ROADWORKS SUMMARY
Hurst Close, CHESSINGTON, KT9 1XE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hurst Close, KT9 1XE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hurst Close, CHESSINGTON, KT9 1XE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hurst Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.

Network Rail logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Epsom & Ewell Footpath 67/30

Network Rail are carrying out Works for Rail Purposes on Epsom & Ewell Footpath 67/30, Epsom & Ewell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2023 at 08:30 and could run through until 18 January 2025. The works will impact the footpath only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 06:33.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Rosedale Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosedale Road, Stoneleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 14:06.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Princes Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Princes Avenue, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Elgar Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Elgar Avenue, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2026
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2026
Details
View Map
Share
Follow
Egmont Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Egmont Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:28.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Derby Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Derby Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Douglas Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Douglas Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Broomfield Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Broomfield Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Worthington Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Worthington Road, Tolworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Ditton Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Dec 2025
Details
View Map
Share
Follow
Beaconsfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Kingsdowne Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Hollyfield Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.

LONG TERM
Between
1 Jul 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Jun 2024 at 11:07.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Browns Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Browns Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Nov 2024 at 08:20.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Langley Road

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Langley Road, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Oct 2024 at 08:38.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
South Place

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on South Place, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 14:50 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Oct 2024 at 14:50.

LONG TERM
Between
1 Jul 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Ewell Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 18 Jun 2024 at 10:38.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Oak Hill Crescent

Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Oak Hill Crescent, Surbiton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2024 at 08:27.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Common Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Common Road, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 May 2024 at 12:56.

Thames Water logo
LONG TERM
Between
22 Aug 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 14:54.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Walton Park

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Park, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Jun 2024 at 11:32.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:31.

Surrey County Council logo
LONG TERM
Between
15 Sep 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 12 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Jul 2024 at 11:06.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 16:40.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
By-pass Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on By-pass Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Jul 2024 at 13:40.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Kingston Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Kingston Road, Leatherhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:15.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:08.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:56.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:58.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:15.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:16.

Southern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are carrying out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:47.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Stoneleigh Crescent

Surrey County Council are carrying out Highway repair and maintenance works on Stoneleigh Crescent, Stoneleigh.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 May 2024 at 13:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Hare Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Hare Lane, Claygate, Esher.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:36.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
North Acre

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Acre, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:49.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Garratts Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratts Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Albert Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Albert Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:17.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:02.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 15:17.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Cheam Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 15:35.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Woodlands Road

Thames Water are carrying out Utility asset works on Woodlands Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 10:13.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wells Road

Thames Water are carrying out Utility asset works on Wells Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 10:14.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wellesley Road

UK Power Networks South Eastern are carrying out New service connection on Wellesley Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 06:07.

Surrey County Council logo
LONG TERM
Between
17 Nov 2024 and 17 May 2025
Details
View Map
Share
Follow
Gadesden Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gadesden Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 08:30.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:46.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:52.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Carshalton Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 14:01.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Weston Green Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Weston Green Road, Thames Ditton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 00:30 and could run through until 23 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 09:13.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:01.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 27 Jan 2025
Details
View Map
Share
Kingston Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingston Hill, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:08.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Road, Kingston Upon Thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 14:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:34.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
West Barnes Lane

Thames Water are carrying out Utility repair and maintenance works on West Barnes Lane, New Malden.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 16:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:21.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:55.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:51.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 15:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:53.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 15:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:52.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Alberta Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.

Finishing
Friday
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2024 at 09:09.

Finishing
Friday
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Sep 2024 at 09:24.

Finishing
Friday
Details
View Map
Share
Follow
Burlington Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:43.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Derwent Avenue

Thames Water are carrying out Utility asset works on Derwent Avenue, Kingston Vale.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:45 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:39.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Heathcote Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Heathcote Road, Epsom.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 19:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 08:05.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Kingston Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kingston Road, New Malden.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 December 2024 at 18:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 10:37.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Lynwood Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lynwood Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 10 Feb 2025
Details
View Map
Share
College Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on College Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:18.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 15:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:37.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 13:15 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 14:06.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Fairmead

Thames Water are carrying out Utility repair and maintenance works on Fairmead, Tolworth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 10:13 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 09:22.

