ROADWORKS SUMMARY
Hedgerley Lane, BEACONSFIELD, HP9 2SB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hedgerley Lane, HP9 2SB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hedgerley Lane, BEACONSFIELD, HP9 2SB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hedgerley Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.

Cadent Gas logo
LONG TERM
Between
28 Feb and 11 Jun 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:17.

Cadent Gas logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are carrying out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 11:06 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:31.

Cadent Gas logo
LONG TERM
Between
7 Apr and 28 Jul 2025
Details
View Map
Share
Follow
Edinburgh Avenue

Cadent Gas are proposing to carry out Utility asset works on Edinburgh Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 10:33.

Cadent Gas logo
LONG TERM
Between
14 Apr and 24 Jul 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:25.

Cadent Gas logo
LONG TERM
Between
16 Apr and 24 Jun 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 13:26.

Cadent Gas logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Orchard Road

Cadent Gas are carrying out Utility asset works on Orchard Road, Seer Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 13:08 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:20.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Bestobell Road

Cadent Gas are carrying out Utility asset works on Bestobell Road, Slough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:45 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 09:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 08:46.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Green Lane

Cadent Gas were proposing to carry out Utility asset works on Green Lane, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 16:46.

Hertfordshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Denham Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 29 Jan 2025 at 07:59.

Thames Water logo
LONG TERM
Between
20 May and 23 Jun 2025
Details
View Map
Share
Denham Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 May 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 16:14.

Cadent Gas logo
LONG TERM
Between
26 May and 11 Sep 2025
Details
View Map
Share
Follow
Edinburgh Avenue

Cadent Gas are proposing to carry out Utility asset works on Edinburgh Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 10:30.

Cadent Gas logo
Between
26 May and 20 Jun 2025
Details
View Map
Share
Follow
Bulstrode Way

Cadent Gas are proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 15:30.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
One Pin Lane

Thames Water are carrying out Utility repair and maintenance works on One Pin Lane, Farnham Common.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 11:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:51.

Between
1 and 20 Jun 2025
Details
View Map
Share
Dundee Road

Optimal Power Networks were proposing to carry out Utility asset works on Dundee Road, Slough.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 June 2025 and run through until 20 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Optimal Power Networks on 27 May 2025 at 08:47.

Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Dundee Road

Optimal Power Networks are proposing to carry out Utility asset works on Dundee Road, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 22 Apr 2025 at 16:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
West End Lane

Cadent Gas are carrying out Utility repair and maintenance works on West End Lane, Stoke Poges.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:00 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:19.

Buckinghamshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Green Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 May 2025 at 12:40.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are carrying out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:00 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 12:15.

Cityfibre Metro Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Cherry Tree Lane

Cityfibre Metro Networks are proposing to carry out Section 58 on Cherry Tree Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 13:10.

Cityfibre Metro Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cherry Tree Lane

Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on Cherry Tree Lane, Fulmer.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:02 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Jun 2025 at 11:01.

Buckinghamshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Old Amersham Road

Buckinghamshire Council are carrying out Highway repair and maintenance works on Old Amersham Road, Denham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 10:00.

Cadent Gas logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Bulstrode Way

Cadent Gas are proposing to carry out Utility asset works on Bulstrode Way, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 09:20.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cherry Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Cherry Lane, Woodrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 09:58.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
West End Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on West End Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Feb 2025 at 08:37.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Mar 2025 at 15:08.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Mar 2025 at 11:31.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hollybush Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hollybush Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Apr 2025 at 14:58.

Hertfordshire County Council logo
Between
3 and 30 Jun 2025
Details
View Map
Share
Denham Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 30 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 17 Feb 2025 at 10:05.

Buckinghamshire Council logo
Today
Details
View Map
Share
West Hyde Lane

Buckinghamshire Council carried out Highway improvement works on West Hyde Lane, Chalfont St Peter.

The road was closed for some or all of the period.

The works were completed on 3 June 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 14:42.

Buckinghamshire Council logo
Today
Details
View Map
Share
West Hyde Lane

Buckinghamshire Council carried out Highway improvement works on West Hyde Lane, Chalfont St Peter.

