ROADWORKS SUMMARY
Alexandra Terrace, LEEDS, LS19 7QE
Introduction

View current and future planned roadworks and road closures for Alexandra Terrace, LS19 7QE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Alexandra Terrace, LEEDS, LS19 7QE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Alexandra Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.
17 Jul 2024 and 17 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Daleside Road, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 17 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:27.
17 Jul 2024 and 16 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Collier Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 16 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:16.
17 Jul 2024 and 16 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brantcliffe Drive, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 16 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:23.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Street, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:38.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Whitelands Road, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:07.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dockfield Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 11:47.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bentley Close, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:00.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rocklands Place, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:53.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Merville Avenue, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:02.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on The Robins, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:54.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Lawn Avenue, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:52.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Grangefield Avenue, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:34.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Back Norwood Terrace, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:52.
30 Jul 2024 and 30 Jul 2025
City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Brantcliffe Way, Baildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 July 2024 and run through until 30 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 May 2025 at 10:50.
22 Aug 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 16:30 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 11:18.
6 Jan and 20 Dec 2025
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.
Sunday
Leeds City Council are carrying out roadworks on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:30 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:22.
Sunday
Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 19:00 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:25.
10 Mar and 28 Nov 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Otley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 4 Mar 2025 at 11:14.
28 Nov 2025
Leeds City Council are carrying out Highway repair and maintenance works on Mill Lane, Otley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 07:00 and could run through until 28 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 12 Mar 2025 at 12:27.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.
31 Mar 2025 and 30 Apr 2026
Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.
31 Mar 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.
1 Apr and 31 Jul 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Leathley Lane, Leathley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 27 Feb 2025 at 14:25.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Maple Avenue, Thornbury, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:10.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 14:43.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:27.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:32.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 13:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:47.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blakehill Terrace, Undercliffe, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:55.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:03.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Falsgrave Avenue, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:05.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flaxton Green, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:30.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flawith Drive, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:29.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flinton Grove, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:31.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farleton Drive, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firbank Green, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fencote Crescent, Fagley, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:28.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Canal Road, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 07:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Frizinghall Road, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Sep 2024 at 15:13.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stony Lane, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:49.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Aireville Road, Frizinghall, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Jan 2025 at 14:34.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Acre Drive, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Crescent, Eccleshill, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shipley Fields Road, Frizinghall, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 12:08.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 16:56.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Festival Avenue, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wrose Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2024 at 15:01.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Snowden Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:01.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Marion Drive, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:36.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Evesham Grove, Idle, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:18.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Road, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:15.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Avenue, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:13.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Drive, Wrose, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:07.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:45.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on The Holt, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Sep 2024 at 13:50.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dock Lane, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2024 at 15:46.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thackley Old Road, Windhill, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 13:59.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on John Street, Shipley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Sep 2024 at 13:48.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Apperley Road, Apperley Bridge, Bradford.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:19.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Baildon Road, Baildon.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Oct 2024 at 14:21.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Heather Road, Baildon.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Sep 2024 at 14:44.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hillings Lane, Menston, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Oct 2024 at 14:33.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bingley Road, Menston, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Oct 2024 at 14:33.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farnley Road, Menston, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:20.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Derry Hill Gardens, Menston, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:27.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fairfax Road, Menston, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:19.
1 May and 31 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Moor Road, Burley Woodhead, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Dec 2024 at 16:01.
1 May and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Nov 2024 at 08:37.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Southfield Road, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:55.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Langford Road, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:54.
1 May and 31 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Main Street, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Sep 2024 at 11:28.
7 Dec 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.
Saturday
Northern Gas Networks are carrying out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 12:25 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 13:19.
15 May and 14 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Kent Road, Pudsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:31.
14 Jun 2025
Leeds City Council are carrying out Highway improvement works on Kent Road, Pudsey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 12:06.
15 May and 21 Jun 2025
Leeds City Council are proposing to carry out Section 50 on Kent Road, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 14 May 2025 at 15:34.
21 Jun 2025
Leeds City Council are carrying out Section 50 on Kent Road, Pudsey.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:30 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 15 May 2025 at 12:40.
15 May and 29 Aug 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Marsh, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:46.
21 Sep 2025
Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:00 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Yorkshire Water on 16 May 2025 at 09:41.
23 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 13:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 13:31.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 08:48.
20 Jun 2025
Leeds City Council are carrying out Highway repair and maintenance works on Birdcage Walk, Otley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:50 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 13:21.
19 May and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.
19 May and 13 Jul 2025
Yorkshire Water are proposing to carry out Utility asset works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 09:50.
Tomorrow
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 13:01.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 12:40.
20 Jul 2025
Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 08:59.
