ROADWORKS SUMMARY
Worple Close, HARROW, HA2 9ST

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Worple Close, HA2 9ST and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Worple Close, HARROW, HA2 9ST

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Worple Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

HS2 logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:00 and could run through until 30 September 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 2 Sep 2024 at 15:12.

HS2 logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Utility asset works on Western Avenue, Perivale.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 11 March 2024 at 09:30 and could run through until 15 October 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by HS2 on 12 Aug 2024 at 15:38.

HS2 logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
West Gate

HS2 are carrying out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 00:01 and could run through until 15 October 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 Aug 2024 at 16:08.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.

HS2 logo
LONG TERM
Until
28 Oct 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:31.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.

London Borough Of Ealing logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are carrying out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 4 Jul 2024 at 09:17.

Cadent Gas logo
LONG TERM
Until
14 Oct 2024
Details
View Map
Share
Follow
Northwood Way

Cadent Gas are carrying out Utility asset works on Northwood Way, Northwood.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 11:03 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 10:54.

HS2 logo
LONG TERM
Until
6 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Section 50 on Western Avenue, Ealing.

These works are categorised as Major.

The works started on 17 July 2024 at 22:00 and could run through until 6 October 2024. The works will impact the footway, carriageway, cycleway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 31 Jul 2024 at 12:35.

Cadent Gas logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Watford Road

Cadent Gas are carrying out Utility asset works on Watford Road, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 July 2024 at 10:52 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:26.

London Borough Of Hillingdon logo
LONG TERM
Between
29 Jul and 31 Oct 2024
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Hayes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hillingdon on 26 Jun 2024 at 06:57.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are proposing to carry out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 12:06.

Cadent Gas logo
LONG TERM
Until
20 Oct 2024
Details
View Map
Share
Follow
Cotman Gardens

Cadent Gas are carrying out Utility asset works on Cotman Gardens, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:41 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 10:04.

Cadent Gas logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Chaplin Road

Cadent Gas are carrying out Utility asset works on Chaplin Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 09:43 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 09:27.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Bridle Road

Cadent Gas are carrying out Utility asset works on Bridle Road, Eastcote.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 08:55 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 08:57.

Affinity Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Avenue Road

Affinity Water are carrying out Utility asset works on Avenue Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:33 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 12:58.

Affinity Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Hamilton Road

Affinity Water are carrying out Utility asset works on Hamilton Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:33 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Aug 2024 at 09:33.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:32.

LONG TERM
Between
12 Aug and 15 Nov 2024
Details
View Map
Share
Greenhill Way

London Borough Of Harrow were proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:27.

Thames Water logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works started on 19 August 2024 at 08:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 09:52.

Cadent Gas logo
LONG TERM
Between
19 Aug and 7 Oct 2024
Details
View Map
Share
Follow
Stuart Avenue

Cadent Gas are proposing to carry out Utility asset works on Stuart Avenue, South Harrow.

These works are categorised as Major.

The works will start on or after 19 August 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 14:47.

LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
College Road

London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.

London Borough Of Ealing logo
LONG TERM
Between
21 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 22 May 2024 at 08:02.

London Borough Of Hillingdon logo
Finishing
Today
Details
View Map
Share
Charville Lane

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Charville Lane, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2024 and run through until 20 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 Aug 2024 at 09:49.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Cambridge Road

Affinity Water are carrying out Utility asset works on Cambridge Road, Southall.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 14:47 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Aug 2024 at 14:48.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Boyd Avenue

Affinity Water are carrying out Utility asset works on Boyd Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 14:47 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Aug 2024 at 14:47.

Cadent Gas logo
LONG TERM
Between
26 Aug and 22 Oct 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are proposing to carry out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:20.

Thames Water logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
St Michael's Crescent

Thames Water are carrying out Utility repair and maintenance works on St Michael's Crescent, Rayners Lane.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 10:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:42.

London Borough Of Hillingdon logo
LONG TERM
Between
27 Aug and 27 Sep 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 27 Jun 2024 at 10:28.

London Borough Of Hillingdon logo
LONG TERM
Between
27 Aug and 27 Sep 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Jul 2024 at 08:07.

