ROADWORKS SUMMARY
Church View, LEEDS, LS14 3ED

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Church View, LS14 3ED and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Church View, LEEDS, LS14 3ED

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Leeds Road

Leeds City Council are carrying out Works for road purposes on Leeds Road, Scholes, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 13 Mar 2025 at 10:06.

Leeds City Council logo
LONG TERM
Between
29 Jul 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Smeaton Approach

Leeds City Council are proposing to carry out Highway improvement works on Smeaton Approach, Manston, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 12 Dec 2024 at 12:42.

Leeds City Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are carrying out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 5 Mar 2025 at 14:46.

Leeds City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Manston Lane

Leeds City Council are proposing to carry out Highway improvement works on Manston Lane, Manston, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 22 Aug 2024 at 13:31.

Leeds City Council logo
LONG TERM
Between
2 Sep 2024 and 2 Apr 2025
Details
View Map
Share
Manston Lane

Leeds City Council were proposing to carry out Section 58 on Manston Lane, Manston, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 2 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Mar 2025 at 14:59.

Leeds City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Manston Lane

Leeds City Council were proposing to carry out Section 58 on Manston Lane, Manston, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 19 Feb 2025 at 17:49.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Templenewsam Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Templenewsam Road, Halton, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 08:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2025 at 12:31.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 23 May 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:56.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 08:27.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 23 May 2025
Details
View Map
Share
Sandmoor Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandmoor Lane, Alwoodley, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 14:47.

Leeds City Council logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Red Hall Lane

Leeds City Council are proposing to carry out Highway improvement works on Red Hall Lane, Shadwell, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Leeds City Council on 25 Oct 2024 at 08:29.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2025 at 08:30 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 08:44.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Easterly Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Easterly Road, Gipton, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jan 2025 at 13:29.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
22 Apr 2025
Details
View Map
Share
Follow
Easterly Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Easterly Road, Gipton, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 09:05 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Mar 2025 at 10:56.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 23 May 2025
Details
View Map
Share
Follow
Harrogate Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 16:30.

Northern Gas Networks logo
LONG TERM
Between
18 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 20 Dec 2024 at 13:13.

Northern Gas Networks logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Selby Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Selby Road, Halton, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 10:00 and could run through until 21 April 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 11:00.

Leeds City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Green Lane

Leeds City Council are proposing to carry out Highway improvement works on Green Lane, Whitkirk, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 10 Mar 2025 at 11:04.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 21 Mar 2025 at 13:08.

Northern Gas Networks logo
Between
24 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Primley Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Primley Park Lane, Alwoodley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Feb 2025 at 12:37.

Quickline Commucations logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Feb 2025 at 09:15.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Milner Lane

BT are proposing to carry out Utility asset works on Milner Lane, Thorner, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Feb 2025 at 11:27.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Milner Lane

BT are carrying out Utility asset works on Milner Lane, Thorner, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 21:00 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 26 Mar 2025 at 07:07.

Quickline Commucations logo
Finishing
Friday
Details
View Map
Share
Follow
Kiddal Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Kiddal Lane, Barwick In Elmet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 21 Mar 2025 at 16:07.

Quickline Commucations logo
Finishing
Friday
Details
View Map
Share
Follow
Kiddal Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Kiddal Lane, Barwick In Elmet, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 14 Feb 2025 at 16:19.

Yorkshire Water logo
LONG TERM
Between
29 Mar and 10 May 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:27.

Leeds City Council logo
Between
30 Mar and 24 Apr 2025
Details
View Map
Share
Harehills Lane

Leeds City Council were proposing to carry out Highway repair and maintenance works on Harehills Lane, Harehills, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 March 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 09:02.

Leeds City Council logo
Between
30 Mar and 24 Apr 2025
Details
View Map
Share
Foundry Approach

Leeds City Council were proposing to carry out Highway repair and maintenance works on Foundry Approach, Harehills, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 March 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 09:00.

Yorkshire Water logo
Between
31 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Foundry Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:09.

Yorkshire Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Main Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Street, East Keswick, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Jan 2025 at 16:15.

Yorkshire Water logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 14:23.

Yorkshire Water logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Ironwood Approach

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ironwood Approach, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:24.

Yorkshire Water logo
LONG TERM
Between
31 Mar and 26 May 2025
Details
View Map
Share
Harrogate Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:24.

