ROADWORKS SUMMARY
Templar Road, ASHBY-DE-LA-ZOUCH, LE65 2AD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Templar Road, LE65 2AD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Templar Road, ASHBY-DE-LA-ZOUCH, LE65 2AD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Templar Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The works started on 27 November 2023 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 16:36.

Derbyshire County Council logo
LONG TERM
Between
3 Apr 2024 and 4 Mar 2026
Details
View Map
Share
Follow
Oak Close

Derbyshire County Council are proposing to carry out roadworks on Oak Close, Castle Gresley, Swadlincote.

These works are categorised as Major.

The works will start on or after 3 April 2024 and could run through until 4 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 3 Apr 2024 at 14:46.

Severn Trent Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Ravenstone Road

Severn Trent Water are carrying out Utility repair and maintenance works on Ravenstone Road, Heather.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 December 2024 at 16:00 and could run through until 17 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 13:12.

Severn Trent Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Robinsons Hill

Severn Trent Water were proposing to carry out Utility asset works on Robinsons Hill, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:50.

Severn Trent Water logo
LONG TERM
Between
12 Feb and 13 May 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 10:50.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 16:36.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Derby Road

Severn Trent Water are proposing to carry out Utility asset works on Derby Road, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 16:03.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.

Finishing
Friday
Details
View Map
Share
Kilwardby Street

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Jan 2025 at 13:22.

BT logo
Finishing
Thursday
Details
View Map
Share
Breedon Lane

BT were proposing to carry out Utility asset works on Breedon Lane, Osgathorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Jan 2025 at 11:35.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Castle Street

Severn Trent Water are proposing to carry out Utility asset works on Castle Street, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 14:24.

Severn Trent Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Dunnsmoor Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Dunnsmoor Lane, Swadlincote.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 08:24.

Severn Trent Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are proposing to carry out New service connection on Moor Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 14:56.

Severn Trent Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are proposing to carry out New service connection on Moor Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 07:56.

Western Power Distribution (East Midlands) logo
Between
2 and 5 Mar 2025
Details
View Map
Share
South Street

Western Power Distribution (East Midlands) were proposing to carry out New service connection on South Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 5 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 5 Feb 2025 at 08:29.

Western Power Distribution (East Midlands) logo
Between
2 and 5 Mar 2025
Details
View Map
Share
Follow
South Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on South Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Jan 2025 at 17:22.

Severn Trent Water logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Robinsons Hill

Severn Trent Water were proposing to carry out Utility asset works on Robinsons Hill, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 14:41.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Mill Close

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Mill Close, Swadlincote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 13:33.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Mill Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Close, Swadlincote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 09:12.

Severn Trent Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Castle Street

Severn Trent Water are proposing to carry out Utility asset works on Castle Street, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 12:21.

Connect Fibre (Fibre Assets) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Church Lane

Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on Church Lane, Whitwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 3 Feb 2025 at 12:52.

Connect Fibre (Fibre Assets) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Church Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Church Lane, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 Jan 2025 at 17:34.

Severn Trent Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Anchor Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Anchor Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 13:16.

Severn Trent Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Anchor Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Anchor Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 16:36.

Severn Trent Water logo
Between
13 and 19 Mar 2025
Details
View Map
Share
Follow
Derby Road

Severn Trent Water are proposing to carry out Utility asset works on Derby Road, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 09:45.

Connect Fibre (Fibre Assets) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Green Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Green Lane, Wilson, Breedon On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 7 Feb 2025 at 13:06.

Connect Fibre (Fibre Assets) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Lower Brand

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Lower Brand, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 7 Feb 2025 at 12:49.

Cadent Gas logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Thorn Street

Cadent Gas are proposing to carry out New service connection on Thorn Street, Woodville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 14:22.

Cadent Gas logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Thorn Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Thorn Street, Woodville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 16:09.

Severn Trent Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Lower Packington Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lower Packington Road, Ashby-de-la-zouch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 16:02.

Connect Fibre (Fibre Assets) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Breedon Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 7 Feb 2025 at 13:23.

Connect Fibre (Fibre Assets) logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Nottingham Road

Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on Nottingham Road, Peggs Green, Coleorton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 3 Feb 2025 at 10:34.

Connect Fibre (Fibre Assets) logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Breedon Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 Jan 2025 at 15:00.

Severn Trent Water logo
Between
26 and 28 Mar 2025
Details
View Map
Share
Follow
Babelake Street

Severn Trent Water are proposing to carry out New service connection on Babelake Street, Packington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 14:49.

