ROADWORKS SUMMARY
New Road Side, LEEDS, LS18 4NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for New Road Side, LS18 4NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to New Road Side, LEEDS, LS18 4NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for New Road Side are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are carrying out Highway improvement works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2022 at 00:01 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 07:42.

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley To Spring Valley Crescent

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.

Leeds City Council logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are carrying out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:05.

LONG TERM
Between
17 Jul 2024 and 17 Jul 2025
Details
View Map
Share
Follow
Daleside Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Daleside Road, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 17 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:27.

Yorkshire Water logo
LONG TERM
Until
22 Aug 2025
Details
View Map
Share
Follow
Morris Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 16:30 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 11:18.

Leeds City Council logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Whitehall Road

Leeds City Council are carrying out Highway improvement works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Leeds City Council on 27 Mar 2025 at 15:00.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.

Leeds City Council logo
LONG TERM
Between
28 Oct 2024 and 10 Jul 2025
Details
View Map
Share
Follow
Springwell Street

Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.

Leeds City Council logo
LONG TERM
Until
12 Jun 2026
Details
View Map
Share
Follow
Water Lane

Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 00:00 and could run through until 12 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 07:45.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:29.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Swinegate

Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Call Lane

Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
The Calls

Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Kirkgate

Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Kirkgate

Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
High Court

Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Great George Street

Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.

Leeds City Council logo
LONG TERM
Between
6 Jan and 20 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.

Leeds City Council logo
LONG TERM
Between
7 Jan and 12 Dec 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 12:59.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.

Northern Gas Networks logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Whitehall Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 15:00 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 15:28.

Northern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Scott Green

Northern Gas Networks are carrying out Utility repair and maintenance works on Scott Green, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 March 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 13:20.

Leeds City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are carrying out roadworks on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:30 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:22.

Leeds City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 19:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 17:25.

LONG TERM
Until
27 Aug 2025
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 March 2025 at 08:00 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Mar 2025 at 10:03.

Leeds City Council logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Mill Hill

Leeds City Council are carrying out Highway improvement works on Mill Hill, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 12:55.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road West Park

Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road Weetwood

Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Low Moorside Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Gainsborough Fields

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 22 Aug 2025
Details
View Map
Share
Follow
Peace Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Peace Street, Laisterdyke, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:26.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 8 Aug 2025
Details
View Map
Share
Peace Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Peace Street, Laisterdyke, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:55.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 22 Aug 2025
Details
View Map
Share
Follow
Pawson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pawson Street, Laisterdyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:35.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 8 Aug 2025
Details
View Map
Share
Pawson Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Pawson Street, Laisterdyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:55.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 22 Aug 2025
Details
View Map
Share
Follow
Planetrees Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 09:17.

Northern Gas Networks logo
LONG TERM
Between
28 Apr and 8 Aug 2025
Details
View Map
Share
Planetrees Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 May 2025 at 08:54.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Tong Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tong Lane, Tong, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jan 2025 at 07:57.

Leeds City Council logo
LONG TERM
Between
1 May and 29 Aug 2025
Details
View Map
Share
Follow
Carr Crofts

Leeds City Council are proposing to carry out Highway repair and maintenance works on Carr Crofts, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:45.

Leeds City Council logo
LONG TERM
Between
1 May and 29 Aug 2025
Details
View Map
Share
Follow
Wesley Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wesley Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:53.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Maple Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Maple Avenue, Thornbury, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:10.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 14:43.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:27.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Intake Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:32.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 13:07.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:47.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Intake Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Blakehill Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blakehill Terrace, Undercliffe, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:55.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:03.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Falsgrave Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Falsgrave Avenue, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:05.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Flaxton Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flaxton Green, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:30.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Flawith Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flawith Drive, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:29.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Flinton Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Flinton Grove, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:31.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Farleton Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Farleton Drive, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:07.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Firbank Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firbank Green, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:44.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Fencote Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fencote Crescent, Fagley, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 14:28.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Stony Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stony Lane, Eccleshill, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:49.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Acre Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Acre Drive, Eccleshill, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:44.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Norman Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Crescent, Eccleshill, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jan 2025 at 10:48.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Norman Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Jan 2025 at 16:56.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Evesham Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Evesham Grove, Idle, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:18.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Low Ash Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Ash Road, Wrose, Shipley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Sep 2024 at 14:15.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Apperley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Apperley Road, Apperley Bridge, Bradford.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Jan 2025 at 12:19.

