ROADWORKS SUMMARY
Empire Way, WEMBLEY, HA9 0EW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Empire Way, HA9 0EW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Empire Way, WEMBLEY, HA9 0EW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Empire Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
31 May 2027
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 31 May 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 16:32.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2025 at 08:00 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 28 Aug 2026 at 09:05.

London Borough Of Barnet logo
LONG TERM
Between
29 Nov 2025 and 28 May 2027
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 28 May 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 23 Oct 2025 at 11:55.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Lady Margaret Road

London Borough Of Ealing are carrying out Highway improvement works on Lady Margaret Road, Southall.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2025 at 08:00 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 7 Jul 2026 at 17:03.

National Highways logo
LONG TERM
Between
3 Mar and 30 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:46.

National Highways logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Great West Road

National Highways are carrying out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2026 at 22:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Mar 2026 at 11:46.

Thames Water logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are carrying out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2026 at 13:00 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 14:40.

HS2 logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are carrying out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 April 2026 at 00:01 and could run through until 27 September 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 27 Aug 2026 at 13:03.

HS2 logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 April 2026 at 00:01 and could run through until 27 September 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 28 Aug 2026 at 09:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 07:00 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:25.

Affinity Water logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Morland Road

Affinity Water are carrying out Utility asset works on Morland Road, Kenton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:30.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
5 May and 1 Dec 2026
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 29 Oct 2025 at 14:54.

London Borough Of Camden logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Kilburn High Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2026 at 07:28 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 11 Sep 2026 at 18:08.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Macfarlane Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Macfarlane Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2026 at 07:00 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Jun 2026 at 11:43.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2026 at 17:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2026 at 09:11.

London Borough Of Ealing logo
LONG TERM
Until
31 Mar 2027
Details
View Map
Share
Follow
Boston Road

London Borough Of Ealing are carrying out Highway improvement works on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 08:00 and could run through until 31 March 2027. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Aug 2026 at 11:48.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Shepherd's Bush Green

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The works started on 4 June 2026 at 22:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Aug 2026 at 12:20.

LONG TERM
Between
1 Jun and 31 Dec 2026
Details
View Map
Share
Follow
Marsh Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Road, Pinner.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Jun 2026 at 14:49.

LONG TERM
Between
1 Jun and 31 Dec 2026
Details
View Map
Share
Follow
Cecil Park

London Borough Of Harrow are proposing to carry out Highway improvement works on Cecil Park, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2026 at 15:49.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Lower Boston Road

London Borough Of Ealing are carrying out Highway improvement works on Lower Boston Road, Hanwell.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Sep 2026 at 10:28.

London Borough Of Barnet logo
LONG TERM
Until
2 Jun 2027
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are carrying out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2026 at 10:00 and could run through until 2 June 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2026 at 14:50.

Affinity Water logo
LONG TERM
Until
24 Sep 2026
Details
View Map
Share
Follow
The Broadway

Affinity Water are carrying out Utility asset works on The Broadway, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2026 at 11:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 10:37.

London Borough Of Ealing logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are carrying out Highway improvement works on Uxbridge Road, Hanwell.

These works are categorised as Major.

The works started on 17 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Sep 2026 at 15:37.

G2 Energy IDNO logo
LONG TERM
Between
17 Jun and 17 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 15 Jun 2026 at 12:07.

London Borough Of Ealing logo
LONG TERM
Until
26 Sep 2026
Details
View Map
Share
Follow
Leeland Road

London Borough Of Ealing are carrying out Highway improvement works on Leeland Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:00 and could run through until 26 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 17:38.

Transport for London (TfL) logo
LONG TERM
Until
28 Feb 2027
Details
View Map
Share
Follow
Du Cane Road

Transport for London (TfL) are carrying out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 19:00 and could run through until 28 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2026 at 16:59.

Affinity Water logo
LONG TERM
Until
16 Nov 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:30 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Jun 2026 at 09:06.

Transport for London (TfL) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, Harrow Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 11:05.

Thames Water logo
LONG TERM
Until
8 Oct 2026
Details
View Map
Share
Follow
Argyle Road

Thames Water are carrying out Statutory Infrastructure Works on Argyle Road, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2026 at 09:46 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 14:12.

Cadent Gas logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Southdown Avenue

Cadent Gas are carrying out Utility asset works on Southdown Avenue, Hanwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 July 2026 at 12:13 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 13:11.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Park View Road

Cadent Gas are carrying out Utility asset works on Park View Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 06:33 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 08:20.

Thames Water logo
LONG TERM
Until
29 Mar 2027
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 16:45 and could run through until 29 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2026 at 08:13.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Oldfield Lane South

Scottish Hydro Electric Power Dis are carrying out New service connection on Oldfield Lane South, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2026 at 08:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2026 at 08:47.

London Borough Of Barnet logo
LONG TERM
Until
21 Oct 2026
Details
View Map
Share
Follow
Limes Avenue

London Borough Of Barnet are carrying out Highway improvement works on Limes Avenue, Golders Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2026 at 08:00 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2026 at 11:47.

Cadent Gas logo
LONG TERM
Until
18 Oct 2026
Details
View Map
Share
Follow
Camrose Avenue

Cadent Gas are carrying out Utility asset works on Camrose Avenue, Edgware.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:20 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 09:33.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are carrying out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:35 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 13:09.

G2 Energy IDNO logo
LONG TERM
Between
29 Jul and 23 Sep 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by G2 Energy IDNO on 21 Jul 2026 at 09:22.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 14:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 11:03.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug 2026 and 2 Aug 2027
Details
View Map
Share
Follow
Avenue Road

Transport for London (TfL) are proposing to carry out roadworks on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 August 2026 and could run through until 2 August 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 10:37.

LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Marsh Road

London Borough Of Harrow are carrying out Highway improvement works on Marsh Road, Pinner.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 14:45.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, Wealdstone.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 14:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:00.

G2 Energy IDNO logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Wrottesley Road

G2 Energy IDNO are carrying out New service connection on Wrottesley Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 08:00 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Sep 2026 at 13:19.

Affinity Water logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Kenton Road

Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 10:22 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 07:53.

Affinity Water logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Kenton Road

Affinity Water are carrying out Utility asset works on Kenton Road, Kenton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 10:22 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 09:33.

Affinity Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Willowcourt Avenue

Affinity Water are carrying out Utility asset works on Willowcourt Avenue, Kenton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2026 at 10:22 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Aug and 24 Sep 2026
Details
View Map
Share
Wood Lane

London Borough Of Hammersmith & Fulham were proposing to carry out Highway improvement works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 August 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 21 Aug 2026 at 16:20.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 19 May 2026 at 09:43.

Electricity Network Company logo
LONG TERM
Until
23 Sep 2026
Details
View Map
Share
Follow
Beresford Avenue

Electricity Network Company are carrying out Utility asset works on Beresford Avenue, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 08:30 and could run through until 23 September 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Aug 2026 at 22:17.

Affinity Water logo
LONG TERM
Between
10 Aug 2026 and 4 Feb 2027
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2026 and could run through until 4 February 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:28.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 09:15 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 18 Aug 2026 at 08:36.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wymering Road

City Of Westminster are proposing to carry out Highway improvement works on Wymering Road, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2026 and could run through until 16 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 10 Aug 2026 at 18:29.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are carrying out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2026 at 08:07 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 09:55.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 August 2026 and run through until 18 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 10:15.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:16.

London Borough Of Hounslow logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Whitestile Road

London Borough Of Hounslow are carrying out Highway improvement works on Whitestile Road, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 09:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 24 Aug 2026 at 13:12.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Raymond Avenue

Cadent Gas are carrying out Utility asset works on Raymond Avenue, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 17:38 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 11:12.

Cadent Gas logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Aldbourne Road

Cadent Gas are carrying out Utility asset works on Aldbourne Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:59 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 15:28.

Cadent Gas logo
LONG TERM
Until
26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are carrying out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 09:01 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 09:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Baldwyn Gardens

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Baldwyn Gardens, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2026 at 09:20 and could run through until 17 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2026 at 09:40.

LONG TERM
Until
27 Oct 2026
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are carrying out Highway improvement works on Pinner Road, North Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 27 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 17 Aug 2026 at 08:40.

LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Camrose Avenue

London Borough Of Harrow are carrying out Highway improvement works on Camrose Avenue, Edgware.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 08:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2026 at 11:47.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 07:30 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:35.

Affinity Water logo
LONG TERM
Until
29 Sep 2026
Details
View Map
Share
Follow
Twyford Abbey Road

Affinity Water are carrying out Utility asset works on Twyford Abbey Road, Park Royal.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 14:00 and could run through until 29 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Aug 2026 at 08:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
15 Oct 2026
Details
View Map
Share
Follow
Farndale Crescent

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Farndale Crescent, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 11:00 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 11:57.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Caple Road

Thames Water are carrying out Utility asset works on Caple Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 10:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 08:30.