Between
12 and 30 Dec 2024
Details
View Map
Share
Follow
Surbiton Hill Park

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Surbiton Hill Park, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Dec 2024 at 11:19.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ridgway

Southern Gas Networks are carrying out Utility repair and maintenance works on Ridgway, Wimbledon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 11:20 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:49.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:09.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clifton Road

Thames Water are carrying out Utility repair and maintenance works on Clifton Road, Kingston Upon Thames.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 08:28 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 15:03.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Leatherhead Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leatherhead Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 10:21.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bank Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Bank Lane, Kingston Upon Thames.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:30 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:34.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Milbourne Lane

Thames Water are carrying out Utility repair and maintenance works on Milbourne Lane, Esher.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:11 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:13.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:56.

Southern Gas Networks logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:07.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 1 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:53.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 1 Aug 2025
Details
View Map
Share
Follow
West Barnes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:04.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:50.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:38.

UK Power Networks South Eastern logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 11:41.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 07:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 10:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 07:32.

Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Clayton Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Nov 2024 at 10:01.

Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Thornhill Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Thornhill Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Oct 2024 at 13:53.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pyne Road

Thames Water are proposing to carry out New service connection on Pyne Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 16:18.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pyne Road

Thames Water are proposing to carry out New service connection on Pyne Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:33.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 23 Jun 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 13:30.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Walpole Place

BT are proposing to carry out Utility asset works on Walpole Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Dec 2024 at 12:29.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Dukes Avenue

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Dukes Avenue, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Dec 2024 at 11:16.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Dukes Avenue

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Dukes Avenue, Kingston Upon Thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Dec 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 22:52.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:24.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:28.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:35.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Fernhill

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Fernhill, Oxshott, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 09:54.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:18.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:52.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Plough Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:48.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:37.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 16:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Manor Lane, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 28 Nov 2024 at 12:50.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Dec 2024 at 07:43.

Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Clayton Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Nov 2024 at 15:44.

Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Clayton Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 2 Dec 2024 at 09:09.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
St Mark's Hill

Thames Water were proposing to carry out Utility repair and maintenance works on St Mark's Hill, Surbiton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 16:43.

Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lingfield Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Lingfield Avenue, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Nov 2024 at 15:41.

Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Lingfield Avenue

Royal Borough Of Kingston Upon Thames were proposing to carry out Highway improvement works on Lingfield Avenue, Kingston Upon Thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 13 Dec 2024 at 09:28.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Eden Street

UK Power Networks South Eastern are proposing to carry out Remedial works on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:10.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lady Booth Road

UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:18.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Thornton Hill

Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:31.

Thames Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Fullers Way South

Thames Water were proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:36.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 13:43.

Network Rail logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Littleheath Lane

Network Rail are proposing to carry out Works for Rail Purposes on Littleheath Lane, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 08:46.

Network Rail logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
The Parade

Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:32.

Network Rail logo
Between
18 and 20 Jan 2025
Details
View Map
Share
The Parade

Network Rail were proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 08:22.

LONG TERM
Between
18 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Eden Street

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Aug 2024 at 15:36.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:58.

Southern Gas Networks logo
Between
20 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:09.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:09.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Ashdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:39.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:48.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:04.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:16.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:06.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fullers Way South

Thames Water are proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Oct 2024 at 12:13.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Hook Rise South

Thames Water were proposing to carry out Utility repair and maintenance works on Hook Rise South, Chessington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 11:18.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hook Rise South

Thames Water are proposing to carry out Utility repair and maintenance works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:08.

LONG TERM
Between
20 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tolworth Park Road

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Tolworth Park Road, Tolworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Dec 2024 at 14:43.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
West Barnes Lane

Network Rail were proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Sep 2024 at 16:40.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 08:04.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Martin Way

London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:49.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:51.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:23.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:06.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:07.

Surrey County Council logo
Between
22 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:38.

Surrey County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Hook Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hook Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 15:46.

