ROADWORKS SUMMARY
Tarn Lane, LEEDS, LS17 9JQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tarn Lane, LS17 9JQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tarn Lane, LEEDS, LS17 9JQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tarn Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Leeds Road

Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 17 Apr 2025 at 13:21.

Leeds City Council logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are carrying out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:05.

Leeds City Council logo
LONG TERM
Between
29 Jul 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Smeaton Approach

Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Headingley Lane

Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:29.

Leeds City Council logo
LONG TERM
Between
4 Nov 2024 and 4 Aug 2025
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Follow
Merrion Street

Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.

Leeds City Council logo
LONG TERM
Between
6 Jan 2025 and 9 Jan 2026
Details
View Map
Share
Merrion Street

Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.

Leeds City Council logo
LONG TERM
Between
7 Jan and 12 Dec 2025
Details
View Map
Share
Headingley Lane

Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 12:59.

Leeds City Council logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Red Hall Lane

Leeds City Council are proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 08:29.

Network Rail logo
LONG TERM
Between
31 Mar and 25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 11:26.

Network Rail logo
LONG TERM
Until
25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are carrying out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 01:00 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 08:45.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:37.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road West Park

Leeds City Council were proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:39.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Section 58 on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:42.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Ring Road Weetwood

Leeds City Council were proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 April 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 4 Apr 2025 at 10:41.

Leeds City Council logo
LONG TERM
Between
31 Mar 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 15 Jan 2025 at 12:42.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 10 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:50.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 15 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:36.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 15 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:53.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Gipton Wood Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Gipton Wood Road, Gipton, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Apr 2025 at 16:03.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Gipton Wood Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Gipton Wood Road, Gipton, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Apr 2025 at 13:32.

Yorkshire Water logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Harrogate Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.

Yorkshire Water logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are carrying out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 12:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 13:45.

Yorkshire Water logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:06.

Yorkshire Water logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.

Yorkshire Water logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are carrying out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 17:00 and could run through until 18 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 17 May 2025 at 12:21.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:28.

Yorkshire Water logo
Between
23 May and 20 Jun 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 14:25.

Northern Gas Networks logo
Between
23 May and 13 Jun 2025
Details
View Map
Share
Guru Nanak Way

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Guru Nanak Way, Chapeltown, Leeds.

These works were categorised as Major.

The works were originally planned to start 23 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 13:23.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are proposing to carry out Remedial works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:17.

Northern Gas Networks logo
LONG TERM
Between
27 May 2025 and 28 Jul 2026
Details
View Map
Share
Ring Road Crossgates

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 28 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 11:41.

Northern Gas Networks logo
LONG TERM
Between
27 May and 28 Jul 2025
Details
View Map
Share
Follow
Ring Road Crossgates

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 08:28.

Leeds City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Harehills Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Leeds City Council on 1 Apr 2025 at 11:55.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ash Grove

Leeds City Council are carrying out Highway improvement works on Ash Grove, Hyde Park, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 27 May 2025 at 09:01.

Northern Gas Networks logo
LONG TERM
Between
27 May and 18 Jul 2025
Details
View Map
Share
Follow
Main Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Street, Linton, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2025 at 13:24.

Yorkshire Water logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are carrying out Utility asset works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 May 2025 at 09:00.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Nowell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nowell Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Apr 2025 at 11:46.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Nowell Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Nowell Lane, Harehills, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 08:00.

Leeds City Council logo
LONG TERM
Between
2 Jun and 19 Sep 2025
Details
View Map
Share
Follow
St Michaels Road

Leeds City Council are proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:32.

Leeds City Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
St Michaels Road

Leeds City Council are carrying out Highway improvement works on St Michaels Road, Headingley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:40.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawthorn Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Apr 2025 at 12:15.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Hawthorn Crescent

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Jun 2025 at 15:57.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Scholes Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:37 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 07:16.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Scholes Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 07:35.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Scholes Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Scholes Lane, Scholes, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:53 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Jun 2025 at 06:28.

