ROADWORKS SUMMARY
King Edward Street, LEEDS, LS1 6AX
Introduction
View current and future planned roadworks and road closures for King Edward Street, LS1 6AX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to King Edward Street, LEEDS, LS1 6AX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for King Edward Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.
8 Jan 2024 and 31 Oct 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.
30 Jun 2025
Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 15:27.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Meanwood Road, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:00 and could run through until 6 January 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Northern Gas Networks on 16 Dec 2024 at 17:00.
29 Jul 2024 and 30 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.
28 Mar 2025
Leeds City Council are carrying out Highway repair and maintenance works on Canal Street, Armley, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 August 2024 at 00:01 and could run through until 28 March 2025. The works will impact the verge only.
This roadwork event was last updated by Leeds City Council on 4 Dec 2024 at 14:29.
9 Aug 2024 and 25 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 13 Aug 2024 at 11:22.
2 Sep 2024 and 28 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 22 Aug 2024 at 13:31.
2 Sep 2024 and 28 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 08:42.
2 Sep 2024 and 2 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 28 Jun 2024 at 11:06.
2 Sep 2024 and 2 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 28 Jun 2024 at 11:07.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:29.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 16 Apr 2024 at 09:45.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 4 Apr 2024 at 08:17.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 21 Mar 2024 at 11:02.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:17.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:34.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:10.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 15 Apr 2024 at 11:16.
30 Sep 2024 and 1 Apr 2025
Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 3 Apr 2024 at 17:33.
30 Sep 2024 and 31 Jan 2025
Leeds City Council were proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 24 Oct 2024 at 17:09.
9 Oct 2024 and 12 Jan 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Pontefract Lane, Richmond Hill, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 12 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 10:46.
30 Apr 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 16:30 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 23 Dec 2024 at 16:30.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 18 Oct 2024 at 10:36.
28 Oct 2024 and 10 Jul 2025
Leeds City Council are proposing to carry out Highway improvement works on Springwell Street, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 10 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 14:29.
12 Jun 2026
Leeds City Council are carrying out Highway repair and maintenance works on Water Lane, Holbeck, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 00:00 and could run through until 12 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 07:45.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Water Lane, Holbeck, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 13:18 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jan 2025 at 16:30.
24 Jan 2025
Leeds City Council are carrying out Highway improvement works on Hyde Park Road, Hyde Park, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 16:50.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:22.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:46.
4 Nov 2024 and 4 Aug 2025
Leeds City Council were proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 29 Aug 2024 at 11:29.
4 Nov 2024 and 4 Aug 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 5 Sep 2024 at 14:48.
25 Nov 2024 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 13:46.
21 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Tong Road, Farnley, Leeds.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 13:05.
25 Nov 2024 and 21 Mar 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Brudenell Road, Hyde Park, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 14 Oct 2024 at 08:28.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Alexandra Road, Hyde Park, Leeds.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 23:02 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 12:20.
5 Dec 2024 and 5 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 12:27.
Thursday
Northern Gas Networks are carrying out Utility repair and maintenance works on Hyde Park Road, Hyde Park, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 14:00 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 10:47.
9 Dec 2024 and 18 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:04.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Hawks Nest Gardens West, Alwoodley, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 16:06.
Yorkshire Water carried out Utility repair and maintenance works on Stone Brig Green, Rothwell, Leeds.
The road was closed for some or all of the period.
The works were originally planned between 2 Jan 2025 and 8 Jan 2025 and were actually completed between 2 Jan 2025 (09:46) and 4 Jan 2025 (14:32). The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Jan 2025 at 15:39.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Ingram Road Distributor, Holbeck, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 08:00 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 09:28.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Elland Road, Beeston, Leeds.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 08:00 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 09:26.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on Lavender Walk, Richmond Hill, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 12:04 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jan 2025 at 09:42.
Wednesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Kirkstall Lane, Kirkstall, Leeds.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 13:00 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 2 Jan 2025 at 14:13.
Wednesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Langdale Terrace, Headingley, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 13:00 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 07:14.
2 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stainbeck Avenue, Meanwood, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 13:11.
2 and 29 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcombe Avenue, Moor Allerton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:29.
2 and 22 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlswood Avenue, Moor Allerton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:28.
Thursday
Yorkshire Water are carrying out Utility repair and maintenance works on Greenhow Road, Burley, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 14:05 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Jan 2025 at 15:14.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 10:26.