Monday
Quickline Commucations are proposing to carry out Utility asset works on Esholt Lane, Esholt, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 27 Mar 2025 at 15:50.
Monday
Quickline Commucations are carrying out Utility asset works on Esholt Lane, Esholt, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:04 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 27 May 2025 at 09:24.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Frizinghall Road, Frizinghall, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.
These works are categorised as Major.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 15:53.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Baildon Road, Baildon.
These works are categorised as Major.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hillings Lane, Menston, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:37.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bingley Road, Menston, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:39.
31 May and 30 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Main Street, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 16:32.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Otley Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 15:14.
2 and 16 Jun 2025
Murphy Power Distribution were proposing to carry out New service connection on Otley Road, Adel, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Dec 2024 at 09:30.
2 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 10:54.
27 Jun 2025
Leeds City Council are carrying out Highway repair and maintenance works on Holt Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:34.
2 and 27 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 09:39.
6 and 29 Jun 2025
Yorkshire Water were proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 29 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 12:09.
6 and 29 Jun 2025
Yorkshire Water are proposing to carry out roadworks on Rushton Avenue, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Feb 2025 at 15:53.
6 and 10 Jun 2025
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 7 Apr 2025 at 13:05.
9 and 18 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:42.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:34.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:54.
9 Jun and 26 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 12:29.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:35.
9 Jun and 18 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:53.
9 and 20 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 11:42.
9 and 20 Jun 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 15:59.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:37.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:32.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 17:05.
9 and 27 Jun 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:24.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 May 2025 at 11:17.
9 and 27 Jun 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:17.
9 Jun and 4 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 12:40.
9 and 12 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Main Street, Pool In Wharfedale, Otley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 May 2025 at 09:31.
13 Jun and 18 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:08.
13 Jun 2025 and 1 Jul 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.
16 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:08.
16 Jun and 18 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Bridge Street, Otley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 10:24.
19 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:45.
19 and 29 Jun 2025
Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 09:28.
21 and 25 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Courthouse Street, Otley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 13:44.
23 Jun and 11 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:36.
23 Jun 2025 and 1 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the verge and footpath.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 14:33.
23 Jun 2025 and 1 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:46.
23 and 27 Jun 2025
Yorkshire Water are proposing to carry out New service connection on Moorway, Guiseley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:18.
23 and 27 Jun 2025
Yorkshire Water are proposing to carry out New service connection on Moorway, Guiseley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 12:29.
25 Jun and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:05.
25 Jun and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:14.
25 Jun and 16 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 16:09.
30 Jun and 11 Jul 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Broadlea Hill, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 10 Apr 2025 at 14:40.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 15:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 30 May 2025 at 16:22.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:57.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:00.
30 Jun 2025 and 31 Jul 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:58.
30 Jun and 8 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.
30 Jun and 8 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:36.
30 Jun and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.
30 Jun and 22 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:03.
3 and 16 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:34.
4 and 18 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Guiseley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2025 at 15:21.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:49.
7 and 11 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:33.
7 and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 09:06.
8 and 14 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:58.
8 and 14 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 08:18.
8 and 14 Jul 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 May 2025 at 10:45.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.
11 and 31 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:09.
14 and 18 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodhall Park Grove, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 12:58.
14 and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 17:42.
14 Jul 2025 and 1 Mar 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.
14 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:42.
14 Jul and 21 Dec 2025
Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 16:18.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 24 Apr 2025 at 13:52.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 08:20.
15 and 17 Jul 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 11 Apr 2025 at 11:12.
21 Jul and 22 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Apr 2025 at 13:51.
21 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 16:30.
21 Jul and 24 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 11:22.
30 Jul and 1 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bargrange Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 08:03.
30 Jul and 1 Aug 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bargrange Avenue, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 July 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 7 May 2025 at 15:42.
7 and 24 Aug 2025
Yorkshire Water are proposing to carry out roadworks on Silverhill Road, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 08:25.
11 and 13 Aug 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hustler Street, Undercliffe, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 May 2025 at 16:02.
11 Aug and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.
13 and 28 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Guiseley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 15:36.
18 Aug and 1 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:36.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:11.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:08.
18 Aug and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:05.
18 Aug and 9 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:13.
18 Aug and 19 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:24.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.
25 Aug 2025 and 2 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 13:55.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.
26 Aug and 1 Oct 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.
27 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Norwood Terrace, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:45.
27 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Grangefield Avenue, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:50.
27 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Lawn Avenue, Burley In Wharfedale, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:48.
Roadworks Map near to Alexandra Terrace, LEEDS, LS19 7QE (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Alexandra Terrace, LEEDS, LS19 7QE (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 29 May 2025 - 10 Jun 2025)
(Scheduled: 14 May 2025 - 7 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.