ROADWORKS SUMMARY
Becca Park, LEEDS, LS25 3BQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Becca Park, LS25 3BQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Becca Park, LEEDS, LS25 3BQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Becca Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Leeds Road

Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 15:27.

Leeds City Council logo
LONG TERM
Between
29 Jul 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Smeaton Approach

Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 08:42.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Aug 2024 at 13:31.

Northern Gas Networks logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Harlech Way

Northern Gas Networks are carrying out Utility repair and maintenance works on Harlech Way, Garforth, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 08:00 and could run through until 26 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Jan 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 09:00 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:27.

National Grid Electricity Transmission logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Toulston Grange To Headley Bar

National Grid Electricity Transmission are carrying out Utility repair and maintenance works on Toulston Grange To Headley Bar, Stutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 4 Feb 2025 at 14:31.

National Grid Electricity Transmission logo
Between
27 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Toulston Grange To Headley Bar

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Toulston Grange To Headley Bar, Stutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 23 Dec 2024 at 09:04.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Austhorpe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:00 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Feb 2025 at 11:27.

Leeds City Council logo
Finishing
Today
Details
View Map
Share
Follow
Green Lane

Leeds City Council are proposing to carry out Highway improvement works on Green Lane, Whitkirk, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 11:06.

Leeds City Council logo
Finishing
Today
Details
View Map
Share
Follow
Green Lane

Leeds City Council are proposing to carry out Highway improvement works on Green Lane, Whitkirk, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 27 Jan 2025 at 09:47.

Northern Powergrid (Yorkshire) logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jan 2025 at 14:22.

Northern Gas Networks logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Skipton Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skipton Rise, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:01.

Northern Powergrid (Yorkshire) logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Station Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jan 2025 at 10:20.

Network Rail logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Station Road

Network Rail were proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Jan 2025 at 14:46.

Network Rail logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 10:33.

Network Rail logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 08:58.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:11.

Quickline Commucations logo
Between
27 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Garnet Lane

Quickline Commucations are proposing to carry out Utility asset works on Garnet Lane, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Feb 2025 at 10:02.

National Highways logo
Between
1 and 3 Mar 2025
Details
View Map
Share
William Parkin Way

National Highways were proposing to carry out Highway repair and maintenance works on William Parkin Way, Austhorpe, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Feb 2025 at 10:43.

Leeds City Council logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Red Hall Lane

Leeds City Council are proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 08:29.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 30 Apr 2025
Details
View Map
Share
Follow
New Sturton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Sturton Lane, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 10 Jan 2025 at 08:53.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 9 May 2025
Details
View Map
Share
Follow
New Sturton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Sturton Lane, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 09:50.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 9 May 2025
Details
View Map
Share
Follow
New Sturton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Sturton Lane, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 13:55.

Quickline Commucations logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Feb 2025 at 09:11.

Quickline Commucations logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 13 Feb 2025 at 10:43.

Northern Powergrid (Yorkshire) logo
Between
6 and 12 Mar 2025
Details
View Map
Share
Follow
Main Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Main Street, Saxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Feb 2025 at 12:30.

Northern Powergrid (Yorkshire) logo
Between
6 and 12 Mar 2025
Details
View Map
Share
Follow
Main Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Main Street, Saxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Feb 2025 at 16:50.

Northern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Edinburgh Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edinburgh Place, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 16:00.

Quickline Commucations logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Feb 2025 at 15:51.

Quickline Commucations logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Feb 2025 at 09:15.

Northern Gas Networks logo
Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Dover Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dover Street, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 16:01.

BT logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Milner Lane

BT are proposing to carry out Utility asset works on Milner Lane, Thorner, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Feb 2025 at 16:20.

Quickline Commucations logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Kiddal Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Kiddal Lane, Barwick In Elmet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 14 Feb 2025 at 16:19.

Yorkshire Water logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:24.

Yorkshire Water logo
Between
31 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Foundry Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:09.

Northern Gas Networks logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Harlech Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harlech Way, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Jul 2024 at 08:34.

Network Rail logo
LONG TERM
Between
31 Mar and 25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 11:26.

Yorkshire Water logo
Between
31 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:51.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Beech Walk

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Walk, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 09:56.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Cedar Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cedar Drive, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:56.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Fairfield Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Road, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 13:36.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Edgerton Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Drive, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:48.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Edgerton Garth

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Garth, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:53.

Quickline Commucations logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Toulston Grange To Headley Bar

Quickline Commucations are proposing to carry out Utility asset works on Toulston Grange To Headley Bar, Stutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 6 Feb 2025 at 11:58.

Northern Gas Networks logo
Between
12 and 20 Apr 2025
Details
View Map
Share
Follow
Windsor Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Green, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 12:40.

Northern Gas Networks logo
Between
12 and 30 Apr 2025
Details
View Map
Share
Inverness Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Inverness Road, Garforth, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 April 2025 and run through until 30 April 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 30 Jan 2025 at 15:04.

Yorkshire Water logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Somerville Green

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Green, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:51.

Northern Gas Networks logo
Between
14 and 30 Apr 2025
Details
View Map
Share
Follow
Inverness Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Inverness Road, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 09:13.

Quickline Commucations logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Stutton Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Stutton Road, Tadcaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Jan 2025 at 10:29.

Yorkshire Water logo
Between
18 and 24 Apr 2025
Details
View Map
Share
Chapel Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Barwick In Elmet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 April 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 12:05.

Northern Gas Networks logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Skipton Rise

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skipton Rise, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 12:41.

Yorkshire Water logo
Between
28 Apr and 26 May 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:12.

Northern Gas Networks logo
LONG TERM
Between
30 Apr and 10 Jul 2025
Details
View Map
Share
Follow
Ludlow Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ludlow Avenue, Garforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 10 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 16:02.

Northern Gas Networks logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 12:38.

Yorkshire Water logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:06.

Yorkshire Water logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:16.


Roadworks Map near to Becca Park, LEEDS, LS25 3BQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 12:14
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Becca Park, LEEDS, LS25 3BQ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Quickline Commucations logo
YORK ROAD, SCHOLES 
(0.7 miles)
Quickline Commucations
Utility asset works - Carriageway, Verge - Two-way signals
Planned
Scheduled: 17 Feb 2025 - 18 Feb 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.