Network Rail logo
LONG TERM
Between
31 Mar and 25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 11:26.

Yorkshire Water logo
Between
31 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:51.

Network Rail logo
LONG TERM
Between
31 Mar and 25 Nov 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Feb 2025 at 09:25.

Northern Gas Networks logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2025 at 14:28.

Yorkshire Water logo
Between
1 and 27 Apr 2025
Details
View Map
Share
Follow
Somerville Green

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Green, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:01.

Yorkshire Water logo
Between
1 and 30 Apr 2025
Details
View Map
Share
Follow
Somerville Green

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Green, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:28.

Northern Gas Networks logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 14:46.

Northern Gas Networks logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Killingbeck Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Killingbeck Drive, Killingbeck, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 10:19.

Leeds City Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Wike Lane

Leeds City Council are proposing to carry out Highway improvement works on Wike Lane, Wike, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the verge only.

This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 14:36.

Leeds City Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Harewood Road

Leeds City Council are proposing to carry out Highway improvement works on Harewood Road, Collingham, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the verge only.

This roadwork event was last updated by Leeds City Council on 24 Mar 2025 at 14:22.

Yorkshire Water logo
LONG TERM
Between
5 Apr and 17 May 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 17:13.

Leeds City Council logo
Between
7 and 30 Apr 2025
Details
View Map
Share
Gledhow Valley Road

Leeds City Council were proposing to carry out Core Sampling on Gledhow Valley Road, Gledhow, Leeds.

These works were categorised as Major.

The works were originally planned to start 7 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Mar 2025 at 08:44.

Yorkshire Water logo
Between
14 and 27 Apr 2025
Details
View Map
Share
Moresdale Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 27 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 21 Mar 2025 at 15:57.

Yorkshire Water logo
Between
14 and 27 Apr 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 27 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 24 Mar 2025 at 10:01.

Yorkshire Water logo
Between
14 and 27 Apr 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 27 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:23.

Yorkshire Water logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Somerville Green

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Green, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:51.

Yorkshire Water logo
Between
16 and 18 Apr 2025
Details
View Map
Share
Follow
Church Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Church Street, Boston Spa, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Mar 2025 at 14:29.

Yorkshire Water logo
Between
18 and 24 Apr 2025
Details
View Map
Share
Chapel Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Barwick In Elmet, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 April 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 12:05.

BT logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Sicklinghall Road

BT are proposing to carry out Utility asset works on Sicklinghall Road, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 25 Feb 2025 at 10:27.

Quickline Commucations logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Clifford, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 25 Mar 2025 at 10:30.

BT logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Sicklinghall Road

BT are proposing to carry out Utility asset works on Sicklinghall Road, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Jan 2025 at 10:02.

Northern Gas Networks logo
Between
22 Apr and 7 May 2025
Details
View Map
Share
Follow
Portage Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portage Avenue, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 07:54.

Leeds City Council logo
Between
26 Apr and 4 May 2025
Details
View Map
Share
Follow
Amberton Road

Leeds City Council are proposing to carry out Highway improvement works on Amberton Road, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 26 Mar 2025 at 10:23.

National Highways logo
Between
28 Apr and 10 May 2025
Details
View Map
Share
Follow
Bullerthorpe Lane

National Highways are proposing to carry out Highway repair and maintenance works on Bullerthorpe Lane, Colton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Mar 2025 at 13:07.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 10 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 13:50.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 15 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:36.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 15 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:53.

Yorkshire Water logo
Between
28 Apr and 27 May 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Mar 2025 at 12:56.

Yorkshire Water logo
Between
28 Apr and 27 May 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Mar 2025 at 09:59.

Yorkshire Water logo
Between
28 Apr and 27 May 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 27 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:38.

Yorkshire Water logo
Between
28 Apr and 18 May 2025
Details
View Map
Share
Follow
Moresdale Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moresdale Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:26.

Yorkshire Water logo
Between
28 Apr and 26 May 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:12.

Quickline Commucations logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Barwick Road

Quickline Commucations are proposing to carry out Utility asset works on Barwick Road, Garforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 26 Mar 2025 at 10:30.