G2 Energy IDNO logo
LONG TERM
Between
25 Aug and 14 Dec 2026
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 12 Aug 2026 at 14:28.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 16:15.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
26 Aug and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Sep 2026 at 10:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Sep 2026
Details
View Map
Share
Follow
Circus Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 09:00 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2026 at 10:43.

London Borough Of Hounslow logo
LONG TERM
Between
28 Aug 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Clifton Gardens (South)

London Borough Of Hounslow are proposing to carry out Highway improvement works on Clifton Gardens (South), Chiswick, London.

These works are categorised as Major.

The works will start on or after 28 August 2026 and could run through until 29 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 31 Jul 2026 at 08:15.

Affinity Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
Greenford Avenue

Affinity Water are carrying out Utility asset works on Greenford Avenue, Southall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 11:44 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Aug 2026 at 13:12.

Affinity Water logo
LONG TERM
Between
28 Aug and 30 Sep 2026
Details
View Map
Share
Iveagh Avenue

Affinity Water were proposing to carry out Utility asset works on Iveagh Avenue, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2026 and run through until 30 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 09:39.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Hill Close

Affinity Water are carrying out Utility repair and maintenance works on Hill Close, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 11:32 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 15:13.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Grange Gardens

Cadent Gas are carrying out Utility asset works on Grange Gardens, Pinner.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2026 at 17:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 10:35.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
31 Aug and 5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2026 at 12:11.

Transport for London (TfL) logo
LONG TERM
Until
5 Dec 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 21:00 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2026 at 08:13.

Affinity Water logo
LONG TERM
Between
31 Aug and 16 Nov 2026
Details
View Map
Share
Twyford Abbey Road

Affinity Water were proposing to carry out Utility asset works on Twyford Abbey Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 August 2026 and run through until 16 November 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Aug 2026 at 15:47.

Thames Water logo
LONG TERM
Until
24 Nov 2026
Details
View Map
Share
Follow
Strode Road

Thames Water are carrying out roadworks on Strode Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:58.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Bertie Road

Thames Water are carrying out roadworks on Bertie Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:57.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Belton Road

Thames Water are carrying out Utility asset works on Belton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 08:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 08:56.

Thames Water logo
LONG TERM
Until
29 Nov 2026
Details
View Map
Share
Follow
Meadway

Thames Water are carrying out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 11:30 and could run through until 29 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:22.

London Borough Of Barnet logo
LONG TERM
Between
31 Aug 2026 and 17 Dec 2027
Details
View Map
Share
Follow
Barnfield Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnfield Road, Edgware.

These works are categorised as Major.

The works will start on or after 31 August 2026 and could run through until 17 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 17 Aug 2026 at 13:25.

Cadent Gas logo
Until
23 Sep 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are carrying out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 08:05 and could run through until 23 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 08:20.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Grosvenor Road

Cadent Gas are carrying out Utility repair and maintenance works on Grosvenor Road, Hanwell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:55 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Broadway

Cadent Gas are carrying out Utility repair and maintenance works on Broadway, West Ealing.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:58 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:43.

G2 Energy IDNO logo
LONG TERM
Until
17 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are carrying out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:30 and could run through until 17 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 14 Sep 2026 at 12:55.

Cadent Gas logo
Between
1 and 28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are proposing to carry out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Brunner Road

Cadent Gas are carrying out Utility asset works on Brunner Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 15:00.

Thames Water logo
LONG TERM
Until
13 Oct 2026
Details
View Map
Share
Follow
Cecil Road

Thames Water are carrying out Utility asset works on Cecil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:00 and could run through until 13 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2026 at 12:57.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Slip Road From Kensington Road To Western Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Slip Road From Kensington Road To Western Avenue, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2026 and run through until 18 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 08:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Islip Manor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Islip Manor Road, Northolt.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 5 Jun 2026 at 11:04.

Thames Water logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
The Mount Square

Thames Water are carrying out Utility asset works on The Mount Square, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:28.

London Borough Of Barnet logo
LONG TERM
Between
1 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Grahame Park Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Grahame Park Way, Grahame Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Aug 2026 at 15:02.

G2 Energy IDNO logo
Between
2 and 27 Sep 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 1 Sep 2026 at 12:14.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are carrying out Utility repair and maintenance works on Kilburn Lane, North Kensington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 10:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 15:06.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Sudbury Hill Close

Affinity Water are proposing to carry out Utility asset works on Sudbury Hill Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Jun 2026 at 11:26.

G2 Energy IDNO logo
LONG TERM
Between
3 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2026 and could run through until 5 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 11:40.

London Borough Of Ealing logo
LONG TERM
Until
3 Oct 2026
Details
View Map
Share
Follow
Footpath From 444-500 Church Road

London Borough Of Ealing are carrying out Highway improvement works on Footpath From 444-500 Church Road, Northolt.

The works started on 3 September 2026 at 00:00 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 4 Sep 2026 at 09:20.

Affinity Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Upton Gardens

Affinity Water are carrying out Utility asset works on Upton Gardens, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Sep 2026 at 14:11.

Affinity Water logo
Finishing
Sunday
Details
View Map
Share
Willowcourt Avenue

Affinity Water were proposing to carry out Utility asset works on Willowcourt Avenue, Kenton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2026 and run through until 20 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 12:09.

Affinity Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Sedgecombe Avenue

Affinity Water are carrying out Utility asset works on Sedgecombe Avenue, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2026 at 13:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:40.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Walk

ESP Electricity are carrying out Utility asset works on Aubrey Walk, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:16.

ESP Electricity logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Aubrey Road

ESP Electricity are carrying out Utility asset works on Aubrey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:10 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 7 Sep 2026 at 11:15.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:54.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 18 Oct 2026
Details
View Map
Share
Follow
Coldershaw Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Coldershaw Road, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 14:55.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Aycliffe Road

Cadent Gas are carrying out Utility asset works on Aycliffe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:23 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:22.

London Borough Of Ealing logo
LONG TERM
Between
7 Sep and 29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are proposing to carry out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 14:47.

London Borough Of Ealing logo
LONG TERM
Until
29 Nov 2026
Details
View Map
Share
Follow
Leeland Terrace

London Borough Of Ealing are carrying out Highway improvement works on Leeland Terrace, West Ealing.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Sep 2026 at 16:48.

Affinity Water logo
Until
24 Sep 2026
Details
View Map
Share
Follow
South Road

Affinity Water are carrying out Utility asset works on South Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 18:00 and could run through until 24 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 07:07.

Affinity Water logo
Until
30 Sep 2026
Details
View Map
Share
Follow
Greenford Avenue

Affinity Water are carrying out Utility asset works on Greenford Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 18:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 07:06.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Hanger Lane

Cadent Gas are carrying out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 15:21.

Cadent Gas logo
LONG TERM
Until
22 Nov 2026
Details
View Map
Share
Follow
Creffield Road

Cadent Gas are carrying out Utility asset works on Creffield Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:50 and could run through until 22 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 15:33.

Scottish Hydro Electric Power Dis logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 13:32.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 10:30.

Cadent Gas logo
Until
29 Sep 2026
Details
View Map
Share
Follow
Park Road

Cadent Gas are carrying out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 14:58 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 15:32.

Cadent Gas logo
LONG TERM
Between
7 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Carlyle Avenue

Cadent Gas are proposing to carry out Utility asset works on Carlyle Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 15:36.

Cadent Gas logo
Between
7 and 25 Sep 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 13:24.

Cadent Gas logo
LONG TERM
Between
7 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Castlebar Hill

Cadent Gas are proposing to carry out Utility asset works on Castlebar Hill, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 16:31.

Cadent Gas logo
LONG TERM
Until
22 Oct 2026
Details
View Map
Share
Follow
Hillcrest Road

Cadent Gas are carrying out Utility asset works on Hillcrest Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 10:11 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:00.

Thames Water logo
LONG TERM
Until
9 Nov 2026
Details
View Map
Share
Follow
Third Avenue

Thames Water are carrying out Utility asset works on Third Avenue, Queen's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:07.

London Borough Of Ealing logo
Until
30 Sep 2026
Details
View Map
Share
Follow
Marnham Crescent

London Borough Of Ealing are carrying out Remedial works on Marnham Crescent, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 00:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 8 Sep 2026 at 09:44.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Dean Road

Thames Water are carrying out Utility asset works on Dean Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 13:28.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Park Avenue

Thames Water are carrying out Utility asset works on Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 08:50.

Cadent Gas logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Cavendish Avenue

Cadent Gas are carrying out Utility asset works on Cavendish Avenue, Sudbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:46 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:06.

