ROADWORKS SUMMARY
Uxbridge Road, PINNER, HA5 4JB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Uxbridge Road, HA5 4JB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Uxbridge Road, PINNER, HA5 4JB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Uxbridge Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:58.

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:47.

Cadent Gas logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Cadent Gas are carrying out Utility asset works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 11:06 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 11:19.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 31 Dec 2024 at 15:53.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Affinity Water logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 11:19.

Cadent Gas logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are carrying out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 13:57 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 13:58.

Cadent Gas logo
LONG TERM
Between
10 Mar and 11 Jul 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:24.

Hertfordshire County Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:30 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:37.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Cannon Lane

Cadent Gas are carrying out Utility asset works on Cannon Lane, Pinner.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 14:08 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
7 Apr 2025 and 1 Sep 2026
Details
View Map
Share
Cecil Park

Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.

Cadent Gas logo
LONG TERM
Between
7 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 09:20.

Cadent Gas logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are carrying out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 08:47 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:09.

Cadent Gas logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Eastbury Avenue

Cadent Gas are carrying out Utility asset works on Eastbury Avenue, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 09:59 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:36.

Cadent Gas logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Southfield Park

Cadent Gas are carrying out Utility asset works on Southfield Park, North Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 08:08 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 May 2025 at 08:53.

Cadent Gas logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Watford Road

Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 10:57.

Cadent Gas logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Watford Road

Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 10:22.

Cadent Gas logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Watford Road

Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 10:24.

Cadent Gas logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Watford Road

Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:31.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Watford Road

Cadent Gas are carrying out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 13:45 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:01.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:04.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:53.

Cadent Gas logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Morford Way

Cadent Gas are carrying out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:36 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 09:29.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sudbury Court Drive

Cadent Gas are carrying out Utility repair and maintenance works on Sudbury Court Drive, Harrow.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 15:46 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:21.

London Borough Of Ealing logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are carrying out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 10:10.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Woodcock Hill

Thames Water are carrying out Utility repair and maintenance works on Woodcock Hill, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 11:23.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:12.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 07:39.

Cadent Gas logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Money Hill Road

Cadent Gas are proposing to carry out Utility asset works on Money Hill Road, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 19 Jun 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 19 Jun 2025
Details
View Map
Share
Follow
Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:41.

Finishing
Monday
Details
View Map
Share
Follow
High Street

Last Mile Electricity (formerly Global Utility Connections) are carrying out New service connection on High Street, Rickmansworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 May 2025 at 08:35.

London Borough Of Hillingdon logo
Between
21 May and 20 Jun 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Apr 2025 at 08:56.

London Borough Of Hillingdon logo
Between
21 May and 20 Jun 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Apr 2025 at 14:25.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wetheral Drive

Cadent Gas are carrying out Utility repair and maintenance works on Wetheral Drive, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2025 at 17:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 09:45.

Cadent Gas logo
Until
16 Jun 2025
Details
View Map
Share
Follow
South Way

Cadent Gas are carrying out Utility asset works on South Way, North Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:27 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 07:51.

Cadent Gas logo
LONG TERM
Between
26 May and 31 Jul 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 12:21.

Cadent Gas logo
LONG TERM
Between
26 May and 3 Aug 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:47.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Edgwarebury Lane

Affinity Water are carrying out Utility repair and maintenance works on Edgwarebury Lane, Edgware.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:53 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 May 2025 at 12:21.

Until
10 Jun 2025
Details
View Map
Share
Follow
Rickmansworth Footpath 027

Last Mile Electricity (formerly Global Utility Connections) are carrying out New service connection on Rickmansworth Footpath 027, Rickmansworth.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:30 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 May 2025 at 09:44.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Rugby Avenue

Affinity Water were proposing to carry out Utility asset works on Rugby Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:35.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 16:43.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Harrow Road

Affinity Water were proposing to carry out Utility asset works on Harrow Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 24 November 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 16:13.