The road was closed for some or all of the period.

The works were completed on 3 June 2025 The works impacted the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 14:07.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Dale Side

Buckinghamshire Council are proposing to carry out Highway improvement works on Dale Side, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:08.

Cadent Gas logo
LONG TERM
Between
6 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Lower Cookham Road

Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 13:26.

Cadent Gas logo
LONG TERM
Between
6 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Lower Cookham Road

Cadent Gas are proposing to carry out Utility asset works on Lower Cookham Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 15:06.

Cadent Gas logo
LONG TERM
Between
9 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Farnham Road

Cadent Gas are proposing to carry out Utility asset works on Farnham Road, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 14:51.

Buckinghamshire Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Framewood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Framewood Road, Wexham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:29.

Cityfibre Metro Networks logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Cherry Tree Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cherry Tree Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 13:10.

Cityfibre Metro Networks logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Cherry Tree Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Cherry Tree Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 23 May 2025 at 11:01.

Buckinghamshire Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Framewood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Framewood Road, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:28.

Buckinghamshire Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Framewood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Framewood Road, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:28.

Cadent Gas logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Bentinck Close

Cadent Gas are proposing to carry out Utility asset works on Bentinck Close, Gerrards Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 09:46.

Cadent Gas logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Bentinck Close

Cadent Gas were proposing to carry out Utility asset works on Bentinck Close, Gerrards Cross.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 16:13.

Buckinghamshire Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
The Brow

Buckinghamshire Council are proposing to carry out Highway improvement works on The Brow, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:11.

Buckinghamshire Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Stylecroft Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Stylecroft Road, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:10.

Buckinghamshire Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Valentine Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Valentine Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Jan 2025 at 12:11.

Buckinghamshire Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
Bells Hill Green

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bells Hill Green, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:30.

Buckinghamshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:31.

Scottish Hydro Electric Power Dis logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Ansculf Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Ansculf Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jun 2025 at 15:39.

Cadent Gas logo
LONG TERM
Between
23 Jun and 28 Sep 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Stoke Poges.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
23 Jun and 28 Sep 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Stoke Poges.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:43.

Cadent Gas logo
LONG TERM
Between
23 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Farnham Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
23 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Farnham Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:44.

Cadent Gas logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Green Lane

Cadent Gas were proposing to carry out Utility asset works on Green Lane, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:38.

Cadent Gas logo
Between
23 Jun and 20 Jul 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are proposing to carry out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 12:49.

Cadent Gas logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are proposing to carry out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:23.

Cadent Gas logo
LONG TERM
Between
23 Jun and 18 Aug 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are proposing to carry out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:50.

Cityfibre Metro Networks logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Farnham Park Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farnham Park Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Apr 2025 at 09:31.

Cityfibre Metro Networks logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Farnham Park Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Farnham Park Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Apr 2025 at 11:38.

Cadent Gas logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Farnham Royal Footpath 4

Cadent Gas are proposing to carry out Utility asset works on Farnham Royal Footpath 4, Farnham Common.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 11:46.

Neoscorp logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Coldmoorholme Lane

Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Neoscorp on 27 Mar 2025 at 12:30.

Neoscorp logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Coldmoorholme Lane

Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Neoscorp on 3 Apr 2025 at 09:26.

Neoscorp logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Coldmoorholme Lane

Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Neoscorp on 30 Apr 2025 at 11:39.

Neoscorp logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Coldmoorholme Lane

Neoscorp are proposing to carry out Utility asset works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Neoscorp on 6 May 2025 at 13:16.

Buckinghamshire Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Straight Bit

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:34.

Thames Water logo
LONG TERM
Between
23 Jun and 8 Aug 2025
Details
View Map
Share
Denham Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:09.

Buckinghamshire Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Deans Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Deans Close, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Mar 2025 at 10:52.

Buckinghamshire Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Holtspur Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holtspur Lane, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:40.

Buckinghamshire Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Wooburn Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wooburn Green Lane, Holtspur, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:41.