Cadent Gas logo
Between
7 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Wood End Road

Cadent Gas are proposing to carry out Utility asset works on Wood End Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 15:52.

Cadent Gas logo
Until
4 Oct 2026
Details
View Map
Share
Follow
Wood End Road

Cadent Gas are carrying out Utility asset works on Wood End Road, Sudbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 12:56 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:21.

Cadent Gas logo
LONG TERM
Until
28 Oct 2026
Details
View Map
Share
Follow
Cavendish Avenue

Cadent Gas are carrying out Utility asset works on Cavendish Avenue, Sudbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 14:04 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:14.

Thames Water logo
Until
5 Oct 2026
Details
View Map
Share
Follow
The Mount

Thames Water are carrying out Utility asset works on The Mount, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 09:28.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Kilburn Lane

Cadent Gas are carrying out Utility repair and maintenance works on Kilburn Lane, Queen's Park, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 10:07 and could run through until 16 September 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 12:53.

G2 Energy IDNO logo
LONG TERM
Between
8 Sep and 2 Nov 2026
Details
View Map
Share
Wrottesley Road

G2 Energy IDNO were proposing to carry out New service connection on Wrottesley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 21:03.

London Borough Of Brent logo
Between
8 and 25 Sep 2026
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out New service connection on High Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Sep 2026 at 15:45.

Eunetworks logo
Finishing
Today
Details
View Map
Share
Follow
Park Avenue

Eunetworks are carrying out Utility repair and maintenance works on Park Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 09:30 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2026 at 14:27.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are carrying out Utility repair and maintenance works on Dudden Hill Lane, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2026 at 10:55 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:28.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Marys Road

Thames Water are carrying out Utility repair and maintenance works on St Marys Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 21:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 08:44.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Park Place

Thames Water are carrying out Utility repair and maintenance works on Park Place, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:29 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 12:50.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
23 Oct 2026
Details
View Map
Share
Follow
Ravenor Park Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Ravenor Park Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:40 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 08:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Station Crescent

Cadent Gas are carrying out Utility repair and maintenance works on Station Crescent, Wembley.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 11:33 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:54.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Spencer Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:59 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 10:41.

G2 Energy IDNO logo
Between
11 Sep and 6 Oct 2026
Details
View Map
Share
Knatchbull Road

G2 Energy IDNO were proposing to carry out New service connection on Knatchbull Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 6 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

G2 Energy IDNO logo
Between
11 Sep and 1 Oct 2026
Details
View Map
Share
Craven Park

G2 Energy IDNO were proposing to carry out New service connection on Craven Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2026 and run through until 1 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:51.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Kingsmead Avenue

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Kingsmead Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 08:13 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 09:25.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Deansbrook Road

Cadent Gas are carrying out Utility repair and maintenance works on Deansbrook Road, Burnt Oak Broadway To Deans Lane, Edgware.

The works started on 11 September 2026 at 19:42 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 07:46.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bond Street

Thames Water are carrying out Utility repair and maintenance works on Bond Street, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 13:03 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 14:22.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sturgess Avenue

Thames Water are carrying out Utility repair and maintenance works on Sturgess Avenue, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2026 at 11:11 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:00.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kingdon Road

Thames Water are carrying out Utility repair and maintenance works on Kingdon Road, West Hampstead, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 15:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2026 at 15:42.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Park Drive

Thames Water are carrying out Utility repair and maintenance works on Park Drive, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2026 at 09:58 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:08.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Weston Road

Thames Water are carrying out Statutory Infrastructure Works on Weston Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Kingswood Road

Thames Water are carrying out Statutory Infrastructure Works on Kingswood Road, Chiswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:25.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2026 at 12:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Grafton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Grafton Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:42 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 12:49.

Scottish Hydro Electric Power Dis logo
Between
14 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
Until
3 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 15:00 and could run through until 3 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 15:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 09:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 12:40.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randolph Avenue

Thames Water are carrying out Utility repair and maintenance works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 08:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Sep and 30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
North Acton Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:21 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Sep 2026 at 09:55.

London Borough Of Ealing logo
LONG TERM
Between
14 Sep and 11 Dec 2026
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Remedial works on Ruislip Road, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2026 at 09:43.

Thames Water logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility asset works on High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 14:30 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 15:59.

London Borough Of Brent logo
LONG TERM
Between
14 Sep 2026 and 28 Feb 2027
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Mar 2026 at 23:42.

London Borough Of Brent logo
LONG TERM
Between
14 Sep and 19 Dec 2026
Details
View Map
Share
Follow
Station Approach

London Borough Of Brent are proposing to carry out Highway improvement works on Station Approach, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 19 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 14 Jul 2026 at 12:50.

Cadent Gas logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Wood End Road

Cadent Gas are proposing to carry out Utility asset works on Wood End Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 11:19.

London Borough Of Barnet logo
Between
14 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2026 at 15:33.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
South Square

London Borough Of Barnet are proposing to carry out Highway improvement works on South Square, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2026 at 14:47.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
South Square

London Borough Of Barnet are proposing to carry out Highway improvement works on South Square, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2026 at 14:04.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
South Square

London Borough Of Barnet are carrying out Highway improvement works on South Square, Golders Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:43 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 08:43.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kenton Gardens

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Kenton Gardens, Kenton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:15 and could run through until 22 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 11:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Ranelagh Road

Thames Water are carrying out Utility repair and maintenance works on Ranelagh Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:35 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 14:24.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Court Way

Thames Water are carrying out Utility repair and maintenance works on Court Way, Acton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:49 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 09:21.

G2 Energy IDNO logo
LONG TERM
Between
15 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Sep 2026 at 08:43.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Okehampton Road

Thames Water are carrying out Utility repair and maintenance works on Okehampton Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:15 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 10:20.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hanover Road

Thames Water are carrying out roadworks on Hanover Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:15 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 15:21.

G2 Energy IDNO logo
LONG TERM
Between
15 Sep 2026 and 6 Oct 2029
Details
View Map
Share
Emerald Road

G2 Energy IDNO were proposing to carry out New service connection on Emerald Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 6 October 2029. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Grange Road

Thames Water are carrying out Utility repair and maintenance works on Grange Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 07:33 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:19.

UK Power Networks Eastern & London logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Farm Avenue

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Farm Avenue, Rayners Lane.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:46 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2026 at 10:49.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Arden Road

Affinity Water are carrying out Utility repair and maintenance works on Arden Road, Finchley, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:29 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 11:21.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Love Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Love Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Love Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Love Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 09:30.

Affinity Water logo
Between
18 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Sudbury Croft

Affinity Water are proposing to carry out Utility asset works on Sudbury Croft, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Aug 2026 at 14:52.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 15:36.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Sep 2026 at 10:58.

London Borough Of Brent logo
LONG TERM
Between
19 Sep and 20 Oct 2026
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out roadworks on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Aug 2026 at 14:54.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Page Street

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Page Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2026 and run through until 22 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:26.

UK Power Networks Eastern & London logo
Between
19 and 29 Sep 2026
Details
View Map
Share
Follow
Watford Way Service Road To Numbers 418-432

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way Service Road To Numbers 418-432, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 12:49.

Eunetworks logo
Between
20 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Ladbroke Grove

Eunetworks are proposing to carry out Utility asset works on Ladbroke Grove, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 19 Aug 2026 at 10:46.

London Borough Of Ealing logo
Finishing
Tuesday
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 Aug 2026 at 07:03.

London Borough Of Barnet logo
Between
20 and 28 Sep 2026
Details
View Map
Share
Follow
Burnt Oak Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 08:50.

London Borough Of Hounslow logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Windmill Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Windmill Road, Brentford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2026 at 11:43.

London Borough Of Hammersmith & Fulham logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:02.

Cadent Gas logo
Between
21 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Wellmeadow Road

Cadent Gas are proposing to carry out Utility asset works on Wellmeadow Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:18.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:52.

London Borough Of Ealing logo
Between
21 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Southfield Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Southfield Road, Chiswick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 10 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 16:29.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Jul 2026 at 15:24.

BT logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Lime Grove

BT are proposing to carry out Utility asset works on Lime Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Sep 2026 at 20:23.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
21 Sep and 29 Dec 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 29 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Cadent Gas logo
Between
21 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Woodville Gardens

Cadent Gas are proposing to carry out Utility asset works on Woodville Gardens, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:01.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
LONG TERM
Between
21 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Park Hill

Cadent Gas are proposing to carry out Utility asset works on Park Hill, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 12:51.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:32.

Thames Water logo
LONG TERM
Between
21 Sep and 2 Nov 2026
Details
View Map
Share
Follow
Bramshill Road

Thames Water are proposing to carry out Utility asset works on Bramshill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 14:27.