London Borough Of Hillingdon logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Jun 2025 at 08:10.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hillside Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Hillside Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 15:30.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Longley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:10.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Longley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:44.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Longley Road

Affinity Water are carrying out Utility repair and maintenance works on Longley Road, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 11:46.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Walton Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:11.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Walton Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:36.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Walton Drive

Affinity Water are carrying out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Jun 2025 at 10:54.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pinner Road

Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 09:47.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pinner Road

Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 10:41.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Mar 2025 at 11:55.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:29.

LONG TERM
Between
2 Jun and 7 Jul 2025
Details
View Map
Share
Follow
West Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on West Way, Pinner.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 29 May 2025 at 13:41.

LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
West Way

London Borough Of Harrow are carrying out Highway repair and maintenance works on West Way, Pinner.

These works are categorised as Major.

The works started on 2 June 2025 at 08:00 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 2 Jun 2025 at 08:22.

Cadent Gas logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 09:36.

Cadent Gas logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:56.

Finishing
Tomorrow
Details
View Map
Share
Follow
Lorne Road

London Borough Of Harrow are carrying out Highway repair and maintenance works on Lorne Road, Wealdstone.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Jun 2025 at 10:19.

London Borough Of Barnet logo
Between
2 and 25 Jun 2025
Details
View Map
Share
Follow
Watling Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Watling Avenue, Burnt Oak, Edgware.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2025 at 15:45.

Hertfordshire County Council logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Eastglade

Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:12.

Hertfordshire County Council logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Eastglade

Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:20.

UK Power Networks Eastern & London logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 16:05.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Meadow Way

Cadent Gas are proposing to carry out Utility asset works on Meadow Way, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 09:20.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Station Road

Virgin Media were proposing to carry out Remedial works on Station Road, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Feb 2025 at 15:38.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Station Road

Virgin Media were proposing to carry out Utility asset works on Station Road, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Mar 2025 at 15:42.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Whippendell Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Whippendell Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 14:57.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Whippendell Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Whippendell Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 30 May 2025 at 14:59.

Cadent Gas logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Rickmansworth Road

Cadent Gas were proposing to carry out Utility asset works on Rickmansworth Road, Watford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 12:36.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Pinner Road

Cadent Gas are carrying out Utility repair and maintenance works on Pinner Road, Northwood.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:27 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:17.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
The Avenue

Cadent Gas are carrying out Utility repair and maintenance works on The Avenue, Northwood.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:41 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:55.

Finishing
Today
Details
View Map
Share
Follow
Dalkeith Grove

London Borough Of Harrow are carrying out Highway repair and maintenance works on Dalkeith Grove, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 3 June 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 10:15.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Scots Hill

Affinity Water are carrying out Utility repair and maintenance works on Scots Hill, Croxley Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 00:45 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jun 2025 at 09:19.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Dec 2024 at 14:39.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Back Lane

Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Ainsdale Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:51.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Ainsdale Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:01.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Otley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:53.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Otley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:12.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Richfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:43.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Richfield Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 12:38.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Ivinghoe Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:46.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Grange Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:25.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Grange Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 12:50.

Cadent Gas logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
Rickmansworth Road

Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:27.

Cadent Gas logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
Rickmansworth Road

Cadent Gas are proposing to carry out Utility asset works on Rickmansworth Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 13:28.

Cadent Gas logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
Cassiobury Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Cassiobury Park Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 14:08.

Cadent Gas logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
Cassiobury Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Cassiobury Park Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:40.

Hertfordshire County Council logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Radlett Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 14:14.

Hertfordshire County Council logo
Between
5 and 10 Jun 2025
Details
View Map
Share
Follow
Radlett Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Mar 2025 at 08:21.

Cadent Gas logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.

Cadent Gas logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:03.

Cadent Gas logo
Between
6 and 27 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:55.

