ROADWORKS SUMMARY
Woodridings Close, PINNER, HA5 4RF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woodridings Close, HA5 4RF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Woodridings Close, PINNER, HA5 4RF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodridings Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Hertfordshire County Council logo
LONG TERM
Until
30 Jul 2024
Details
View Map
Share
Follow
Westland Road

Hertfordshire County Council are carrying out roadworks on Westland Road, Watford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 May 2023 at 08:00 and could run through until 30 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Jan 2024 at 10:58.

HS2 logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Eastcote Lane

HS2 are carrying out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2023 at 07:00 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 22 Apr 2024 at 09:47.

London Borough Of Ealing logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Ealing Road

London Borough Of Ealing are carrying out Highway improvement works on Ealing Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 August 2023 at 08:00 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 15:01.

London Borough Of Ealing logo
LONG TERM
Until
26 May 2024
Details
View Map
Share
Follow
Kensington Road

London Borough Of Ealing are carrying out Highway improvement works on Kensington Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2023 at 07:00 and could run through until 26 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Apr 2024 at 10:52.

HS2 logo
LONG TERM
Until
23 May 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 08:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.

HS2 logo
LONG TERM
Until
23 May 2024
Details
View Map
Share
Follow
Uneeda Drive

HS2 are carrying out Utility asset works on Uneeda Drive, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:30 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.

HS2 logo
LONG TERM
Until
23 May 2024
Details
View Map
Share
Follow
Rockware Avenue

HS2 are carrying out Utility asset works on Rockware Avenue, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 07:00 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.

HS2 logo
LONG TERM
Until
23 May 2024
Details
View Map
Share
Follow
Greenford Road

HS2 are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 05:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.

London Borough Of Ealing logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Station Parade

London Borough Of Ealing are carrying out Highway improvement works on Station Parade, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2023 at 11:49.

Affinity Water logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Rickmansworth Road

Affinity Water are carrying out Utility asset works on Rickmansworth Road, Northwood.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 13:12 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 15:30.

Affinity Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Preston Road

Affinity Water are carrying out Utility repair and maintenance works on Preston Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 10:15 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Apr 2024 at 16:32.

LONG TERM
Until
21 May 2024
Details
View Map
Share
Follow
Hilfield Lane

Leep Utilities Electric are carrying out New service connection on Hilfield Lane, Aldenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 February 2024 at 16:00 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 27 Mar 2024 at 15:32.

Affinity Water logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Hayling Road

Affinity Water are carrying out Utility asset works on Hayling Road, Hayling, South Oxhey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 March 2024 at 08:40 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 14:28.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Sussex Crescent

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 08:55.

Cadent Gas logo
LONG TERM
Until
20 May 2024
Details
View Map
Share
Follow
Parkside Way

Cadent Gas are carrying out Utility asset works on Parkside Way, North Harrow.

These works are categorised as Major.

The works started on 22 March 2024 at 08:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:43.

Cadent Gas logo
LONG TERM
Until
6 Jun 2024
Details
View Map
Share
Follow
Heathbourne Road

Cadent Gas are carrying out Utility asset works on Heathbourne Road, Bushey Heath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 15:00 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2024 at 15:11.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Peterborough Road

Thames Water are carrying out Utility repair and maintenance works on Peterborough Road, Harrow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 19:30 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 08:55.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grange Avenue

Thames Water are carrying out Utility repair and maintenance works on Grange Avenue, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 11:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:52.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Uppingham Avenue

Thames Water are carrying out roadworks on Uppingham Avenue, Stanmore.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 11:30 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:53.

Thames Water logo
Until
4 May 2024
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, Elstree.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 12:00 and could run through until 4 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 12:38.

Cadent Gas logo
LONG TERM
Between
14 Apr and 12 Aug 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 16:30.

Cadent Gas logo
LONG TERM
Until
9 Jun 2024
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are carrying out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:13 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:21.

London Borough Of Brent logo
LONG TERM
Between
15 Apr and 26 Jul 2024
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 9 Apr 2024 at 13:34.

