ROADWORKS SUMMARY
Belprin Road, BEVERLEY, HU17 0LN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Belprin Road, HU17 0LN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Belprin Road, BEVERLEY, HU17 0LN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Belprin Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

East Riding Of Yorkshire Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Beverley South Western Bypass

East Riding Of Yorkshire Council are carrying out Highway improvement works on Beverley South Western Bypass, Beverley.

These works are categorised as Major.

The works started on 8 January 2024 at 00:00 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 18 Jul 2024 at 09:08.

East Riding Of Yorkshire Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Beverley Road

East Riding Of Yorkshire Council are carrying out Highway improvement works on Beverley Road, Woodmansey.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 15:28 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Oct 2024 at 14:51.

East Riding Of Yorkshire Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Beverley South Western Bypass

East Riding Of Yorkshire Council are carrying out Highway improvement works on Beverley South Western Bypass, Walkington.

These works are categorised as Major.

The works started on 22 January 2024 at 15:32 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 18 Jul 2024 at 09:08.

East Riding Of Yorkshire Council logo
LONG TERM
Between
29 May 2024 and 6 Dec 2025
Details
View Map
Share
Follow
Beverley South Western Bypass

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Beverley South Western Bypass, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 6 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 30 May 2024 at 13:46.

East Riding Of Yorkshire Council logo
LONG TERM
Until
6 Dec 2025
Details
View Map
Share
Follow
Beverley South Western Bypass

East Riding Of Yorkshire Council are carrying out Highway improvement works on Beverley South Western Bypass, Beverley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2024 at 00:00 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 9 Dec 2024 at 10:16.

East Riding Of Yorkshire Council logo
LONG TERM
Until
26 Dec 2025
Details
View Map
Share
Follow
Main Street

East Riding Of Yorkshire Council are carrying out Highway improvement works on Main Street, Bentley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 12:24 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 26 Jun 2024 at 11:29.

Yorkshire Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Fpath At Quillcourt

Yorkshire Water were proposing to carry out Utility asset works on Fpath At Quillcourt, Kingston Upon Hull.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 13 December 2024. The works were due to impact the verge and footpath.

This roadwork event was last updated by Yorkshire Water on 13 Sep 2024 at 08:25.

Yorkshire Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Fpath At Orniscourt

Yorkshire Water are carrying out Utility asset works on Fpath At Orniscourt, Kingston Upon Hull.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 23 September 2024 at 16:44 and could run through until 20 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 12:14.

East Riding Of Yorkshire Council logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
Lincoln Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Lincoln Way, Beverley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:51 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 21 Oct 2024 at 16:30.

East Riding Of Yorkshire Council logo
LONG TERM
Between
14 Oct 2024 and 12 Jul 2025
Details
View Map
Share
Follow
Lincoln Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Lincoln Way, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 12 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 28 Aug 2024 at 13:12.

East Riding Of Yorkshire Council logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
Lincoln Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Lincoln Way, Beverley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:08 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 21 Oct 2024 at 16:30.

East Riding Of Yorkshire Council logo
LONG TERM
Between
14 Oct 2024 and 12 Jul 2025
Details
View Map
Share
Follow
Minster Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Minster Way, Woodmansey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 12 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 28 Aug 2024 at 13:12.

East Riding Of Yorkshire Council logo
LONG TERM
Until
12 Jul 2025
Details
View Map
Share
Follow
Minster Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Minster Way, Woodmansey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 00:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 21 Oct 2024 at 16:30.

East Riding Of Yorkshire Council logo
LONG TERM
Between
14 Oct 2024 and 12 Jul 2025
Details
View Map
Share
Follow
Lincoln Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Lincoln Way, Beverley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 12 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 28 Aug 2024 at 13:12.

Yorkshire Water logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Carr Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Carr Lane, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2024 at 08:41.

Yorkshire Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Carr Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Carr Lane, Weel.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 14:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 11:38.

Northern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Beverley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 15:17.

Northern Gas Networks logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Beverley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 09:13.

Northern Gas Networks logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Beverley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:48.

Yorkshire Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Weel Road

Yorkshire Water are carrying out Utility repair and maintenance works on Weel Road, Weel.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 09:00 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 09:49.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Beverley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2024 at 09:41.

East Riding Of Yorkshire Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Dunflat Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Dunflat Road, Bentley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 20 Nov 2024 at 12:42.

East Riding Of Yorkshire Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wingfield Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Wingfield Way, Beverley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 13 Nov 2024 at 16:37.

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wingfield Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Wingfield Way, Beverley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:18 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 25 Nov 2024 at 16:30.

Northern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Beverley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 10:22.

Northern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Beverley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beverley Road, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 17:21.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Weel Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Weel Road, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2024 at 08:41.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Burden Road

Yorkshire Water are carrying out Utility repair and maintenance works on Burden Road, Beverley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 10:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 10:11.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Callas

Northern Gas Networks are carrying out Utility repair and maintenance works on Callas, Bishop Burton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 14:24 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:26.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Callas

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Callas, Bishop Burton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Oct 2024 at 15:27.

