ROADWORKS SUMMARY
Moorland Avenue, LEEDS, LS20 9EQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Moorland Avenue, LS20 9EQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Moorland Avenue, LEEDS, LS20 9EQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moorland Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Between
10 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 4 Mar 2025 at 11:14.

Leeds City Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Mill Lane

Leeds City Council are carrying out Highway repair and maintenance works on Mill Lane, Otley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 07:00 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 Mar 2025 at 12:27.

Northern Gas Networks logo
LONG TERM
Between
13 Jun 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Calverley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Dudley Hill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Harrogate Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Undercliffe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bradford Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Albion Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 1 Mar 2026
Details
View Map
Share
Follow
Quakers Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 1 Jul 2025 at 10:11.

Yorkshire Water logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are carrying out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:00 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 5 Aug 2025 at 08:44.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:02.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:00.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Square

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Victoria Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Salts Mill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.

LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 13:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2025 at 10:33.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Norwood Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Norwood Terrace, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:45.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Grangefield Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Grangefield Avenue, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:50.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Lawn Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Lawn Avenue, Burley In Wharfedale, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:48.

LONG TERM
Between
1 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:15.

Northern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Oct 2025 at 13:31.

Northern Gas Networks logo
LONG TERM
Until
6 Nov 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:11.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Derry Hill

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Derry Hill, Menston, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:35.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
St Peters Way

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Peters Way, Menston, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:34.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Moorfield Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorfield Avenue, Menston, Ilkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:38.

Yorkshire Water logo
LONG TERM
Between
8 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:44.

LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Sep 2025 at 08:24.

Yorkshire Water logo
LONG TERM
Until
23 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2025 at 08:00 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 19 Sep 2025 at 08:16.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thorn Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thorn Close, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Grosvenor Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Grosvenor Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Bradford Road Nw

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Bradford Road Nw, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:35.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Sandals Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sandals Road, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Kirklands Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:42.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Poplar Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Poplar Crescent, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:02.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Birklands Road South

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Birklands Road South, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:07.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thornacre Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thornacre Crescent, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:59.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Westfield Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:33.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Spring Hill

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Spring Hill, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:16.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenaire

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenaire, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:05.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenfield

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenfield, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:58.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Temple Rhydding Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Temple Rhydding Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Highfield Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Highfield Crescent, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Lens Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lens Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:20.

Yorkshire Water logo
LONG TERM
Between
22 Sep 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 25 Apr 2025 at 06:47.

Leeds City Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Victoria Avenue

Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Jun 2025 at 09:57.

Leeds City Council logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Victoria Avenue

Leeds City Council were proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.

These works were categorised as Major.

The works were originally planned to start 22 September 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Oct 2025 at 14:12.

LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Sep 2025 at 15:48.

Leeds City Council logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway improvement works on Bridge Street, Otley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Sep 2025 at 07:39.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:03.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:41.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:56.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:43.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
2 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Leeds Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2025 at 08:56.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
2 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Leeds Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2025 at 11:56.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Westway

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Westway, Guiseley, Leeds.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Oct 2025 at 10:12.

Leeds City Council logo
Between
4 and 20 Oct 2025
Details
View Map
Share
Follow
Bridge Street

Leeds City Council are proposing to carry out Highway improvement works on Bridge Street, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 Sep 2025 at 15:59.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Victoria Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Victoria Road, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 15:23.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Victoria Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility asset works on Victoria Road, Saltaire, Shipley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Sep 2025 at 10:30.

Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Baildon Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Baildon Road, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2025 at 11:19.

Yorkshire Water logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:30.

Yorkshire Water logo
Monday
Details
View Map
Share
Harecroft Road

Yorkshire Water carried out Utility repair and maintenance works on Harecroft Road, Otley.

The road was closed for some or all of the period.

The works were originally planned between 7 Oct 2025 and 13 Oct 2025 and were actually completed between 7 Oct 2025 (13:44) and 8 Oct 2025 (08:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2025 at 10:07.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lyndale Drive

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Lyndale Drive, Wrose, Shipley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 07:30 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2025 at 11:14.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2025 at 12:37.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out New service connection on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Jul 2025 at 11:05.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
George Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on George Street, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 15:25.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Caroline Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Caroline Street, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2025 at 11:57.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:18.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:17.

Yorkshire Water logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:23.

Yorkshire Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Valley Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Valley Road, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:43.

Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 Aug 2025 at 12:13.

Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Aug 2025 at 10:11.

Yorkshire Water logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 10:01.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Victoria Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Victoria Road, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Oct 2025 at 16:30.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
George Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on George Street, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Oct 2025 at 16:30.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Caroline Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Caroline Street, Saltaire, Shipley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2025 at 16:30.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Otley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2025 at 16:30.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Acorn Park

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Acorn Park, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2025 at 08:18.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 16:01.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 15:04.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2025 at 16:30.

Northern Gas Networks logo
Between
22 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 11:43.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 10:29.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 14:17.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 15:16.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Sep 2025 at 08:04.

Yorkshire Water logo
LONG TERM
Between
27 Oct 2025 and 1 Feb 2026
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 07:20.

Yorkshire Water logo
Between
29 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Back Clarence Road

Yorkshire Water are proposing to carry out New service connection on Back Clarence Road, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 13:53.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility asset works on Church Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:39.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Church Lane

Yorkshire Water are proposing to carry out Utility asset works on Church Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 13:53.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Weston Lane

Yorkshire Water are proposing to carry out Utility asset works on Weston Lane, Weston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 10:59.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Weston Lane

Yorkshire Water are proposing to carry out Utility asset works on Weston Lane, Weston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 09:20.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Moor Lane

Yorkshire Water are proposing to carry out Utility asset works on Moor Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:48.