Buckinghamshire Council logo
Between
26 and 29 Jun 2025
Details
View Map
Share
Follow
Penn Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Penn Road, Knotty Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:05.

Buckinghamshire Council logo
Between
26 and 29 Jun 2025
Details
View Map
Share
Follow
Witheridge Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Witheridge Lane, Knotty Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:05.

Buckinghamshire Council logo
Between
26 and 29 Jun 2025
Details
View Map
Share
Follow
Clay Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Clay Street, Knotty Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 12:06.

Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Scafell Road

Optimal Power Networks are proposing to carry out Utility asset works on Scafell Road, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 6 May 2025 at 11:19.

Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Scafell Road

Optimal Power Networks are proposing to carry out Utility asset works on Scafell Road, Slough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 13 May 2025 at 13:11.

Cityfibre Metro Networks logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Purton Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Apr 2025 at 09:33.

Cityfibre Metro Networks logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Purton Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Purton Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Apr 2025 at 11:38.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Harvest Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Harvest Hill, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 11:44.

Cadent Gas logo
Between
1 and 18 Jul 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 14:41.

Buckinghamshire Council logo
Between
1 and 10 Jul 2025
Details
View Map
Share
Follow
Penn Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Penn Drive, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 14:37.

Buckinghamshire Council logo
Between
2 and 14 Jul 2025
Details
View Map
Share
Follow
Wheatley Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Wheatley Way, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 14:47.

Buckinghamshire Council logo
Between
3 and 15 Jul 2025
Details
View Map
Share
Follow
The Paddock

Buckinghamshire Council are proposing to carry out Highway improvement works on The Paddock, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 May 2025 at 15:21.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Christmas Lane

Cadent Gas are proposing to carry out Utility asset works on Christmas Lane, Farnham Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 10:12.

Cadent Gas logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 11:54.

Cadent Gas logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:24.

Buckinghamshire Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Joiners Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Joiners Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 May 2025 at 12:32.

Buckinghamshire Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
The Brow

Buckinghamshire Council are proposing to carry out Highway improvement works on The Brow, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.

Buckinghamshire Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Stylecroft Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Stylecroft Road, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.

Buckinghamshire Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Valentine Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Valentine Way, Chalfont St Giles.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:40.

Affinity Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Tower Road

Affinity Water are proposing to carry out Utility asset works on Tower Road, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Apr 2025 at 09:49.

Thames Water logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Blackpond Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Blackpond Lane, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:14.

Buckinghamshire Council logo
Between
9 and 15 Jul 2025
Details
View Map
Share
Follow
Rawlings Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Rawlings Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 14:29.

Buckinghamshire Council logo
Between
11 and 16 Jul 2025
Details
View Map
Share
Follow
Dale Side

Buckinghamshire Council are proposing to carry out Highway improvement works on Dale Side, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Hawthorn Lane

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Hawthorn Lane, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:20.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Kiln Lane

Thames Water are proposing to carry out New service connection on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:34.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Kiln Lane

Thames Water are proposing to carry out New service connection on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 13:51.

Buckinghamshire Council logo
LONG TERM
Between
14 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Juniper Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Juniper Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Feb 2025 at 16:31.

Cadent Gas logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Hill Meadow

Cadent Gas are proposing to carry out Utility asset works on Hill Meadow, Coleshill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:40.

Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Buckingham Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 21 May 2025 at 12:42.

Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Buckingham Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Optimal Power Networks on 22 May 2025 at 13:20.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Hollybush Hill

Thames Water were proposing to carry out New service connection on Hollybush Hill, Stoke Poges.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 24 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 May 2025 at 10:54.

Cadent Gas logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Hollybush Hill

Cadent Gas are proposing to carry out Utility asset works on Hollybush Hill, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:51.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Hawks Hill

BT were proposing to carry out Utility asset works on Hawks Hill, Bourne End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 May 2025 at 07:49.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Kiln Lane

BT were proposing to carry out Utility asset works on Kiln Lane, Cores End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 13 May 2025 at 07:52.

Cityfibre Metro Networks logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Egypt Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Egypt Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 May 2025 at 12:06.

Cityfibre Metro Networks logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Egypt Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Egypt Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 29 May 2025 at 09:31.