5 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Sheepscar Street North, Sheepscar, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Leeds City Council on 23 Dec 2024 at 10:44.
5 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Sheepscar Street North, Sheepscar, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Leeds City Council on 19 Dec 2024 at 12:22.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farrer Lane, Oulton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.
6 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberford Road, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:51.
6 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Church Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 15:04.
6 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Church Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Dec 2024 at 14:54.
6 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Crescent, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:59.
6 and 24 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Newsam Green Road, Newsam Green, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 13:18.
6 and 24 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Admiral Street, Hunslet, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 12:35.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Silver Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 09:41.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Swinegate, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:35.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Call Lane, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:34.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on The Calls, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 10:01.
6 Jan 2025 and 9 Jan 2026
Leeds City Council were proposing to carry out Highway improvement works on Kirkgate, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Kirkgate, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 09:58.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on High Court, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 17 Sep 2024 at 13:33.
6 and 24 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Park Cross Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Oct 2024 at 09:42.
6 and 24 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Park Cross Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 12:31.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Merrion Street, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 20 Sep 2024 at 08:24.
6 Jan 2025 and 9 Jan 2026
Leeds City Council were proposing to carry out Highway improvement works on Merrion Street, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 12 Sep 2024 at 11:54.
6 Jan 2025 and 9 Jan 2026
Leeds City Council are proposing to carry out Highway improvement works on Great George Street, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 2 Oct 2024 at 12:08.
6 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 16 Dec 2024 at 10:27.
6 and 31 Jan 2025
Leeds City Council were proposing to carry out Highway improvement works on Burmantofts Street, Burmantofts, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 14:48.
6 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 15:05.
6 and 31 Jan 2025
Leeds City Council were proposing to carry out Highway improvement works on Beckett Street, Burmantofts, Leeds.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 17 Dec 2024 at 14:47.
6 Jan and 12 Dec 2025
Leeds City Council are proposing to carry out Highway improvement works on Headingley Lane, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 11:44.
6 Jan and 12 Dec 2025
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 24 Oct 2024 at 08:59.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 11:25.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 09:12.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 6 Nov 2024 at 12:02.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 16:01.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 11:18.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 11:51.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 09:09.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Weetwood, Weetwood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 11:12.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Highway improvement works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 11:17.
6 Jan 2025 and 30 Apr 2026
Leeds City Council are proposing to carry out Section 58 on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 09:11.
6 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Primley Park Lane, Alwoodley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 16:31.
8 and 13 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Welton Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:27.
8 and 13 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Welton Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 15:50.
8 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 09:05.
Friday
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Primley Park Avenue, Alwoodley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 16:51.
9 and 29 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Evanston Avenue, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 14:00.
9 and 29 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cardigan Fields, Burley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 10:06.
9 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Primley Park Lane, Alwoodley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 16:27.
13 Jan and 30 May 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 14:29.
13 Jan and 30 May 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:31.
13 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fleet Lane, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:52.
13 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Quarry Hill, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 14:53.
13 and 17 Jan 2025
Leeds City Council were proposing to carry out Highway improvement works on Rowland Road, Beeston, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Dec 2024 at 08:03.
13 and 17 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Neville Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 13:55.
13 Jan and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 07:42.
13 Jan and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 07:45.
13 Jan and 9 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Sheepscar, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.
13 Jan and 9 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Byron Street, Sheepscar, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 15 Nov 2024 at 08:35.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 12:37.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 10:28.
13 and 17 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Half Mile Lane, Stanningley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Nov 2024 at 16:10.
13 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Norwood Road, Hyde Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 17:01.
13 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Lascelles Road West, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 14:51.
13 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Lascelles Road West, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 12:23.
13 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Back Shepherds Place, Chapeltown, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 12:54.
13 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Back Shepherds Place, Chapeltown, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 19 Dec 2024 at 13:42.
13 and 16 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hawthorn Crescent, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Dec 2024 at 14:58.
13 and 16 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hawthorn Crescent, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 15:44.
13 and 20 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 15:53.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:27.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 15:48.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:54.
13 and 20 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 15:53.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:27.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 15:46.
13 and 15 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 08:35.
14 and 22 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Rochester Terrace, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Nov 2024 at 12:34.
14 and 22 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Rochester Terrace, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 13:30.