Cadent Gas logo
Until
12 May 2024
Details
View Map
Share
Follow
Northolt Lane

Cadent Gas are carrying out Utility asset works on Northolt Lane, Greenford.

These works are categorised as Major.

The works started on 22 April 2024 at 16:41 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 06:57.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Rectory Lane

Affinity Water are carrying out Utility repair and maintenance works on Rectory Lane, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 13:26.

London Borough Of Brent logo
LONG TERM
Between
22 Apr and 24 May 2024
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

The works will start on or after 22 April 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 17 Apr 2024 at 06:34.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Honeypot Lane

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Honeypot Lane, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 12:04 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 08:25.

Between
22 Apr and 18 May 2024
Details
View Map
Share
Follow
Merlin Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlin Crescent, Edgware.

These works are categorised as Major.

The works will start on or after 22 April 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 18 Apr 2024 at 10:32.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Catsey Lane

Affinity Water are carrying out Utility repair and maintenance works on Catsey Lane, Bushey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 10:58 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Apr 2024 at 13:01.

Between
25 Apr and 12 May 2024
Details
View Map
Share
Follow
Lankers Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lankers Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Apr 2024 at 09:03.

Finishing
Today
Details
View Map
Share
Follow
Headstone Road

London Borough Of Harrow are carrying out Highway repair and maintenance works on Headstone Road, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 19:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 08:19.

Finishing
Today
Details
View Map
Share
Follow
Rochester Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rochester Drive, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Apr 2024 at 09:02.

BT logo
Between
27 Apr and 19 May 2024
Details
View Map
Share
Follow
Pinner Hill Road

BT are proposing to carry out Utility asset works on Pinner Hill Road, Pinner.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Mar 2024 at 15:01.

Hertfordshire County Council logo
Between
27 Apr and 12 May 2024
Details
View Map
Share
Follow
Clarendon Road

Hertfordshire County Council are proposing to carry out roadworks on Clarendon Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Apr 2024 at 12:59.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
College Hill Road

Affinity Water are proposing to carry out Utility repair and maintenance works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Jan 2024 at 10:02.

Hertfordshire County Council logo
Between
29 Apr and 5 May 2024
Details
View Map
Share
Follow
Hagden Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 27 Mar 2024 at 08:37.

London Borough Of Barnet logo
Between
2 and 5 May 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 5 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2024 at 13:37.

Hertfordshire County Council logo
Between
2 and 7 May 2024
Details
View Map
Share
Follow
Turnberry Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Turnberry Court, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Mar 2024 at 13:59.

Transport for London (TfL) logo
Between
3 and 6 May 2024
Details
View Map
Share
Follow
Station Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Station Road, The Hale, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 10:18.

Murphy Power Distribution logo
Between
4 and 7 May 2024
Details
View Map
Share
Follow
Boleyn Drive

Murphy Power Distribution are proposing to carry out Utility asset works on Boleyn Drive, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 26 Feb 2024 at 09:36.

Between
5 and 31 May 2024
Details
View Map
Share
Follow
September Way

London Borough Of Harrow are proposing to carry out Highway improvement works on September Way, Stanmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 31 May 2024. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 19:13.

Thames Water logo
LONG TERM
Between
6 May and 26 Jul 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:34.

London Borough Of Barnet logo
Between
6 and 11 May 2024
Details
View Map
Share
Follow
Deansbrook Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Deansbrook Road, Burnt Oak Broadway To Deans Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.

Hertfordshire County Council logo
LONG TERM
Between
6 May and 11 Aug 2024
Details
View Map
Share
Follow
Little Green Lane

Hertfordshire County Council are proposing to carry out Works for road purposes on Little Green Lane, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 15:15.

London Borough Of Ealing logo
LONG TERM
Between
7 May and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.

London Borough Of Ealing logo
LONG TERM
Between
7 May and 1 Dec 2024
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.

Between
7 and 13 May 2024
Details
View Map
Share
Follow
Clamp Hill

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 25 Apr 2024 at 09:30.

Between
7 and 30 May 2024
Details
View Map
Share
Follow
Meriden Way

Leep Utilities Electric are proposing to carry out New service connection on Meriden Way, Watford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 12 Apr 2024 at 09:38.