Yorkshire Water logo
Between
30 Oct and 26 Nov 2025
Details
View Map
Share
Follow
Moor Lane

Yorkshire Water are proposing to carry out Utility asset works on Moor Lane, Weston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 14:06.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Broadway

Yorkshire Water are proposing to carry out Utility asset works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:45.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rawdon Road

Yorkshire Water are proposing to carry out Utility asset works on Rawdon Road, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:41.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rawdon Road

Yorkshire Water are proposing to carry out Utility asset works on Rawdon Road, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 23 Sep 2025 at 12:39.

Leeds City Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Stanhope Drive

Leeds City Council are proposing to carry out Highway repair and maintenance works on Stanhope Drive, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Oct 2025 at 14:08.

Quickline Commucations logo
Between
6 and 10 Nov 2025
Details
View Map
Share
Follow
Greenlea Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 9 Sep 2025 at 15:34.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Otley Old Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Old Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 10:51.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Tinshill Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Road, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 10:52.

Northern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 12:44.

Yorkshire Water logo
LONG TERM
Between
11 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Broadway

Yorkshire Water are proposing to carry out Utility asset works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 23 Sep 2025 at 12:34.

Leeds City Council logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
King George Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on King George Road, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Oct 2025 at 14:10.

Northern Powergrid (Yorkshire) logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Carr Hill Grove

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Carr Hill Grove, Calverley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2025 at 15:47.

Yorkshire Water logo
Between
24 Nov and 3 Dec 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 11:02.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Ladderbanks Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ladderbanks Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2025 at 14:55.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Ladderbanks Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ladderbanks Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2025 at 08:32.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Ladderbanks Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ladderbanks Lane, Baildon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2025 at 08:07.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 15:20.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 16:11.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Knott Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:41.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Knott Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 13:54.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Knott Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Sep 2025 at 10:09.

LONG TERM
Between
1 Dec 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 11:34.

Northern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Langley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Langley Lane, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Oct 2025 at 15:03.

Northern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Langley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Langley Lane, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2025 at 08:28.

Between
3 and 17 Dec 2025
Details
View Map
Share
Follow
Leeds Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Leeds Road, Eccleshill, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 4 Sep 2025 at 08:32.

Between
5 and 19 Dec 2025
Details
View Map
Share
Leeds Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Leeds Road, Eccleshill, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Sep 2025 at 12:14.

Yorkshire Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Bolling Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bolling Road, Ben Rhydding, Ilkley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2025 at 16:03.

Yorkshire Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Laburnum Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Laburnum Road, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Sep 2025 at 11:14.

Yorkshire Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Laburnum Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Laburnum Road, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 13:48.

Yorkshire Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Laburnum Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Laburnum Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 16:12.

Yorkshire Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Laburnum Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Laburnum Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 15:58.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 11 Feb 2026
Details
View Map
Share
Follow
Leeds Road

Yorkshire Water are proposing to carry out Utility asset works on Leeds Road, Rawdon, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 11 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 30 Jun 2025 at 13:23.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 15 Mar 2026
Details
View Map
Share
Follow
Green Lane

Yorkshire Water are proposing to carry out Utility asset works on Green Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 15 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 25 Apr 2025 at 06:48.

Northern Gas Networks logo
Between
5 and 19 Jan 2026
Details
View Map
Share
Follow
Cookridge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cookridge Lane, Cookridge, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 19 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:33.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 27 Feb 2026
Details
View Map
Share
Follow
Hallam Lane

Yorkshire Water are proposing to carry out Utility asset works on Hallam Lane, Askwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:27.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 27 Feb 2026
Details
View Map
Share
Follow
Hallam Lane

Yorkshire Water are proposing to carry out Utility asset works on Hallam Lane, Askwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 13:56.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 27 Feb 2026
Details
View Map
Share
Follow
Askwith Village

Yorkshire Water are proposing to carry out Utility asset works on Askwith Village, Askwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:46.

Yorkshire Water logo
LONG TERM
Between
5 Jan and 27 Feb 2026
Details
View Map
Share
Follow
Askwith Village

Yorkshire Water are proposing to carry out Utility asset works on Askwith Village, Askwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 15:14.


Roadworks Map near to Moorland Avenue, LEEDS, LS20 9EQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 8 Oct 2025 22:38
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Moorland Avenue, LEEDS, LS20 9EQ (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
OTLEY ROAD, GUISELEY 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Lane closure
Planned
Scheduled: 8 Oct 2025 - 9 Oct 2025
0.4
Details
Share
Follow
2
Leeds City Council logo
LEEDS ROAD, GUISELEY 
(0.5 miles)
Leeds City Council
Highway repair and maintenance works - Footway, Footpath - Some carriageway incursion
Planned
Scheduled: 9 Oct 2025
0.5
Details
Share
Follow
3
Virgin Media logo
URGENT
  
NEW ROAD, YEADON 
(0.9 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 6 Oct 2025 19:00
(Scheduled: 6 Oct 2025 - 8 Oct 2025)
0.9
Details
Share
Follow
4
Yorkshire Water logo
URGENT
  
WESTWAY, GUISELEY 
(0.9 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Complete
2 Oct 2025 09:05 - 3 Oct 2025 18:11
0.9
Details
Share
5
Yorkshire Water logo
URGENT
  
WESTWAY, GUISELEY 
(0.9 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 2 Oct 2025 - 8 Oct 2025)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.