15 and 17 Jan 2025
Leeds City Council are proposing to carry out roadworks on Inner Ring Road, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 6 Dec 2024 at 12:27.
20 Jan and 7 Feb 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Crescent, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Dec 2024 at 15:23.
20 Jan and 4 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cross Lane, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 14:58.
20 Jan and 4 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr Crofts, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 13:54.
20 and 24 Jan 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Barden Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 31 Oct 2024 at 15:39.
20 Jan and 12 Mar 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 16:40.
20 Jan and 12 Apr 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 27 Nov 2024 at 13:33.
20 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Vicarage Terrace, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 09:57.
20 Jan and 2 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakwood Lane, Roundhay, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 16:30.
20 Jan and 28 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Burton Crescent, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 Dec 2024 at 13:08.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kedleston Road, Moor Allerton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:31.
22 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on High Court Lane, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Dec 2024 at 08:37.
22 and 24 Jan 2025
Leeds City Council are proposing to carry out Core Sampling on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 19 Dec 2024 at 09:52.
22 Jan and 4 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:23.
27 Jan and 21 Mar 2025
Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 13:07.
27 Jan and 21 Mar 2025
Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:01.
27 Jan and 21 Mar 2025
Yorkshire Water are proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:55.
27 Jan and 10 Feb 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:40.
27 and 31 Jan 2025
Leeds City Council are proposing to carry out Highway improvement works on Barden Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 13:04.
27 Jan and 10 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Harehills Park View, Harehills, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 May 2024 at 08:23.
27 and 29 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 13:49.
27 and 29 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawthorn Crescent, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Dec 2024 at 14:52.
27 Jan and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:18.
28 Jan and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Templenewsam Road, Halton, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 19 Dec 2024 at 13:44.
28 Jan and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Templenewsam Road, Halton, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 16:12.
28 and 30 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Primley Park Avenue, Alwoodley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 12:21.
28 and 30 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Primley Park Avenue, Alwoodley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Dec 2024 at 09:43.
29 Jan and 10 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Hunslet, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 25 Nov 2024 at 13:11.
29 Jan and 12 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 January 2025 and run through until 12 February 2025. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 12:12.
29 Jan and 12 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill View, Miles Hill, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 16:11.
31 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhill Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 12:10.
31 Jan and 14 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on St Pauls Street, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 25 Sep 2024 at 10:43.
3 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:27.
3 and 14 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 31 Oct 2024 at 15:17.
3 and 14 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 Dec 2024 at 08:27.
3 and 17 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Globe Road, Holbeck, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 13:59.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Austhorpe Lane, Austhorpe, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 09:44.
3 and 7 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Dec 2024 at 07:56.
3 Feb and 3 Mar 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Church Lane, Chapel Allerton, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 11:51.
7 and 21 Feb 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Dec 2024 at 15:17.
7 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornhill Road, Upper Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 11:50.
10 and 12 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Millshaw, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Dec 2024 at 14:19.
10 and 12 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Millshaw, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Dec 2024 at 07:42.
10 and 14 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 6 Nov 2024 at 08:49.
10 and 21 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Nov 2024 at 09:26.
10 and 14 Feb 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Greenthorpe Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 Dec 2024 at 09:52.
12 and 15 Feb 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 17 Dec 2024 at 08:32.
13 Feb and 16 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Street, Woodhouse, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Jul 2024 at 15:49.
13 Feb and 16 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Woodhouse, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 16 Jul 2024 at 09:57.
17 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:51.
17 and 21 Feb 2025
Leeds City Council are proposing to carry out Highway improvement works on Oakhurst Avenue, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 8 Nov 2024 at 08:18.
17 and 21 Feb 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Queen Street, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 21 Nov 2024 at 09:47.
17 Feb and 8 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Dec 2024 at 15:37.
17 and 23 Feb 2025
Leeds City Council are proposing to carry out Highway improvement works on St Michaels Road, Headingley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 6 Dec 2024 at 14:43.
17 and 21 Feb 2025
Leeds City Council are proposing to carry out Highway improvement works on Moor Grange Drive, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 10:09.
17 Feb and 23 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:56.
17 Feb and 23 May 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandmoor Lane, Alwoodley, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:47.
18 Feb and 18 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 13:09.
18 Feb and 18 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 15:27.
18 and 22 Feb 2025
Leeds City Council are proposing to carry out Highway improvement works on Rossefield Drive, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 13 Dec 2024 at 15:20.