London Borough Of Ealing logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Greenford Roundabout

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2026 at 17:29.

London Borough Of Ealing logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Greenford Roundabout

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 21:12.

Thames Water logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Baker Road

Thames Water are proposing to carry out Utility asset works on Baker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 13:22.

Cadent Gas logo
LONG TERM
Between
21 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Willesden Lane

Cadent Gas are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2026 at 15:33.

Cadent Gas logo
LONG TERM
Between
21 Sep and 30 Nov 2026
Details
View Map
Share
Follow
Willesden Lane

Cadent Gas are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 08:53.

Affinity Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Dabbs Hill Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Dabbs Hill Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 10:52.

Affinity Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Dabbs Hill Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Dabbs Hill Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Sep 2026 at 12:07.

Thames Water logo
LONG TERM
Between
21 Sep 2026 and 4 Jan 2027
Details
View Map
Share
Follow
Verney Street

Thames Water are proposing to carry out Utility asset works on Verney Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 4 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 08:15.

Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out roadworks on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:33.

Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Malvern Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Malvern Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:43.

Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Malvern Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Malvern Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:38.

Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Alexandra Avenue

London Borough Of Harrow are proposing to carry out roadworks on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:34.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2026 at 15:11.

Transport for London (TfL) logo
Between
21 and 24 Sep 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Sep 2026 at 11:58.

Cadent Gas logo
Between
21 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Turner Road

Cadent Gas are proposing to carry out Utility asset works on Turner Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 16:38.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Risingholme Road

Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Aug 2026 at 16:10.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Risingholme Road

Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 09:32.

Thames Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Risingholme Road

Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 09:40.

Cadent Gas logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Watford Way Service Road To Numbers 418-432

Cadent Gas are proposing to carry out New service connection on Watford Way Service Road To Numbers 418-432, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 08:58.

Cadent Gas logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Watford Way Service Road To Numbers 418-432

Cadent Gas are proposing to carry out New service connection on Watford Way Service Road To Numbers 418-432, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 14:45.

Between
21 and 24 Sep 2026
Details
View Map
Share
Whitchurch Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Whitchurch Lane, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 07:58.

Affinity Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Marsh Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Marsh Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2026 at 12:29.

Affinity Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Marsh Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Marsh Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Sep 2026 at 09:38.

Thames Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Standish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Standish Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2026 at 15:05.

Cadent Gas logo
Between
22 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Drayton Bridge Road

Cadent Gas are proposing to carry out Utility asset works on Drayton Bridge Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 11:16.

Scottish Hydro Electric Power Dis logo
Between
22 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Stanhope Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Stanhope Park Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 May 2026 at 18:35.

Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Whitmore Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Whitmore Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:41.

Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Drury Road

London Borough Of Harrow are proposing to carry out roadworks on Drury Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:42.

Affinity Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Kenton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kenton Road, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Jul 2026 at 10:36.

Affinity Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Kenton Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Kenton Road, Kenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 10:35.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Church Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Church Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:36.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Church Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Church Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:42.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Suffolk Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Suffolk Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:32.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Suffolk Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Suffolk Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:40.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Whittington Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Whittington Way, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:32.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Whittington Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Whittington Way, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:40.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 10:57.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 13:50.

Between
23 and 26 Sep 2026
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 16:27.

Scottish Hydro Electric Power Dis logo
Between
24 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Haven Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Haven Green, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 17 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 14:27.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Jul 2026 at 10:00.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Drive

BT are proposing to carry out Utility asset works on Long Drive, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Sep 2026 at 12:51.

G2 Energy IDNO logo
LONG TERM
Between
24 Sep and 29 Oct 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Aug 2026 at 14:18.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Aug 2026 at 09:26.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 12:12.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Hendon Way Off Slip North Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 16:31.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Spalding Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Spalding Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:04.

Vodafone logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Preston Road

Vodafone are proposing to carry out Utility asset works on Preston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 10 Sep 2026 at 08:21.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:12.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 12:14.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Road, West Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:40.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Elliot Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Elliot Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:40.

Transport for London (TfL) logo
Between
24 and 26 Sep 2026
Details
View Map
Share
Follow
Graham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Graham Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 12:29.

Vodafone logo
Between
25 and 29 Sep 2026
Details
View Map
Share
Follow
Preston Road

Vodafone are proposing to carry out Utility asset works on Preston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 5 Aug 2026 at 13:53.

Transport for London (TfL) logo
Between
25 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:18.

Transport for London (TfL) logo
Between
25 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:18.

UK Power Networks Eastern & London logo
Between
25 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Chandos Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chandos Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2026 at 11:34.

UK Power Networks Eastern & London logo
Between
26 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Watford Way

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way, Mill Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 13 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2026 at 12:55.

UK Power Networks Eastern & London logo
Between
26 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Watford Way

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Watford Way, Mill Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 13 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 09:50.

London Borough Of Barnet logo
LONG TERM
Between
26 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Gibbs Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 11:21.

London Borough Of Barnet logo
Between
26 Sep and 24 Oct 2026
Details
View Map
Share
Follow
Gibbs Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2026 at 11:17.

London Borough Of Barnet logo
LONG TERM
Between
26 Sep and 10 Nov 2026
Details
View Map
Share
Follow
Selvage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 08:57.

London Borough Of Barnet logo
LONG TERM
Between
26 Sep and 10 Nov 2026
Details
View Map
Share
Follow
Selvage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 10:59.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Windmill Road

Cadent Gas were proposing to carry out Utility asset works on Windmill Road, Brentford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 7 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:23.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Windmill Road

Cadent Gas are proposing to carry out Utility asset works on Windmill Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 07:50.

Cadent Gas logo
Between
28 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 09:07.

Thames Water logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Rothschild Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rothschild Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2026 at 14:53.

Thames Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
St Marks Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Marks Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 10:08.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
St Leonards Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on St Leonards Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jul 2026 at 09:24.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2026 at 15:05.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
The Croft

Cadent Gas are proposing to carry out Utility asset works on The Croft, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 00:15.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Helena Road

Cadent Gas are proposing to carry out Utility asset works on Helena Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 12:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Sep and 13 Nov 2026
Details
View Map
Share
Alliance Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Alliance Road, Acton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 13 November 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Aug 2026 at 14:17.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Sep 2026 at 13:59.

Scottish Hydro Electric Power Dis logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 13:51.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Sep and 12 Nov 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jun 2026 at 17:11.

Thames Water logo
Between
28 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Buckingham Road

Thames Water are proposing to carry out Utility asset works on Buckingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2026 at 13:45.

HS2 logo
LONG TERM
Between
28 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 20 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 24 Aug 2026 at 13:17.

HS2 logo
LONG TERM
Between
28 Sep and 20 Dec 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 20 December 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 24 Aug 2026 at 13:21.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2026 at 11:47.

UK Power Networks Eastern & London logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Newton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Newton Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 11:56.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Drury Way

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Drury Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Aug 2026 at 14:16.

Cadent Gas logo
LONG TERM
Between
28 Sep and 30 Oct 2026
Details
View Map
Share
Follow
South Vale

Cadent Gas are proposing to carry out Utility asset works on South Vale, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 11:16.

Thames Water logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
North End Avenue

Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:20.

Thames Water logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
North End Avenue

Thames Water were proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 19 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 11:52.

Thames Water logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
North End Avenue

Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2026 at 18:25.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Brentfield Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Brentfield Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:02.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Hendon Way On Slip Southbound From Brentfield Gardens Junction With Woodville Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way On Slip Southbound From Brentfield Gardens Junction With Woodville Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2026 at 09:26.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Woodville Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Woodville Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:09.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Highfield Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Highfield Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 14:09.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:20.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:19.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Haley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Haley Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:53.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Renters Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:53.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Denehurst Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Denehurst Gardens, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:45.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Beaufort Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Beaufort Gardens, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:37.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2026 at 13:30.

Transport for London (TfL) logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 15:19.

Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
The Broadway

London Borough Of Harrow are proposing to carry out Highway improvement works on The Broadway, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 13:37.

Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Marsh Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 14:14.

Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
London Road

London Borough Of Harrow are proposing to carry out Highway improvement works on London Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 13:53.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:33.

National Highways logo
Between
29 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Aug 2026 at 08:21.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:40.

National Highways logo
Between
29 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:57.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jul 2026 at 11:01.

BT logo
Between
29 Sep and 1 Oct 2026
Details
View Map
Share
Follow
Carlisle Avenue

BT are proposing to carry out Utility asset works on Carlisle Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Sep 2026 at 11:42.

Transport for London (TfL) logo
Between
29 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Ruislip Road

Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:52.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 11 Nov 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:36.

Transport for London (TfL) logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:33.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2026 at 09:34.

Thames Water logo
Between
30 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Redan Street

Thames Water are proposing to carry out New service connection on Redan Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 16:09.

G2 Energy IDNO logo
LONG TERM
Between
30 Sep and 11 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 17:32.

