ROADWORKS SUMMARY
Southview Crescent, ILFORD, IG2 6DG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Southview Crescent, IG2 6DG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southview Crescent, ILFORD, IG2 6DG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southview Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Until
20 Dec 2025
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 20 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 7 Mar 2025 at 12:50.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jan 2025 at 16:15.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.

Thames Water logo
LONG TERM
Until
7 Apr 2026
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.

LONG TERM
Between
15 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:37.

LONG TERM
Between
15 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:36.

LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 31 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:41.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Apr 2025 at 15:42.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.

Thames Water logo
LONG TERM
Between
18 Jan and 24 May 2025
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 13:25.

Thames Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Forest Road

Thames Water are carrying out Utility repair and maintenance works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 January 2025 at 09:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 9 May 2025
Details
View Map
Share
South Access Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jan 2025 at 09:53.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:15.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are carrying out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:19 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 15:59.

Thames Water logo
LONG TERM
Between
10 Feb and 27 Jun 2025
Details
View Map
Share
Romford Road

Thames Water were proposing to carry out Utility asset works on Romford Road, Manor Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:19.

Thames Water logo
LONG TERM
Between
17 Feb and 11 Jul 2025
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 15:48.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The works started on 3 March 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Apr 2025 at 16:03.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Leslie Road

London Borough Of Newham are proposing to carry out Section 50 on Leslie Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 24 Feb 2025 at 16:02.

LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Newham are carrying out Section 50 on Leslie Road, Canning Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 09:00 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 Feb 2025 at 12:53.

Thames Water logo
LONG TERM
Between
28 Feb and 5 May 2025
Details
View Map
Share
Follow
Elmsdale Road

Thames Water are proposing to carry out Utility asset works on Elmsdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Nov 2023 at 14:12.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Thames Water logo
LONG TERM
Between
3 Mar and 25 May 2025
Details
View Map
Share
Follow
Cleveland Park Avenue

Thames Water are proposing to carry out Utility asset works on Cleveland Park Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:38.

London Borough Of Waltham Forest logo
LONG TERM
Between
3 Mar and 27 Sep 2025
Details
View Map
Share
Follow
Forest Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Forest Road, Walthamstow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 September 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 8 Jan 2025 at 13:24.

Thames Water logo
LONG TERM
Between
6 Mar and 14 May 2025
Details
View Map
Share
Follow
Belle Vue Road

Thames Water are proposing to carry out Utility asset works on Belle Vue Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:52.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:22.

Transport for London (TfL) logo
LONG TERM
Between
15 Mar and 27 Sep 2025
Details
View Map
Share
High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 12:11.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Gregory Road

Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

LONG TERM
Between
17 Mar and 30 May 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 15:22.

LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are carrying out Highway improvement works on Leyton Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 07:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 7 Apr 2025 at 08:49.

Thames Water logo
LONG TERM
Between
17 Mar and 25 Jul 2025
Details
View Map
Share
Follow
Greenleaf Road

Thames Water are proposing to carry out Utility asset works on Greenleaf Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 15:28.

Thames Water logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Greenleaf Road

Thames Water are carrying out Utility asset works on Greenleaf Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 09:15 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 09:27.

Thames Water logo
LONG TERM
Between
17 Mar and 1 Aug 2025
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

The works will start on or after 17 March 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 12:57.

London Borough Of Waltham Forest logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Priory Court

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Priory Court, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 20 Feb 2025 at 16:11.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Eastern Avenue

Thames Water are carrying out Utility repair and maintenance works on Eastern Avenue, Ilford.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 06:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 09:01.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Northcote Road

Thames Water are carrying out Utility asset works on Northcote Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:45 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:10.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Warner Road

Thames Water are carrying out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:45 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:11.

Thames Water logo
LONG TERM
Between
22 Mar and 30 May 2025
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out Utility asset works on Clifford Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 14:27.

Thames Water logo
LONG TERM
Between
22 Mar and 30 May 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out Utility asset works on St Johns Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 14:27.

LONG TERM
Between
22 Mar and 30 May 2025
Details
View Map
Share
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 14:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 15:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jan 2025 at 15:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Sep 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 12:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 15:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jan 2025 at 16:11.

Thames Water logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
Clifford Road

Thames Water are carrying out Utility asset works on Clifford Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 20:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 07:54.

Thames Water logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are carrying out Utility asset works on St Johns Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 20:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 07:55.

London Borough Of Waltham Forest logo
LONG TERM
Between
24 Mar and 8 Sep 2025
Details
View Map
Share
Follow
Bisterne Avenue

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Bisterne Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 7 Apr 2025 at 15:11.

London Borough Of Waltham Forest logo
LONG TERM
Between
24 Mar and 8 Sep 2025
Details
View Map
Share
Follow
Bisterne Avenue

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Bisterne Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Waltham Forest on 16 Apr 2025 at 16:54.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:47.