Thames Water logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Hedsor Lane

Thames Water are proposing to carry out New service connection on Hedsor Lane, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:08.

LONG TERM
Between
23 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 15 Apr 2025 at 10:12.

LONG TERM
Between
23 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Wentworth Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Wentworth Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 24 Apr 2025 at 10:01.

Buckinghamshire Council logo
On
23 Jul 2025
Details
View Map
Share
Follow
School Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on School Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 July 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Apr 2025 at 12:58.

Buckinghamshire Council logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Dukes Wood Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.

Buckinghamshire Council logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Dukes Wood Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Avenue, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 08:41.

Cadent Gas logo
LONG TERM
Between
24 Jul and 2 Sep 2025
Details
View Map
Share
Follow
The Pound

Cadent Gas are proposing to carry out Utility asset works on The Pound, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:19.

Thames Water logo
LONG TERM
Between
25 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Denham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Denham Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 11:37.

Scottish Hydro Electric Power Dis logo
Between
26 Jul and 4 Aug 2025
Details
View Map
Share
Blackpond Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Blackpond Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 May 2025 at 13:12.

Cadent Gas logo
Between
27 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Road

Cadent Gas are proposing to carry out Utility asset works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jan 2024 at 12:15.

Cadent Gas logo
LONG TERM
Between
28 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Wexham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:09.

Cadent Gas logo
LONG TERM
Between
28 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Wexham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 12:49.

Cadent Gas logo
LONG TERM
Between
28 Jul and 29 Sep 2025
Details
View Map
Share
Church Lane

Cadent Gas were proposing to carry out Utility asset works on Church Lane, Wexham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:31.

Cadent Gas logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Road

Cadent Gas are proposing to carry out Utility asset works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:53.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are proposing to carry out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:46.

Cadent Gas logo
LONG TERM
Between
28 Jul and 23 Sep 2025
Details
View Map
Share
Follow
West End Lane

Cadent Gas are proposing to carry out Utility asset works on West End Lane, Stoke Poges.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:45.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Hollybush Hill

Cadent Gas are proposing to carry out Utility asset works on Hollybush Hill, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 14:57.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Hollybush Hill

Cadent Gas are proposing to carry out Utility asset works on Hollybush Hill, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:20.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Hollybush Hill

Cadent Gas are proposing to carry out Utility asset works on Hollybush Hill, Stoke Poges.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:58.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Hollybush Hill

Cadent Gas are proposing to carry out Utility asset works on Hollybush Hill, Stoke Poges.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 12:55.

Cadent Gas logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Christmas Lane

Cadent Gas are proposing to carry out Utility asset works on Christmas Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:07.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Cores End Road

Cadent Gas were proposing to carry out Utility asset works on Cores End Road, Bourne End.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 09:39.

Cadent Gas logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 11:16.

Buckinghamshire Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Windsor Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 09:13.

Buckinghamshire Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Windsor Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 29 May 2025 at 15:37.

Cadent Gas logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:24.

Cadent Gas logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:37.

Cadent Gas logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Beaconsfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:59.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bayne Hill

Cadent Gas are proposing to carry out Utility asset works on Bayne Hill, Seer Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:36.

Cadent Gas logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Bayne Hill

Cadent Gas are proposing to carry out Utility asset works on Bayne Hill, Seer Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:35.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Chalfont Road

Cadent Gas were proposing to carry out Utility asset works on Chalfont Road, Seer Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 14:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Church Road, Tylers Green.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2025 at 15:32.

Cadent Gas logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Magpie Lane

Cadent Gas are proposing to carry out Utility asset works on Magpie Lane, Coleshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:48.

Buckinghamshire Council logo
Between
29 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Oxford Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Avenue, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 14:31.

Buckinghamshire Council logo
Between
29 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Cambridge Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Cambridge Avenue, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 14:33.

Eunetworks logo
LONG TERM
Between
29 Jul and 1 Sep 2025
Details
View Map
Share
London Road

Eunetworks were proposing to carry out Utility asset works on London Road, Loudwater.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Dec 2024 at 15:06.