Cadent Gas logo
Between
6 and 27 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:21.

London Borough Of Barnet logo
Between
8 and 11 Jun 2025
Details
View Map
Share
Follow
Brockley Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 14:15.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Mar 2025 at 16:19.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:25.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Mar 2025 at 13:53.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:42.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 May 2025 at 12:56.

London Borough Of Barnet logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Brockley Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2025 at 14:21.

Hertfordshire County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Hagden Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 17 Mar 2025 at 11:13.

Hertfordshire County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Hagden Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Hagden Lane, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 30 May 2025 at 10:12.

Hertfordshire County Council logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Follow
Stephenson Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Stephenson Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 11 Mar 2025 at 13:17.

Hertfordshire County Council logo
Between
9 and 15 Jun 2025
Details
View Map
Share
Stephenson Way

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Stephenson Way, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 15 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 2 May 2025 at 10:26.

UK Power Networks Eastern & London logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Mayfield Avenue

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Mayfield Avenue, Kenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2025 at 10:19.

Hertfordshire County Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Mead Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mead Way, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:34.

Hertfordshire County Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Mead Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mead Way, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:25.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:58.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:47.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hale Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hale Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 13:59.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Dickinson Square

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 13:50.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Dickinson Square

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:07.

Hertfordshire County Council logo
Between
15 and 17 Jun 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 09:48.

Hertfordshire County Council logo
Between
15 and 18 Jun 2025
Details
View Map
Share
Follow
Otterspool Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 14:54.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Strathcona Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Strathcona Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 08:16.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 09:50.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 09:51.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 11:06.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 08:06.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Apr 2025 at 08:04.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:45.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Conway Gardens

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Conway Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Waltham Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Waltham Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Nash Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nash Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:43.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Princes Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:38.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hillfield Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:20.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hillfield Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:05.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hillfield Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 30 May 2025 at 11:43.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Stag Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.

Cadent Gas logo
Between
16 Jun and 10 Jul 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:28.

Cadent Gas logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Watford Road

Cadent Gas are proposing to carry out Utility asset works on Watford Road, Croxley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 12:47.

Hertfordshire County Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Watling Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Watling Street, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 14:03.

Hertfordshire County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Orphanage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 7 May 2025 at 12:18.

Hertfordshire County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Orphanage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Orphanage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 7 May 2025 at 14:45.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:47.

Hertfordshire County Council logo
Between
19 and 25 Jun 2025
Details
View Map
Share
Follow
Otterspool Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Mar 2025 at 14:50.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:33.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Kenton Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kenton Road, Harrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Cumberland Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Cumberland Road, Stanmore.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 12 May 2025 at 09:41.

Hertfordshire County Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 21 Jan 2025 at 11:50.

Hertfordshire County Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Sarratt Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Feb 2025 at 12:32.

Hertfordshire County Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Sarratt Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Mar 2025 at 15:05.

Affinity Water logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Elton Avenue

Affinity Water are proposing to carry out Utility asset works on Elton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Vaughan Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:43.

Cadent Gas logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 09:50.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Spencer Road

BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Apr 2025 at 13:34.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Spencer Road

BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
The Cross Way

BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 13:16.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
The Cross Way

BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 28 Jun 2025
Details
View Map
Share
St Thomas' Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 28 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 11:57.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
St Thomas' Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Jun 2025 at 11:31.

UK Power Networks Eastern & London logo
Between
23 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 11:46.

UK Power Networks Eastern & London logo
Between
23 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 13:05.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Mandeville Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mandeville Close, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:09.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Norfolk Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Norfolk Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 13:02.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:37.

London Borough Of Brent logo
Between
27 Jun and 26 Jul 2025
Details
View Map
Share
Follow
St Andrews Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 28 Mar 2025 at 08:55.

Hertfordshire County Council logo
Between
28 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Cassiobury Park Avenue

Hertfordshire County Council are proposing to carry out Highway improvement works on Cassiobury Park Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 14:30.