London Borough Of Hillingdon logo
LONG TERM
Between
27 Aug and 30 Sep 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 31 Jul 2024 at 13:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Green Lane

Cadent Gas are carrying out Utility asset works on Green Lane, Uxbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 10:27 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 11:04.

Thames Water logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
District Road

Thames Water are carrying out Utility repair and maintenance works on District Road, Wembley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 15:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:15.

Hertfordshire County Council logo
LONG TERM
Between
2 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Oxhey Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Oxhey Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Feb 2024 at 13:47.

Hertfordshire County Council logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Oxhey Road

Hertfordshire County Council are carrying out Highway improvement works on Oxhey Road, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 10:17 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2024 at 10:17.

Hertfordshire County Council logo
LONG TERM
Between
2 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Eastbury Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Eastbury Road, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Feb 2024 at 13:48.

Hertfordshire County Council logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Eastbury Road

Hertfordshire County Council are carrying out Highway improvement works on Eastbury Road, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 10:17 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2024 at 10:17.

Hertfordshire County Council logo
LONG TERM
Between
2 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Deacons Hill

Hertfordshire County Council are proposing to carry out Highway improvement works on Deacons Hill, Watford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 23 Feb 2024 at 13:48.

Hertfordshire County Council logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Deacons Hill

Hertfordshire County Council are carrying out Highway improvement works on Deacons Hill, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 10:18 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 2 Sep 2024 at 10:18.

London Borough Of Hillingdon logo
Finishing
Today
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 08:00 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 14:36.

G2 Energy IDNO logo
Between
5 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Hillingdon Road

G2 Energy IDNO are proposing to carry out Utility asset works on Hillingdon Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2024 and could run through until 3 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by G2 Energy IDNO on 13 Aug 2024 at 07:47.

G2 Energy IDNO logo
Between
5 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Hillingdon Road

G2 Energy IDNO are proposing to carry out Utility asset works on Hillingdon Road, Uxbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2024 and could run through until 3 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by G2 Energy IDNO on 14 Aug 2024 at 11:08.

G2 Energy IDNO logo
Between
5 Sep and 3 Oct 2024
Details
View Map
Share
Hillingdon Road

G2 Energy IDNO were proposing to carry out Utility asset works on Hillingdon Road, Uxbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2024 and run through until 3 October 2024. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by G2 Energy IDNO on 2 Sep 2024 at 08:34.

Cadent Gas logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
New Road

Cadent Gas are carrying out Utility asset works on New Road, Uxbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 09:04 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 09:42.

London Borough Of Ealing logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Ealing are carrying out Highway improvement works on Broadmead Road, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 13 Sep 2024 at 15:03.

London Borough Of Hillingdon logo
Between
9 Sep and 9 Oct 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 08:50.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Cecil Park

Cadent Gas are carrying out Utility repair and maintenance works on Cecil Park, Pinner.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 17:00 and could run through until 22 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 11:12.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Parr Road

Affinity Water are carrying out Utility repair and maintenance works on Parr Road, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 10:42 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 19:12.

London Borough Of Ealing logo
LONG TERM
Between
16 Sep and 2 Nov 2024
Details
View Map
Share
Follow
Merrick Road

London Borough Of Ealing are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2024 at 15:24.

London Borough Of Ealing logo
LONG TERM
Until
2 Nov 2024
Details
View Map
Share
Follow
Merrick Road

London Borough Of Ealing are carrying out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 17:41 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 17 Sep 2024 at 09:07.

Cadent Gas logo
Between
16 Sep and 7 Oct 2024
Details
View Map
Share
Eastcote Road

Cadent Gas were proposing to carry out Utility asset works on Eastcote Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 7 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 08:12.

Between
16 and 27 Sep 2024
Details
View Map
Share
Pinner Park Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Aug 2024 at 14:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Pinner Park Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:16.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Almond Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Almond Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Verwood Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Verwood Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Parkfield Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Crescent, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Parkfield Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 16:39.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Augustine Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Augustine Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 16:37.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Bancroft Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bancroft Gardens, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

Between
16 and 27 Sep 2024
Details
View Map
Share
Follow
Theobald Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Theobald Crescent, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:17.