Hertfordshire County Council logo
Between
8 and 12 May 2024
Details
View Map
Share
Follow
Harefield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harefield Road, East, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 26 Apr 2024 at 14:36.

Cadent Gas logo
Between
12 May and 9 Jun 2024
Details
View Map
Share
Follow
Barrow Point Lane

Cadent Gas are proposing to carry out Utility asset works on Barrow Point Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:10.

Cadent Gas logo
Between
12 and 27 May 2024
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Pinner.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.

Between
12 and 23 May 2024
Details
View Map
Share
Follow
Park Avenue

Leep Utilities Electric are proposing to carry out New service connection on Park Avenue, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 25 Apr 2024 at 09:51.

Between
12 and 23 May 2024
Details
View Map
Share
Follow
Otterspool Way

Leep Utilities Electric are proposing to carry out New service connection on Otterspool Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 25 Apr 2024 at 09:52.

Between
13 and 17 May 2024
Details
View Map
Share
Follow
Albury Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Albury Drive, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 08:49.

Between
13 and 20 May 2024
Details
View Map
Share
Follow
Longcrofte Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Longcrofte Road, Canons Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 3 Apr 2024 at 12:24.

Hertfordshire County Council logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Banbury Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Banbury Street, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:43.

Hertfordshire County Council logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Souldern Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Souldern Street, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:44.

Hertfordshire County Council logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Queens Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Queens Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 08:58.

Between
13 May and 4 Jun 2024
Details
View Map
Share
Follow
Garsmouth Way

Leep Utilities Electric are proposing to carry out New service connection on Garsmouth Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 12 Apr 2024 at 09:41.

London Borough Of Barnet logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jan 2024 at 09:16.

Hertfordshire County Council logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Aynho Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aynho Street, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 18 Apr 2024 at 10:41.

Affinity Water logo
Between
20 and 22 May 2024
Details
View Map
Share
Follow
Llanover Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 07:53.

Between
20 and 25 May 2024
Details
View Map
Share
Follow
Wildcroft Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Wildcroft Gardens, Canons Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 3 Apr 2024 at 12:24.

Between
20 May and 3 Jun 2024
Details
View Map
Share
Follow
Brookshill

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Brookshill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 16 Apr 2024 at 09:01.

Cadent Gas logo
LONG TERM
Between
20 May and 12 Jul 2024
Details
View Map
Share
Follow
Barton Way

Cadent Gas are proposing to carry out Utility asset works on Barton Way, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 12:39.

Between
21 May and 13 Jun 2024
Details
View Map
Share
Follow
Hilfield Lane

Leep Utilities Electric are proposing to carry out New service connection on Hilfield Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:20.

Affinity Water logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
College Road

Affinity Water are proposing to carry out Utility repair and maintenance works on College Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2024 at 08:57.

Affinity Water logo
Between
27 May and 3 Jun 2024
Details
View Map
Share
Follow
Greenhill Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 08:19.

Affinity Water logo
Between
28 May and 2 Jun 2024
Details
View Map
Share
Follow
The Green

Affinity Water are proposing to carry out Utility repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Mar 2024 at 11:59.

Between
28 May and 19 Jun 2024
Details
View Map
Share
Follow
Hilfield Lane

Leep Utilities Electric are proposing to carry out New service connection on Hilfield Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:27.

BT logo
Between
1 and 8 Jun 2024
Details
View Map
Share
Follow
Reddings Avenue

BT are proposing to carry out Utility asset works on Reddings Avenue, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 8 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Mar 2024 at 10:21.

Hertfordshire County Council logo
Between
1 and 3 Jun 2024
Details
View Map
Share
Follow
Clarendon Road

Hertfordshire County Council are proposing to carry out roadworks on Clarendon Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 24 Apr 2024 at 12:19.

Between
1 and 24 Jun 2024
Details
View Map
Share
Follow
Hilfield Lane

Leep Utilities Electric are proposing to carry out New service connection on Hilfield Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:33.