Murphy Power Distribution logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Otley Road

Murphy Power Distribution were proposing to carry out Utility asset works on Otley Road, Adel, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 15:14.

Murphy Power Distribution logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Otley Road

Murphy Power Distribution were proposing to carry out New service connection on Otley Road, Adel, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Dec 2024 at 09:30.

Leeds City Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 10:54.

Leeds City Council logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Holt Road

Leeds City Council are carrying out Highway repair and maintenance works on Holt Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Jun 2025 at 08:34.

Northern Powergrid (Yorkshire) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 09:39.

Leeds City Council logo
LONG TERM
Between
5 Jun 2025 and 26 Mar 2026
Details
View Map
Share
Otley Road

Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 26 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 13:00.

Yorkshire Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 12:58.

Yorkshire Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:34.

Yorkshire Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 15:09.

Yorkshire Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:33.

Yorkshire Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:54.

Yorkshire Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Mar 2025 at 12:57.

Yorkshire Water logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:47.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:37.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 09:32.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Holt Park Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 17:05.

Leeds City Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Holt Park Road

Leeds City Council were proposing to carry out Highway repair and maintenance works on Holt Park Road, Adel, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 May 2025 at 09:24.

Northern Powergrid (Yorkshire) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Kings Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Kings Road, Bramhope, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 12:40.

Yorkshire Water logo
Between
11 and 24 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 10:18.

Network Rail logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 10:04.

Network Rail logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Apr 2025 at 08:07.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:17.

Yorkshire Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Foundry Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 09:09.

Yorkshire Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Foundry Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 11:46.

Northern Powergrid (Yorkshire) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Apr 2025 at 11:31.

Northern Powergrid (Yorkshire) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 May 2025 at 13:10.

Northern Powergrid (Yorkshire) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 13:49.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Chelwood Drive

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:58.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 14:43.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 17:01.

Yorkshire Water logo
Between
16 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Chelwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Drive, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 12:07.

Yorkshire Water logo
LONG TERM
Between
19 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 14:57.

Yorkshire Water logo
LONG TERM
Between
19 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:49.

Yorkshire Water logo
Between
19 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:47.

Northern Gas Networks logo
LONG TERM
Between
20 Jun and 21 Aug 2025
Details
View Map
Share
Follow
Ring Road Crossgates

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:23.

Northern Gas Networks logo
Between
20 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:49.

Northern Powergrid (Yorkshire) logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Torre Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Torre Road, Burmantofts, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 May 2025 at 11:21.

Yorkshire Water logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:05.

Leeds City Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
St Marks Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on St Marks Street, Woodhouse, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Apr 2025 at 09:17.

Yorkshire Water logo
Between
23 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:31.

Yorkshire Water logo
Between
23 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:51.

Yorkshire Water logo
Between
23 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:15.

Quickline Commucations logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Kiddal Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Kiddal Lane, Barwick In Elmet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 8 May 2025 at 14:44.

Yorkshire Water logo
Between
30 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:13.

Yorkshire Water logo
Between
30 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:44.

Yorkshire Water logo
Between
30 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:03.

Yorkshire Water logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 10:02.

Leeds City Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 29 May 2025 at 10:50.

Leeds City Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Victoria Road

Leeds City Council are proposing to carry out Highway improvement works on Victoria Road, Hyde Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 14:32.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 15:57.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Ring Road West Park

Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 30 May 2025 at 16:22.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:57.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Ring Road Weetwood

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 09:00.

Leeds City Council logo
LONG TERM
Between
30 Jun 2025 and 31 Jul 2026
Details
View Map
Share
Follow
Otley Road

Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 2 Jun 2025 at 08:58.

Yorkshire Water logo
Between
30 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Avenue, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:28.

Yorkshire Water logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Avenue, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 11:19.

Yorkshire Water logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are proposing to carry out Remedial works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:52.

Northern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 15:02.

Northern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:50.

Network Rail logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 10:06.

Network Rail logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 May 2025 at 09:44.

Northern Gas Networks logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 15:53.