Hertfordshire County Council logo
Between
28 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Cassiobury Park Avenue

Hertfordshire County Council are proposing to carry out Highway improvement works on Cassiobury Park Avenue, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 10:35.

Cadent Gas logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Cedars Avenue

Cadent Gas are proposing to carry out Utility asset works on Cedars Avenue, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:53.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 15:48.

Hertfordshire County Council logo
Between
1 and 11 Jul 2025
Details
View Map
Share
Rickmansworth Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Rickmansworth Road, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 12:05.

Hertfordshire County Council logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Otterspool Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Apr 2025 at 10:42.

Hertfordshire County Council logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Otterspool Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otterspool Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 09:43.

Scottish Hydro Electric Power Dis logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Orchard Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Orchard Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 07:12.

Affinity Water logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Uxbridge Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Uxbridge Road, Hatch End.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 17:44.

Affinity Water logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Woodhall Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhall Drive, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:36.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Pinner Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 14:23.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 16:52.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 07:37.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 11:17.

Affinity Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Bonnersfield Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:29.

Affinity Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Bonnersfield Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:10.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Nightingale Road

Cadent Gas are proposing to carry out Utility asset works on Nightingale Road, Rickmansworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:56.

Between
8 and 10 Jul 2025
Details
View Map
Share
Leamington Crescent

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 14:39.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
High Worple

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on High Worple, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:09.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Imperial Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Imperial Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Close, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:05.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Argyle Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Argyle Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:06.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Compton Rise

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Compton Rise, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 16:21.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Shooters Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shooters Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:07.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Stirling Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Stirling Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:06.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Aberdeen Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Aberdeen Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 08:22.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Abbey Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Abbey Close, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 12:33.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
College Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on College Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 10:16.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Snaresbrook Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Snaresbrook Drive, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:04.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Walton Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Walton Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
D'arcy Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Drive, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Kenmore Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Culver Grove

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Apr 2025 at 10:56.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Whitefriars Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Whitefriars Avenue, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 14:52.

Hertfordshire County Council logo
Between
9 and 19 Jul 2025
Details
View Map
Share
Little Oxhey Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 14:59.

Hertfordshire County Council logo
Between
9 and 19 Jul 2025
Details
View Map
Share
Prestwick Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 14:55.

Between
10 and 14 Jul 2025
Details
View Map
Share
Follow
Perwell Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Perwell Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:24.

Hertfordshire County Council logo
Between
10 and 15 Jul 2025
Details
View Map
Share
Follow
Radlett Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 10:21.

Hertfordshire County Council logo
Between
10 and 15 Jul 2025
Details
View Map
Share
Follow
Radlett Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Radlett Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 12:44.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
The Rutts

Affinity Water are proposing to carry out Utility repair and maintenance works on The Rutts, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 11:10.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Marlborough Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 May 2025 at 10:01.

Affinity Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Little Green Lane

Affinity Water are proposing to carry out Utility asset works on Little Green Lane, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 13:13.

Hertfordshire County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Grange Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 14:04.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Stuart Avenue

BT were proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:05.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Stuart Avenue

BT are proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 09:23.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Kings Road

BT were proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:05.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 09:22.

Affinity Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Harrow View

Affinity Water were proposing to carry out Utility repair and maintenance works on Harrow View, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 May 2025 at 13:07.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are proposing to carry out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:24.

Hertfordshire County Council logo
Between
21 and 31 Jul 2025
Details
View Map
Share
Prestwick Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 15:00.

Cadent Gas logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:38.

Hertfordshire County Council logo
Between
21 and 31 Jul 2025
Details
View Map
Share
Hayling Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 15:01.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 08:38.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Harvil Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Harvil Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 May 2025 at 14:21.

Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:26.

Hertfordshire County Council logo
Between
23 and 26 Jul 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 16:10.