BT logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Swakeleys Road

BT are proposing to carry out Utility repair and maintenance works on Swakeleys Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 11 Apr 2024 at 09:41.

Affinity Water logo
Between
2 and 8 Jun 2024
Details
View Map
Share
Follow
Love Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Love Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Apr 2024 at 13:53.

Affinity Water logo
Between
3 and 6 Jun 2024
Details
View Map
Share
Follow
Rushout Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Rushout Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Mar 2024 at 07:01.

Cadent Gas logo
Between
3 and 9 Jun 2024
Details
View Map
Share
Follow
Graham Road

Cadent Gas are proposing to carry out New service connection on Graham Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:37.

Hertfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Sandy Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Apr 2024 at 06:30.

Affinity Water logo
Between
4 and 7 Jun 2024
Details
View Map
Share
Follow
Hagden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hagden Lane, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Mar 2024 at 09:53.

Affinity Water logo
Between
4 and 7 Jun 2024
Details
View Map
Share
Follow
Belgrave Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Belgrave Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Mar 2024 at 11:44.

Affinity Water logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Summerhouse Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Summerhouse Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 10:11.

London Borough Of Barnet logo
Between
6 and 27 Jun 2024
Details
View Map
Share
Follow
Stonegrove

London Borough Of Barnet are proposing to carry out Highway improvement works on Stonegrove, Edgware.

These works are categorised as Major.

The works will start on or after 6 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2024 at 09:01.

Between
7 and 29 Jun 2024
Details
View Map
Share
Follow
Hartspring Lane

Leep Utilities Electric are proposing to carry out New service connection on Hartspring Lane, Bushey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:39.

Cadent Gas logo
LONG TERM
Between
9 Jun and 14 Jul 2024
Details
View Map
Share
Follow
Love Lane

Cadent Gas are proposing to carry out Utility asset works on Love Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:09.

Affinity Water logo
Between
10 and 12 Jun 2024
Details
View Map
Share
Follow
Hilfield Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Hilfield Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 11:32.

UK Power Networks Eastern & London logo
Between
11 and 17 Jun 2024
Details
View Map
Share
Follow
Athelstone Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Athelstone Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2024 at 08:52.

Hertfordshire County Council logo
Between
11 and 13 Jun 2024
Details
View Map
Share
Follow
Primrose Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Primrose Lane, Aldenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 14:53.

Between
12 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Otterspool Way

Leep Utilities Electric are proposing to carry out New service connection on Otterspool Way, Watford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:45.

BT logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
Princess Lane

BT are proposing to carry out Utility asset works on Princess Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2024 at 09:07.

Affinity Water logo
Between
17 and 20 Jun 2024
Details
View Map
Share
Follow
Sussex Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 08:37.

Murphy Power Distribution logo
LONG TERM
Between
17 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Holyrood Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 26 Apr 2024 at 08:44.

Cadent Gas logo
LONG TERM
Between
17 Jun 2024 and 13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:40.

Between
18 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Otterspool Way

Leep Utilities Electric are proposing to carry out New service connection on Otterspool Way, Watford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:52.

Hertfordshire County Council logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Oxhey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oxhey Lane, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Apr 2024 at 10:29.

Cadent Gas logo
LONG TERM
Between
24 Jun and 14 Aug 2024
Details
View Map
Share
Follow
Catlins Lane

Cadent Gas are proposing to carry out Highway repair and maintenance works on Catlins Lane, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 14 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 13:16.

Affinity Water logo
Between
25 and 28 Jun 2024
Details
View Map
Share
Follow
Sedgecombe Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Sedgecombe Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 18:44.

Affinity Water logo
Between
25 and 27 Jun 2024
Details
View Map
Share
Follow
Grant Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Grant Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 09:24.

Between
25 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Berry Grove Lane

Leep Utilities Electric are proposing to carry out New service connection on Berry Grove Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 14:57.

Affinity Water logo
Between
26 and 28 Jun 2024
Details
View Map
Share
Follow
Wentworth Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Apr 2024 at 17:45.

London Borough Of Barnet logo
LONG TERM
Between
27 Jun and 1 Aug 2024
Details
View Map
Share
Follow
Silkstream Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Silkstream Road, Edgware.