Leeds City Council logo
LONG TERM
Between
12 May and 21 Jun 2025
Details
View Map
Share
Follow
Armley Road

Leeds City Council are proposing to carry out Highway improvement works on Armley Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 21 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:25.

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Armley Road

Leeds City Council are carrying out Highway improvement works on Armley Road, Armley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 15:27 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 27 May 2025 at 16:19.

Leeds City Council logo
LONG TERM
Until
7 Dec 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.

Northern Gas Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Quakers Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 12:25 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 09:42.

Leeds City Council logo
LONG TERM
Between
15 May and 14 Jun 2025
Details
View Map
Share
Follow
Kent Road

Leeds City Council are proposing to carry out Highway improvement works on Kent Road, Pudsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 May 2025 at 15:31.

Leeds City Council logo
LONG TERM
Until
14 Jun 2025
Details
View Map
Share
Follow
Kent Road

Leeds City Council are carrying out Highway improvement works on Kent Road, Pudsey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 12:06.

Leeds City Council logo
LONG TERM
Between
15 May and 21 Jun 2025
Details
View Map
Share
Follow
Kent Road

Leeds City Council are proposing to carry out Section 50 on Kent Road, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 14 May 2025 at 15:34.

Leeds City Council logo
LONG TERM
Until
21 Jun 2025
Details
View Map
Share
Follow
Kent Road

Leeds City Council are carrying out Section 50 on Kent Road, Pudsey.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:30 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 May 2025 at 12:40.

Leeds City Council logo
LONG TERM
Between
15 May and 29 Aug 2025
Details
View Map
Share
Follow
Marsh

Leeds City Council are proposing to carry out Highway repair and maintenance works on Marsh, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Feb 2025 at 12:46.

Yorkshire Water logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Yorkshire Water on 16 May 2025 at 09:41.

Northern Gas Networks logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Victoria Mount

Northern Gas Networks are carrying out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 13:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 13:31.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Calverley Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 08:48.

Yorkshire Water logo
LONG TERM
Between
19 May and 21 Sep 2025
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.

Yorkshire Water logo
LONG TERM
Between
19 May and 13 Jul 2025
Details
View Map
Share
Follow
Intake Road

Yorkshire Water are proposing to carry out Utility asset works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Mar 2025 at 09:50.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Landseer Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 13:01.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Landseer Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Road, Bramley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Jan 2025 at 12:40.

Northern Gas Networks logo
Between
23 May and 13 Jun 2025
Details
View Map
Share
Guru Nanak Way

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Guru Nanak Way, Chapeltown, Leeds.

These works were categorised as Major.

The works were originally planned to start 23 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 13:23.

Northern Powergrid (Yorkshire) logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Woodside View

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.

Northern Powergrid (Yorkshire) logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Woodside View

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodside View, Burley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.

Northern Powergrid (Yorkshire) logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Argie Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:43.

Northern Powergrid (Yorkshire) logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Argie Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Argie Avenue, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 12:53.

Northern Powergrid (Yorkshire) logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Argie Avenue

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Argie Avenue, Burley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:15 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 09:31.

Leeds City Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Road

Leeds City Council are carrying out Highway repair and maintenance works on Church Road, Armley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:38.

Northern Gas Networks logo
Until
19 Jun 2025
Details
View Map
Share
Follow
Heights Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Heights Lane, Armley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:38.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Park Street

Yorkshire Water are carrying out Utility repair and maintenance works on Park Street, Armley, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 13:36.

Yorkshire Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Intake Road

Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 08:59.

Northern Powergrid (Yorkshire) logo
Between
27 May and 23 Jun 2025
Details
View Map
Share
Follow
Woodside View

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodside View, Burley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:36.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ash Grove

Leeds City Council are carrying out Highway improvement works on Ash Grove, Hyde Park, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 27 May 2025 at 09:01.