Northern Powergrid (Yorkshire) logo
Between
6 and 11 Jul 2025
Details
View Map
Share
Follow
Cross Chapel Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cross Chapel Street, Headingley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 May 2025 at 14:43.

Yorkshire Water logo
LONG TERM
Between
7 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:46.

Yorkshire Water logo
LONG TERM
Between
7 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:56.

Northern Powergrid (Yorkshire) logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Oakwood Lane

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 May 2025 at 14:41.

Northern Powergrid (Yorkshire) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Nice Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Nice Avenue, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:13.

Northern Powergrid (Yorkshire) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Nice Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Nice Avenue, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 07:46.

Yorkshire Water logo
Between
14 and 27 Jul 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Apr 2025 at 16:30.

Yorkshire Water logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:13.

Northern Powergrid (Yorkshire) logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Back Nice View

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Back Nice View, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:14.

Northern Powergrid (Yorkshire) logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Back Nice View

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Back Nice View, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 07:46.

Northern Powergrid (Yorkshire) logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Rossall Grove

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Rossall Grove, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 10:14.

Northern Powergrid (Yorkshire) logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Rossall Grove

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Rossall Grove, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 May 2025 at 16:18.

Yorkshire Water logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Brooklands Avenue

Yorkshire Water were proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 May 2025 at 13:37.

Yorkshire Water logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Brooklands Avenue

Yorkshire Water were proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 May 2025 at 10:57.

Yorkshire Water logo
Between
14 and 20 Jul 2025
Details
View Map
Share
Follow
Brooklands Avenue

Yorkshire Water are proposing to carry out Utility asset works on Brooklands Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 May 2025 at 11:02.

Northern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Apr 2025 at 12:55.

Northern Gas Networks logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Stainbeck Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 15:43.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Chelwood Crescent

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Apr 2025 at 15:57.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Chelwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Apr 2025 at 13:32.

Yorkshire Water logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Chelwood Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chelwood Crescent, Moor Allerton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 14:21.

Northern Gas Networks logo
LONG TERM
Between
16 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 10:00.

Yorkshire Water logo
LONG TERM
Between
18 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:34.

Yorkshire Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Hawkshead Crescent

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Mar 2025 at 14:19.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 17 Sep 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:19.

Yorkshire Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:49.

Yorkshire Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 14:55.

Northern Gas Networks logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 13:06.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Main Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Street, Linton, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 13:46.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Green Lane

BT are proposing to carry out Utility asset works on Green Lane, Weeton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 20 May 2025 at 09:40.

Northern Gas Networks logo
LONG TERM
Between
22 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 16:32.

Northern Gas Networks logo
LONG TERM
Between
22 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 16:03.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 13:19.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 09:59.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 May 2025 at 12:41.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 5 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Burmantofts, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:41.

Northern Gas Networks logo
Between
23 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Chapeltown Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Apr 2025 at 17:22.

Northern Gas Networks logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:39.

Northern Gas Networks logo
Between
23 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 10:21.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Meanwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Jul 2024 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Meanwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 12:33.

Northern Gas Networks logo
Between
24 Jul and 14 Aug 2025
Details
View Map
Share
Follow
St Wilfrids Circus

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Wilfrids Circus, Harehills, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:16.

Yorkshire Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Dufton Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dufton Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Mar 2025 at 08:08.

Northern Powergrid (Yorkshire) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Oakwood Lane

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Oakwood Lane, Roundhay, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 May 2025 at 12:54.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 4 Sep 2025
Details
View Map
Share
Follow
Lidgett Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Lane, Gledhow, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 14:46.

Northern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Lidgett Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidgett Avenue, Gledhow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:08.

Yorkshire Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Shaftesbury Road

Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Road, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:55.

Yorkshire Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Shaftesbury Road

Yorkshire Water are proposing to carry out Utility asset works on Shaftesbury Road, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 14:45.

Yorkshire Water logo
Between
29 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:43.

Northern Gas Networks logo
LONG TERM
Between
29 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 14:52.

