ROADWORKS SUMMARY
Moor Drive, OTLEY, LS21 1DZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Moor Drive, LS21 1DZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Moor Drive, OTLEY, LS21 1DZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moor Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ilkley Road

City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Ilkley Road, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 07:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Jun 2024 at 14:29.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ilkley Road

City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Ilkley Road, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2024 at 07:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 Oct 2024 at 10:19.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
The Robins

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on The Robins, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:54.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
Back Lawn Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Lawn Avenue, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:52.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
Back Grangefield Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Grangefield Avenue, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:34.

LONG TERM
Between
29 Jul 2024 and 29 Jul 2025
Details
View Map
Share
Follow
Back Norwood Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Norwood Terrace, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:52.

Leeds City Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Pool Road

Leeds City Council are carrying out Highway improvement works on Pool Road, Otley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 14:58.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
North Broadgate Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on North Broadgate Lane, Horsforth, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 15:09 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:56.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hawthorn Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Hawthorn Road, Yeadon, Leeds.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 12:11 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:54.

Northern Gas Networks logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Creskeld Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Creskeld Drive, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 14:40.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Moseley Wood Bank

Leeds City Council are proposing to carry out Highway improvement works on Moseley Wood Bank, Cookridge, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 09:58.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Moseley Wood Bank

Leeds City Council are carrying out Highway repair and maintenance works on Moseley Wood Bank, Cookridge, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:30 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 9 Dec 2024 at 09:38.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Moorway

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moorway, Guiseley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 11:48.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Guiseley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 5 Nov 2024 at 12:31.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Henshaw Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Henshaw Oval, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Nov 2024 at 16:11.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Henshaw Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Henshaw Oval, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 5 Nov 2024 at 10:29.

Northern Gas Networks logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 16:30.

Northern Gas Networks logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 15:41.

Northern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Dean Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Horsforth, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 10:53.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 12 Mar 2025
Details
View Map
Share
Follow
Pool Bank New Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Pool Bank New Road, Pool In Wharfedale, Otley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Jun 2024 at 12:19.

Northern Gas Networks logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 15:04.

Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Menston, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Dec 2024 at 12:18.

Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Menston, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Dec 2024 at 14:59.

Yorkshire Water logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Creskeld Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Creskeld Lane, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 13:46.

Northern Powergrid (Yorkshire) logo
Between
21 and 29 Jan 2025
Details
View Map
Share
Follow
Holt Park Crescent

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Holt Park Crescent, Adel, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Dec 2024 at 13:32.

Nexfibre Networks Limited logo
Between
22 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Long Meadows

Nexfibre Networks Limited are proposing to carry out Utility asset works on Long Meadows, Bramhope, Leeds.

These works are categorised as Major.

The works will start on or after 22 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 12:53.

Northern Gas Networks logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Creskeld Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Creskeld Crescent, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 16:01.

Northern Gas Networks logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Creskeld Drive

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Creskeld Drive, Bramhope, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Aug 2024 at 11:48.

Nexfibre Networks Limited logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Parklands

Nexfibre Networks Limited are proposing to carry out Utility asset works on Parklands, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 15:47.

Nexfibre Networks Limited logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Parklands

Nexfibre Networks Limited are proposing to carry out Utility asset works on Parklands, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 15:43.

North Yorkshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Weeton Lane

North Yorkshire County Council are proposing to carry out Section 50 on Weeton Lane, Weeton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 11 Dec 2024 at 16:07.

Nexfibre Networks Limited logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Wynmore Drive

Nexfibre Networks Limited are proposing to carry out Utility asset works on Wynmore Drive, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 12:25.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Breary Lane East

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Breary Lane East, Bramhope, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 16:03.

Northern Gas Networks logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.

Northern Gas Networks logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:42.

Northern Gas Networks logo
LONG TERM
Between
7 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:40.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 15:14.

Northern Gas Networks logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Tinshill Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Drive, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.

Northern Gas Networks logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Tinshill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.


Roadworks Map near to Moor Drive, OTLEY, LS21 1DZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Moor Drive, OTLEY, LS21 1DZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
CAMBRIDGE STREET 
(0.9 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
7 Dec 2024 19:00 - 11 Dec 2024 10:45
0.9
Details
Share
2
Leeds City Council logo
MILL LANE 
(1.0 miles)
Leeds City Council
Remedial works - Verge - Road closure
Planned
Scheduled: 9 Dec 2024 - 13 Dec 2024
1.0
Details
Share
Follow
3
Yorkshire Water logo
URGENT
  
BRIDGE STREET 
(1.0 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
9 Dec 2024 23:19 - 10 Dec 2024 06:00
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.