Thames Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Elmsdale Road

Thames Water are carrying out Utility asset works on Elmsdale Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 13:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 13:13.

Thames Water logo
LONG TERM
Between
28 Mar and 8 Aug 2025
Details
View Map
Share
Follow
Hale End Road

Thames Water are proposing to carry out Utility asset works on Hale End Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 12:23.

LONG TERM
Between
31 Mar and 5 May 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 15:06.

LONG TERM
Until
5 May 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are carrying out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 13:00 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 13:51.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Ward Road

Thames Water were proposing to carry out Utility asset works on Ward Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 15:29.

Thames Water logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Westbury Road

Thames Water are carrying out Utility asset works on Westbury Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 09:45 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 09:45.

LONG TERM
Between
1 Apr 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:07.

LONG TERM
Between
1 Apr 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:20.

Thames Water logo
LONG TERM
Between
5 Apr and 27 Aug 2025
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 15:12.

Cadent Gas logo
LONG TERM
Between
7 Apr and 11 May 2025
Details
View Map
Share
Follow
Gascoigne Road

Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 13:55.

Finishing
Friday
Details
View Map
Share
Follow
Abercrombie Road

London Borough Of Newham are carrying out Highway improvement works on Abercrombie Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 24 Apr 2025 at 12:38.

Thames Water logo
LONG TERM
Between
7 Apr and 15 Aug 2025
Details
View Map
Share
Forest Road

Thames Water were proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:10.

London Borough Of Waltham Forest logo
LONG TERM
Between
7 Apr and 3 Sep 2025
Details
View Map
Share
Follow
Avon Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Avon Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 9 Apr 2025 at 15:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Apr and 14 May 2025
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Howard Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 15:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Apr and 14 May 2025
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Howard Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 16:26.

LONG TERM
Between
9 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 12:55.

Thames Water logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Coleridge Road

Thames Water are carrying out Utility asset works on Coleridge Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 08:20 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 08:21.

Thames Water logo
Between
9 Apr and 9 May 2025
Details
View Map
Share
Follow
Russell Road

Thames Water are proposing to carry out Utility asset works on Russell Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 12:53.

Thames Water logo
Until
9 May 2025
Details
View Map
Share
Follow
Russell Road

Thames Water are carrying out Utility asset works on Russell Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 13:00 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 13:07.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Yewtree Avenue

UK Power Networks Eastern & London are carrying out New service connection on Yewtree Avenue, Dagenham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 13:30 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 09:40.

Thames Water logo
LONG TERM
Between
10 Apr and 12 Jun 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are proposing to carry out Utility asset works on Woodstock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:10.

Thames Water logo
LONG TERM
Between
11 Apr and 16 May 2025
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:24.

Transport for London (TfL) logo
Between
11 Apr and 7 May 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 08:24.

Transport for London (TfL) logo
Between
11 Apr and 7 May 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 09:39.

Cadent Gas logo
LONG TERM
Between
14 Apr and 20 May 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 20 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:24.

Cadent Gas logo
LONG TERM
Between
14 Apr and 20 May 2025
Details
View Map
Share
Church End

Cadent Gas were proposing to carry out Utility asset works on Church End, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 20 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:25.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

UK Power Networks Eastern & London logo
Between
14 Apr and 4 May 2025
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:37.

Until
12 May 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Redbridge are carrying out Highway improvement works on Wellesley Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:55 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 14 Apr 2025 at 07:55.

Between
14 Apr and 12 May 2025
Details
View Map
Share
Hermon Hill

London Borough Of Redbridge were proposing to carry out Highway improvement works on Hermon Hill, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 7 Apr 2025 at 10:23.

Until
12 May 2025
Details
View Map
Share
Follow
Hermon Hill

London Borough Of Redbridge are carrying out Highway improvement works on Hermon Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:55 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 14 Apr 2025 at 07:55.

Thames Water logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Brookdale Road

Thames Water are proposing to carry out Utility asset works on Brookdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 12:46.

Thames Water logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Brookdale Road

Thames Water are proposing to carry out Utility asset works on Brookdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 13:05.

LONG TERM
Between
15 Apr and 27 May 2025
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are proposing to carry out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 11 Apr 2025 at 13:46.

LONG TERM
Until
27 May 2025
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 09:00 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Apr 2025 at 12:33.

Finishing
Wednesday
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are proposing to carry out Section 50 on Leyton Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 16:21.

Finishing
Wednesday
Details
View Map
Share
Follow
Leyton Road

London Borough Of Newham are carrying out Section 50 on Leyton Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 09:55 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 15 Apr 2025 at 12:29.

Finishing
Thursday
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 12 Mar 2025 at 13:30.

Thames Water logo
Between
18 Apr and 9 May 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Walthamstow.

These works are categorised as Major.

The works will start on or after 18 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:35.