London Borough Of Hillingdon logo
Between
16 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Northgate

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Northgate, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Sep 2024 at 15:22.

Hertfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hartsbourne Avenue

Hertfordshire County Council are proposing to carry out Section 50 on Hartsbourne Avenue, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Sep 2024 at 13:09.

Hertfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hartsbourne Avenue

Hertfordshire County Council are proposing to carry out Section 50 on Hartsbourne Avenue, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 30 Aug 2024 at 12:53.

London Borough Of Hillingdon logo
Between
18 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Hillingdon logo
Between
18 Sep and 18 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:00.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Highview Road

Thames Water are carrying out Utility repair and maintenance works on Highview Road, West Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:10 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:58.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Station Road

Affinity Water are carrying out Utility repair and maintenance works on Station Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 10:03 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 11:44.

London Borough Of Hillingdon logo
Between
19 Sep and 18 Oct 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:32.

London Borough Of Hillingdon logo
Between
19 Sep and 19 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:00.

London Borough Of Hillingdon logo
Until
18 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 08:00 and could run through until 18 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 19 Sep 2024 at 08:21.

London Borough Of Hillingdon logo
Between
19 Sep and 19 Oct 2024
Details
View Map
Share
Follow
Breakspear Road North

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road North, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:39.

Cadent Gas logo
Until
27 Sep 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are carrying out Utility repair and maintenance works on Sandy Lane, Northwood.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 18:34 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 18:38.

Scottish Hydro Electric Power Dis logo
Between
21 Sep and 18 Oct 2024
Details
View Map
Share
Freemans Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Freemans Lane, Hayes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2024 and run through until 18 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:52.

Until
31 Oct 2024
Details
View Map
Share
Follow
Old Redding

London Borough Of Harrow are carrying out Highway repair and maintenance works on Old Redding, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 06:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 06:49.

Until
1 Nov 2024
Details
View Map
Share
Follow
Common Road

London Borough Of Harrow are carrying out Highway repair and maintenance works on Common Road, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2024 at 11:20.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grittleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Grittleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 16:33.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Pinner Park Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:42.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Almond Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Almond Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:40.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Verwood Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Verwood Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:29.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tudor Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Affinity Water on 16 Jul 2024 at 08:37.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Parkfield Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Crescent, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:25.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Parkfield Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:21.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Augustine Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Augustine Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:14.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Bancroft Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bancroft Gardens, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 10:12.

Between
23 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Theobald Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Theobald Crescent, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 09:42.

London Borough Of Hillingdon logo
Between
23 Sep and 16 Oct 2024
Details
View Map
Share
Follow
Northgate

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Northgate, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:03.

Between
23 and 28 Sep 2024
Details
View Map
Share
Woodhall Gate

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Woodhall Gate, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 28 September 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 16:15.

Hertfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Magnaville Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Magnaville Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 Sep 2024 at 14:15.

Cadent Gas logo
LONG TERM
Between
24 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:31.

Affinity Water logo
Between
25 and 27 Sep 2024
Details
View Map
Share
Follow
Durdans Road

Affinity Water are proposing to carry out Remedial works on Durdans Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Jun 2024 at 15:00.

Affinity Water logo
Between
28 Sep and 1 Oct 2024
Details
View Map
Share
Follow
South Way

Affinity Water are proposing to carry out Permanent reinstatement on South Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Jul 2024 at 07:37.

Between
30 Sep and 2 Oct 2024
Details
View Map
Share
Rayners Lane

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 2 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 08:53.

Between
30 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on West Drive, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Aug 2024 at 08:48.

Between
30 Sep and 3 Oct 2024
Details
View Map
Share
Follow
West Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on West Drive, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Jul 2024 at 14:21.

Hertfordshire County Council logo
Between
30 Sep and 3 Oct 2024
Details
View Map
Share
Sandy Lane

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 3 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Aug 2024 at 12:58.

Affinity Water logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Masons Avenue

Affinity Water were proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 3 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Aug 2024 at 13:08.

Between
3 and 5 Oct 2024
Details
View Map
Share
Follow
Gordon Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Gordon Avenue, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 5 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:42.

HS2 logo
Between
6 and 24 Oct 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are proposing to carry out Utility asset works on Western Avenue, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 9 Sep 2024 at 12:21.