Northern Gas Networks logo
Until
19 Dec 2024
Details
View Map
Share
Follow
Hall Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Hall Road, Kingston Upon Hull.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 16:05 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:37.

East Riding Of Yorkshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chantry Lane

East Riding Of Yorkshire Council are carrying out Highway improvement works on Chantry Lane, Etton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:25 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 11 Dec 2024 at 08:40.

Northern Powergrid (Yorkshire) logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Cherry Tree Terrace

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cherry Tree Terrace, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Oct 2024 at 10:38.

Northern Powergrid (Yorkshire) logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Cherry Tree Terrace

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cherry Tree Terrace, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Oct 2024 at 10:16.

Northern Powergrid (Yorkshire) logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Cherry Tree Terrace

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Cherry Tree Terrace, Beverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Oct 2024 at 08:41.

Northern Powergrid (Yorkshire) logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Cherry Tree Terrace

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Cherry Tree Terrace, Beverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Oct 2024 at 08:45.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Butcher Row

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Butcher Row, Beverley.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 16:21.

East Riding Of Yorkshire Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Woodhall Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Woodhall Way, Molescroft.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 22 Nov 2024 at 15:10.

East Riding Of Yorkshire Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
St Leonards Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on St Leonards Road, Molescroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 18 Nov 2024 at 13:30.

East Riding Of Yorkshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
St Leonards Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on St Leonards Road, Molescroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 13 Nov 2024 at 11:15.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Butcher Row

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Butcher Row, Beverley.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 10:09.

Yorkshire Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Burden Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Burden Road, Beverley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 15:23.

East Riding Of Yorkshire Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Jocks Lodge Eastbound Interchange

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Jocks Lodge Eastbound Interchange, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 17 Oct 2024 at 08:56.

East Riding Of Yorkshire Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Jocks Lodge Eastbound Interchange

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Jocks Lodge Eastbound Interchange, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 16 Oct 2024 at 14:24.

East Riding Of Yorkshire Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Jocks Lodge Eastbound Interchange

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Jocks Lodge Eastbound Interchange, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 16 Oct 2024 at 14:24.

East Riding Of Yorkshire Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Jocks Lodge Eastbound Interchange

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Jocks Lodge Eastbound Interchange, Beverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 17 Oct 2024 at 08:56.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Toll Gavel

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Toll Gavel, Beverley.

These works are categorised as Major.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 10:09.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Toll Gavel

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Toll Gavel, Beverley.

These works are categorised as Major.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 14:13.

East Riding Of Yorkshire Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Carr Lane

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Carr Lane, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 25 Sep 2024 at 08:41.

East Riding Of Yorkshire Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Weel Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Weel Road, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 29 Aug 2024 at 15:57.

East Riding Of Yorkshire Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Carr Lane

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Carr Lane, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 15 Oct 2024 at 11:22.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Butcher Row

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Butcher Row, Beverley.

These works were categorised as Major.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 12:33.

East Riding Of Yorkshire Council logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Carr Lane

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Carr Lane, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 29 Aug 2024 at 14:53.

East Riding Of Yorkshire Council logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Weel Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Weel Road, Weel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 29 Aug 2024 at 15:57.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Toll Gavel

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Toll Gavel, Beverley.

These works were categorised as Major.

The works were originally planned to start 3 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 12:37.

East Riding Of Yorkshire Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Main Street

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Main Street, Cherry Burton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 19 Nov 2024 at 11:02.

Network Rail logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
Thwaite Street

Network Rail are proposing to carry out Works for Rail Purposes on Thwaite Street, Cottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 May 2024 at 14:30.


Roadworks Map near to Belprin Road, BEVERLEY, HU17 0LN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 12 Dec 2024 14:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Belprin Road, BEVERLEY, HU17 0LN (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
OLD BARMSTON ROAD 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 6 Dec 2024 10:20
(Scheduled: 6 Dec 2024 - 17 Dec 2024)
0.3
Details
Share
Follow
2
Northern Powergrid (Yorkshire) logo
URGENT
  
SWINEMOOR LANE 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 10 Dec 2024 12:45
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.3
Details
Share
Follow
3
Yorkshire Water logo
URGENT
  
BURDEN ROAD 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 3 Dec 2024 10:00
(Scheduled: 3 Dec 2024 - 13 Dec 2024)
0.4
Details
Share
Follow
4
East Riding Of Yorkshire Council logo
SAMPLE AVENUE 
(0.5 miles)
East Riding Of Yorkshire Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 13 Dec 2024
0.5
Details
Share
Follow
5
Yorkshire Water logo
HOLME CHURCH LANE 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 11 Dec 2024 - 13 Dec 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.