Murphy Power Distribution logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 4 Feb 2025 at 15:32.

Cadent Gas logo
LONG TERM
Between
21 Apr and 4 Jun 2025
Details
View Map
Share
Montalt Road

Cadent Gas were proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 16:07.

Cadent Gas logo
Between
21 Apr and 6 May 2025
Details
View Map
Share
Beechwood Drive

Cadent Gas were proposing to carry out Utility asset works on Beechwood Drive, Woodford Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 16:08.

Cadent Gas logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Henrys Avenue

Cadent Gas were proposing to carry out Utility asset works on Henrys Avenue, Woodford Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 16:08.

Cadent Gas logo
Between
21 Apr and 9 May 2025
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Utility asset works on Wood Lane, Woodford Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 16:08.

Cadent Gas logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Follow
Larkshall Road

Cadent Gas are proposing to carry out Utility asset works on Larkshall Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 10:30.

Cadent Gas logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Follow
Larkshall Road

Cadent Gas are proposing to carry out Utility asset works on Larkshall Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 15:35.

LONG TERM
Between
21 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.

Thames Water logo
LONG TERM
Between
21 Apr and 30 May 2025
Details
View Map
Share
Follow
Exeter Road

Thames Water are proposing to carry out Utility asset works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:21.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Palamos Road

Thames Water were proposing to carry out Utility repair and maintenance works on Palamos Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Feb 2025 at 09:27.

Cadent Gas logo
LONG TERM
Between
22 Apr and 28 Jul 2025
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 14:55.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are carrying out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 09:39 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 10:25.

Thames Water logo
Until
22 May 2025
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are carrying out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 12:00 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 12:14.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2025 at 10:36.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Francis Avenue

Thames Water are proposing to carry out Utility asset works on Francis Avenue, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 13:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Apr and 19 Jun 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

Thames Water logo
Between
25 Apr and 23 May 2025
Details
View Map
Share
Follow
Borwick Avenue

Thames Water are proposing to carry out Utility asset works on Borwick Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:29.

Thames Water logo
Between
25 Apr and 23 May 2025
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:28.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Dace Road

Thames Water are carrying out Utility repair and maintenance works on Dace Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 08:00 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 08:55.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Crosby Road

Thames Water are carrying out Utility repair and maintenance works on Crosby Road, Forest Gate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 15:20 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2025 at 07:11.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
George Lane

Cadent Gas are carrying out Utility repair and maintenance works on George Lane, South Woodford, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 April 2025 at 08:55 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Apr 2025 at 08:56.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
East Avenue

Cadent Gas are proposing to carry out roadworks on East Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
East Avenue

Cadent Gas are proposing to carry out roadworks on East Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:17.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Feb 2025 at 15:39.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Marden Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 16:16.

Essex County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Coopers Close

Essex County Council are proposing to carry out Highway improvement works on Coopers Close, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Apr 2025 at 12:57.

Finishing
Wednesday
Details
View Map
Share
Follow
Collier Row Lane

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Collier Row Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 21 Apr 2025 at 16:30.

Finishing
Wednesday
Details
View Map
Share
Follow
Collier Row Lane

London Borough Of Havering are proposing to carry out Highway repair and maintenance works on Collier Row Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 25 Apr 2025 at 16:23.

Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Olympic Park Avenue

London Borough Of Newham are proposing to carry out Remedial works on Olympic Park Avenue, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Apr 2025 at 11:53.

Finishing
Friday
Details
View Map
Share
Follow
Horns Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Horns Road, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 11 Apr 2025 at 16:00.

Thames Water logo
Between
28 Apr and 15 May 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Walthamstow.

These works are categorised as Major.

The works will start on or after 28 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:02.

Thames Water logo
LONG TERM
Between
28 Apr 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

The works will start on or after 28 April 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:40.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Melbourne Road

Thames Water are proposing to carry out New service connection on Melbourne Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 15:44.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Melbourne Road

Thames Water are proposing to carry out New service connection on Melbourne Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:55.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Algers Road

Thames Water are proposing to carry out New service connection on Algers Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 15:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Aubrey Road

Thames Water are proposing to carry out New service connection on Aubrey Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 15:43.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Balmoral Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 15:10.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 12:59.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:55.

Between
28 Apr and 7 May 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out New service connection on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 24 Apr 2025 at 15:50.

London Borough Of Waltham Forest logo
Between
28 Apr and 10 May 2025
Details
View Map
Share
Follow
Ferndale Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Ferndale Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 12 Feb 2025 at 16:20.

London Borough Of Waltham Forest logo
Between
28 Apr and 10 May 2025
Details
View Map
Share
Follow
Ferndale Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Ferndale Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 28 Feb 2025 at 16:13.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Jan 2025 at 14:50.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Coopers Close

Essex County Council are proposing to carry out Highway improvement works on Coopers Close, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Mar 2025 at 09:36.