19 Feb and 23 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Potternewton Lane, Chapel Allerton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 10:37.
23 Feb and 2 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on Acre Close, Middleton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 16:05.
23 Feb and 23 Mar 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:43.
23 Feb and 23 Mar 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 14:11.
24 Feb and 11 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lea, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:25.
24 and 28 Feb 2025
Leeds City Council are proposing to carry out Highway improvement works on Orion Walk, Belle Isle, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 14:55.
24 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Southleigh Crescent, Beeston, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Sep 2024 at 10:17.
24 Feb and 10 Mar 2025
Leeds City Council are proposing to carry out Section 50 on Wesley Road, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 9 Dec 2024 at 11:54.
24 and 28 Feb 2025
Leeds City Council were proposing to carry out Highway improvement works on St Johns Avenue, Hyde Park, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 5 Dec 2024 at 08:27.
24 Feb and 14 Mar 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Church Lane, Chapel Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Dec 2024 at 11:40.
24 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcombe Avenue, Moor Allerton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 12:32.
24 Feb and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 19 Nov 2024 at 15:17.
25 Feb and 11 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portage Avenue, Halton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 13:14.
25 Feb and 11 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portage Avenue, Halton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 13:44.
28 Feb and 25 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Lane, Horsforth, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:51.
28 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Drive, Cookridge, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.
1 and 3 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on William Parkin Way, Austhorpe, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 13:03.
1 and 23 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Easterly Road, Gipton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 24 Jun 2024 at 11:14.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greengate, Oulton, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Oct 2024 at 12:26.
3 and 7 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on Horsfall Street, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 12 Nov 2024 at 12:14.
3 Mar and 2 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 13:18.
3 and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:23.
3 and 21 Mar 2025
Leeds City Council were proposing to carry out Highway improvement works on Burton Road, Beeston, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 4 Nov 2024 at 14:53.
3 and 7 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Dec 2024 at 08:27.
3 and 7 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dewsbury Road, Hunslet, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Jan 2025 at 11:17.
3 and 21 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on Hough End Lane, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 12:42.
3 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Hill North, Meanwood, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Dec 2024 at 11:54.
3 Mar and 30 Jun 2025
Leeds City Council are proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 08:29.
7 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tinshill Lane, Cookridge, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 12:41.
8 and 15 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on The Oval, Hunslet, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 Dec 2024 at 12:01.
9 and 17 Mar 2025
Leeds City Council were proposing to carry out Highway repair and maintenance works on Queen Street, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 28 Nov 2024 at 10:25.
10 and 20 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 19 Dec 2024 at 15:28.
10 and 21 Mar 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Grafton Street, Sheepscar, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 10:22.
10 and 14 Mar 2025
Leeds City Council were proposing to carry out Highway improvement works on Rossefield Drive, Bramley, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 10 Dec 2024 at 11:38.
10 Mar and 29 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:38.
10 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road West Park, West Park, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Dec 2024 at 11:07.
10 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:48.
10 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Headingley, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 14:10.
10 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Dec 2024 at 16:52.
10 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Otley Road, Adel, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Dec 2024 at 13:37.
11 and 20 Mar 2025
Leeds City Council are proposing to carry out Highway improvement works on York Road, Burmantofts, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 19 Nov 2024 at 08:28.
17 Mar and 23 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 08:28.
18 Mar and 21 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 13:13.
24 and 29 Mar 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Butts Court, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 20 Dec 2024 at 12:56.
24 Mar and 7 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Hall Road, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Dec 2024 at 09:02.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
1 Apr 2025 and 31 Mar 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.
2 and 29 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chapeltown Road, Chapeltown, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 15:49.
3 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Hill View, Miles Hill, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 19 Dec 2024 at 14:27.
Roadworks Map near to King Edward Street, LEEDS, LS1 6AX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to King Edward Street, LEEDS, LS1 6AX (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Jan 2025 - 9 Jan 2025)
(Scheduled: 19 Dec 2022 - 6 Jun 2025)
(Scheduled: 28 Oct 2024 - 17 Jan 2025)
(Scheduled: 2 Jan 2025 - 8 Jan 2025)
(Scheduled: 2 Jan 2025 - 8 Jan 2025)
(Scheduled: 29 Dec 2024 - 10 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.