Cityfibre Metro Networks logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Poyle Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Poyle Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 12:57.

Cityfibre Metro Networks logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Wymers Wood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Wymers Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 12:56.

Cityfibre Metro Networks logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Collinswood Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Collinswood Road, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 May 2025 at 12:50.

Buckinghamshire Council logo
Between
2 and 7 Aug 2025
Details
View Map
Share
Follow
Windsor Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 9 Apr 2025 at 09:19.

Cadent Gas logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Lent Rise Road

Cadent Gas were proposing to carry out Utility asset works on Lent Rise Road, Burnham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 07:58.

Cadent Gas logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Stomp Road

Cadent Gas are proposing to carry out Utility asset works on Stomp Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:19.

Cadent Gas logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Hogfair Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Hogfair Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 15:11.

Scottish Hydro Electric Power Dis logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Ansculf Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Ansculf Road, Slough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jun 2025 at 12:56.

Cadent Gas logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Farnham Road

Cadent Gas are proposing to carry out Utility asset works on Farnham Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:23.

Buckinghamshire Council logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Hill Farm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hill Farm Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Mar 2025 at 11:29.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 09:30.

Cityfibre Metro Networks logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Tilehouse Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 11:31.

Cadent Gas logo
Between
4 and 21 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 12:10.

Cadent Gas logo
Between
4 and 21 Aug 2025
Details
View Map
Share
Follow
Tilehouse Lane

Cadent Gas are proposing to carry out Utility asset works on Tilehouse Lane, Denham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:27.

Buckinghamshire Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Juniper Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Juniper Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Mar 2025 at 09:10.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Seer Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:33.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
School Lane

Cadent Gas are proposing to carry out Utility asset works on School Lane, Seer Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:38.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Bottom Lane

Cadent Gas are proposing to carry out Utility asset works on Bottom Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:50.

Cadent Gas logo
LONG TERM
Between
4 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Orchard Road

Cadent Gas are proposing to carry out Utility asset works on Orchard Road, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:51.

Buckinghamshire Council logo
Between
5 and 11 Aug 2025
Details
View Map
Share
Follow
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 14:28.

Buckinghamshire Council logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Bottom Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Bottom Lane, Seer Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2025 at 12:58.

LONG TERM
Between
8 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 23 May 2025 at 10:16.

Between
8 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Optimal Power Networks are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Optimal Power Networks on 30 May 2025 at 09:55.

BT logo
Between
9 and 24 Aug 2025
Details
View Map
Share
Follow
Buckingham Avenue

BT are proposing to carry out Utility asset works on Buckingham Avenue, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 11:40.

BT logo
Between
9 and 24 Aug 2025
Details
View Map
Share
Follow
Bestobell Road

BT are proposing to carry out Utility asset works on Bestobell Road, Slough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 11:39.

Cadent Gas logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 08:43.

Cadent Gas logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Farnham Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:22.

Scottish Hydro Electric Power Dis logo
Between
11 and 20 Aug 2025
Details
View Map
Share
Blackpond Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Blackpond Lane, Farnham Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 20 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 May 2025 at 12:48.

Cadent Gas logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Collinswood Road

Cadent Gas are proposing to carry out Utility asset works on Collinswood Road, Farnham Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:52.

Cadent Gas logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 09:30.

Hertfordshire County Council logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 19 Feb 2025 at 13:59.

Hertfordshire County Council logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 10 Mar 2025 at 10:24.

Cadent Gas logo
Between
11 and 24 Aug 2025
Details
View Map
Share
Orchard Road

Cadent Gas were proposing to carry out Utility asset works on Orchard Road, Seer Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 24 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 08:14.

Hertfordshire County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Chalfont Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chalfont Road, Maple Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 19 Feb 2025 at 16:18.

Hertfordshire County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Chalfont Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chalfont Road, Maple Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 27 Feb 2025 at 11:28.

Buckinghamshire Council logo
Between
14 and 18 Aug 2025
Details
View Map
Share
Follow
Windsor Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Windsor Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:46.