Between
30 Apr and 9 May 2025
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 12 Mar 2025 at 13:30.

Thames Water logo
Between
30 Apr and 14 May 2025
Details
View Map
Share
Follow
Macdonald Road

Thames Water are proposing to carry out Utility repair and maintenance works on Macdonald Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 12:58.

Thames Water logo
Between
30 Apr and 14 May 2025
Details
View Map
Share
Follow
Macdonald Road

Thames Water are proposing to carry out Utility repair and maintenance works on Macdonald Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:19.

Between
2 and 5 May 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 25 Feb 2025 at 15:42.

Between
2 and 5 May 2025
Details
View Map
Share
Follow
International Way

London Borough Of Newham are proposing to carry out Section 50 on International Way, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 8 Apr 2025 at 13:51.

Cadent Gas logo
LONG TERM
Between
5 May and 23 Jun 2025
Details
View Map
Share
Follow
Forest Side

Cadent Gas are proposing to carry out Utility asset works on Forest Side, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2024 at 14:22.

Cadent Gas logo
LONG TERM
Between
5 May and 23 Jun 2025
Details
View Map
Share
Follow
Forest Side

Cadent Gas are proposing to carry out Utility asset works on Forest Side, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 14:28.

Cadent Gas logo
Between
5 and 21 May 2025
Details
View Map
Share
Shernhall Street

Cadent Gas were proposing to carry out Utility asset works on Shernhall Street, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:26.

BT logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Canterbury Road

BT are proposing to carry out Utility repair and maintenance works on Canterbury Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Mar 2025 at 15:51.

BT logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Chesterfield Road

BT are proposing to carry out Utility repair and maintenance works on Chesterfield Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Mar 2025 at 16:08.

BT logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Mar 2025 at 16:14.

BT logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Brooke Road

BT are proposing to carry out Utility repair and maintenance works on Brooke Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Mar 2025 at 16:15.

BT logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Oakhurst Gardens

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Mar 2025 at 16:13.

Between
5 and 19 May 2025
Details
View Map
Share
Follow
Atherton Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Atherton Road, Clayhall, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.

Thames Water logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
Borwick Avenue

Thames Water are proposing to carry out Utility asset works on Borwick Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:42.

Thames Water logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 May and 9 Jun 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 09:05.

Between
6 and 8 May 2025
Details
View Map
Share
Follow
Horndon Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Horndon Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 27 Jan 2025 at 12:00.

Thames Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 07:28.

Thames Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 10:49.

Thames Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 13:08.

Thames Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 07:54.

Thames Water logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Royston Parade

Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 10:12.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
Follow
High Street

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on High Street, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 January 2026. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Apr 2025 at 15:15.

London Borough Of Waltham Forest logo
LONG TERM
Between
6 May 2025 and 31 Jan 2026
Details
View Map
Share
High Street

London Borough Of Waltham Forest were proposing to carry out Highway improvement works on High Street, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 31 January 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Waltham Forest on 9 Apr 2025 at 11:14.

Fulcrum Pipelines logo
Between
6 and 23 May 2025
Details
View Map
Share
Liberty Bridge Road

Fulcrum Pipelines were proposing to carry out Utility asset works on Liberty Bridge Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Fulcrum Pipelines on 8 Apr 2025 at 10:01.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
7 May and 26 Jun 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 May and 23 Jul 2025
Details
View Map
Share
Follow
Perth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Murphy Power Distribution logo
Between
12 and 19 May 2025
Details
View Map
Share
Merrielands Crescent

Murphy Power Distribution were proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 19 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 17 Apr 2025 at 12:05.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
High Road Leytonstone

Cadent Gas are proposing to carry out Utility asset works on High Road Leytonstone, Leytonstone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 16:20.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
High Road Leytonstone

Cadent Gas are proposing to carry out Utility asset works on High Road Leytonstone, Leytonstone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 00:10.

Cadent Gas logo
Between
12 and 18 May 2025
Details
View Map
Share
Follow
York Place

Cadent Gas are proposing to carry out New service connection on York Place, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 10:45.

Cadent Gas logo
Between
12 and 18 May 2025
Details
View Map
Share
Follow
Balaam Street

Cadent Gas are proposing to carry out New service connection on Balaam Street, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 11:53.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Anglian Road

BT are proposing to carry out Utility repair and maintenance works on Anglian Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Mar 2025 at 12:05.

BT logo
Between
12 and 14 May 2025
Details
View Map
Share
Follow
Melon Road

BT are proposing to carry out Utility repair and maintenance works on Melon Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Mar 2025 at 13:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 16 Jun 2025
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Howard Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 13:47.

Essex County Council logo
Between
12 and 29 May 2025
Details
View Map
Share
Follow
Bushfields

Essex County Council are proposing to carry out Highway improvement works on Bushfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Feb 2025 at 09:28.