Network Rail logo
Between
24 and 27 Jan 2025
Details
View Map
Share
Follow
The Parade

Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:29.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
King Charles Road

Network Rail are proposing to carry out Works for Rail Purposes on King Charles Road, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 10:25.

Surrey County Council logo
Between
27 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Street, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:00.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:04.

Surrey County Council logo
Between
27 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Street, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:34.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:45.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:35.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 11:29.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Plough Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 16:55.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Plough Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 14:25.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:02.

LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Elmcroft Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Elmcroft Drive, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Dec 2024 at 15:40.

LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Elmcroft Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Elmcroft Drive, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Dec 2024 at 15:53.

Transport for London (TfL) logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Ace Parade

Transport for London (TfL) are proposing to carry out New service connection on Ace Parade, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 14:44.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Alexandra Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Nov 2024 at 13:08.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 12 Nov 2024 at 10:13.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:48.

Cornerstone Telecommunications Infrastructure logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Alexandra Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Central Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:46.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:27.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:17.

UK Power Networks South Eastern logo
LONG TERM
Between
28 Jan and 5 Mar 2025
Details
View Map
Share
Follow
Burgh Heath Road

UK Power Networks South Eastern are proposing to carry out New service connection on Burgh Heath Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 12:46.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Nov 2024 at 10:36.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:33.

Network Rail logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
The Parade

Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:31.

Southern Gas Networks logo
Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Fairview Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fairview Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:23.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 11:15.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:26.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:52.

Southern Gas Networks logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:11.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:06.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Kingsdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 11:17.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:18.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 18:11.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Farm Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:05.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 07:50.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.

Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Orchard Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Orchard Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Oct 2024 at 11:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 09:36.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 5 Dec 2024 at 08:14.

Surrey County Council logo
Between
6 and 18 Feb 2025
Details
View Map
Share
Follow
Christ Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Christ Church Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 10:19.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:19.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 13:35.

UK Power Networks South Eastern logo
Between
8 and 16 Feb 2025
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out New service connection on London Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 09:32.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:32.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:18.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:46.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Coverts Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coverts Road, Claygate, Esher.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:05.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 06:52.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:50.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 07:40.

Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Red Lion Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Dec 2024 at 10:51.

Southern Gas Networks logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Hazelwood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 11:04.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:54.

Thames Water logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Gibbon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gibbon Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 13:59.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:50.

UK Power Networks South Eastern logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Montpelier Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Montpelier Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 14:26.

BT logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Walpole Place

BT are proposing to carry out Utility asset works on Walpole Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Nov 2024 at 10:14.

Thames Water logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:41.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2024 at 10:34.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2024 at 09:02.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:11.

Southern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Longdown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longdown Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Harbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:25.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Harbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:32.

Surrey County Council logo
LONG TERM
Between
17 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Copsem Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:33.

Surrey County Council logo
Between
17 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Copsem Lane

Surrey County Council are proposing to carry out Highway improvement works on Copsem Lane, Esher.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Hilbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hilbert Road, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:10.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Hilbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hilbert Road, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:44.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Wrayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrayfield Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:07.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Wrayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrayfield Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:46.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tolworth Rise South

Thames Water are proposing to carry out Utility repair and maintenance works on Tolworth Rise South, Tolworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:00.

Surrey County Council logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Portsmouth Road

Surrey County Council were proposing to carry out Highway improvement works on Portsmouth Road, Long Ditton, Surbiton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 14:51.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
The Roystons

Thames Water are proposing to carry out New service connection on The Roystons, Surbiton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 08:10.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Northway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northway, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:34.

Surrey County Council logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Hampton Court Way

Surrey County Council are proposing to carry out Highway improvement works on Hampton Court Way, East Molesey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:07.

London Borough Of Merton logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 11:50.

London Borough Of Merton logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 17 Dec 2024 at 07:56.

Southern Gas Networks logo
Between
18 Feb and 7 Mar 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Ewell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
22 Feb and 23 Apr 2025
Details
View Map
Share
Follow
Hook Rise South

Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise South, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:31.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Dec 2024 at 20:27.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:02.

