ROADWORKS SUMMARY
Eamont Close, RUISLIP, HA4 7YX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Eamont Close, HA4 7YX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Eamont Close, RUISLIP, HA4 7YX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Eamont Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Denham Way

Thames Water are carrying out Utility asset works on Denham Way, Maple Cross.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 10:00 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:56.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 14:57.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 23:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:05.

Hertfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are carrying out Section 50 on Denham Way, Maple Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 2 Dec 2024 at 14:57.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are carrying out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:40 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.

ESP Electricity logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Iron Bridge Road

ESP Electricity are carrying out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 10:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 28 Nov 2024 at 07:04.

Buckinghamshire Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Bangors Road South

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bangors Road South, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 13:06.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 12:09.

London Borough Of Hillingdon logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 14:29.

Hertfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Victoria Close

Hertfordshire County Council are carrying out Section 50 on Victoria Close, Rickmansworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 07:56 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 08:59.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Horton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 6 Aug 2024 at 13:48.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:26.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:43.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 7 Nov 2024 at 14:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bolton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:19.

London Borough Of Ealing logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Rowdell Road

London Borough Of Ealing are carrying out Highway improvement works on Rowdell Road, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2024 at 16:48.

Thames Water logo
Between
25 Nov and 25 Dec 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 16:08.

UK Power Networks Eastern & London logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Townfield

UK Power Networks Eastern & London are carrying out New service connection on Townfield, Rickmansworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 13:53.

UK Power Networks Eastern & London logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Greenhill Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Greenhill Crescent, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 11:21.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:07 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:47.

Buckinghamshire Council logo
Between
27 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Nov 2024 at 09:55.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Evreham Road

Affinity Water were proposing to carry out Remedial works on Evreham Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 09:52.

Cityfibre Metro Networks logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 15:14.

Cityfibre Metro Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 16:55.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Sep 2024 at 13:19.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:01.

Cityfibre Metro Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Dec 2024 at 08:31.

London Borough Of Hillingdon logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Dec 2024 at 09:03.

Finishing
Today
Details
View Map
Share
Milman Close

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:50.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on High Street, Wealdstone.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 03:14 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:43.

Finishing
Today
Details
View Map
Share
Marsworth Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Highlands End

Cadent Gas are proposing to carry out Utility asset works on Highlands End, Chalfont St Peter.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:18.

Hertfordshire County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
The Woods

Hertfordshire County Council are proposing to carry out Highway improvement works on The Woods, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 14:18.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Long Drive

Network Rail are carrying out Works for Rail Purposes on Long Drive, Ruislip.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 22:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Dec 2024 at 09:22.

London Borough Of Hillingdon logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fairfield Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 08:55.

Scottish Hydro Electric Power Dis logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Pield Heath Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pield Heath Road, Uxbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Dec 2024 at 09:34.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Fairway Drive

BT are proposing to carry out New service connection on Fairway Drive, Greenford.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Nov 2024 at 08:24.

Finishing
Sunday
Details
View Map
Share
Pinner Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 11:13.

London Borough Of Hillingdon logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Buckinghamshire Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Dukes Wood Drive

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Drive, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:56.

Buckinghamshire Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Dukes Wood Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Dukes Wood Avenue, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Apr 2024 at 10:57.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Whitethorn Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Whitethorn Avenue, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 08:18.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Whitethorn Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Whitethorn Avenue, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:18.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:17.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Oct 2024 at 13:52.

Buckinghamshire Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
St Huberts Close

Buckinghamshire Council are proposing to carry out roadworks on St Huberts Close, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Nov 2024 at 15:26.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 14:54.

Between
9 and 12 Dec 2024
Details
View Map
Share
Parkfield Gardens

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:29.

Hertfordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Valley Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 11:46.

Hertfordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Valley Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Valley Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:40.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Havelock Place

London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 09:19.

Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Lower Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Grange Way

Cadent Gas are proposing to carry out Utility asset works on Grange Way, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:38.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Hertfordshire County Council logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Section 50 on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 16:51.

Affinity Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:47.

Between
18 and 21 Dec 2024
Details
View Map
Share
Pinner Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Oct 2024 at 15:34.

London Borough Of Hillingdon logo
LONG TERM
Between
20 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Batchworth Lane

Cadent Gas are proposing to carry out Utility asset works on Batchworth Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 13:54.

Buckinghamshire Council logo
Between
3 and 14 Jan 2025
Details
View Map
Share
Denham Avenue

Buckinghamshire Council were proposing to carry out Highway improvement works on Denham Avenue, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 14 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 09:21.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
West Drayton Road

Cadent Gas were proposing to carry out Utility asset works on West Drayton Road, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:37.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:38.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Junction Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.

Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Moorfield Road

Cadent Gas were proposing to carry out Utility asset works on Moorfield Road, Denham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:09.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Marsham Lane

BT are proposing to carry out Utility asset works on Marsham Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Oct 2024 at 13:59.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Nibthwaite Road

BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.

Buckinghamshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Station Approach

Buckinghamshire Council are proposing to carry out Highway improvement works on Station Approach, Gerrards Cross.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 13 Nov 2024 at 12:40.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 11:52.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
London Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 13:28.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Dickinson Square

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:54.

Hertfordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Dickinson Square

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dickinson Square, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 13:32.

UK Power Networks Eastern & London logo
Between
7 and 28 Jan 2025
Details
View Map
Share
Follow
Rectory Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Rectory Road, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:13.

London Borough Of Hillingdon logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 15:48.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Clitheroe Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:30.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Clitheroe Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:32.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:15.

Hertfordshire County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Denham Way

Hertfordshire County Council are proposing to carry out Highway improvement works on Denham Way, Maple Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 11:19.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
The Watergate

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:26.

Hertfordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
The Watergate

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:36.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:31.

Affinity Water logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Victoria Close

Affinity Water are proposing to carry out Utility asset works on Victoria Close, Rickmansworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 10:30.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 16:33.

Cadent Gas logo
LONG TERM
Between
14 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:16.

London Borough Of Hillingdon logo
LONG TERM
Between
14 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Dec 2024 at 08:08.

Hertfordshire County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Clitheroe Gardens

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:44.

Affinity Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Eastcote Lane

Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 12:25.

Scottish Hydro Electric Power Dis logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fulmer Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fulmer Lane, Gerrards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:20.

Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 20 Nov 2024 at 08:01.

Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 22 Nov 2024 at 07:21.

Cityfibre Metro Networks logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Bangors Road South

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 10:47.

London Borough Of Hillingdon logo
LONG TERM
Between
27 Jan and 27 Mar 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 15:44.

Cadent Gas logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:07.

Affinity Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.

London Borough Of Ealing logo
LONG TERM
Between
28 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:19.

Affinity Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Silk Mill Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Silk Mill Road, Oxhey Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 12:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Station Roundabout

UK Power Networks Eastern & London are proposing to carry out New service connection on Station Roundabout, Rickmansworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:12.

Buckinghamshire Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Southlands Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Southlands Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Nov 2024 at 10:19.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

London Borough Of Hillingdon logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 15:46.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 15:25.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:54.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
3 Feb and 15 Apr 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:19.

Hertfordshire County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:55.

Hertfordshire County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
The Green

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Croxley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:30.

London Borough Of Hillingdon logo
Between
5 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 3 Dec 2024 at 15:43.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:14.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 13:48.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Nov 2024 at 10:46.

Network Rail logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:16.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 07:52.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Freemans Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Freemans Lane, Hayes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Nov 2024 at 11:53.

Affinity Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Kingsway

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:25.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Blenheim Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Blenheim Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:47.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fine Bush Lane

BT are proposing to carry out Utility asset works on Fine Bush Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:24.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Alexandra Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 08:40.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodhurst Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhurst Drive, Denham Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 14:00.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodhurst Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhurst Drive, Denham Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 13:05.

