ROADWORKS SUMMARY
Great Hampden, GREAT MISSENDEN, HP16 9RJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Great Hampden, HP16 9RJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Great Hampden, GREAT MISSENDEN, HP16 9RJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Great Hampden are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

HS2 logo
LONG TERM
Until
31 May 2026
Details
View Map
Share
Follow
Wendover Bridleway 14

HS2 are carrying out Works for Rail Purposes on Wendover Bridleway 14, Wendover.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2023 at 08:00 and could run through until 31 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by HS2 on 22 Oct 2024 at 13:59.

HS2 logo
LONG TERM
Until
9 Dec 2026
Details
View Map
Share
Follow
Wendover Bridleway 14

HS2 are carrying out Works for Rail Purposes on Wendover Bridleway 14, Wendover.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 08:00 and could run through until 9 December 2026. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by HS2 on 24 Apr 2025 at 09:20.

Buckinghamshire Council logo
LONG TERM
Between
1 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Haw Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Haw Lane, Bledlow Ridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 11 Feb 2025 at 08:09.

Affinity Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Hotley Bottom Lane

Affinity Water were proposing to carry out Utility asset works on Hotley Bottom Lane, Prestwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 5 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 12:32.

Affinity Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hotley Bottom Lane

Affinity Water are carrying out Utility asset works on Hotley Bottom Lane, Prestwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 13:00 and could run through until 5 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 16 Jun 2025 at 13:20.

Affinity Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hotley Bottom Lane

Affinity Water are proposing to carry out Utility asset works on Hotley Bottom Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 5 September 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:19.

Buckinghamshire Council logo
LONG TERM
Between
24 Jul and 18 Sep 2025
Details
View Map
Share
Follow
Amersham Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Amersham Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 19 Mar 2025 at 09:40.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Amersham Road

Cadent Gas are proposing to carry out Utility asset works on Amersham Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 08:55.

Affinity Water logo
LONG TERM
Between
28 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Coombe Lane

Affinity Water are proposing to carry out Utility asset works on Coombe Lane, Naphill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 12 Jun 2025 at 11:55.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Kiln Road

Affinity Water were proposing to carry out Utility asset works on Kiln Road, Prestwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2025 and run through until 3 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 12:39.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Kiln Road

Affinity Water are proposing to carry out Utility asset works on Kiln Road, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 3 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:16.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Kiln Road

Affinity Water are carrying out Utility asset works on Kiln Road, Prestwood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 09:30 and could run through until 3 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 21 Aug 2025 at 11:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Great Missenden Bridleway 48

Thames Water were proposing to carry out Utility repair and maintenance works on Great Missenden Bridleway 48, Great Missenden.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 8 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 25 Aug 2025 at 08:45.

Thames Water logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Great Missenden Bridleway 48

Thames Water are carrying out Utility repair and maintenance works on Great Missenden Bridleway 48, Great Missenden.

The works should not impact the carriageway.

The works started on 25 August 2025 at 08:30 and could run through until 15 September 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 07:37.

Cadent Gas logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Longfield

Cadent Gas are carrying out Utility asset works on Longfield, Little Kingshill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:25 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:16.

Buckinghamshire Council logo
Between
26 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Wycombe Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Wycombe Road, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Jun 2025 at 10:20.

Cadent Gas logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Chalk Lane

Cadent Gas are carrying out Utility asset works on Chalk Lane, Hyde Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:17 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:13.

Affinity Water logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Coombe Lane

Affinity Water are carrying out Utility asset works on Coombe Lane, Naphill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 18:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Aug 2025 at 09:24.

Affinity Water logo
LONG TERM
Between
26 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Coombe Lane

Affinity Water are proposing to carry out Utility asset works on Coombe Lane, Naphill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 11:20.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Aug 2025 at 08:19.

Cadent Gas logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Stony Lane

Cadent Gas were proposing to carry out Utility asset works on Stony Lane, Little Kingshill.

These works were categorised as Major.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 15:48.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hare Lane

Affinity Water are carrying out Utility repair and maintenance works on Hare Lane, Little Kingshill.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 23:30 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 07:25.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Aug 2025 at 12:10.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Follow
Hampden Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Jul 2025 at 08:47.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
High Street

Affinity Water are proposing to carry out Utility repair and maintenance works on High Street, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 07:24.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Flowers Bottom Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Flowers Bottom Lane, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 6 Aug 2025 at 10:48.

Cityfibre Metro Networks logo
Finishing
Today
Details
View Map
Share
Follow
Honor End Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Honor End Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Apr 2025 at 08:30.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Bellfield Road

Network Rail were proposing to carry out Works for Rail Purposes on Bellfield Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Jun 2025 at 14:21.

