Leeds City Council are proposing to carry out roadworks on Top Moor Side, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:52.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:42.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Quebec Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 16:01.
23 Jun and 2 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smith Street, Listerhills, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 May 2025 at 11:06.
23 Jun and 2 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smith Street, Listerhills, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 16:27.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westgate, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:17.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wigan Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 15:55.
23 Jun and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:25.
23 Jun and 11 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:36.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:42.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:58.
23 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on St Marks Street, Woodhouse, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:17.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:12.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:14.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:59.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:57.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:10.
25 Jun and 22 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:32.
25 Jun and 18 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:13.
25 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:41.
25 Jun and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:05.
25 Jun and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:14.
25 Jun and 16 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 16:09.
30 Jun and 13 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 14:27.
30 Jun and 4 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Autumn Street, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:26.
30 Jun and 2 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:50.
30 Jun and 2 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:32.
30 Jun and 11 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Broadlea Hill, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 10 Apr 2025 at 14:40.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 15:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 16:22.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:00.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:58.
30 Jun and 8 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.
30 Jun and 8 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:36.
30 Jun and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.
30 Jun and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:03.
3 and 16 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:34.
6 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cross Chapel Street, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 14:43.
7 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.
7 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.
7 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Fitzwilliam Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2025 at 11:53.
7 and 25 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Fitzwilliam Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Jun 2025 at 11:01.
7 Jul and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:30.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:49.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:33.
7 and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 09:06.
9 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:13.
9 and 11 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Apr 2025 at 12:02.
9 and 11 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on North Brook Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Apr 2025 at 14:31.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Birch Close, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 16:00.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fenby Avenue, Dudley Hill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wakefield Road, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:27.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:59.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.
11 and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:09.
14 Jul and 29 Aug 2025
Kirklees Council are proposing to carry out Section 50 on Whitehall Road West, Birkenshaw, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 May 2025 at 07:14.
14 Jul and 1 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 14:15.
14 and 27 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 11:51.
14 Jul and 8 Aug 2025
Energy Assets Pipelines were proposing to carry out Utility asset works on Thornton Road, Bradford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 8 Apr 2025 at 10:08.
14 Jul and 8 Aug 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 8 Apr 2025 at 10:46.
14 Jul and 8 Aug 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 2 Jun 2025 at 14:23.
14 Jul and 8 Aug 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Thornton Road, Bradford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 7 Apr 2025 at 15:29.
14 Jul and 8 Aug 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Thornton Road, Bradford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 8 Apr 2025 at 10:05.
14 Jul and 8 Aug 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 8 Apr 2025 at 14:29.
14 Jul and 8 Aug 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 2 Jun 2025 at 14:26.
14 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Brook Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.
14 and 18 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodhall Park Grove, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 30 May 2025 at 14:46.
14 and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 17:42.
14 Jul 2025 and 1 Mar 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.
14 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:42.
14 Jul and 21 Dec 2025
Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 16:18.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 24 Apr 2025 at 13:52.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 08:20.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ned Lane, Holme Wood, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Tyersal Lane, Tyersal, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.
15 and 17 Jul 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 11 Apr 2025 at 11:12.
18 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Altar Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Apr 2025 at 13:50.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:14.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:02.
21 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:32.
21 Jul and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Feb 2025 at 10:29.
21 Jul and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Feb 2025 at 11:31.
21 Jul and 31 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 15:23.
21 Jul and 22 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Apr 2025 at 13:51.
21 Jul and 1 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosebery Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 08:40.
21 Jul and 1 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosebery Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 09:55.
21 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 16:30.
21 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 11:22.
22 Jul and 8 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 09:43.
22 and 24 Jul 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 July 2025 and run through until 24 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 13:35.
22 and 24 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 30 Apr 2025 at 09:50.
22 Jul and 14 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heights Lane, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 14:24.
23 Jul and 19 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Robin Lane, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 14:51.
23 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:36.
23 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jul 2024 at 13:27.
23 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 12:33.
24 and 26 Jul 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on West Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 28 May 2025 at 08:56.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:21.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 16:52.
24 Jul and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 14:54.
28 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 14:18.
28 Jul and 10 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 May 2025 at 11:49.
28 Jul and 17 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Mar 2025 at 11:00.
28 Jul and 8 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 16 May 2025 at 14:14.
30 Jul and 5 Aug 2025
Yorkshire Water are proposing to carry out Utility asset works on Raikes Lane, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 08:13.
30 Jul and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:10.
30 Jul and 1 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bargrange Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 08:03.
30 Jul and 1 Aug 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bargrange Avenue, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 July 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 15:42.
1 and 8 Aug 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Lowood Lane, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 28 May 2025 at 16:19.
1 and 8 Aug 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Lowood Lane, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 29 May 2025 at 10:37.
4 Aug and 12 Sep 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wellington Road, Holbeck, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 15 Jan 2024 at 16:30.
4 Aug 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:44.
5 and 7 Aug 2025
BT were proposing to carry out Utility asset works on Grosvenor Road, Manningham, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 23 May 2025 at 10:30.
6 and 20 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bentley Lane, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 15:20.
7 and 24 Aug 2025
Yorkshire Water are proposing to carry out roadworks on Silverhill Road, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 08:25.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:36.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:26.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:06.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:09.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:13.
8 Aug and 4 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:39.
8 Aug and 31 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:52.
11 and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Duncombe Street, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:35.
11 and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Duncombe Street, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 15:03.
11 and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Duncombe Street, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 16:50.
11 and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Duncombe Street, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 14:53.
11 and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Duncombe Street, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 15:38.
11 and 13 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hustler Street, Undercliffe, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 May 2025 at 16:02.
11 Aug and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.
12 and 14 Aug 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Jacob Street, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 19 May 2025 at 16:04.
13 Aug and 17 Sep 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Parkside Road, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 May 2025 at 12:02.
18 Aug and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickets Close, Odsal, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 15:03.
18 Aug and 5 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickets Close, Odsal, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 10:10.
18 Aug and 3 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 10:26.
18 Aug and 3 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 10:36.
18 Aug and 3 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 08:44.
18 Aug and 1 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:36.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:11.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:08.
18 Aug and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:05.
18 Aug and 9 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:13.
18 Aug and 19 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:24.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.
25 and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 14 Apr 2025 at 13:22.
25 Aug 2025 and 2 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 13:55.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.
26 Aug and 1 Oct 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.
Roadworks Map near to Bradford Road, PUDSEY, LS28 6EF (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bradford Road, PUDSEY, LS28 6EF (31 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 May 2025 - 9 Jun 2025)
(Scheduled: 30 May 2025 - 9 Jun 2025)
(Scheduled: 30 May 2025 - 5 Jun 2025)
(Scheduled: 12 May 2025 - 7 Dec 2026)