G2 Energy IDNO logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Field End Road

G2 Energy IDNO were proposing to carry out New service connection on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 10:45.

G2 Energy IDNO logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Field End Road

G2 Energy IDNO are proposing to carry out New service connection on Field End Road, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 11:07.

Cadent Gas logo
Between
14 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chessington Court

Cadent Gas are proposing to carry out Utility asset works on Chessington Court, Pinner.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:30.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 10:03.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 09:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 11:00.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:23.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:14.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:53.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Chase

Cadent Gas are proposing to carry out Utility asset works on The Chase, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:39.

Affinity Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Affinity Water are proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 07:47.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Nov 2024 at 07:30.

Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
The Close

London Borough Of Harrow are proposing to carry out Highway improvement works on The Close, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 26 Nov 2024 at 07:39.

Affinity Water logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Palmerston Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:28.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 14:34.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Dene Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 10:09.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Northolt Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

BT are proposing to carry out Utility repair and maintenance works on Greenford Road, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 15:55.

Cadent Gas logo
Between
25 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Elms Road

Cadent Gas are proposing to carry out Utility asset works on Elms Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:24.

Affinity Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 13:40.

Affinity Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 07:59.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Affinity Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 15:11.

Virgin Media logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Station Road

Virgin Media were proposing to carry out Remedial works on Station Road, Rickmansworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Dec 2024 at 16:35.


Roadworks Map near to Eamont Close, RUISLIP, HA4 7YX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Eamont Close, RUISLIP, HA4 7YX (25 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Hillingdon logo
MAJOR
  
BREAKSPEAR ROAD 
(0.2 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 11 Dec 2024
0.2
Details
Share
Follow
2
London Borough Of Hillingdon logo
MAJOR
  
BREAKSPEAR ROAD 
(0.2 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Road closure
Complete
11 Nov 2024 08:00 - 14 Nov 2024 17:00
0.2
Details
Share
3
Virgin Media logo
URGENT
  
STOWE CRESCENT 
(0.2 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Complete
3 Dec 2024 10:00 - 13:36
0.2
Details
Share
4
HS2 logo
BREAKSPEAR ROAD SOUTH 
(0.3 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
In Progress
Since: 13 Sep 2021 08:00
(Scheduled: 13 Sep 2021 - 31 Dec 2025)
0.3
Details
Share
Follow
5
BT logo
FAIRFIELD AVENUE 
(0.3 miles)
BT
Remedial works - Footway, Carriageway - Give and take
Planned
Scheduled: 5 Dec 2024 - 6 Dec 2024
0.3
Details
Share
Follow
6
HS2 logo
CLACK LANE PUBLIC FOOTPATH TO BREAKSPEAR ROAD SOUTH 
(0.4 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
In Progress
Since: 12 Dec 2022 10:00
(Scheduled: 12 Dec 2022 - 31 Mar 2025)
0.4
Details
Share
Follow
7
London Borough Of Hillingdon logo
BREAKSPEAR ROAD 
(0.4 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 3 Dec 2024 13:30
(Scheduled: 3 Dec 2024 - 4 Dec 2024)
0.4
Details
Share
Follow
8
London Borough Of Hillingdon logo
MAJOR
  
STANDALE GROVE 
(0.5 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Nov 2024 - 6 Dec 2024
0.5
Details
Share
Follow
9
Affinity Water logo
HILL LANE 
(0.5 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
2 Dec 2024 08:58 - 10:21
0.5
Details
Share
10
HS2 logo
BREAKSPEAR ROAD SOUTH 
(0.5 miles)
HS2
Works for Rail Purposes - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 17 May 2021 08:00
(Scheduled: 10 May 2021 - 31 Dec 2025)
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data