Cadent Gas logo
LONG TERM
Between
18 Aug and 23 Sep 2025
Details
View Map
Share
Follow
Lent Rise Road

Cadent Gas are proposing to carry out Utility asset works on Lent Rise Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:17.

Cadent Gas logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Stomp Road

Cadent Gas are proposing to carry out Utility asset works on Stomp Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 15:01.

Buckinghamshire Council logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Beaconsfield Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Beaconsfield Road, Farnham Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Apr 2025 at 15:07.

Buckinghamshire Council logo
Between
18 and 19 Aug 2025
Details
View Map
Share
Follow
Wilton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wilton Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:51.

Buckinghamshire Council logo
Between
18 and 19 Aug 2025
Details
View Map
Share
Follow
Wilton Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wilton Lane, Jordans.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:44.

Buckinghamshire Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Whielden Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Whielden Lane, Winchmore Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 20 Mar 2025 at 13:01.

Buckinghamshire Council logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
Egypt Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Egypt Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 13:51.

Buckinghamshire Council logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
Egypt Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Egypt Lane, Farnham Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 May 2025 at 10:45.

Buckinghamshire Council logo
Between
19 and 26 Aug 2025
Details
View Map
Share
Follow
Wheatley Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Wheatley Way, Chalfont St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Mar 2025 at 12:24.

Cadent Gas logo
LONG TERM
Between
20 Aug and 21 Sep 2025
Details
View Map
Share
Follow
Bull Lane

Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 10:18.

Buckinghamshire Council logo
Between
20 and 26 Aug 2025
Details
View Map
Share
Follow
School Road

Buckinghamshire Council are proposing to carry out Highway improvement works on School Road, Tylers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:21.

Buckinghamshire Council logo
Between
23 and 26 Aug 2025
Details
View Map
Share
Follow
Straight Bit

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:44.

Buckinghamshire Council logo
Between
25 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Holtspur Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Holtspur Lane, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:45.

Buckinghamshire Council logo
Between
25 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Wooburn Green Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wooburn Green Lane, Holtspur, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 May 2025 at 11:46.

Cadent Gas logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Manor Way

Cadent Gas are proposing to carry out Utility asset works on Manor Way, Coleshill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:39.

Cadent Gas logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Lent Rise Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Lent Rise Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 12:18.

Cadent Gas logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Lent Rise Road

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Lent Rise Road, Burnham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 08:35.

National Highways logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Follow
Sevenhills Road

National Highways are proposing to carry out Works for road purposes on Sevenhills Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 29 May 2025 at 13:52.

Buckinghamshire Council logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Alderbourne Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Alderbourne Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 10:58.

Buckinghamshire Council logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Hawkswood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Hawkswood Lane, Fulmer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Jun 2025 at 10:44.

Affinity Water logo
Between
28 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Station Road, Beaconsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 May 2025 at 11:54.


Roadworks Map near to Hedgerley Lane, BEACONSFIELD, HP9 2SB (5 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Last Updated: 3 Jun 2025 21:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hedgerley Lane, BEACONSFIELD, HP9 2SB (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Buckinghamshire Council logo
WINDSOR ROAD 
(0.5 miles)
Buckinghamshire Council
Highway repair and maintenance works - Verge - Lane closure
Complete
3 Jun 2025 12:08 - 13:32
0.5
Details
Share
2
HS2 logo
SLOUGH ROAD 
(0.6 miles)
HS2
Works for Rail Purposes - Carriageway - Road closure
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
3
Buckinghamshire Council logo
OXFORD ROAD 
(0.7 miles)
Buckinghamshire Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Two-way signals
Planned
Scheduled: 4 Jun 2025
0.7
Details
Share
Follow
4
Buckinghamshire Council logo
SLOUGH ROAD 
(0.8 miles)
Buckinghamshire Council
Highway repair and maintenance works - Verge - Lane closure
Complete
3 Jun 2025 10:43 - 13:32
0.8
Details
Share
5
Buckinghamshire Council logo
EMERGENCY
  
WINDSOR END 
(0.8 miles)
Buckinghamshire Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 3 Jun 2025 14:18
(Scheduled: 3 Jun 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.