ROADWORKS SUMMARY
Black Hill Road, OTLEY, LS21 1QA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Black Hill Road, LS21 1QA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Black Hill Road, OTLEY, LS21 1QA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Black Hill Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:29.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 16 Apr 2024 at 09:45.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 4 Apr 2024 at 08:17.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 21 Mar 2024 at 11:02.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:17.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:34.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:10.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:16.

Leeds City Council logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.

Yorkshire Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Morris Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 16:30 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 16:30.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Primley Park Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Primley Park Lane, Alwoodley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Feb 2025 at 16:03.

Northern Gas Networks logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 January 2025 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 08:41.

Leeds City Council logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Burton Crescent

Leeds City Council are proposing to carry out Highway repair and maintenance works on Burton Crescent, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 Dec 2024 at 13:08.

Leeds City Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Burton Crescent

Leeds City Council are carrying out Highway repair and maintenance works on Burton Crescent, Headingley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 07:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 Jan 2025 at 07:44.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kedleston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kedleston Road, Moor Allerton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:31.

Northern Gas Networks logo
LONG TERM
Between
22 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Scott Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:23.

Nexfibre Networks Limited logo
Finishing
Friday
Details
View Map
Share
Follow
Long Meadows

Nexfibre Networks Limited are proposing to carry out Utility asset works on Long Meadows, Bramhope, Leeds.

These works are categorised as Major.

The works will start on or after 22 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 12:53.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:18.

Yorkshire Water logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
Pool Bank New Road

Yorkshire Water are carrying out Statutory Infrastructure Works on Pool Bank New Road, Pool In Wharfedale, Otley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:30 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 27 Jan 2025 at 09:55.

Leeds City Council logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Church Lane

Leeds City Council were proposing to carry out Highway repair and maintenance works on Church Lane, Chapel Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 11:51.

Nexfibre Networks Limited logo
Finishing
Monday
Details
View Map
Share
Follow
Wynmore Drive

Nexfibre Networks Limited are proposing to carry out Utility asset works on Wynmore Drive, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 12:25.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Breary Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Breary Lane East, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 16:03.

Northern Gas Networks logo
Until
6 Mar 2025
Details
View Map
Share
Follow
Farm Hill North

Northern Gas Networks are carrying out Utility repair and maintenance works on Farm Hill North, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 08:00 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Feb 2025 at 10:51.

Northern Gas Networks logo
LONG TERM
Between
7 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 10:24.

Northern Gas Networks logo
LONG TERM
Between
7 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 16:58.

Northern Gas Networks logo
LONG TERM
Between
7 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:40.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:42.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 11:41.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 17:01.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 17:06.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Scott Hall Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Scott Hall Road, Leeds.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 11:42 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 12:29.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Monk Bridge Avenue

Yorkshire Water are carrying out Utility repair and maintenance works on Monk Bridge Avenue, Meanwood, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2025 at 07:57 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Feb 2025 at 09:16.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Moor Grange Drive

Leeds City Council were proposing to carry out Highway improvement works on Moor Grange Drive, West Park, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Feb 2025 at 10:32.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Feb 2025 at 11:06.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 23 May 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:56.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 08:27.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 23 May 2025
Details
View Map
Share
Sandmoor Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandmoor Lane, Alwoodley, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:47.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 12:04.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 15:14.

Northern Gas Networks logo
LONG TERM
Between
19 Feb and 23 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:37.

Northern Powergrid (Yorkshire) logo
Between
23 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:43.

Northern Powergrid (Yorkshire) logo
Between
23 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 14:11.

Leeds City Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Church Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Church Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Dec 2024 at 11:40.

Leeds City Council logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Broadway

Leeds City Council are proposing to carry out Highway improvement works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 12:24.

Leeds City Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Broadway

Leeds City Council are proposing to carry out Highway improvement works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 09:37.

Northern Gas Networks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Westcombe Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcombe Avenue, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:32.

Northern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 15:17.

Northern Gas Networks logo
Between
28 Feb and 25 Mar 2025
Details
View Map
Share
Follow
Low Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Lane, Horsforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:51.

Northern Gas Networks logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Tinshill Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Drive, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.