Scottish Hydro Electric Power Dis logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Desborough Road

Scottish Hydro Electric Power Dis are carrying out Permanent reinstatement on Desborough Road, High Wycombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:05 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Sep 2025 at 09:29.

Network Rail logo
Until
13 Sep 2025
Details
View Map
Share
Follow
Bellfield Road

Network Rail are carrying out Works for Rail Purposes on Bellfield Road, High Wycombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 20:00 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2025 at 08:46.

Buckinghamshire Council logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Abbey Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Abbey Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2025 at 10:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Sep and 7 Nov 2025
Details
View Map
Share
West Wycombe Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Wycombe Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jul 2025 at 16:26.

Scottish Hydro Electric Power Dis logo
Finishing
Tuesday
Details
View Map
Share
Follow
West Wycombe Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on West Wycombe Road, High Wycombe.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:17 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2025 at 10:33.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hangings Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hangings Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Apr 2025 at 08:30.

Buckinghamshire Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wycombe Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Wycombe Road, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Apr 2025 at 12:06.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Sep and 14 Oct 2025
Details
View Map
Share
Chapel Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Chapel Lane, Sands, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2025 at 15:04.

Buckinghamshire Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wycombe Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Wycombe Road, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 15:19.

Cityfibre Metro Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Hampden Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jun 2025 at 09:05.

Cityfibre Metro Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hampden Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hampden Road, Great Hampden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Apr 2025 at 08:32.

BT logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Amersham Hill

BT are proposing to carry out Utility asset works on Amersham Hill, Totteridge, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Jun 2025 at 15:12.

Cityfibre Metro Networks logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Honor End Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Honor End Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jun 2025 at 09:05.

Gigaclear logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility repair and maintenance works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 18 Aug 2025 at 09:59.

Affinity Water logo
LONG TERM
Between
8 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Main Road

Affinity Water are proposing to carry out Utility asset works on Main Road, Naphill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Jun 2025 at 10:37.

Gigaclear logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility repair and maintenance works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 20 Jun 2025 at 09:08.

Gigaclear logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Hare Lane

Gigaclear are proposing to carry out Utility repair and maintenance works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 13 Jun 2025 at 07:48.

BT logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Amersham Road

BT are proposing to carry out Utility asset works on Amersham Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Jun 2025 at 15:13.

Buckinghamshire Council logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Tower Street

Buckinghamshire Council are proposing to carry out Highway improvement works on Tower Street, Terriers, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2025 at 13:19.

Buckinghamshire Council logo
Between
9 and 13 Sep 2025
Details
View Map
Share
Follow
Dunsmore Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Dunsmore Road, Wendover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 09:36.

Buckinghamshire Council logo
Between
9 and 13 Sep 2025
Details
View Map
Share
Dunsmore Lane

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Dunsmore Lane, Wendover.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 13 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 09:32.

Buckinghamshire Council logo
Between
9 and 13 Sep 2025
Details
View Map
Share
Dunsmore Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Dunsmore Road, Wendover.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 13 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 09:32.

Buckinghamshire Council logo
Between
9 and 13 Sep 2025
Details
View Map
Share
Follow
Dunsmore Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Dunsmore Lane, Wendover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 13 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Jun 2025 at 09:38.

Buckinghamshire Council logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Follow
Trafford Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Trafford Close, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Mar 2025 at 15:26.

Cityfibre Metro Networks logo
Between
10 and 12 Sep 2025
Details
View Map
Share
Follow
Hangings Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hangings Lane, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Jun 2025 at 09:05.

Cadent Gas logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Hare Lane

Cadent Gas are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 09:03.

Buckinghamshire Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Lower Lodge Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Lower Lodge Lane, Hazlemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Sep 2025 at 16:17.

Cadent Gas logo
LONG TERM
Between
15 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Green Street

Cadent Gas are proposing to carry out Utility asset works on Green Street, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 13:34.

Cadent Gas logo
LONG TERM
Between
15 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Green Street

Cadent Gas are proposing to carry out Utility asset works on Green Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 13:33.

Network Rail logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Nags Head Lane

Network Rail are proposing to carry out Works for Rail Purposes on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Jun 2025 at 09:13.

Buckinghamshire Council logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Kimblewick Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Kimblewick Road, Little Meadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 May 2025 at 10:31.

Buckinghamshire Council logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Upper Hollis

Buckinghamshire Council are proposing to carry out Highway improvement works on Upper Hollis, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Mar 2025 at 15:27.

Vodafone logo
Between
20 and 23 Sep 2025
Details
View Map
Share
Follow
Amersham Road

Vodafone are proposing to carry out Utility repair and maintenance works on Amersham Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 May 2025 at 08:40.

Vodafone logo
Between
20 and 23 Sep 2025
Details
View Map
Share
Follow
Amersham Road

Vodafone are proposing to carry out Utility repair and maintenance works on Amersham Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 May 2025 at 11:07.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Aylesbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aylesbury Road, Wendover.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 11:49.