Quickline Commucations logo
Finishing
Monday
Details
View Map
Share
Follow
Esholt Lane

Quickline Commucations are proposing to carry out Utility asset works on Esholt Lane, Esholt, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 27 Mar 2025 at 15:50.

Quickline Commucations logo
Finishing
Monday
Details
View Map
Share
Follow
Esholt Lane

Quickline Commucations are carrying out Utility asset works on Esholt Lane, Esholt, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:04 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 27 May 2025 at 09:24.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Simpson Grove

Leeds City Council are proposing to carry out Section 50 on Simpson Grove, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 1 May 2025 at 12:34.

Leeds City Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Simpson Grove

Leeds City Council are carrying out Section 50 on Simpson Grove, Armley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 11:05.

Between
31 May and 30 Jun 2025
Details
View Map
Share
Follow
Norman Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Norman Lane, Wrose, Bradford.

These works are categorised as Major.

The works will start on or after 31 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 15:53.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Congress Street

Leeds City Council are proposing to carry out Highway improvement works on Congress Street, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Apr 2025 at 12:43.

Leeds City Council logo
LONG TERM
Between
2 Jun and 19 Sep 2025
Details
View Map
Share
Follow
St Michaels Road

Leeds City Council are proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:32.

Leeds City Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
St Michaels Road

Leeds City Council are carrying out Highway improvement works on St Michaels Road, Headingley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:40.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawthorn Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 12:15.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Hawthorn Crescent

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 15:57.

Murphy Power Distribution logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Otley Road

Murphy Power Distribution were proposing to carry out Utility asset works on Otley Road, Adel, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 15:14.

Murphy Power Distribution logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Otley Road

Murphy Power Distribution were proposing to carry out New service connection on Otley Road, Adel, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Dec 2024 at 09:30.

Leeds City Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 10:54.

Leeds City Council logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Holt Road

Leeds City Council are carrying out Highway repair and maintenance works on Holt Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:34.

Northern Powergrid (Yorkshire) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 09:39.

Leeds City Council logo
Finishing
Thursday
Details
View Map
Share
Mill Hill

Leeds City Council were proposing to carry out Permanent reinstatement on Mill Hill, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 15:14.

Leeds City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Mill Hill

Leeds City Council are proposing to carry out Permanent reinstatement on Mill Hill, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 15:44.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sweet Street West

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Apr 2025 at 13:39.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Sweet Street West

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Sweet Street West, Holbeck, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 14:14.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 8 May 2025 at 13:57.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 22 May 2025 at 15:15.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cardigan Fields

Leeds City Council are proposing to carry out Core Sampling on Cardigan Fields, Burley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 8 May 2025 at 14:01.

Electricity Network Company logo
Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Water Lane

Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 15:32.

Electricity Network Company logo
Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Water Lane

Electricity Network Company are proposing to carry out Utility asset works on Water Lane, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:35.

Leeds City Council logo
LONG TERM
Between
5 Jun 2025 and 26 Mar 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 26 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 13:00.

Yorkshire Water logo
Between
6 and 29 Jun 2025
Details
View Map
Share
Melbourne Grove

Yorkshire Water were proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 29 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 12:09.

Yorkshire Water logo
Between
6 and 29 Jun 2025
Details
View Map
Share
Follow
Rushton Avenue

Yorkshire Water are proposing to carry out roadworks on Rushton Avenue, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Feb 2025 at 15:53.

Quickline Commucations logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Greenlea Road

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 7 Apr 2025 at 13:05.

Leeds City Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Acres Hall Avenue

Leeds City Council are proposing to carry out Highway improvement works on Acres Hall Avenue, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Dec 2024 at 08:52.

Leeds City Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Acres Hall Avenue

Leeds City Council are proposing to carry out Highway improvement works on Acres Hall Avenue, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 07:34.

Yorkshire Water logo
Between
9 and 18 Jun 2025
Details
View Map
Share
Follow
Randolph Street

Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:42.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:34.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:54.