G2 Energy IDNO logo
LONG TERM
Between
1 Oct and 4 Nov 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 30 Jul 2026 at 15:49.

London Borough Of Ealing logo
Between
1 and 23 Oct 2026
Details
View Map
Share
Follow
Ferrymead Avenue

London Borough Of Ealing are proposing to carry out Remedial works on Ferrymead Avenue, Greenford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 3 Aug 2026 at 15:49.

Transport for London (TfL) logo
Between
1 and 3 Oct 2026
Details
View Map
Share
Follow
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:49.

Transport for London (TfL) logo
Between
1 and 29 Oct 2026
Details
View Map
Share
Follow
Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:37.

Transport for London (TfL) logo
Between
1 and 29 Oct 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:34.

Transport for London (TfL) logo
Between
1 and 3 Oct 2026
Details
View Map
Share
Follow
Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:48.

Transport for London (TfL) logo
Between
1 and 3 Oct 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2026 at 11:44.

London Borough Of Barnet logo
Between
1 and 6 Oct 2026
Details
View Map
Share
Follow
Purcells Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Purcells Avenue, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2026 at 15:27.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:41.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:29.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:39.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:40.

Transport for London (TfL) logo
Between
2 and 19 Oct 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 11:28.

London Borough Of Hammersmith & Fulham logo
Between
5 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 8 Sep 2026 at 12:07.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Beauclerc Road

BT are proposing to carry out Utility asset works on Beauclerc Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Jul 2026 at 12:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Goldhawk Road

Thames Water are proposing to carry out Utility repair and maintenance works on Goldhawk Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:03.

Thames Water logo
Between
5 and 24 Oct 2026
Details
View Map
Share
Follow
Pennard Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pennard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 16:07.

Cadent Gas logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
Wormholt Road

Cadent Gas are proposing to carry out Utility asset works on Wormholt Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2026 at 11:14.

Cadent Gas logo
LONG TERM
Between
5 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2026 at 13:40.

London Borough Of Hammersmith & Fulham logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 14 Sep 2026 at 11:42.

Cadent Gas logo
LONG TERM
Between
5 Oct and 18 Dec 2026
Details
View Map
Share
Follow
Mount Park Road

Cadent Gas are proposing to carry out Utility asset works on Mount Park Road, Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Portal Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Portal Way, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Wales Farm Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Victoria Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Sep 2026 at 09:34.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 12 Dec 2026
Details
View Map
Share
Follow
Harrow Road

G2 Energy IDNO are proposing to carry out New service connection on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 15 Sep 2026 at 12:07.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct 2026 and 23 Jan 2027
Details
View Map
Share
Follow
Sutherland Avenue

G2 Energy IDNO are proposing to carry out New service connection on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:20.

Cadent Gas logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Woodfield Crescent

Cadent Gas are proposing to carry out Utility asset works on Woodfield Crescent, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 13:46.

G2 Energy IDNO logo
LONG TERM
Between
5 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Hamilton Terrace

G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 21:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Wellington Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 13:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2026 at 13:47.

Cadent Gas logo
LONG TERM
Between
5 Oct and 15 Nov 2026
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 13:15.

Thames Water logo
LONG TERM
Between
5 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Bruce Road

Thames Water are proposing to carry out Utility asset works on Bruce Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2026 at 07:38.

Cadent Gas logo
LONG TERM
Between
5 Oct and 13 Dec 2026
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 14:30.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Eastcote Lane

Cadent Gas are proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 11:24.

Cadent Gas logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Islip Manor Road

Cadent Gas are proposing to carry out Utility asset works on Islip Manor Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 11:03.

UK Power Networks Eastern & London logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Hillside Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Hillside Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2026 at 15:39.

Thames Water logo
Between
5 and 26 Oct 2026
Details
View Map
Share
Follow
North End Avenue

Thames Water are proposing to carry out Utility asset works on North End Avenue, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 21:02.

London Borough Of Barnet logo
LONG TERM
Between
5 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2026 at 15:12.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Queensbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Queensbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2026 at 08:06.

Thames Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Queensbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Queensbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 12:44.

Affinity Water logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Roxborough Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Jun 2026 at 09:16.

London Borough Of Hillingdon logo
LONG TERM
Between
5 Oct and 11 Nov 2026
Details
View Map
Share
Follow
North View

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North View, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 14 Sep 2026 at 09:07.

Cadent Gas logo
Between
5 and 19 Oct 2026
Details
View Map
Share
Follow
Shaldon Road

Cadent Gas are proposing to carry out Utility asset works on Shaldon Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 14:57.

Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Wolverton Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Wolverton Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jun 2026 at 12:13.

Cadent Gas logo
Between
5 and 25 Oct 2026
Details
View Map
Share
Follow
Grange Hill

Cadent Gas are proposing to carry out Utility asset works on Grange Hill, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:04.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Cambridge Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cambridge Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 12:00.

London Borough Of Hounslow logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Oxford Road South

London Borough Of Hounslow are proposing to carry out Highway improvement works on Oxford Road South, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Sep 2026 at 09:57.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 09:47.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 Oct 2026
Details
View Map
Share
Follow
Heathfield Terrace

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Heathfield Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2026 at 15:19.

London Borough Of Barnet logo
Between
6 and 10 Oct 2026
Details
View Map
Share
Follow
Dunstan Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dunstan Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2026 at 15:12.

London Borough Of Barnet logo
On
6 Oct 2026
Details
View Map
Share
Follow
Gibbs Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 October 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2026 at 14:42.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 08:47.

National Highways logo
Between
7 and 15 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2026 at 14:58.

Eunetworks logo
Between
7 and 11 Oct 2026
Details
View Map
Share
Follow
Cambridge Gardens

Eunetworks are proposing to carry out Utility asset works on Cambridge Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 19 Aug 2026 at 10:49.

G2 Energy IDNO logo
LONG TERM
Between
7 Oct and 24 Nov 2026
Details
View Map
Share
Winchelsea Road

G2 Energy IDNO were proposing to carry out New service connection on Winchelsea Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:52.

Thames Water logo
Between
7 and 20 Oct 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2026 at 15:05.

Thames Water logo
Between
7 and 9 Oct 2026
Details
View Map
Share
Follow
Eastside Road

Thames Water are proposing to carry out Utility repair and maintenance works on Eastside Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 15:30.

Thames Water logo
Between
7 and 9 Oct 2026
Details
View Map
Share
Follow
Eastside Road

Thames Water are proposing to carry out Utility repair and maintenance works on Eastside Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:56.

London Borough Of Ealing logo
LONG TERM
Between
8 Oct 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Drayton Green Road

London Borough Of Ealing are proposing to carry out Remedial works on Drayton Green Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 5 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 7 Aug 2026 at 09:19.

London Borough Of Barnet logo
On
8 Oct 2026
Details
View Map
Share
Follow
Quakers Course

London Borough Of Barnet are proposing to carry out Highway improvement works on Quakers Course, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 October 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2026 at 10:11.

Affinity Water logo
Between
9 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Priory Avenue

Affinity Water are proposing to carry out Utility asset works on Priory Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:50.

Affinity Water logo
Between
9 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Priory Gardens

Affinity Water are proposing to carry out Utility asset works on Priory Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.

London Borough Of Barnet logo
On
9 Oct 2026
Details
View Map
Share
Follow
Fairview Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairview Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 9 October 2026 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2026 at 10:42.

Scottish Hydro Electric Power Dis logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 14 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 12:55.

Scottish Hydro Electric Power Dis logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Chiswick High Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Chiswick High Road, Chiswick, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Sep 2026 at 12:35.

London Borough Of Hammersmith & Fulham logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:59.

Thames Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Sinclair Gardens

Thames Water are proposing to carry out Remedial works on Sinclair Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 09:12.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Galloway Road

Cadent Gas are proposing to carry out Utility asset works on Galloway Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 16:06.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Freeland Road

Cadent Gas are proposing to carry out Utility asset works on Freeland Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2026 at 11:36.

Cadent Gas logo
Between
12 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Castlebar Road

Cadent Gas are proposing to carry out Utility asset works on Castlebar Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2026 at 11:49.

Thames Water logo
Between
12 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Droop Street

Thames Water are proposing to carry out Utility asset works on Droop Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:21.

Affinity Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Towers Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Towers Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Feb 2026 at 07:01.

London Borough Of Ealing logo
Between
12 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Tangmere Gardens

London Borough Of Ealing are proposing to carry out Highway improvement works on Tangmere Gardens, Northolt.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 15:18.

Thames Water logo
LONG TERM
Between
12 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Northcote Road

Thames Water are proposing to carry out Utility asset works on Northcote Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 May 2026 at 09:09.

Cadent Gas logo
LONG TERM
Between
12 Oct and 18 Dec 2026
Details
View Map
Share
Follow
Woodcock Hill

Cadent Gas are proposing to carry out Utility asset works on Woodcock Hill, Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 08:24.

Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Spencer Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jun 2026 at 11:33.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Dale Avenue

Cadent Gas are proposing to carry out Utility asset works on Dale Avenue, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 15:59.

Thames Water logo
Between
12 and 15 Oct 2026
Details
View Map
Share
Follow
Longcrofte Road

Thames Water are proposing to carry out Utility repair and maintenance works on Longcrofte Road, Canons Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:16.

Thames Water logo
Between
13 and 15 Oct 2026
Details
View Map
Share
Follow
Tunis Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tunis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 15 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2026 at 15:35.

Transport for London (TfL) logo
Between
13 and 16 Oct 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:38.

London Borough Of Barnet logo
Between
13 Oct and 10 Nov 2026
Details
View Map
Share
Follow
Gibbs Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 09:12.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Cheviot Gardens

BT are proposing to carry out Utility asset works on Cheviot Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Jul 2026 at 10:28.

BT logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Cheviot Gardens

BT are proposing to carry out Utility asset works on Cheviot Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2026 at 14:02.

Between
14 and 17 Oct 2026
Details
View Map
Share
Follow
Marsh Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Road, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 10 Sep 2026 at 18:17.

Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Embry Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Embry Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:05.

Virgin Media logo
Between
15 and 17 Oct 2026
Details
View Map
Share
Follow
Brook Lane North

Virgin Media are proposing to carry out Utility asset works on Brook Lane North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Sep 2026 at 08:12.

Thames Water logo
Between
15 and 27 Oct 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jun 2026 at 09:14.

UK Power Networks Eastern & London logo
Between
15 and 23 Oct 2026
Details
View Map
Share
Follow
Lamorna Grove

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Lamorna Grove, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Aug 2026 at 16:03.

London Borough Of Ealing logo
Between
17 and 19 Oct 2026
Details
View Map
Share
Follow
Twyford Abbey Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 19 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 21 Aug 2026 at 10:34.

Scottish Hydro Electric Power Dis logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Grasmere Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Grasmere Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jul 2026 at 11:12.

Thames Water logo
Between
19 and 25 Oct 2026
Details
View Map
Share
Follow
Marchwood Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marchwood Crescent, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 25 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Aug 2026 at 11:06.

Thames Water logo
LONG TERM
Between
19 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Greenhill Park

Thames Water are proposing to carry out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 14:54.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Sneyd Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sneyd Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 15:43.

Thames Water logo
Between
19 and 22 Oct 2026
Details
View Map
Share
Follow
Sneyd Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sneyd Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2026 at 09:25.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Ashford Road

Thames Water were proposing to carry out New service connection on Ashford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2026 at 11:15.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Ashford Road

Thames Water were proposing to carry out New service connection on Ashford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:18.

Thames Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out New service connection on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2026 at 08:31.

Cadent Gas logo
Between
19 Oct and 8 Nov 2026
Details
View Map
Share
Follow
Rutherford Way

Cadent Gas are proposing to carry out Utility asset works on Rutherford Way, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 08:55.

Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Brookside Close

London Borough Of Harrow are proposing to carry out Highway improvement works on Brookside Close, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:06.

Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 18:00.

Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 17:56.

Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 17:41.

Cadent Gas logo
LONG TERM
Between
19 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 10:07.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Pinner Park Gardens

Cadent Gas are proposing to carry out Utility asset works on Pinner Park Gardens, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 10:12.

Cadent Gas logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Tenby Road

Cadent Gas are proposing to carry out Utility asset works on Tenby Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 12:30.

London Borough Of Barnet logo
Between
19 and 26 Oct 2026
Details
View Map
Share
Follow
Burnt Oak Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2026 at 09:20.

Eunetworks logo
Between
20 and 24 Oct 2026
Details
View Map
Share
Follow
Alliance Road

Eunetworks are proposing to carry out Utility asset works on Alliance Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 24 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 8 Sep 2026 at 15:03.

Thames Water logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Loveridge Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Loveridge Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Sep 2026 at 16:02.

Affinity Water logo
Between
21 and 23 Oct 2026
Details
View Map
Share
Follow
Booth Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Booth Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Apr 2026 at 12:23.

Between
21 and 23 Oct 2026
Details
View Map
Share
Follow
Silver Close

London Borough Of Harrow are proposing to carry out Highway improvement works on Silver Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:05.

Thames Water logo
Between
22 and 24 Oct 2026
Details
View Map
Share
Follow
Church Path

Thames Water are proposing to carry out Statutory Infrastructure Works on Church Path, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 12:20.

Transport for London (TfL) logo
Between
22 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Hendon Way Off Slip North Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2026 at 16:31.

Transport for London (TfL) logo
Between
22 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:30.

Transport for London (TfL) logo
Between
22 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:27.

Transport for London (TfL) logo
Between
23 and 26 Oct 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 13:19.

Transport for London (TfL) logo
Between
23 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2026 at 15:51.

Scottish Hydro Electric Power Dis logo
Between
23 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Thames Water logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 09:55.

London Borough Of Hammersmith & Fulham logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Hammersmith Grove

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Hammersmith Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Sep 2026 at 13:58.

London Borough Of Hammersmith & Fulham logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Shepherd's Bush Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 7 Sep 2026 at 13:03.

Network Rail logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Uxbridge Road

Network Rail were proposing to carry out Works for Rail Purposes on Uxbridge Road, Southall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 29 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 11:44.

Network Rail logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Uxbridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Uxbridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 13:33.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 20 Aug 2026 at 16:34.

London Borough Of Ealing logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
East Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 26 Aug 2026 at 13:55.

Transport for London (TfL) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2026 at 12:28.

UK Power Networks Eastern & London logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
St Charles Square

UK Power Networks Eastern & London are proposing to carry out New service connection on St Charles Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Sep 2026 at 15:32.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Brondesbury Villas

Thames Water are proposing to carry out Utility repair and maintenance works on Brondesbury Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 13:27.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Brondesbury Villas

Thames Water are proposing to carry out Utility repair and maintenance works on Brondesbury Villas, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 08:43.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Woodville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Woodville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Aug 2026 at 13:27.

Thames Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Woodville Road

Thames Water are proposing to carry out Utility repair and maintenance works on Woodville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 08:41.

Network Rail logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Long Drive

Network Rail are proposing to carry out Works for Rail Purposes on Long Drive, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2026 at 10:15.

Cadent Gas logo
LONG TERM
Between
26 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 17 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 14:14.

Cadent Gas logo
LONG TERM
Between
26 Oct 2026 and 17 Jan 2027
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 17 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 09:12.

Cadent Gas logo
LONG TERM
Between
26 Oct and 22 Dec 2026
Details
View Map
Share
Follow
Salmon Street

Cadent Gas are proposing to carry out Utility asset works on Salmon Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 08:23.

Affinity Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Bridgewater Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Bridgewater Gardens, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Jul 2026 at 11:33.

Cadent Gas logo
Between
26 Oct and 11 Nov 2026
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 09:54.

Affinity Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Binyon Crescent

Affinity Water are proposing to carry out Utility asset works on Binyon Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Aug 2026 at 15:25.

London Borough Of Barnet logo
Between
26 Oct and 10 Nov 2026
Details
View Map
Share
Follow
Selvage Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 11:32.

Affinity Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Hankins Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hankins Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Mar 2026 at 15:46.

National Highways logo
Between
27 and 31 Oct 2026
Details
View Map
Share
Follow
Great West Road

National Highways are proposing to carry out Works for road purposes on Great West Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2025 at 14:54.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2026 at 12:42.

City Of Westminster logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Warrington Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warrington Crescent, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Sep 2026 at 16:13.

Thames Water logo
Between
27 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility asset works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jun 2026 at 09:09.

G2 Energy IDNO logo
LONG TERM
Between
28 Oct and 22 Dec 2026
Details
View Map
Share
Follow
Hillside

G2 Energy IDNO are proposing to carry out New service connection on Hillside, Stonebridge, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Aug 2026 at 13:15.

Transport for London (TfL) logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:44.

BT logo
Between
30 Oct and 3 Nov 2026
Details
View Map
Share
Follow
Duncan Grove

BT are proposing to carry out Utility asset works on Duncan Grove, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2026 at 15:10.

Transport for London (TfL) logo
Between
30 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2026 and could run through until 2 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2026 at 15:17.

Between
2 and 14 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Leep Utilities Electric are proposing to carry out New service connection on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:06.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Sep 2026 at 11:27.

Thames Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Venetia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Venetia Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 11:45.

London Borough Of Ealing logo
LONG TERM
Between
2 Nov 2026 and 31 Mar 2027
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 31 March 2027. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 6 Aug 2026 at 13:47.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Westbourne Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Westbourne Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Sep 2026 at 12:41.