Cadent Gas logo
LONG TERM
Between
22 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Chalk Lane

Cadent Gas are proposing to carry out Utility asset works on Chalk Lane, Hyde Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 09:18.

UK Power Networks Eastern & London logo
Between
23 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Village Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Village Road, Ballinger.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Aug 2025 at 14:40.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bullbaiters Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bullbaiters Lane, Hyde Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jun 2025 at 08:48.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bullbaiters Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Bullbaiters Lane, Hyde Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jun 2025 at 09:11.

Affinity Water logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Main Road

Affinity Water are proposing to carry out Utility asset works on Main Road, Naphill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Aug 2025 at 15:32.

UK Power Networks Eastern & London logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Potter Row

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Potter Row, Great Missenden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2025 at 14:07.

UK Power Networks Eastern & London logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Potter Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Potter Row, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 09:42.

Affinity Water logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Main Road

Affinity Water are proposing to carry out Utility asset works on Main Road, Naphill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Aug 2025 at 11:21.

Buckinghamshire Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Watchet Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Watchet Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Jul 2025 at 11:41.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Hampden Road

Thames Water were proposing to carry out New service connection on Hampden Road, Speen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 14:12.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Rectory Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Rectory Avenue, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 15:30.

Buckinghamshire Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Watchet Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Watchet Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Jul 2025 at 12:45.

Scottish Hydro Electric Power Dis logo
Between
15 and 28 Oct 2025
Details
View Map
Share
Chapel Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Chapel Lane, Sands, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 28 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2025 at 14:42.

Thames Water logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Park Mill

Thames Water are proposing to carry out Utility repair and maintenance works on Park Mill, Princes Risborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:27.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Back Street

Thames Water are proposing to carry out Remedial works on Back Street, Wendover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 11:23.

Network Rail logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Nags Head Lane

Network Rail are proposing to carry out Works for Rail Purposes on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2025 at 07:29.

UK Power Networks Eastern & London logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Village Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Village Road, Lee Common.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 11:26.

Network Rail logo
Between
21 and 25 Oct 2025
Details
View Map
Share
Follow
Nags Head Lane

Network Rail are proposing to carry out Works for Rail Purposes on Nags Head Lane, Great Missenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 09:25.

Buckinghamshire Council logo
Between
22 and 28 Oct 2025
Details
View Map
Share
Follow
Chippendale Close

Buckinghamshire Council are proposing to carry out Highway improvement works on Chippendale Close, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Apr 2025 at 14:40.

Cadent Gas logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hare Lane

Cadent Gas are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 07:44.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Brook Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 10:00.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Village Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Village Road, Lee Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Aug 2025 at 07:25.

Thames Water logo
LONG TERM
Between
27 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Horseshoe Road

Thames Water are proposing to carry out Utility asset works on Horseshoe Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 19 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 10:24.

Cadent Gas logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hare Lane

Cadent Gas are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 08:15.

Buckinghamshire Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
London Road

Buckinghamshire Council are proposing to carry out Highway improvement works on London Road, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Jun 2025 at 08:40.

Cadent Gas logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hare Lane

Cadent Gas are proposing to carry out Utility asset works on Hare Lane, Little Kingshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 09:33.

Thames Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Hampden Road

Thames Water are proposing to carry out New service connection on Hampden Road, Speen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 08:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
29 Oct 2025 and 3 Mar 2026
Details
View Map
Share
New Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on New Road, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 3 March 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2025 at 13:00.

Buckinghamshire Council logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Hampden Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hampden Road, Denner Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Jun 2025 at 08:36.

Thames Water logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Follow
Jubilee Road

Thames Water are proposing to carry out New service connection on Jubilee Road, Downley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 14:48.

Affinity Water logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Wycombe Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Wycombe Road, Prestwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Aug 2025 at 07:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Nov 2025 and 13 Feb 2026
Details
View Map
Share
Oxford Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Oxford Road, Piddington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2025 and run through until 13 February 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Jul 2025 at 12:05.

Buckinghamshire Council logo
Between
1 and 29 Dec 2025
Details
View Map
Share
Follow
Abbey Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Abbey Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 29 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2025 at 10:19.


Roadworks Map near to Great Hampden, GREAT MISSENDEN, HP16 9RJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Great Hampden, GREAT MISSENDEN, HP16 9RJ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
MAJOR
  
HAMPDEN ROAD 
(0.6 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 3 Sep 2025
0.6
Details
Share
Follow
2
Cityfibre Metro Networks logo
MAJOR
  
HANGINGS LANE 
(0.9 miles)
Cityfibre Metro Networks
Statutory Infrastructure Works - Carriageway - Road closure
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.