Leeds City Council logo
LONG TERM
Between
9 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 12:29.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Ring Road Farsley

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:35.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Ring Road Farsley

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

The works will start on or after 9 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 11:53.

Leeds City Council logo
LONG TERM
Between
9 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 16 May 2025 at 16:37.

Leeds City Council logo
LONG TERM
Between
9 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:47.

Leeds City Council logo
LONG TERM
Between
9 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Brudenell Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 28 May 2025 at 12:10.

Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Ranelagh Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 11:42.

Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Ranelagh Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ranelagh Avenue, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2025 at 15:59.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:37.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:32.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 17:05.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Holt Park Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:24.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Crescent

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 11:17.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Crescent

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Crescent, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:17.

Northern Powergrid (Yorkshire) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 12:40.

Leeds City Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Main Street

Leeds City Council are proposing to carry out Highway improvement works on Main Street, Pool In Wharfedale, Otley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 May 2025 at 09:31.

Northern Gas Networks logo
LONG TERM
Between
13 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Victoria Mount

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Mount, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:08.

Northern Gas Networks logo
LONG TERM
Between
13 Jun 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Calverley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.

Leeds City Council logo
LONG TERM
Between
16 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 May 2025 at 11:32.

Leeds City Council logo
LONG TERM
Between
16 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Neville Street

Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 12:26.

Yorkshire Water logo
Between
16 and 29 Jun 2025
Details
View Map
Share
Follow
Randolph Street

Yorkshire Water are proposing to carry out Utility asset works on Randolph Street, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:08.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Chelwood Drive

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:58.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 14:43.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 17:01.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 12:07.

Northern Gas Networks logo
Between
17 Jun and 1 Jul 2025
Details
View Map
Share
Tower Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Tower Lane, Armley, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 14:41.

Network Rail logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
St Michaels Lane

Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 16:27.

Network Rail logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
St Michaels Lane

Network Rail are proposing to carry out Works for Rail Purposes on St Michaels Lane, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 May 2025 at 12:56.

Yorkshire Water logo
Between
19 and 29 Jun 2025
Details
View Map
Share
Follow
Melbourne Grove

Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 11:45.

Yorkshire Water logo
Between
19 and 29 Jun 2025
Details
View Map
Share
Follow
Melbourne Grove

Yorkshire Water are proposing to carry out Utility asset works on Melbourne Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 09:28.

Northern Gas Networks logo
Between
20 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:49.

Leeds City Council logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Top Moor Side

Leeds City Council are proposing to carry out roadworks on Top Moor Side, Holbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:52.

Northern Gas Networks logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Hill Top Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:25.

Northern Gas Networks logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:36.

Leeds City Council logo
LONG TERM
Between
23 Jun 2025 and 1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:46.

Leeds City Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
St Marks Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:17.

Yorkshire Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Moorway

Yorkshire Water are proposing to carry out New service connection on Moorway, Guiseley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:18.

Yorkshire Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Moorway

Yorkshire Water are proposing to carry out New service connection on Moorway, Guiseley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 12:29.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Pasture Mount

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:12.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Back Christ Church View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:14.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Christ Church Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:59.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Christ Church Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 11:57.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Christ Church Mount

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:10.

Northern Gas Networks logo
Between
25 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Christ Church Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:32.

Northern Gas Networks logo
LONG TERM
Between
25 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2025 at 12:13.

Northern Gas Networks logo
LONG TERM
Between
25 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:05.

Northern Gas Networks logo
LONG TERM
Between
25 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:14.

Northern Gas Networks logo
Between
25 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 16:09.

Leeds City Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Autumn Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Autumn Street, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:26.

Leeds City Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:50.

Leeds City Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:32.

Leeds City Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Broadlea Hill

Leeds City Council are proposing to carry out Highway repair and maintenance works on Broadlea Hill, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 10 Apr 2025 at 14:40.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 15:57.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 16:22.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:57.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:00.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Otley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Otley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:36.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Hollins Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:54.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Hollins Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Hill, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 15:03.

Northern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 15:02.

Northern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:50.