These works are categorised as Major.

The works will start on or after 27 June 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 08:52.

Hertfordshire County Council logo
Between
27 and 29 Jun 2024
Details
View Map
Share
Follow
Orphanage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 09:43.

Murphy Power Distribution logo
Between
29 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:27.

LONG TERM
Between
29 Jun and 30 Jul 2024
Details
View Map
Share
Follow
Bushey Mill Lane

Leep Utilities Electric are proposing to carry out New service connection on Bushey Mill Lane, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 15:08.

LONG TERM
Between
29 Jun and 30 Jul 2024
Details
View Map
Share
Follow
Berry Grove Lane

Leep Utilities Electric are proposing to carry out New service connection on Berry Grove Lane, Bushey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leep Utilities Electric on 5 Mar 2024 at 15:03.

Between
30 Jun and 28 Jul 2024
Details
View Map
Share
Follow
Mollison Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 19:24.

Cadent Gas logo
LONG TERM
Between
30 Jun and 11 Aug 2024
Details
View Map
Share
Follow
Belmont Lane

Cadent Gas are proposing to carry out Utility asset works on Belmont Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 09:13.

Between
30 Jun and 28 Jul 2024
Details
View Map
Share
Follow
Gordon Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Gordon Avenue, Stanmore.

These works are categorised as Major.

The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 26 Apr 2024 at 19:17.

UK Power Networks Eastern & London logo
Between
1 and 5 Jul 2024
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 13:46.

Murphy Power Distribution logo
Between
6 and 10 Jul 2024
Details
View Map
Share
Follow
Parkfield Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Parkfield Crescent, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:25.

Hertfordshire County Council logo
Between
11 and 14 Jul 2024
Details
View Map
Share
Follow
Watling Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2024 at 13:56.

Affinity Water logo
Between
15 and 18 Jul 2024
Details
View Map
Share
Follow
Healey Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Healey Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 08:15.

Affinity Water logo
Between
16 and 18 Jul 2024
Details
View Map
Share
Follow
Moor Lane Crossing

Affinity Water are proposing to carry out Utility repair and maintenance works on Moor Lane Crossing, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 10:14.

Affinity Water logo
Between
16 and 18 Jul 2024
Details
View Map
Share
Follow
Melbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Melbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 12:22.

Affinity Water logo
Between
17 and 19 Jul 2024
Details
View Map
Share
Follow
Southill Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Southill Lane, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 19 July 2024. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 14:38.

Affinity Water logo
Between
21 and 28 Jul 2024
Details
View Map
Share
Follow
Kenton Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Kenton Lane, Harrow Weald.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 09:01.

Between
22 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Oldfield Lane North

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Apr 2024 at 08:43.

Affinity Water logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Salisbury Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Salisbury Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 08:21.

UK Power Networks Eastern & London logo
Between
22 and 29 Jul 2024
Details
View Map
Share
Follow
Kenton Gardens

UK Power Networks Eastern & London are proposing to carry out Remedial works on Kenton Gardens, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 07:53.

Virgin Media logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Blawith Road

Virgin Media are proposing to carry out Utility asset works on Blawith Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Apr 2024 at 09:04.

Affinity Water logo
Between
23 and 26 Jul 2024
Details
View Map
Share
Follow
Romilly Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Romilly Drive, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 11:23.


Roadworks Map near to Woodridings Close, PINNER, HA5 4RF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 16:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woodridings Close, PINNER, HA5 4RF (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
WOODHALL AVENUE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 25 Apr 2024 12:54
(Scheduled: 24 Apr 2024 - 28 Jun 2024)
0.4
Details
Share
Follow
2
BT logo
HIGHBANKS ROAD 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
27 Apr 2024 08:50 - 11:13
0.8
Details
Share
3
BT logo
MAJOR
  
PINNER HILL ROAD 
(1.0 miles)
BT
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 27 Apr 2024 - 19 May 2024
1.0
Details
Share
Follow
4
BT logo
ANGLESMEDE WAY 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 25 Apr 2024 13:38
(Scheduled: 24 Apr 2024 - 28 Apr 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data