Cadent Gas logo
LONG TERM
Between
2 Nov 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Framfield Road

Cadent Gas are proposing to carry out Utility asset works on Framfield Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 10 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 16:03.

G2 Energy IDNO logo
Between
2 and 13 Nov 2026
Details
View Map
Share
Foscote Mews

G2 Energy IDNO were proposing to carry out New service connection on Foscote Mews, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 13 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:49.

Thames Water logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Nutbourne Street

Thames Water are proposing to carry out Utility asset works on Nutbourne Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:10.

Thames Water logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Fifth Avenue

Thames Water are proposing to carry out Utility asset works on Fifth Avenue, Queen's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2026 at 13:10.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2026 at 10:12.

Thames Water logo
LONG TERM
Between
2 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Conley Road

Thames Water are proposing to carry out Utility asset works on Conley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2026 at 16:30.

Thames Water logo
LONG TERM
Between
2 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Conley Road

Thames Water are proposing to carry out Utility asset works on Conley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:14.

Thames Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Streatley Place

Thames Water are proposing to carry out New service connection on Streatley Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Aug 2026 at 21:18.

Affinity Water logo
LONG TERM
Between
2 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Church Gardens

Affinity Water are proposing to carry out Utility asset works on Church Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.

Affinity Water logo
LONG TERM
Between
2 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Medway Gardens

Affinity Water are proposing to carry out Utility asset works on Medway Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.

Affinity Water logo
Between
2 and 19 Nov 2026
Details
View Map
Share
Follow
Elms Park Avenue

Affinity Water are proposing to carry out Utility asset works on Elms Park Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.

Affinity Water logo
Between
2 and 19 Nov 2026
Details
View Map
Share
Follow
St Andrews Avenue

Affinity Water are proposing to carry out Utility asset works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.

Affinity Water logo
Between
2 and 19 Nov 2026
Details
View Map
Share
Follow
Priory Park Road

Affinity Water are proposing to carry out Utility asset works on Priory Park Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.

Affinity Water logo
Between
2 and 19 Nov 2026
Details
View Map
Share
Follow
Priory Hill

Affinity Water are proposing to carry out Utility asset works on Priory Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.

G2 Energy IDNO logo
LONG TERM
Between
3 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Hamilton Terrace

G2 Energy IDNO are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 22 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 31 Jul 2026 at 12:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Chase Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chase Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jul 2026 at 13:35.

Cadent Gas logo
LONG TERM
Between
9 Nov 2026 and 7 Jan 2027
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 10:35.

Thames Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Pembridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Pembridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 13:28.

Cadent Gas logo
Between
9 and 26 Nov 2026
Details
View Map
Share
Follow
Montpelier Road

Cadent Gas are proposing to carry out Utility asset works on Montpelier Road, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 08:49.

Cadent Gas logo
LONG TERM
Between
9 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Glencairn Drive

Cadent Gas are proposing to carry out Utility asset works on Glencairn Drive, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

Cadent Gas logo
LONG TERM
Between
9 Nov 2026 and 12 Jan 2027
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 12 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 15:21.

G2 Energy IDNO logo
Between
9 and 24 Nov 2026
Details
View Map
Share
Mordaunt Road

G2 Energy IDNO were proposing to carry out New service connection on Mordaunt Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 24 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

BT logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Old Ruislip Road

BT are proposing to carry out Utility asset works on Old Ruislip Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Aug 2026 at 10:21.

BT logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Old Ruislip Road

BT are proposing to carry out Utility asset works on Old Ruislip Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Sep 2026 at 15:48.

UK Power Networks Eastern & London logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Glendale Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Glendale Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 16:51.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Newton Avenue

Thames Water are proposing to carry out Statutory Infrastructure Works on Newton Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Ramsay Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ramsay Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
10 and 12 Nov 2026
Details
View Map
Share
Follow
Bollo Bridge Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Bollo Bridge Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2026 at 13:46.

Thames Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Chiswick Mall

Thames Water are proposing to carry out Utility asset works on Chiswick Mall, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2026 at 16:32.

Transport for London (TfL) logo
Between
11 and 14 Nov 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 15:37.

National Highways logo
Between
11 and 27 Nov 2026
Details
View Map
Share
Follow
Selvage Lane

National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Sep 2026 at 18:32.

Between
13 and 21 Nov 2026
Details
View Map
Share
Follow
Colville Road

Leep Utilities Electric are proposing to carry out New service connection on Colville Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 11 Sep 2026 at 09:09.

Transport for London (TfL) logo
Between
13 and 17 Nov 2026
Details
View Map
Share
Follow
Brentfield Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Brentfield Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:25.

Transport for London (TfL) logo
Between
13 and 17 Nov 2026
Details
View Map
Share
Follow
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:25.

Transport for London (TfL) logo
Between
13 and 17 Nov 2026
Details
View Map
Share
Follow
Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Brent Cross Roundabout North Bound To Hendon Way, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:20.

Transport for London (TfL) logo
Between
13 and 17 Nov 2026
Details
View Map
Share
Follow
Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:24.

Transport for London (TfL) logo
Between
13 and 17 Nov 2026
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jul 2026 at 16:18.

Thames Water logo
Between
16 and 29 Nov 2026
Details
View Map
Share
Follow
Lionel Road North

Thames Water are proposing to carry out Utility asset works on Lionel Road North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 29 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2026 at 13:58.

London Borough Of Ealing logo
LONG TERM
Between
16 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2026 at 15:21.

Affinity Water logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Courthope Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Jul 2026 at 09:53.

Affinity Water logo
Between
16 and 27 Nov 2026
Details
View Map
Share
Follow
Courthope Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Sep 2026 at 11:45.

UK Power Networks Eastern & London logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Alverstone Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Alverstone Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2026 at 11:51.

Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Uxbridge Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:47.

Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Kenton Lane, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:40.

Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Clamp Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:53.

Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Uxbridge Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:31.

National Highways logo
Between
16 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Selvage Lane

National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Sep 2026 at 18:43.

UK Power Networks Eastern & London logo
Between
17 and 19 Nov 2026
Details
View Map
Share
Follow
Glendale Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Glendale Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 12:53.

Thames Water logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Perryn Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Perryn Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2026 at 10:47.

G2 Energy IDNO logo
LONG TERM
Between
18 Nov and 18 Dec 2026
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2026 and run through until 18 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:53.

Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Camrose Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Camrose Avenue, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 15:11.

Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Stanmore Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Stanmore Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 13:32.

Transport for London (TfL) logo
Between
19 and 28 Nov 2026
Details
View Map
Share
Follow
Ruislip Road

Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 19 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:24.

Between
19 and 21 Nov 2026
Details
View Map
Share
Follow
Imperial Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 10:34.

Between
19 and 21 Nov 2026
Details
View Map
Share
Follow
Whitchurch Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Whitchurch Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 10 Sep 2026 at 13:01.

Network Rail logo
Between
21 and 23 Nov 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Cadent Gas logo
LONG TERM
Between
23 Nov 2026 and 24 Jan 2027
Details
View Map
Share
Follow
Carlyle Avenue

Cadent Gas are proposing to carry out Utility asset works on Carlyle Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 24 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 11:57.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Casselden Road

Thames Water are proposing to carry out Utility asset works on Casselden Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2026 at 12:39.

Thames Water logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Brownlow Road

Thames Water are proposing to carry out Utility asset works on Brownlow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jun 2026 at 05:41.

Thames Water logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Brownlow Road

Thames Water are proposing to carry out Utility asset works on Brownlow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:14.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Maybury Gardens

Thames Water are proposing to carry out roadworks on Maybury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 15 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2026 at 00:01.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 4 Jan 2027
Details
View Map
Share
Follow
Hawthorn Road

Thames Water are proposing to carry out roadworks on Hawthorn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 January 2027. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2026 at 00:02.

Thames Water logo
LONG TERM
Between
23 Nov 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2026 at 16:31.

Cadent Gas logo
Between
23 Nov and 1 Dec 2026
Details
View Map
Share
Follow
Deanscroft Avenue

Cadent Gas are proposing to carry out Utility asset works on Deanscroft Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:00.

Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
West Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on West Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 16:47.

Affinity Water logo
LONG TERM
Between
23 Nov 2026 and 16 Feb 2027
Details
View Map
Share
Follow
Clayton Field

Affinity Water are proposing to carry out Utility asset works on Clayton Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 16 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 13:53.

Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Boniface Walk

London Borough Of Harrow are proposing to carry out Highway improvement works on Boniface Walk, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 17:52.

Thames Water logo
Between
24 and 26 Nov 2026
Details
View Map
Share
Follow
Elmore Close

Thames Water are proposing to carry out Utility repair and maintenance works on Elmore Close, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:58.

Transport for London (TfL) logo
Between
26 and 28 Nov 2026
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2026 at 13:55.

