ROADWORKS SUMMARY
Park Road, BROUGH, HU15 1NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Park Road, HU15 1NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Park Road, BROUGH, HU15 1NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Park Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Stanley Jackson Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Stanley Jackson Way, Welton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 07:17 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 6 Dec 2024 at 09:10.

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Welton Road

East Riding Of Yorkshire Council are carrying out Highway improvement works on Welton Road, Brough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 07:17 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 6 Dec 2024 at 09:10.

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Water Lane

East Riding Of Yorkshire Council are carrying out Highway improvement works on Water Lane, Elloughton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 07:17 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 6 Dec 2024 at 09:10.

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Welton Low Road

East Riding Of Yorkshire Council are carrying out Highway improvement works on Welton Low Road, Elloughton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 07:16 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 6 Dec 2024 at 09:10.

National Highways logo
LONG TERM
Between
2 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Dale Road

National Highways are proposing to carry out Highway repair and maintenance works on Dale Road, Elloughton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 2 Oct 2024 at 15:03.

East Riding Of Yorkshire Council logo
LONG TERM
Between
14 Oct 2024 and 18 Oct 2025
Details
View Map
Share
Follow
Boothferry Road Roundabout

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Boothferry Road Roundabout, Hessle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Aug 2024 at 14:22.

East Riding Of Yorkshire Council logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Skillings Lane

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Skillings Lane, Brough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 19 Aug 2024 at 11:59.

East Riding Of Yorkshire Council logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Gibson Lane Track

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Gibson Lane Track, Welton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Nov 2024 at 12:36.

East Riding Of Yorkshire Council logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Gibson Lane South

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Gibson Lane South, Melton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Nov 2024 at 16:22.

East Riding Of Yorkshire Council logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wyke Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Wyke Way, Melton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Nov 2024 at 12:52.

East Riding Of Yorkshire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Gibson Lane Track

East Riding Of Yorkshire Council are carrying out Highway improvement works on Gibson Lane Track, Welton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 20 Nov 2024 at 16:14.

East Riding Of Yorkshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brickyard Lane

East Riding Of Yorkshire Council are carrying out Remedial works on Brickyard Lane, Melton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 14:41 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 28 Nov 2024 at 14:47.

East Riding Of Yorkshire Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Skillings Lane

East Riding Of Yorkshire Council are carrying out Highway improvement works on Skillings Lane, Brough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 00:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 3 Dec 2024 at 09:48.

Northern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ferry Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Ferry Road, South Cave.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:07 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 16:07.

East Riding Of Yorkshire Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Rowley Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Rowley Road, Little Weighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 4 Dec 2024 at 13:18.

East Riding Of Yorkshire Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Rowley Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Rowley Road, Little Weighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 19 Nov 2024 at 10:31.

East Riding Of Yorkshire Council logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Wyke Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Wyke Way, Melton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Nov 2024 at 12:52.

Yorkshire Water logo
Between
9 and 14 Jan 2025
Details
View Map
Share
Ferriby High Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Ferriby High Road, North Ferriby.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 14 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 2 Dec 2024 at 16:24.

East Riding Of Yorkshire Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Lowfield Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Lowfield Road, Anlaby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 5 Dec 2024 at 12:43.

East Riding Of Yorkshire Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Hull Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Hull Road, Anlaby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 5 Dec 2024 at 12:43.

Northern Powergrid (Yorkshire) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beverley Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beverley Road, South Cave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 12:50.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Tranby Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tranby Lane, Anlaby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 10:21.

East Riding Of Yorkshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Lowfield Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Lowfield Road, Anlaby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 11 Dec 2024 at 12:57.

East Riding Of Yorkshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Hull Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Hull Road, Anlaby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 11 Dec 2024 at 12:57.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
A15 From Humber Bridge To A1077

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From Humber Bridge To A1077, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Ferriby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Ferriby Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.


Roadworks Map near to Park Road, BROUGH, HU15 1NW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 12 Dec 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Park Road, BROUGH, HU15 1NW (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
PARK ROAD 
(0.1 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 6 Dec 2024 08:30
(Scheduled: 6 Dec 2024 - 19 Dec 2024)
0.1
Details
Share
Follow
2
MG3 Networks logo
COWGATE 
(0.2 miles)
MG3 Networks
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 10 Dec 2024 - 12 Dec 2024
0.2
Details
Share
Follow
3
MG3 Networks logo
COWGATE 
(0.2 miles)
MG3 Networks
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Complete
10 Dec 2024 08:00 - 12 Dec 2024 13:38
0.2
Details
Share
4
MG3 Networks logo
DALE ROAD 
(0.3 miles)
MG3 Networks
Utility asset works - Footway, Verge - Stop/go boards
In Progress
Since: 10 Dec 2024 09:20
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.3
Details
Share
Follow
5
East Riding Of Yorkshire Council logo
MAJOR
  
STANLEY JACKSON WAY 
(0.3 miles)
East Riding Of Yorkshire Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 31 Jul 2023 07:17
(Scheduled: 31 Jul 2023 - 20 Dec 2024)
0.3
Details
Share
Follow
6
East Riding Of Yorkshire Council logo
MAJOR
  
WATER LANE 
(0.4 miles)
East Riding Of Yorkshire Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 31 Jul 2023 07:17
(Scheduled: 31 Jul 2023 - 20 Dec 2024)
0.4
Details
Share
Follow
7
East Riding Of Yorkshire Council logo
MAJOR
  
WELTON LOW ROAD 
(0.4 miles)
East Riding Of Yorkshire Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 31 Jul 2023 07:16
(Scheduled: 31 Jul 2023 - 20 Dec 2024)
0.4
Details
Share
Follow
8
East Riding Of Yorkshire Council logo
MAJOR
  
WELTON ROAD 
(0.4 miles)
East Riding Of Yorkshire Council
Highway improvement works - Carriageway - Multi-way signals
In Progress
Since: 31 Jul 2023 07:17
(Scheduled: 31 Jul 2023 - 20 Dec 2024)
0.4
Details
Share
Follow
9
East Riding Of Yorkshire Council logo
ST JAMES ROAD 
(0.8 miles)
East Riding Of Yorkshire Council
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 10 Dec 2024 11:03
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.8
Details
Share
Follow
10
Northern Gas Networks logo
URGENT
  
THE OVAL 
(0.8 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
10 Dec 2024 14:17 - 11 Dec 2024 15:00
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.