Northern Gas Networks logo
Between
30 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 May 2025 at 08:12.

Northern Gas Networks logo
Between
30 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 09:53.

Northern Gas Networks logo
Between
30 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 12:57.

Northern Gas Networks logo
Between
30 Jul and 16 Aug 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 11:40.

Northern Gas Networks logo
Between
31 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.

Northern Gas Networks logo
Between
31 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 13:05.

Northern Gas Networks logo
Between
31 Jul and 27 Aug 2025
Details
View Map
Share
Follow
Harehills Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 May 2025 at 15:22.

Northern Gas Networks logo
LONG TERM
Between
1 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 07:54.

Northern Gas Networks logo
Between
1 and 15 Aug 2025
Details
View Map
Share
Follow
Knights Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knights Hill, Whitkirk, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 11:28.

Northern Gas Networks logo
Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Bentley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bentley Lane, Meanwood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 15:20.

Yorkshire Water logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:47.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:40.

Yorkshire Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
Devonshire Crescent

Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:43.

Yorkshire Water logo
Between
11 and 17 Aug 2025
Details
View Map
Share
Follow
Devonshire Crescent

Yorkshire Water are proposing to carry out Utility asset works on Devonshire Crescent, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:22.

Northern Gas Networks logo
Between
12 and 27 Aug 2025
Details
View Map
Share
Follow
St Martins View

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Martins View, Potternewton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:32.

Northern Gas Networks logo
Between
12 and 27 Aug 2025
Details
View Map
Share
Follow
Chapeltown Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 16:26.

Northern Gas Networks logo
LONG TERM
Between
13 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Mar 2025 at 11:52.

Northern Gas Networks logo
LONG TERM
Between
13 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 09:22.

Northern Gas Networks logo
Between
13 and 27 Aug 2025
Details
View Map
Share
Follow
Knights Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knights Hill, Whitkirk, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Mar 2025 at 12:29.

Yorkshire Water logo
LONG TERM
Between
14 Aug and 14 Sep 2025
Details
View Map
Share
Follow
Skelwith Walk

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Walk, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:08.

Yorkshire Water logo
Between
18 and 24 Aug 2025
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:16.

Yorkshire Water logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:02.

Yorkshire Water logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:25.

Yorkshire Water logo
Between
18 and 31 Aug 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Apr 2025 at 14:56.

Northern Gas Networks logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Denton Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denton Avenue, Gledhow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 11:21.

Yorkshire Water logo
Between
18 and 24 Aug 2025
Details
View Map
Share
Follow
East Moor Drive

Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:51.

Yorkshire Water logo
Between
18 and 24 Aug 2025
Details
View Map
Share
Follow
East Moor Drive

Yorkshire Water are proposing to carry out Utility asset works on East Moor Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Apr 2025 at 15:44.

Yorkshire Water logo
Between
20 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:17.

Yorkshire Water logo
Between
20 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Mardale Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mardale Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 15:01.

Northern Gas Networks logo
Between
21 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Oak Tree Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Tree Lane, Killingbeck, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:18.

Northern Gas Networks logo
Between
21 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Leopold Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Street, Chapeltown, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 16:01.

Yorkshire Water logo
Between
25 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Holmfield Drive

Yorkshire Water are proposing to carry out Utility asset works on Holmfield Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Apr 2025 at 16:42.

Yorkshire Water logo
Between
25 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Holmfield Drive

Yorkshire Water are proposing to carry out Utility asset works on Holmfield Drive, Lidgett Park, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Apr 2025 at 13:55.

Yorkshire Water logo
Between
26 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Skelwith Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Skelwith Approach, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Apr 2025 at 14:10.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
St Wilfrids Circus

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Wilfrids Circus, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:29.

Northern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Apr 2025 at 12:33.

Northern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Foundry Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Foundry Drive, Harehills, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Apr 2025 at 11:25.


Roadworks Map near to Tarn Lane, LEEDS, LS17 9JQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tarn Lane, LEEDS, LS17 9JQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.