Western Power Distribution (East Midlands) logo
Between
30 Mar and 2 Apr 2025
Details
View Map
Share
Follow
South Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on South Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Feb 2025 at 14:34.

Cadent Gas logo
LONG TERM
Between
31 Mar and 7 Jul 2025
Details
View Map
Share
Follow
Burton Road

Cadent Gas are proposing to carry out Utility asset works on Burton Road, Midway, Swadlincote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 13:13.

Cadent Gas logo
Between
31 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Wood Lane

Cadent Gas are proposing to carry out Utility asset works on Wood Lane, Newhall, Swadlincote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 09:30.

Cadent Gas logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Ashby Road East

Cadent Gas are proposing to carry out Utility asset works on Ashby Road East, Bretby, Burton On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 09:29.

Cadent Gas logo
Between
31 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Ashby Road East

Cadent Gas are proposing to carry out Utility asset works on Ashby Road East, Bretby, Burton On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 13:11.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Penn Lane

Severn Trent Water were proposing to carry out Utility asset works on Penn Lane, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:53.

Severn Trent Water logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Selina Street

Severn Trent Water were proposing to carry out Utility asset works on Selina Street, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.

BT logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Babelake Street

BT are proposing to carry out Utility repair and maintenance works on Babelake Street, Packington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Jan 2025 at 10:52.

Between
12 and 17 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Feb 2025 at 15:56.

Between
12 and 17 Apr 2025
Details
View Map
Share
Follow
Kilwardby Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Kilwardby Street, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Jan 2025 at 12:28.

Severn Trent Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Melbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 16:03.

Severn Trent Water logo
LONG TERM
Between
14 Apr and 24 Jun 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 14:42.

Severn Trent Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 09:08.

Severn Trent Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Lower Packington Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lower Packington Road, Ashby-de-la-zouch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 10:36.

Severn Trent Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 15:03.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
From A0512 Ashby Road To The Moorlands

BT are proposing to carry out Utility repair and maintenance works on From A0512 Ashby Road To The Moorlands, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Jan 2025 at 17:45.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
From A0512 Ashby Road To The Moorlands

BT are proposing to carry out Utility repair and maintenance works on From A0512 Ashby Road To The Moorlands, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Feb 2025 at 16:02.

Derbyshire County Council logo
LONG TERM
Between
5 May and 30 Sep 2025
Details
View Map
Share
Follow
Linton Heath

Derbyshire County Council are proposing to carry out Highway improvement works on Linton Heath, Linton, Swadlincote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Feb 2025 at 09:30.

Derbyshire County Council logo
LONG TERM
Between
5 May and 30 Sep 2025
Details
View Map
Share
Follow
Linton Heath

Derbyshire County Council are proposing to carry out Highway improvement works on Linton Heath, Linton, Swadlincote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Feb 2025 at 09:49.

Derbyshire County Council logo
LONG TERM
Between
5 May and 30 Sep 2025
Details
View Map
Share
Follow
Lullington Road

Derbyshire County Council are proposing to carry out Highway improvement works on Lullington Road, Overseal, Swadlincote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Feb 2025 at 09:33.

Derbyshire County Council logo
LONG TERM
Between
5 May and 30 Sep 2025
Details
View Map
Share
Follow
Lullington Road

Derbyshire County Council are proposing to carry out Highway improvement works on Lullington Road, Overseal, Swadlincote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 11 Feb 2025 at 15:54.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Worthington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 15:26.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:39.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 15:24.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:37.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 15:21.

BT logo
Between
6 and 21 May 2025
Details
View Map
Share
Nottingham Road

BT were proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Jan 2025 at 14:45.


Roadworks Map near to Templar Road, ASHBY-DE-LA-ZOUCH, LE65 2AD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 15 Feb 2025 11:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Templar Road, ASHBY-DE-LA-ZOUCH, LE65 2AD (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Leicestershire County Council logo
A511 FROM JUNCTION OF HEATH LANE TO ROUNDABOUT AT JUNCTION OF NOTTINGHAM ROAD, ASHBY DE LA ZOUCH 
(0.5 miles)
Leicestershire County Council
Highway improvement works - Carriageway - No carriageway incursion
Planned
Scheduled: 11 Feb 2025 - 18 Feb 2025
0.5
Details
Share
Follow
2
Virgin Media logo
UPPINGHAM DRIVE, ASHBY DE LA ZOUCH 
(0.6 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
13 Feb 2025 09:25 - 09:30
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.