Quickline Commucations logo
Between
2 and 7 May 2025
Details
View Map
Share
Follow
High Street

Quickline Commucations are proposing to carry out Utility asset works on High Street, Bramham, Wetherby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 25 Mar 2025 at 13:27.

Northern Powergrid (Yorkshire) logo
Between
6 May and 3 Jun 2025
Details
View Map
Share
Follow
Gipton Wood Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Gipton Wood Road, Gipton, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Mar 2025 at 11:07.

Yorkshire Water logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Harrogate Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.

Northern Gas Networks logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Caernarvon Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caernarvon Avenue, Garforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 12:38.

Yorkshire Water logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:16.

Yorkshire Water logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Oval, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:06.

Yorkshire Water logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jan 2025 at 16:26.

Yorkshire Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
West Park Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on West Park Avenue, Roundhay, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Mar 2025 at 14:13.

Virgin Media logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Back Morritt Drive

Virgin Media are proposing to carry out Utility asset works on Back Morritt Drive, Halton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Mar 2025 at 09:27.

Yorkshire Water logo
Between
19 and 25 May 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:34.

Yorkshire Water logo
LONG TERM
Between
19 May and 23 Jun 2025
Details
View Map
Share
Follow
Harrogate Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Harrogate Road, Harewood, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 17:14.

Yorkshire Water logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:28.

Yorkshire Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Easterly Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Easterly Grove, Gipton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Mar 2025 at 13:18.

Yorkshire Water logo
Between
23 May and 20 Jun 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Feb 2025 at 14:25.

Yorkshire Water logo
Between
26 May and 8 Jun 2025
Details
View Map
Share
Follow
Stainmore Place

Yorkshire Water are proposing to carry out Remedial works on Stainmore Place, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:17.

Northern Gas Networks logo
LONG TERM
Between
27 May and 28 Jul 2025
Details
View Map
Share
Follow
Ring Road Crossgates

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 08:28.

Northern Gas Networks logo
LONG TERM
Between
27 May 2025 and 28 Jul 2026
Details
View Map
Share
Ring Road Crossgates

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 28 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Mar 2025 at 11:41.

Yorkshire Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Feb 2025 at 12:58.

Yorkshire Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:34.

Yorkshire Water logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Hawkshead Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hawkshead Crescent, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:47.

Yorkshire Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:33.

Yorkshire Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:54.

Yorkshire Water logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Mar 2025 at 12:57.

Network Rail logo
Between
12 and 16 Jun 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Cross Gates, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Jan 2025 at 10:04.

Yorkshire Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Foundry Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 11:46.

Yorkshire Water logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Foundry Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Foundry Lane, Seacroft, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 09:09.

Yorkshire Water logo
Between
19 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Alston Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Alston Lane, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:47.

Yorkshire Water logo
LONG TERM
Between
19 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Somerville Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Avenue, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 14:57.

Yorkshire Water logo
LONG TERM
Between
19 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Somerville Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Grove, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 09:49.

Northern Gas Networks logo
LONG TERM
Between
20 Jun and 21 Aug 2025
Details
View Map
Share
Follow
Ring Road Crossgates

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ring Road Crossgates, Cross Gates, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 12:23.

Yorkshire Water logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Somerville Mount

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Somerville Mount, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:05.

Yorkshire Water logo
Between
23 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Mar 2025 at 09:51.

Yorkshire Water logo
Between
23 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Tarnside Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Tarnside Drive, Seacroft, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Mar 2025 at 14:31.


Roadworks Map near to Church View, LEEDS, LS14 3ED

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Mar 2025 10:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Church View, LEEDS, LS14 3ED (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
URGENT
  
CARR LANE, THORNER 
(0.1 miles)
BT
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 26 Mar 2025 09:30
(Scheduled: 26 Mar 2025 - 28 Mar 2025)
0.1
Details
Share
Follow
2
BT logo
MAJOR
  
MILNER LANE, THORNER 
(0.5 miles)
BT
Utility asset works - Carriageway, Verge - Road closure
In Progress
Since: 25 Mar 2025 21:00
(Scheduled: 25 Mar 2025 - 27 Mar 2025)
0.5
Details
Share
Follow
3
BT logo
MAJOR
  
MILNER LANE, THORNER 
(0.5 miles)
BT
Utility asset works - Carriageway, Verge - Road closure
Planned
Scheduled: 25 Mar 2025 - 27 Mar 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.