Essex County Council logo
Between
12 and 29 May 2025
Details
View Map
Share
Follow
Alderton Hall Lane

Essex County Council are proposing to carry out Highway improvement works on Alderton Hall Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Feb 2025 at 09:30.

Essex County Council logo
Between
12 and 29 May 2025
Details
View Map
Share
Follow
Colson Road

Essex County Council are proposing to carry out Highway improvement works on Colson Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Feb 2025 at 09:13.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Flanders Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Flanders Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 10 Feb 2025 at 12:47.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lynford Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Audley Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Belgrave Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Belgrave Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 17 Mar 2025 at 13:15.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Woodstock Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Cardigan Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Charlbury Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Oakwood Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Breamore Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Arundel Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Nutfield Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Leamington Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.

Between
12 and 16 May 2025
Details
View Map
Share
Follow
Talbot Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Ron Leighton Way

Thames Water were proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:27.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out New service connection on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:45.

Thames Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Clements Road

Thames Water were proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:23.

Fulcrum Pipelines logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Montfichet Road

Fulcrum Pipelines are proposing to carry out Utility repair and maintenance works on Montfichet Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Fulcrum Pipelines on 11 Feb 2025 at 14:35.

Between
16 and 22 May 2025
Details
View Map
Share
Follow
Cleveland Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:30.

Cadent Gas logo
Between
19 May and 8 Jun 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:48.

Essex County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Millers Lane

Essex County Council are proposing to carry out Highway improvement works on Millers Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Feb 2025 at 09:06.

Essex County Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Millers Lane

Essex County Council are proposing to carry out Highway improvement works on Millers Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Apr 2025 at 13:50.

Between
19 and 23 May 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Capel Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 17 Feb 2025 at 12:54.

Between
19 and 30 May 2025
Details
View Map
Share
Follow
High Street North

London Borough Of Newham are proposing to carry out Highway improvement works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 25 Feb 2025 at 11:36.

Thames Water logo
Between
19 and 25 May 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:52.

Virgin Media logo
Between
19 and 21 May 2025
Details
View Map
Share
Hale End Road

Virgin Media were proposing to carry out Utility repair and maintenance works on Hale End Road, Woodford Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Feb 2025 at 13:02.

Virgin Media logo
Between
19 and 21 May 2025
Details
View Map
Share
Hale End Road

Virgin Media were proposing to carry out Utility repair and maintenance works on Hale End Road, Woodford Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 21 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Apr 2025 at 13:54.

London Borough Of Waltham Forest logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Byron Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Byron Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 22 Apr 2025 at 15:18.

London Borough Of Waltham Forest logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Byron Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Byron Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 24 Apr 2025 at 17:03.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Oct 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.

Cadent Gas logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Henley Road

Cadent Gas are proposing to carry out New service connection on Henley Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:15.

Cadent Gas logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Mayville Road

Cadent Gas are proposing to carry out New service connection on Mayville Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 28 Jun 2025
Details
View Map
Share
Follow
South Crescent

UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.

UK Power Networks Eastern & London logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:37.

Thames Water logo
Between
26 May and 1 Jun 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Statutory Infrastructure Works on High Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 09:54.

Virgin Media logo
Between
26 and 28 May 2025
Details
View Map
Share
Manor Road

Virgin Media were proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 12 Feb 2025 at 14:20.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Fairlop Gardens

BT are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Hainault, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2025 at 09:45.

Essex County Council logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Palmerston Road

Essex County Council are proposing to carry out Highway improvement works on Palmerston Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 10:23.

Transport for London (TfL) logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 09:47.

Thames Water logo
Between
28 May and 25 Jun 2025
Details
View Map
Share
Follow
Hempstead Road

Thames Water are proposing to carry out Utility asset works on Hempstead Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:53.

Thames Water logo
Between
28 May and 25 Jun 2025
Details
View Map
Share
Follow
Hylands Road

Thames Water are proposing to carry out Utility asset works on Hylands Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:54.

Thames Water logo
Between
28 May and 3 Jun 2025
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:25.

Essex County Council logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Back Lane

Essex County Council are proposing to carry out Highway improvement works on Back Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 12:05.

Essex County Council logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Palmerston Road

Essex County Council are proposing to carry out Highway improvement works on Palmerston Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Apr 2025 at 08:25.

Essex County Council logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Victoria Road

Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 12:01.

Essex County Council logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Princes Road

Essex County Council are proposing to carry out Highway improvement works on Princes Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 12:03.

Essex County Council logo
Between
30 May and 5 Jun 2025
Details
View Map
Share
Follow
Parkside

Essex County Council are proposing to carry out Highway improvement works on Parkside, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 12:17.

Cadent Gas logo
Between
2 and 19 Jun 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 14:09.

Cadent Gas logo
Between
2 and 19 Jun 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 14:11.

Cadent Gas logo
LONG TERM
Between
2 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:43.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road

Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.