BT logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Lime Grove

BT were proposing to carry out Utility asset works on Lime Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 8 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2026 at 08:20.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 17 September 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Aug 2026 at 11:45.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 17 Sep 2027
Details
View Map
Share
Minerva Road

London Borough Of Ealing were proposing to carry out Remedial works on Minerva Road, Park Royal.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2026 and run through until 17 September 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:44.

London Borough Of Ealing logo
LONG TERM
Between
30 Nov 2026 and 4 Apr 2028
Details
View Map
Share
Follow
Minerva Road

London Borough Of Ealing are proposing to carry out Remedial works on Minerva Road, Park Royal.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 April 2028. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 25 Aug 2026 at 10:55.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
St Albans Road

Thames Water are proposing to carry out Utility asset works on St Albans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2026 at 15:02.

Thames Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Park Road

Thames Water are proposing to carry out Utility asset works on Park Road, Harlesden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2026 at 13:22.

Thames Water logo
Between
30 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2026 at 14:16.

Affinity Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Clarendon Gardens

Affinity Water are proposing to carry out Utility asset works on Clarendon Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 12:03.

Cadent Gas logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:00.

Affinity Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
The Glen

Affinity Water are proposing to carry out Utility repair and maintenance works on The Glen, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Aug 2026 at 11:31.

Cadent Gas logo
Between
30 Nov and 13 Dec 2026
Details
View Map
Share
Follow
Temple Fortune Lane

Cadent Gas are proposing to carry out Utility asset works on Temple Fortune Lane, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 17:00.

UK Power Networks Eastern & London logo
Between
30 Nov and 8 Dec 2026
Details
View Map
Share
Follow
St Marys Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on St Marys Avenue, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 12:18.

Cadent Gas logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Chandos Crescent

Cadent Gas are proposing to carry out Utility asset works on Chandos Crescent, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 10:24.

Cadent Gas logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Buckingham Road

Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 11:24.

Cadent Gas logo
Between
1 and 21 Dec 2026
Details
View Map
Share
Follow
Cheriton Close

Cadent Gas are proposing to carry out Utility asset works on Cheriton Close, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:46.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Victoria Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2026 and 3 Feb 2027
Details
View Map
Share
Follow
Ruislip Road East

Cadent Gas are proposing to carry out Utility asset works on Ruislip Road East, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 11:57.

London Borough Of Ealing logo
LONG TERM
Between
2 Dec 2026 and 30 Jul 2027
Details
View Map
Share
Follow
Old Oak Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 30 July 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2026 at 11:43.

Affinity Water logo
Between
2 and 17 Dec 2026
Details
View Map
Share
Follow
Priory Avenue

Affinity Water are proposing to carry out Utility asset works on Priory Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:29.

Affinity Water logo
Between
2 and 17 Dec 2026
Details
View Map
Share
Follow
Priory Gardens

Affinity Water are proposing to carry out Utility asset works on Priory Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:50.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 10:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 17 Feb 2027
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2026 and run through until 17 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:35.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2026 at 09:51.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Lyndale Avenue

Transport for London (TfL) are proposing to carry out roadworks on Lyndale Avenue, Cricklewood, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 08:50.

Virgin Media logo
Between
2 and 4 Dec 2026
Details
View Map
Share
Follow
Cowley Place

Virgin Media are proposing to carry out Utility asset works on Cowley Place, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Aug 2026 at 15:11.

UK Power Networks Eastern & London logo
Between
3 and 11 Dec 2026
Details
View Map
Share
Follow
Aston Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Aston Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:20.

Network Rail logo
Between
5 and 7 Dec 2026
Details
View Map
Share
Follow
Bollo Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bollo Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Feb 2026 at 14:28.

Cadent Gas logo
Between
7 and 31 Dec 2026
Details
View Map
Share
Follow
Gurnell Grove

Cadent Gas are proposing to carry out Utility asset works on Gurnell Grove, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 17:00.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 15 Feb 2027
Details
View Map
Share
Follow
Talbot Road

Cadent Gas are proposing to carry out Utility asset works on Talbot Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 13:50.

UK Power Networks Eastern & London logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Wayside

UK Power Networks Eastern & London are proposing to carry out New service connection on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2026 at 09:07.

Cadent Gas logo
Between
7 and 25 Dec 2026
Details
View Map
Share
Follow
Pinner View

Cadent Gas are proposing to carry out Utility asset works on Pinner View, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 25 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 15:00.

Cadent Gas logo
Between
7 and 25 Dec 2026
Details
View Map
Share
Follow
Pinner View

Cadent Gas are proposing to carry out Utility asset works on Pinner View, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 25 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 11:00.

Cadent Gas logo
Between
7 and 29 Dec 2026
Details
View Map
Share
Follow
Headstone Gardens

Cadent Gas are proposing to carry out Utility asset works on Headstone Gardens, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 29 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 19:30.

Cadent Gas logo
Between
7 and 25 Dec 2026
Details
View Map
Share
Pinner View

Cadent Gas were proposing to carry out Utility asset works on Pinner View, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 25 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 09:09.

Cadent Gas logo
Between
7 and 29 Dec 2026
Details
View Map
Share
Follow
Victor Road

Cadent Gas are proposing to carry out Utility asset works on Victor Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 29 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:03.

Cadent Gas logo
LONG TERM
Between
7 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Haverford Way

Cadent Gas are proposing to carry out Utility asset works on Haverford Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:29.

BT logo
Between
9 and 14 Dec 2026
Details
View Map
Share
Follow
Heronsgate

BT are proposing to carry out Utility asset works on Heronsgate, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Sep 2026 at 11:22.

G2 Energy IDNO logo
Between
13 Dec 2026 and 6 Jan 2027
Details
View Map
Share
Acton Lane

G2 Energy IDNO were proposing to carry out New service connection on Acton Lane, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2026 and run through until 6 January 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:54.

Affinity Water logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Hamilton Road

Affinity Water are proposing to carry out Utility asset works on Hamilton Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 09:51.

Cadent Gas logo
Between
14 Dec 2026 and 10 Jan 2027
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 10 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2026 at 16:30.

G2 Energy IDNO logo
LONG TERM
Between
14 Dec 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Brentfield

G2 Energy IDNO are proposing to carry out New service connection on Brentfield, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 8 February 2027. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 6 Sep 2026 at 20:47.

Thames Water logo
Between
14 Dec 2026 and 4 Jan 2027
Details
View Map
Share
Follow
Chesham Street

Thames Water are proposing to carry out Utility asset works on Chesham Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 4 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jul 2026 at 12:49.


Roadworks Map near to Empire Way, WEMBLEY, HA9 0EW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 04:19
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Empire Way, WEMBLEY, HA9 0EW (24 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
URGENT
  
DAGMAR AVENUE 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - Give and take
Complete
10 Sep 2026 10:29 - 15 Sep 2026 14:10
0.2
Details
Share
2
Affinity Water logo
URGENT
  
PARK LANE 
(0.3 miles)
Affinity Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 15 Sep 2026 09:20
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.3
Details
Share
Follow
3
Affinity Water logo
EMERGENCY
  
WEMBLEY HILL ROAD 
(0.4 miles)
Affinity Water
Utility asset works - Footway, Carriageway - Give and take
Complete
11 Sep 2026 08:40 - 15 Sep 2026 15:05
0.4
Details
Share
4
London Borough Of Brent logo
MAJOR
  
RUTHERFORD WAY 
(0.4 miles)
London Borough Of Brent
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 9 Mar 2026 10:00
(Scheduled: 9 Mar 2026 - 30 Nov 2028)
0.4
Details
Share
Follow
5
UK Power Networks Eastern & London logo
FULTON ROAD 
(0.4 miles)
UK Power Networks Eastern & London
New service connection - Footway - Multi-way signals
In Progress
Since: 13 Sep 2026 09:05
(Scheduled: 13 Sep 2026 - 18 Sep 2026)
0.4
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
FIFTH WAY 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 10 Sep 2026 - 7 Oct 2026)
0.5
Details
Share
7
Cadent Gas logo
MAJOR
  
FIFTH WAY 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 10 Sep 2026 - 7 Oct 2026)
0.5
Details
Share
8
BT logo
HIGHFIELD AVENUE 
(0.7 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 17 Sep 2026
0.7
Details
Share
Follow
9
London Borough Of Brent logo
URGENT
  
FOURTH WAY 
(0.7 miles)
London Borough Of Brent
Section 50 - Footway, Carriageway - Multi-way signals
In Progress
Since: 15 Sep 2026 09:00
(Scheduled: 15 Sep 2026 - 16 Sep 2026)
0.7
Details
Share
Follow
10
BT logo
CLARENDON GARDENS 
(0.7 miles)
BT
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 17 Sep 2026 - 18 Sep 2026
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data