Northern Gas Networks logo
Between
3 and 16 Jul 2025
Details
View Map
Share
Follow
Warm Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:34.

Northern Gas Networks logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 15:53.

Northern Gas Networks logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Guiseley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2025 at 15:21.

Northern Powergrid (Yorkshire) logo
Between
6 and 11 Jul 2025
Details
View Map
Share
Follow
Cross Chapel Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cross Chapel Street, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 14:43.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Landscove Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Heysham Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.

Northern Powergrid (Yorkshire) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Spen Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:49.

Northern Powergrid (Yorkshire) logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Spen Walk

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Walk, West Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 17:33.

Northern Gas Networks logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Dean Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dean Lane, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 09:06.

Northern Powergrid (Yorkshire) logo
Between
8 and 14 Jul 2025
Details
View Map
Share
Follow
Tredgold Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 May 2025 at 10:58.

Northern Powergrid (Yorkshire) logo
Between
8 and 14 Jul 2025
Details
View Map
Share
Follow
Tredgold Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 08:18.

Northern Powergrid (Yorkshire) logo
Between
8 and 14 Jul 2025
Details
View Map
Share
Follow
Tredgold Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Tredgold Avenue, Bramhope, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 May 2025 at 10:45.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
New Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:59.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Dudley Hill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Harrogate Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Undercliffe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bradford Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Albion Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.

Northern Gas Networks logo
Between
11 and 31 Jul 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:09.

Yorkshire Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Woodhall Park Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodhall Park Grove, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 May 2025 at 14:46.

Northern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:55.

Northern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 15:43.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Chelwood Crescent

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:57.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Chelwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 13:32.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Chelwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 14:21.

Northern Gas Networks logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Warm Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warm Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 17:42.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 1 Mar 2026
Details
View Map
Share
Follow
Quakers Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Greenacre Park

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:42.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 21 Dec 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 16:18.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 24 Apr 2025 at 13:52.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Windmill Lane

Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 08:20.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ned Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ned Lane, Holme Wood, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Tyersal Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Tyersal Lane, Tyersal, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

Quickline Commucations logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Greenlea Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 11 Apr 2025 at 11:12.

Northern Gas Networks logo
LONG TERM
Between
16 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 10:00.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Upper Wortley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:14.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Tong Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:02.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Whingate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 14:32.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Thornbury Road

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Feb 2025 at 10:29.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Thornbury Road

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Feb 2025 at 11:31.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Thornbury Road

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 15:23.

BT logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bradford Road

BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Apr 2025 at 13:51.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Quakers Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 16:30.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Greenacre Park

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 11:22.

Northern Gas Networks logo
LONG TERM
Between
22 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Low Moor Side Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 09:43.

Northern Gas Networks logo
Between
22 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Heights Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heights Lane, Armley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 14:24.

Northern Gas Networks logo
LONG TERM
Between
22 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 16:32.

Northern Gas Networks logo
LONG TERM
Between
22 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 16:03.

Northern Gas Networks logo
Between
23 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Robin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Robin Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Jun 2024 at 14:51.

Northern Gas Networks logo
Between
23 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Hill Top Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 10:36.

Northern Gas Networks logo
Between
23 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Chapeltown Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 17:22.

Northern Gas Networks logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:39.

Northern Gas Networks logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 10:21.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Meanwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jul 2024 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Meanwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 12:33.

Northern Gas Networks logo
LONG TERM
Between
24 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Upper Wortley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wortley Road, Upper Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:21.

Northern Gas Networks logo
LONG TERM
Between
24 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Tong Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 16:52.

Northern Gas Networks logo
LONG TERM
Between
24 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Whingate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whingate, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Nov 2024 at 14:54.

Leeds City Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Theaker Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 16 May 2025 at 14:14.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 4 Sep 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 14:46.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Lidgett Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Avenue, Gledhow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:08.

Northern Gas Networks logo
LONG TERM
Between
29 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:52.

Northern Gas Networks logo
Between
30 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Hill Top Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:10.

Northern Gas Networks logo
Between
31 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 13:05.

Northern Gas Networks logo
Between
31 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 15:22.

Leeds City Council logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wellington Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Wellington Road, Holbeck, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 15 Jan 2024 at 16:30.