Northern Gas Networks logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Tinshill Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Drive, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Jan 2025 at 11:40.

Northern Gas Networks logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Tinshill Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Drive, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Jan 2025 at 16:40.

Northern Gas Networks logo
LONG TERM
Between
6 Mar and 16 Apr 2025
Details
View Map
Share
Follow
Scott Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 11:55.

Northern Gas Networks logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Tinshill Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Tinshill Lane, Cookridge, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 15:21.

Leeds City Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Church Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Church Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Jan 2025 at 09:03.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Ring Road West Park

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Jan 2025 at 15:24.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Ring Road West Park

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Jan 2025 at 15:10.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:48.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 14:10.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:52.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Otley Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 13:37.

Yorkshire Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Wescoe Hill Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wescoe Hill Lane, Weeton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 27 Jan 2025 at 10:25.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 23 May 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 16:30.

Yorkshire Water logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Creskeld Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Creskeld Lane, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 09:15.

Yorkshire Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Creskeld Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Creskeld Lane, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Jan 2025 at 13:27.

Yorkshire Water logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Creskeld Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Creskeld Lane, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Jan 2025 at 14:05.

Northern Gas Networks logo
Between
18 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Miles Hill View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill View, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 11:58.

Northern Gas Networks logo
Between
20 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Low Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Lane, Horsforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Jan 2025 at 13:24.

Leeds City Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Main Street

Leeds City Council are proposing to carry out Highway improvement works on Main Street, Pool In Wharfedale, Otley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 13:27.

Yorkshire Water logo
LONG TERM
Between
29 Mar and 10 May 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:27.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 16 Jan 2025 at 16:30.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 16 Jan 2025 at 16:30.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 16:55.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 16:41.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:31.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 17 Jan 2025 at 10:27.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:44.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:35.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:19.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.

Yorkshire Water logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Harrogate Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:24.

Yorkshire Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Courthouse Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Courthouse Street, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 13:59.

Yorkshire Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Courthouse Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Courthouse Street, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 13:58.

Northern Gas Networks logo
Between
4 and 29 Apr 2025
Details
View Map
Share
Follow
Farm Hill North

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Hill North, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:49.

Yorkshire Water logo
LONG TERM
Between
5 Apr and 17 May 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 17:13.

Leeds City Council logo
LONG TERM
Between
7 Apr and 12 Dec 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 27 Jan 2025 at 14:05.

Yorkshire Water logo
LONG TERM
Between
7 Apr and 20 May 2025
Details
View Map
Share
Follow
Hall Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Hall Green Lane, North Rigton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 13 Feb 2025 at 16:38.

Yorkshire Water logo
LONG TERM
Between
7 Apr and 20 May 2025
Details
View Map
Share
Follow
Hall Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Hall Green Lane, North Rigton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 20 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 14 Feb 2025 at 12:37.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 16:17.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 16:47.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:00.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Avenue, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 16:23.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Avenue, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:04.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Avenue, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 08:44.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Street, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 16:19.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Street, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:29.

Northern Gas Networks logo
Between
9 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Street, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 08:45.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Remedial works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:14.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Potternewton Lane

Northern Gas Networks are proposing to carry out Remedial works on Potternewton Lane, Chapel Allerton, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 08:49.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Grove, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 16:20.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Grove, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 15:10.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Grove, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 13 Feb 2025 at 08:45.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Road, Miles Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 16:24.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Road, Miles Hill, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 15:46.

Northern Gas Networks logo
Between
15 Apr and 2 May 2025
Details
View Map
Share
Follow
Miles Hill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Road, Miles Hill, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 08:37.

Yorkshire Water logo
Between
18 and 22 Apr 2025
Details
View Map
Share
Follow
Courthouse Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Courthouse Street, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 Feb 2025 at 13:01.

Yorkshire Water logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Harrogate Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.

Yorkshire Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Church Hill

Yorkshire Water are proposing to carry out Utility asset works on Church Hill, North Rigton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Feb 2025 at 16:35.

Yorkshire Water logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.


Roadworks Map near to Black Hill Road, OTLEY, LS21 1QA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 15 Feb 2025 17:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Black Hill Road, OTLEY, LS21 1QA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.