Cadent Gas logo
Between
6 and 25 Oct 2024
Details
View Map
Share
Follow
The Oaks

Cadent Gas are proposing to carry out Utility asset works on The Oaks, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 10:45.

Cadent Gas logo
Between
6 and 25 Oct 2024
Details
View Map
Share
Follow
The Oaks

Cadent Gas are proposing to carry out Utility asset works on The Oaks, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 00:10.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:42.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:09.

London Borough Of Hillingdon logo
LONG TERM
Between
7 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Park Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2024 at 08:21.

Thames Water logo
Between
8 and 12 Oct 2024
Details
View Map
Share
Follow
Cavendish Avenue

Thames Water are proposing to carry out New service connection on Cavendish Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2024 at 10:28.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Herlwyn Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:40.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Herlwyn Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:40.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:41.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:08.

London Borough Of Hillingdon logo
LONG TERM
Between
8 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Moorhall Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Moorhall Road, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2024 at 08:22.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 14:07.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 17 Sep 2024 at 11:09.

London Borough Of Hillingdon logo
LONG TERM
Between
9 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Wood Lane, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 18 Sep 2024 at 08:22.

Between
9 and 11 Oct 2024
Details
View Map
Share
Follow
Norwood Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Norwood Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 08:51.

Between
9 and 12 Oct 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:27.

Between
10 and 12 Oct 2024
Details
View Map
Share
Follow
Eastcote Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Eastcote Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Affinity Water logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Featherstone Terrace

Affinity Water are proposing to carry out Utility repair and maintenance works on Featherstone Terrace, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Aug 2024 at 12:46.

London Borough Of Hillingdon logo
LONG TERM
Between
14 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Goulds Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Goulds Green, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:31.

Cadent Gas logo
Between
14 and 20 Oct 2024
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:08.

Affinity Water logo
Between
14 and 25 Oct 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 12 Jul 2024 at 09:05.

Affinity Water logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
St James Gardens

Affinity Water are proposing to carry out Utility asset works on St James Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Jul 2024 at 14:41.

BT logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
The Avenue

BT are proposing to carry out Utility repair and maintenance works on The Avenue, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Jul 2024 at 09:17.

Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:10.

Between
17 and 19 Oct 2024
Details
View Map
Share
Follow
Pinner Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:24.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
West Drayton Road

Cadent Gas are proposing to carry out Utility asset works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:08.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
West Drayton Road

Cadent Gas are proposing to carry out Utility asset works on West Drayton Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 13:31.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Between
21 and 26 Oct 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Park Lane, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 11:16.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:27.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
King Edwards Road

Cadent Gas are proposing to carry out Utility asset works on King Edwards Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 10:53.

Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Peterborough Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Aug 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:32.

UK Power Networks Eastern & London logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Hermitage Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Hermitage Way, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2024 at 09:21.

London Borough Of Hillingdon logo
LONG TERM
Between
21 Oct and 21 Nov 2024
Details
View Map
Share
Follow
Kings Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Close, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:34.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
West End Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:13.

London Borough Of Hillingdon logo
LONG TERM
Between
22 Oct and 22 Nov 2024
Details
View Map
Share
Follow
West End Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Sep 2024 at 09:29.

Between
23 and 25 Oct 2024
Details
View Map
Share
Follow
Wargrave Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Wargrave Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
24 and 26 Oct 2024
Details
View Map
Share
Follow
Whitby Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Whitby Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Affinity Water logo
Between
26 and 31 Oct 2024
Details
View Map
Share
Follow
Kingsway

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Aug 2024 at 07:23.

Affinity Water logo
Between
26 and 31 Oct 2024
Details
View Map
Share
Follow
Kingsway

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Sep 2024 at 15:09.

London Borough Of Ealing logo
Between
26 and 28 Oct 2024
Details
View Map
Share
Follow
Aintree Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Aintree Road, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 16 Sep 2024 at 12:36.

London Borough Of Hillingdon logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Owen Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:37.

London Borough Of Hillingdon logo
LONG TERM
Between
28 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Sep 2024 at 16:32.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:10.

Affinity Water logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Masons Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Sep 2024 at 14:36.