Surrey County Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 15:15.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albert Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:44.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 12:53.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 09:48.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Marham Gardens

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Marham Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Dec 2024 at 08:10.

Network Rail logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
West Barnes Lane

Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2024 at 08:58.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Belmont Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Avenue, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Belmont Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Avenue, New Malden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Cherrywood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cherrywood Lane, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:37.

Thames Water logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Kingston Road

Thames Water were proposing to carry out Utility repair and maintenance works on Kingston Road, Raynes Park.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:02.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Brighton Road Service Road Between Burgh Wood And Tattenham Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road Service Road Between Burgh Wood And Tattenham Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
The Downsway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Downsway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 11:03.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:27.

Telefonica UK logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Jubilee Way

Telefonica UK are proposing to carry out Utility asset works on Jubilee Way, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 12 Nov 2024 at 10:23.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Hayes Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Crescent, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:11.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Hayes Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Crescent, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:49.

T-Mobile (UK) logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Victoria Avenue

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Victoria Avenue, West Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 12 Dec 2024 at 09:46.

T-Mobile (UK) logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Victoria Avenue

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Victoria Avenue, West Molesey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 12 Dec 2024 at 11:33.

London Borough Of Sutton logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Throwley Way

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Throwley Way, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 28 Nov 2024 at 11:12.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Burgh Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burgh Heath Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:14.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:13.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:43.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:55.

Thames Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Gilders Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gilders Road, Chessington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:43.

Thames Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Cox Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Cox Lane, West Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:51.

Southern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Buxton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buxton Crescent, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:12.

Southern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Buxton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buxton Crescent, North Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:47.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Tavistock Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tavistock Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 16:01.

Transport for London (TfL) logo
LONG TERM
Between
10 Mar and 10 May 2025
Details
View Map
Share
Follow
Stonecot Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonecot Hill, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 10 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:37.

Southern Gas Networks logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Blakes Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakes Lane, New Malden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:57.

Thames Water logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Southsea Road

Thames Water are proposing to carry out New service connection on Southsea Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:55.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 19 May 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:42.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 19 May 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:50.

Southern Gas Networks logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:42.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Watts Lane

BT are proposing to carry out Utility asset works on Watts Lane, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Dec 2024 at 13:52.


Roadworks Map near to Hurst Close, CHESSINGTON, KT9 1XE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hurst Close, CHESSINGTON, KT9 1XE (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
HURST CLOSE 
(0.0 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 09:50
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.0
Details
Share
Follow
2
FINLAYS CLOSE 
(0.1 miles)
Royal Borough Of Kingston Upon Thames
Highway repair and maintenance works - Carriageway - Stop/go boards
Complete
16 Dec 2024 08:00 - 08:15
0.1
Details
Share
3
MOUNT ROAD 
(0.3 miles)
Royal Borough Of Kingston Upon Thames
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
17 Dec 2024 07:58 - 08:20
0.3
Details
Share
4
Telefonica UK logo
JUBILEE WAY 
(0.3 miles)
Telefonica UK
Utility asset works - Footway, Carriageway - Two-way signals
In Progress
Since: 16 Dec 2024 22:00
(Scheduled: 16 Dec 2024 - 21 Dec 2024)
0.3
Details
Share
Follow
5
Community Fibre logo
JASMIN ROAD 
(0.4 miles)
Community Fibre
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Complete
17 Dec 2024 08:27 - 11:17
0.4
Details
Share
6
FIRCROFT ROAD 
(0.5 miles)
Royal Borough Of Kingston Upon Thames
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
17 Dec 2024 08:30 - 08:48
0.5
Details
Share
7
Community Fibre logo
POPLAR CRESCENT 
(0.7 miles)
Community Fibre
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.7
Details
Share
Follow
8
ELM ROAD 
(0.7 miles)
Royal Borough Of Kingston Upon Thames
Highway repair and maintenance works - Carriageway - Stop/go boards
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.7
Details
Share
Follow
9
Virgin Media logo
CHESSINGTON ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.8
Details
Share
Follow
10
BT logo
VERNON CLOSE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 18 Dec 2024 - 20 Dec 2024)
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data