Northern Gas Networks logo
Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Bentley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bentley Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 15:20.

Yorkshire Water logo
Between
7 and 24 Aug 2025
Details
View Map
Share
Follow
Silverhill Road

Yorkshire Water are proposing to carry out roadworks on Silverhill Road, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 08:25.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Pasture Mount

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pasture Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:36.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Back Christ Church View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Christ Church View, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:26.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Christ Church Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Road, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:06.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Christ Church Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Avenue, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:09.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Christ Church Mount

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 12:13.

Northern Gas Networks logo
Between
8 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Christ Church Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Christ Church Place, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 16:39.

Northern Gas Networks logo
LONG TERM
Between
8 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:52.

Yorkshire Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Hustler Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hustler Street, Undercliffe, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 May 2025 at 16:02.

Yorkshire Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
Devonshire Crescent

Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:43.

Yorkshire Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
Devonshire Crescent

Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:22.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 21 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.

Northern Gas Networks logo
Between
12 and 27 Aug 2025
Details
View Map
Share
Follow
St Martins View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Martins View, Potternewton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:32.

Northern Gas Networks logo
Between
12 and 27 Aug 2025
Details
View Map
Share
Follow
Chapeltown Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:26.

Northern Gas Networks logo
Between
13 and 28 Aug 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradford Road, Guiseley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 15:36.

Northern Gas Networks logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Bank

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bank, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:36.

Northern Gas Networks logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Denton Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denton Avenue, Gledhow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:21.

Yorkshire Water logo
Between
18 and 24 Aug 2025
Details
View Map
Share
Follow
East Moor Drive

Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:51.

Yorkshire Water logo
Between
18 and 24 Aug 2025
Details
View Map
Share
Follow
East Moor Drive

Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:44.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:11.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:08.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:05.

Northern Gas Networks logo
Between
18 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 13:13.

Yorkshire Water logo
LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:24.

Northern Gas Networks logo
Between
21 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Leopold Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 16:01.

Leeds City Council logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Theaker Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Theaker Lane, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 14 Apr 2025 at 13:22.

Leeds City Council logo
LONG TERM
Between
25 Aug 2025 and 2 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 13:55.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Batter Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.


Roadworks Map near to New Road Side, LEEDS, LS18 4NG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 09:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to New Road Side, LEEDS, LS18 4NG (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
BACK CLARENCE ROAD, HORSFORTH 
(0.1 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 3 Jun 2025 - 6 Jun 2025)
0.1
Details
Share
2
Leeds City Council logo
MAJOR
  
CLARENCE ROAD, Horsforth 
(0.1 miles)
Leeds City Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 6 May 2025 - 4 Jul 2025
0.1
Details
Share
Follow
3
Leeds City Council logo
MAJOR
  
CLARENCE ROAD, Horsforth 
(0.1 miles)
Leeds City Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 6 May 2025 09:30
(Scheduled: 6 May 2025 - 4 Jul 2025)
0.1
Details
Share
Follow
4
Yorkshire Water logo
URGENT
  
CLARENCE ROAD, HORSFORTH 
(0.1 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
29 May 2025 17:43 - 21:19
0.1
Details
Share
5
BT logo
OLIVER HILL, HORSFORTH 
(0.2 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 30 May 2025 - 3 Jun 2025
0.2
Details
Share
Follow
6
Yorkshire Water logo
WOODWAY, HORSFORTH 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
ABBEY COURT, HORSFORTH 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 26 May 2025 - 20 Jun 2025
0.4
Details
Share
Follow
8
Northern Powergrid (Yorkshire) logo
URGENT
  
NEW ROAD SIDE, HORSFORTH 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
29 May 2025 09:30 - 31 May 2025 10:30
0.4
Details
Share
9
Northern Gas Networks logo
MAJOR
  
NEWLAITHES ROAD, HORSFORTH 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 22 May 2025 - 27 Jun 2025
0.4
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
VICTORIA AVENUE, HORSFORTH 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 08:00
(Scheduled: 2 Jun 2025 - 16 Jun 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.