ROADWORKS SUMMARY
Whin Park, OTLEY, LS21 1QB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Whin Park, LS21 1QB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Whin Park, OTLEY, LS21 1QB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Whin Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Between
10 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 4 Mar 2025 at 11:14.

Leeds City Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Leeds City Council are carrying out Highway repair and maintenance works on Mill Lane, Otley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 07:00 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 Mar 2025 at 12:27.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road West Park

Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road Weetwood

Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.

Leeds City Council logo
LONG TERM
Between
5 Jun 2025 and 26 Mar 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 26 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 13:00.

Northern Gas Networks logo
LONG TERM
Between
13 Jun 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Calverley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 1 Mar 2026
Details
View Map
Share
Follow
Quakers Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 1 Jul 2025 at 10:11.

Yorkshire Water logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are carrying out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:00 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 5 Aug 2025 at 08:44.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 24 Apr 2025 at 13:52.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 08:20.

Northern Gas Networks logo
LONG TERM
Between
16 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 10:00.

Yorkshire Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Greenacre Park

Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 17:03.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:52.

Yorkshire Water logo
LONG TERM
Between
1 Aug and 15 Sep 2025
Details
View Map
Share
Queenswood Drive

Yorkshire Water were proposing to carry out Utility asset works on Queenswood Drive, Headingley, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jul 2025 at 07:22.

Leeds City Council logo
LONG TERM
Until
11 Sep 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are carrying out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 11 September 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Aug 2025 at 10:16.

Leeds City Council logo
LONG TERM
Until
11 Sep 2026
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are carrying out Highway improvement works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 11 September 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Aug 2025 at 10:13.

Leeds City Council logo
LONG TERM
Until
11 Sep 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are carrying out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 11 September 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Aug 2025 at 10:18.

Leeds City Council logo
LONG TERM
Until
11 Sep 2026
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are carrying out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 11 September 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Aug 2025 at 10:15.

Leeds City Council logo
LONG TERM
Until
11 Sep 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are carrying out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 11 September 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Aug 2025 at 10:14.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 21 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.

Leeds City Council logo
LONG TERM
Between
14 Aug 2025 and 11 Oct 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Aug 2025 at 10:26.

Leeds City Council logo
LONG TERM
Between
14 Aug 2025 and 11 Oct 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 11 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Aug 2025 at 10:44.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Denton Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denton Avenue, Gledhow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 14:59.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:57.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:12.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:02.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:46.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:02.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:00.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 24 Jun 2025 at 12:38.

Yorkshire Water logo
LONG TERM
Until
25 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 16:45 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 08:38.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Holmfield Drive

Yorkshire Water are carrying out Utility asset works on Holmfield Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 16:30 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 12:37.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Layton Park Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Layton Park Avenue, Rawdon, Leeds.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 10:45 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Batter Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.

Northern Gas Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Wike Ridge Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Wike Ridge Lane, Alwoodley, Leeds.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 09:21 and could run through until 6 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 12:43.

Network Rail logo
Until
14 Sep 2025
Details
View Map
Share
Follow
Burn Bridge Lane

Network Rail are carrying out Works for Rail Purposes on Burn Bridge Lane, Burn Bridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 August 2025 at 11:30 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Sep 2025 at 13:20.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Sutherland Crescent

Yorkshire Water are proposing to carry out Utility asset works on Sutherland Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 12:09.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Sutherland Crescent

Yorkshire Water are proposing to carry out Utility asset works on Sutherland Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 14:03.

Northern Gas Networks logo
LONG TERM
Until
7 Oct 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:15.

Northern Gas Networks logo
LONG TERM
Until
7 Oct 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:14.

Northern Gas Networks logo
LONG TERM
Until
6 Nov 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:11.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Kerry Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Jun 2025 at 14:32.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
King Lane

Yorkshire Water are carrying out Utility repair and maintenance works on King Lane, Moortown, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:32 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:19.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Victoria Gardens

Yorkshire Water are carrying out Utility repair and maintenance works on Victoria Gardens, Horsforth, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:15 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 11:37.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Tredgold Crescent

Yorkshire Water are carrying out Utility repair and maintenance works on Tredgold Crescent, Bramhope, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:21 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 10:23.

Northern Gas Networks logo
Between
5 and 22 Sep 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 1 Jul 2025 at 09:53.

Northern Gas Networks logo
Between
5 and 22 Sep 2025
Details
View Map
Share
Potternewton Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 16:09.

Northern Gas Networks logo
Between
5 and 22 Sep 2025
Details
View Map
Share
Miles Hill Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Miles Hill Avenue, Miles Hill, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 16:12.

Northern Gas Networks logo
Between
5 and 22 Sep 2025
Details
View Map
Share
Miles Hill Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Miles Hill Street, Miles Hill, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 16:10.