Cadent Gas logo
Between
2 and 16 Jun 2025
Details
View Map
Share
Follow
Larkshall Road

Cadent Gas are proposing to carry out Utility asset works on Larkshall Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:57.

Essex County Council logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Forest Side

Essex County Council are proposing to carry out Highway improvement works on Forest Side, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Feb 2025 at 08:49.

Essex County Council logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Parkside

Essex County Council are proposing to carry out Highway improvement works on Parkside, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Mar 2025 at 10:52.

Essex County Council logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Brook Road

Essex County Council are proposing to carry out Highway improvement works on Brook Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 12:08.

Essex County Council logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Bushfields

Essex County Council are proposing to carry out Highway improvement works on Bushfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Mar 2025 at 14:42.

Thames Water logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Edison Close

Thames Water are proposing to carry out Utility asset works on Edison Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:22.

LONG TERM
Between
2 Jun and 18 Oct 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.

Essex County Council logo
Between
3 and 9 Jun 2025
Details
View Map
Share
Follow
Forest Side

Essex County Council are proposing to carry out Highway improvement works on Forest Side, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Mar 2025 at 10:54.

Cadent Gas logo
LONG TERM
Between
4 Jun and 27 Aug 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
4 Jun and 27 Aug 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 27 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 14:59.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Colson Gardens

Essex County Council are proposing to carry out Highway improvement works on Colson Gardens, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 15:36.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Colson Gardens

Essex County Council are proposing to carry out Highway improvement works on Colson Gardens, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:15.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Honeycroft

Essex County Council are proposing to carry out Highway improvement works on Honeycroft, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Feb 2025 at 09:33.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Honeycroft

Essex County Council are proposing to carry out Highway improvement works on Honeycroft, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:17.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ladyfields

Essex County Council are proposing to carry out Highway improvement works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Feb 2025 at 09:23.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ladyfields

Essex County Council are proposing to carry out Highway improvement works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Mar 2025 at 10:18.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Chigwell Lane

Essex County Council are proposing to carry out Highway improvement works on Chigwell Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Feb 2025 at 09:20.

Essex County Council logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Chigwell Lane

Essex County Council are proposing to carry out Highway improvement works on Chigwell Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Mar 2025 at 08:39.

Thames Water logo
Between
4 and 9 Jun 2025
Details
View Map
Share
Follow
Sandhurst Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.

Thames Water logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Flanders Road

Thames Water are proposing to carry out Utility repair and maintenance works on Flanders Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.

Cadent Gas logo
LONG TERM
Between
5 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
LONG TERM
Between
5 Jun and 11 Jul 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:18.

Cadent Gas logo
Between
5 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cameron Road

Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 and 26 Jun 2025
Details
View Map
Share
Follow
Norfolk Road

Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
5 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Esk Road

Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:55.

Thames Water logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Gardner Road

Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:54.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Meldrum Road

Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:02.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Mayesbrook Road

Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.

Cadent Gas logo
LONG TERM
Between
9 Jun and 15 Jul 2025
Details
View Map
Share
Follow
Goodmayes Lane

Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.

Cadent Gas logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Heron Mews

Cadent Gas are proposing to carry out Utility asset works on Heron Mews, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:00.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Oakhurst Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 16:09.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 16:16.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dore Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:19.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out Utility repair and maintenance works on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:15.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:38.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:49.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Mar 2025 at 08:30.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Mar 2025 at 13:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:38.

Thames Water logo
Between
12 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Hylands Road

Thames Water are proposing to carry out Utility asset works on Hylands Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:22.

Thames Water logo
Between
15 and 19 Jun 2025
Details
View Map
Share
Follow
Elmsdale Road

Thames Water are proposing to carry out Utility asset works on Elmsdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Cadent Gas logo
Between
16 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.

Cadent Gas logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:04.

Cadent Gas logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:09.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Station Approach

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Station Approach, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Pedley Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Felstead Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Felstead Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Beattyville Gardens

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Beattyville Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Sunset Avenue

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Sunset Avenue, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cambridge Park

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Grove Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Grove Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cowslip Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cowslip Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Chigwell Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Chigwell Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cambridge Park

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Buckhurst Way

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Buckhurst Way, Buckhurst Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 25 Apr 2025 at 16:09.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Cleveland Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Worcester Crescent

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Worcester Crescent, Woodford Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 25 Apr 2025 at 16:08.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Blake Hall Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Granville Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Granville Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Oxford Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Oxford Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Arran Drive

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Arran Drive, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Brook Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Brook Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Gaysham Avenue

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Gaysham Avenue, Gants Hill, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Northbrook Road

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Northbrook Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 25 Apr 2025 at 16:05.

LONG TERM
Between
16 Jun and 21 Jul 2025
Details
View Map
Share
Atherton Road

London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Atherton Road, Clayhall, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 3 Mar 2025 at 16:55.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Feb 2025 at 11:13.