Hertfordshire County Council logo
Between
23 and 26 Jul 2025
Details
View Map
Share
Follow
Sarratt Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 16:09.

Thames Water logo
Between
24 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:17.

Hertfordshire County Council logo
LONG TERM
Between
27 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Station Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:47.

Hertfordshire County Council logo
LONG TERM
Between
27 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Langley Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Langley Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:37.

Cadent Gas logo
LONG TERM
Between
28 Jul and 13 Oct 2025
Details
View Map
Share
Victoria Road

Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.

Cadent Gas logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
East Lane

Cadent Gas are proposing to carry out Utility asset works on East Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 22:55.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Herlwyn Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 07:22.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Herlwyn Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:39.

Cadent Gas logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Marsh Road

Cadent Gas are proposing to carry out Utility asset works on Marsh Road, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 10:20.

Affinity Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 May 2025 at 12:49.

Affinity Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 May 2025 at 09:28.

Cadent Gas logo
LONG TERM
Between
28 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 15:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 13:10.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Bushey.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.

These works are categorised as Major.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Park Road, Rickmansworth.

These works are categorised as Major.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 13:11.

Cadent Gas logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:58.

Cadent Gas logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Bushey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:38.

Cadent Gas logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Bushey Hall Road

Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2025 at 16:30.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Station Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:22.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Langley Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Langley Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:20.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
St Albans Road

Hertfordshire County Council are proposing to carry out Highway improvement works on St Albans Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Jan 2025 at 14:23.

Hertfordshire County Council logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
St Albans Road

Hertfordshire County Council are proposing to carry out Highway improvement works on St Albans Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 20 May 2025 at 10:40.

Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:29.

Hertfordshire County Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Scammell Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Scammell Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 15:36.

Hertfordshire County Council logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Vicarage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 15:36.

Thames Water logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Southdown Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Southdown Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:51.

Affinity Water logo
Between
2 and 24 Aug 2025
Details
View Map
Share
Follow
Maxwell Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Maxwell Road, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:55.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Station Approach

Affinity Water are proposing to carry out Utility asset works on Station Approach, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Fishers Way

Affinity Water are proposing to carry out Utility asset works on Fishers Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 14:06.

Cadent Gas logo
LONG TERM
Between
4 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Victoria Road

Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works are categorised as Major.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 15:07.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Sumner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sumner Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:03.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Vaughan Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:31.

Between
4 and 18 Aug 2025
Details
View Map
Share
Vaughan Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 16:47.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Hill Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hill Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 09:57.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Tudor Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Tudor Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 May 2025 at 14:29.

Affinity Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Risingholme Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 May 2025 at 15:13.

Affinity Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Risingholme Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:00.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Boxtree Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Boxtree Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 09:57.

Cadent Gas logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:40.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:11.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:18.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:17.

Hertfordshire County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Harcourt Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Harcourt Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 10:03.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Leamington Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 May 2025 at 08:54.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
D'arcy Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Gardens, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:30.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Montrose Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Montrose Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:30.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Broadway, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:28.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Green Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:28.

Hertfordshire County Council logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 10:31.

Hertfordshire County Council logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Grange Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 May 2025 at 11:03.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 13:40.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Cannon Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Cannon Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 15:57.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Bridge Street

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bridge Street, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:52.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Canning Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:34.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Culver Grove

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:45.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Summit Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Summit Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 3 Jun 2025 at 11:36.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
The Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:22.

Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:47.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 07:40.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:55.

Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:51.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Christchurch Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:31.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:21.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Mollison Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:08.

Affinity Water logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Little Bushey Lane

Affinity Water are proposing to carry out Remedial works on Little Bushey Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:26.

Between
10 and 12 Aug 2025
Details
View Map
Share
Follow
Elm Park

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elm Park, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:59.

Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
The Bridge

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Bridge, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 14:18.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Harwoods Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harwoods Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 May 2025 at 09:55.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Harwoods Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Harwoods Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 May 2025 at 11:48.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Benskin Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Benskin Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 May 2025 at 11:47.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Milton Street

Affinity Water are proposing to carry out Highway repair and maintenance works on Milton Street, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 May 2025 at 15:38.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Copsewood Road

Affinity Water were proposing to carry out Highway repair and maintenance works on Copsewood Road, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:25.

Affinity Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Copsewood Road

Affinity Water were proposing to carry out Highway repair and maintenance works on Copsewood Road, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 May 2025 at 13:21.

Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Masons Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:47.

Affinity Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Norfolk Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norfolk Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Affinity Water on 25 Apr 2025 at 11:32.

Affinity Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Norfolk Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Norfolk Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Affinity Water on 7 May 2025 at 08:36.

Between
13 and 16 Aug 2025
Details
View Map
Share
Follow
Northwick Park Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Northwick Park Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:51.

Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
The Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Gardens, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 09:20.

Between
14 and 18 Aug 2025
Details
View Map
Share
Follow
Vaughan Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 May 2025 at 14:25.

Hertfordshire County Council logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 11:40.

Hertfordshire County Council logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Sarratt Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sarratt Road, Sarratt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 11:36.

Cadent Gas logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Princes Way

Cadent Gas are proposing to carry out Utility asset works on Princes Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 15:06.

Cadent Gas logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Field End Road

Cadent Gas are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:32.

Cadent Gas logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Swakeleys Road

Cadent Gas are proposing to carry out Utility asset works on Swakeleys Road, Ickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 07:37.

Cadent Gas logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:30.

UK Power Networks Eastern & London logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Potter Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Potter Street, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 May 2025 at 10:28.

Vodafone logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
Clarendon Road

Vodafone are proposing to carry out New service connection on Clarendon Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 20 May 2025 at 09:07.

Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Marsh Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Marsh Road, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 14:52.

Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:17.

Between
21 and 23 Aug 2025
Details
View Map
Share
Follow
Eastcote Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eastcote Road, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:02.

Cadent Gas logo
Between
21 and 27 Aug 2025
Details
View Map
Share
Follow
Harrogate Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Harrogate Road, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 08:00.

Hertfordshire County Council logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Scammell Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Scammell Way, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2025 at 09:57.

Hertfordshire County Council logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Vicarage Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 08:36.

Hertfordshire County Council logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Hempstead Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Road, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 13:50.


Roadworks Map near to Uxbridge Road, PINNER, HA5 4JB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 14:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Uxbridge Road, PINNER, HA5 4JB (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MILNE FEILD 
(0.5 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
2
EMERGENCY
  
THORNTON GROVE 
(0.5 miles)
London Borough Of Harrow
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Complete
2 Jun 2025 13:09 - 14:05
0.5
Details
Share
3
MAJOR
  
ALBURY DRIVE 
(0.6 miles)
London Borough Of Harrow
Highway improvement works - Footway - Some carriageway incursion
In Progress
Since: 30 May 2025 08:00
(Scheduled: 19 May 2025 - 10 Aug 2025)
0.6
Details
Share
Follow
4
BT logo
BONIFACE WALK 
(0.8 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.8
Details
Share
Follow
5
Virgin Media logo
MOSS LANE 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.8
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
NORMAN CRESCENT 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jul 2025
0.9
Details
Share
Follow
7
UK Power Networks Eastern & London logo
URGENT
  
LONG ELMES 
(0.9 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 2 Jun 2025 11:54
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.9
Details
Share
Follow
8
UK Power Networks Eastern & London logo
URGENT
  
LONG ELMES 
(0.9 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 11:40
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.9
Details
Share
Follow
9
Affinity Water logo
URGENT
  
GEORGE V AVENUE 
(0.9 miles)
Affinity Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Jun 2025 11:43
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
0.9
Details
Share
Follow
10
UK Power Networks Eastern & London logo
URGENT
  
MOSS LANE 
(0.9 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 3 Jun 2025 14:25
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data