Yorkshire Water logo
LONG TERM
Between
8 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:44.

Vodafone logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Stainbeck Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 26 Aug 2025 at 14:21.

Vodafone logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Stainbeck Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 28 Aug 2025 at 16:38.

Yorkshire Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Kerry Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jul 2025 at 12:33.

Yorkshire Water logo
Between
15 and 21 Sep 2025
Details
View Map
Share
Follow
Kedleston Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kedleston Road, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 09:53.

Yorkshire Water logo
Between
15 and 21 Sep 2025
Details
View Map
Share
Follow
Kedleston Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kedleston Road, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 15:49.

Yorkshire Water logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:14.

Yorkshire Water logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Allerton Grove

Yorkshire Water are proposing to carry out Utility asset works on Allerton Grove, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:52.

Yorkshire Water logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Allerton Grove

Yorkshire Water are proposing to carry out Utility asset works on Allerton Grove, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:11.

Yorkshire Water logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Norton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norton Road, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 14:59.

Yorkshire Water logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Norton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norton Road, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 11:30.

Yorkshire Water logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Norton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norton Road, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 14:58.

Yorkshire Water logo
LONG TERM
Between
22 Sep 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 25 Apr 2025 at 06:47.

Leeds City Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Victoria Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Jun 2025 at 09:57.

Leeds City Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Victoria Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 19 Jun 2025 at 11:17.

Northern Gas Networks logo
Between
23 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Aug 2025 at 16:31.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
King George Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on King George Avenue, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2025 at 14:13.

Northern Gas Networks logo
Between
30 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2025 at 10:20.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:03.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:41.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:56.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:43.

Yorkshire Water logo
Between
6 and 12 Oct 2025
Details
View Map
Share
Follow
Lime Tree Avenue

Yorkshire Water are proposing to carry out Utility asset works on Lime Tree Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 11:49.

Yorkshire Water logo
Between
6 and 12 Oct 2025
Details
View Map
Share
Follow
Lime Tree Avenue

Yorkshire Water are proposing to carry out Utility asset works on Lime Tree Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 14:56.

Yorkshire Water logo
Between
6 and 19 Oct 2025
Details
View Map
Share
Follow
Westcombe Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westcombe Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Apr 2025 at 12:41.

Yorkshire Water logo
Between
6 and 19 Oct 2025
Details
View Map
Share
Follow
Westcombe Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westcombe Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Apr 2025 at 15:52.

Yorkshire Water logo
Between
6 and 19 Oct 2025
Details
View Map
Share
Kedleston Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Kedleston Road, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 19 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Apr 2025 at 10:07.

Yorkshire Water logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:30.

Northern Powergrid (Northeast) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Swindon Lane

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Swindon Lane, Kirkby Overblow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Sep 2025 at 14:37.

Cornerstone Telecommunications Infrastructure logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Drummond Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Drummond Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Aug 2025 at 16:56.

Cornerstone Telecommunications Infrastructure logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Drummond Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Drummond Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Aug 2025 at 14:07.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:18.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:17.

Yorkshire Water logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:23.

Yorkshire Water logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
High Moor Avenue

Yorkshire Water are proposing to carry out Utility asset works on High Moor Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:49.

Yorkshire Water logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
High Moor Avenue

Yorkshire Water are proposing to carry out Utility asset works on High Moor Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:55.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Kingswood Gardens

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Kingswood Gardens, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 9 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Apr 2025 at 10:49.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Kingswood Gardens

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kingswood Gardens, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 16:26.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Kingswood Gardens

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kingswood Gardens, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 13:09.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Kingswood Gardens

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kingswood Gardens, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 14:00.

Vodafone logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Stainbeck Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 29 Aug 2025 at 15:15.

Vodafone logo
Between
24 and 26 Oct 2025
Details
View Map
Share
Follow
Stainbeck Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 26 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 27 Aug 2025 at 08:53.

Yorkshire Water logo
LONG TERM
Between
27 Oct 2025 and 1 Feb 2026
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 07:20.

Yorkshire Water logo
Between
29 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Back Clarence Road

Yorkshire Water are proposing to carry out New service connection on Back Clarence Road, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 13:53.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Broadway

Yorkshire Water are proposing to carry out Utility asset works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:45.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rawdon Road

Yorkshire Water are proposing to carry out Utility asset works on Rawdon Road, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:41.

Yorkshire Water logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Earlswood Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earlswood Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 16:22.

Yorkshire Water logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Earlswood Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earlswood Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 12:58.

Yorkshire Water logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Earlswood Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earlswood Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:49.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 10:51.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 10:52.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 12:44.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Knott Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:41.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Knott Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 13:27.


Roadworks Map near to Whin Park, OTLEY, LS21 1QB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Whin Park, OTLEY, LS21 1QB (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)