Between
17 Jun and 7 Jul 2025
Details
View Map
Share
Follow
High Street North

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Mar 2025 at 09:23.

Between
17 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Maybank Road

London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Maybank Road, South Woodford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.

Thames Water logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Temple Mill Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Temple Mill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 16:52.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 11:54.

Thames Water logo
LONG TERM
Between
19 Jun and 11 Sep 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jun and 21 Dec 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:38.

UK Power Networks Eastern & London logo
Between
20 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

Cadent Gas logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Benton Road

Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Acacia Road

Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 14:49.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Acacia Road

Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 15:17.

Cadent Gas logo
Between
23 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Cecil Road

Cadent Gas are proposing to carry out Utility asset works on Cecil Road, Leytonstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 15:17.

Between
23 and 25 Jun 2025
Details
View Map
Share
Ferns Road

London Borough Of Newham were proposing to carry out roadworks on Ferns Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 19:35.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 15:13.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 11:43.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:48.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Feb 2025 at 11:15.

LONG TERM
Between
23 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Choats Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2025 at 14:23.

Between
24 and 28 Jun 2025
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Section 50 on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 6 Mar 2025 at 14:59.

Thames Water logo
Between
24 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Colchester Avenue

Thames Water are proposing to carry out New service connection on Colchester Avenue, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.

Cadent Gas logo
Between
25 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Bishops Close

Cadent Gas are proposing to carry out Utility asset works on Bishops Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 08:50.

Cadent Gas logo
Between
25 Jun and 9 Jul 2025
Details
View Map
Share
Bishops Close

Cadent Gas were proposing to carry out Utility asset works on Bishops Close, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 15:00.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:47.

Cadent Gas logo
LONG TERM
Between
26 Jun and 18 Sep 2025
Details
View Map
Share
Sunnyside Road

Cadent Gas were proposing to carry out Utility asset works on Sunnyside Road, Ilford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 18 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:50.

Thames Water logo
LONG TERM
Between
27 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:22.

LONG TERM
Between
28 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.

Thames Water logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Cleveland Park Avenue

Thames Water are proposing to carry out Utility asset works on Cleveland Park Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
30 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Dagenham Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Aldborough Road South

Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
30 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Colenso Road

Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.

Cadent Gas logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Cadent Gas are proposing to carry out Utility asset works on Ashley Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 16:20.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

UK Power Networks Eastern & London logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.

Essex County Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Bushfields

Essex County Council are proposing to carry out Highway improvement works on Bushfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Apr 2025 at 09:16.

Essex County Council logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Chigwell Lane

Essex County Council are proposing to carry out Highway improvement works on Chigwell Lane, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 17 Apr 2025 at 09:12.

Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Montfichet Road

London Borough Of Newham are proposing to carry out Section 50 on Montfichet Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 14:51.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Priory Court

Thames Water are proposing to carry out New service connection on Priory Court, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 15:42.

Thames Water logo
Between
30 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:26.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:24.

Between
3 and 17 Jul 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 21 Apr 2025 at 21:51.

Thames Water logo
Between
6 and 10 Jul 2025
Details
View Map
Share
Follow
Truro Road

Thames Water are proposing to carry out Utility asset works on Truro Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Nov 2023 at 14:48.

Cadent Gas logo
Between
7 and 21 Jul 2025
Details
View Map
Share
Follow
Chingford Mount Road

Cadent Gas are proposing to carry out Utility asset works on Chingford Mount Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:56.

BT logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Fernhill Court

BT were proposing to carry out Utility asset works on Fernhill Court, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 8 Apr 2025 at 15:38.

Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Wellesley Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Wellesley Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hermon Hill

London Borough Of Redbridge are proposing to carry out Highway improvement works on Hermon Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Ilford Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
York Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on York Road, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Atherton Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Atherton Road, Clayhall, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

London Borough Of Enfield logo
Between
10 and 17 Jul 2025
Details
View Map
Share
Water Lane

London Borough Of Enfield were proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 10 Apr 2025 at 12:54.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Water Lane

London Borough Of Redbridge are proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 12:59.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Lynford Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Audley Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Woodstock Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Cardigan Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Charlbury Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Oakwood Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Breamore Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Arundel Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Nutfield Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Leamington Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.

Between
10 and 17 Jul 2025
Details
View Map
Share
Follow
Talbot Gardens

London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.

Thames Water logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Ravenhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:28.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.

Murphy Power Distribution logo
Between
14 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Merrielands Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Arden Crescent

Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Aug 2025
Details
View Map
Share
Follow
Arden Crescent

Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:49.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Seton Gardens

Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.

Cadent Gas logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Seton Gardens

Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:50.

UK Power Networks Eastern & London logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:18.

UK Power Networks Eastern & London logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Royal Docks Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:09.

LONG TERM
Between
14 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 14 Apr 2025 at 14:33.

LONG TERM
Between
14 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Manford Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Manford Way, Chigwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 14 Apr 2025 at 15:18.

Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Belgrave Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Belgrave Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 11 Apr 2025 at 15:15.

LONG TERM
Between
14 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Brocket Way

London Borough Of Redbridge are proposing to carry out Highway improvement works on Brocket Way, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Redbridge on 14 Apr 2025 at 14:20.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jan 2025 at 20:27.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Prince Regent Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:00.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:30.

Electricity Network Company logo
Between
14 and 24 Jul 2025
Details
View Map
Share
Follow
Victoria Dock Road

Electricity Network Company are proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 16:36.

Virgin Media logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Movers Lane

Virgin Media are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 1 Apr 2025 at 09:48.

Transport for London (TfL) logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Forty Acre Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 14:00.

UK Power Networks Eastern & London logo
Between
17 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barking Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.

Virgin Media logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Manor Road

Virgin Media were proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 July 2025 and run through until 19 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 3 Apr 2025 at 14:51.

Cadent Gas logo
LONG TERM
Between
21 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Meadow Walk

Cadent Gas are proposing to carry out Utility asset works on Meadow Walk, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 08:37.

Cadent Gas logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Newnham Close

Cadent Gas are proposing to carry out Utility asset works on Newnham Close, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 08:21.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
The Crescent

Cadent Gas were proposing to carry out Utility asset works on The Crescent, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Algers Road

Cadent Gas were proposing to carry out Utility asset works on Algers Road, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:10.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Albion Hill

Cadent Gas were proposing to carry out Utility asset works on Albion Hill, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:10.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Nafferton Rise

Cadent Gas were proposing to carry out Utility asset works on Nafferton Rise, Loughton Town, Loughton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 August 2025. The works were due to impact the footway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:08.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Apr 2025 at 15:09.

BT logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Dunedin Road

BT are proposing to carry out Utility asset works on Dunedin Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2025 at 21:03.

Thames Water logo
Between
21 and 27 Jul 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:23.

Thames Water logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Prince Regent Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:28.

London Borough Of Waltham Forest logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Fyfield Road

London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Fyfield Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 25 Mar 2025 at 14:29.

Thames Water logo
Between
23 Jul and 5 Aug 2025
Details
View Map
Share
Follow
St Helens Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Helens Road, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 08:31.

Virgin Media logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Manor Road

Virgin Media are proposing to carry out Utility asset works on Manor Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 Apr 2025 at 13:21.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:06.

Transport for London (TfL) logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Hackney To M11 Link Road

Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:55.


Roadworks Map near to Southview Crescent, ILFORD, IG2 6DG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2025 00:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southview Crescent, ILFORD, IG2 6DG (45 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
URGENT
  
LYNTON CRESCENT, GANTS HILL 
(0.1 miles)
London Borough Of Redbridge
Highway improvement works - Carriageway - Some carriageway incursion
Complete
24 Apr 2025 08:20 - 08:44
0.1
Details
Share
2
URGENT
  
WAREMEAD ROAD, GANTS HILL 
(0.3 miles)
London Borough Of Redbridge
Highway improvement works - Carriageway - Some carriageway incursion
Complete
25 Apr 2025 11:41 - 12:14
0.3
Details
Share
3
URGENT
  
WAREMEAD ROAD, GANTS HILL 
(0.3 miles)
London Borough Of Redbridge
Highway improvement works - Carriageway - Some carriageway incursion
Complete
25 Apr 2025 11:41 - 12:15
0.3
Details
Share
4
URGENT
  
WAREMEAD ROAD, GANTS HILL 
(0.3 miles)
London Borough Of Redbridge
Highway improvement works - Carriageway - Some carriageway incursion
Complete
25 Apr 2025 11:41 - 13:34
0.3
Details
Share
5
Thames Water logo
EMERGENCY
  
EASTERN AVENUE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Lane closure
In Progress
Since: 21 Mar 2025 06:00
(Scheduled: 21 Mar 2025 - 2 May 2025)
0.3
Details
Share
Follow
6
Thames Water logo
EMERGENCY
  
WOODFORD AVENUE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 31 Mar 2025 08:40
(Scheduled: 31 Mar 2025 - 2 May 2025)
0.3
Details
Share
Follow
7
BT logo
URGENT
  
CRANBROOK ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 25 Apr 2025 08:00
(Scheduled: 25 Apr 2025 - 29 Apr 2025)
0.4
Details
Share
Follow
8
Thames Water logo
EMERGENCY
  
ETHELBERT GARDENS, GANTS HILL 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
22 Feb 2025 22:05 - 22 Apr 2025 15:30
0.4
Details
Share
9
Cadent Gas logo
MAJOR
  
BRISBANE ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 3 Feb 2025 09:19
(Scheduled: 3 Feb 2025 - 27 Apr 2025)
0.4
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
BRISBANE ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 3 Feb 2025 - 27 Apr 2025
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.