Cornerstone Telecommunications Infrastructure logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Sep 2024 at 10:25.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:43.

Between
28 and 31 Oct 2024
Details
View Map
Share
Weald Rise

London Borough Of Harrow were proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Aug 2024 at 14:54.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Weald Rise

London Borough Of Harrow are proposing to carry out Highway improvement works on Weald Rise, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 29 Aug 2024 at 16:30.

Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Brookshill

London Borough Of Harrow are proposing to carry out Highway improvement works on Brookshill, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.

Between
28 and 31 Oct 2024
Details
View Map
Share
Follow
Old Redding

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Old Redding, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Aug 2024 at 10:53.

Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Common Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Common Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:42.

London Borough Of Hillingdon logo
LONG TERM
Between
30 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:56.

Between
31 Oct and 2 Nov 2024
Details
View Map
Share
Follow
Latimer Gardens

London Borough Of Harrow are proposing to carry out Highway improvement works on Latimer Gardens, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:43.

Between
31 Oct and 3 Nov 2024
Details
View Map
Share
Follow
College Hill Road

London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:08.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Goulds Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Goulds Green, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:57.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Glencoe Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:55.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:50.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Owen Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Ayles Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Ayles Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:37.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:56.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Field End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
West End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:01.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kings Close

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kings Close, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:51.

London Borough Of Hillingdon logo
Between
4 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Green Man Lane

Thames Water were proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:59.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:00.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.

London Borough Of Ealing logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2024 at 14:49.

Between
4 and 8 Nov 2024
Details
View Map
Share
Cannon Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Cannon Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 15:09.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rusland Park Road

BT are proposing to carry out Utility repair and maintenance works on Rusland Park Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:48.

BT logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Marlborough Hill

BT are proposing to carry out Utility repair and maintenance works on Marlborough Hill, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Sep 2024 at 09:47.

Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Belmont Circle

London Borough Of Harrow are proposing to carry out Highway improvement works on Belmont Circle, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:11.

Hertfordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Gosforth Lane

Hertfordshire County Council are proposing to carry out Works for road purposes on Gosforth Lane, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Sep 2024 at 15:55.

Affinity Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Cornwall Road

Affinity Water are proposing to carry out Utility asset works on Cornwall Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:07.

Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:21.

London Borough Of Hillingdon logo
Between
7 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Glencoe Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:31.

Between
7 and 9 Nov 2024
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 09:58.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Eastholme

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Eastholme, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:37.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Eastholme

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Eastholme, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 16 Sep 2024 at 13:40.

Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Chester Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Chester Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Aug 2024 at 23:22.

London Borough Of Hillingdon logo
Between
11 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Affinity Water are proposing to carry out Utility asset works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Aug 2024 at 11:56.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Affinity Water are proposing to carry out Utility asset works on Gainsborough Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Aug 2024 at 09:03.

Affinity Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Sussex Crescent

Affinity Water were proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Aug 2024 at 09:51.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Moorhall Road

Cadent Gas are proposing to carry out Utility asset works on Moorhall Road, Harefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 14:43.

Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Pinner Green

London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.

Between
18 and 20 Nov 2024
Details
View Map
Share
Paines Lane

London Borough Of Harrow were proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:20.

Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Paines Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on Paines Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Sep 2024 at 15:27.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Altham Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Altham Road, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2024 at 08:47.

Affinity Water logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Hawthorn Farm Avenue

Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 14:38.

Affinity Water logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Hawthorn Farm Avenue

Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 10:48.

Between
19 and 23 Nov 2024
Details
View Map
Share
Pinner Green

London Borough Of Harrow were proposing to carry out Highway improvement works on Pinner Green, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 13:18.

Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Sylvia Avenue

London Borough Of Harrow are proposing to carry out Highway improvement works on Sylvia Avenue, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Eliot Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:01.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Manor Park Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Manor Park Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

Affinity Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Parkfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Parkfield Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
The Chase

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Chase, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

UK Power Networks Eastern & London logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 15:54.

Affinity Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Aug 2024 at 13:12.

UK Power Networks Eastern & London logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Elmcroft Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elmcroft Crescent, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Affinity Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Springfield

Affinity Water are proposing to carry out Utility repair and maintenance works on Springfield, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 30 Aug 2024 at 11:05.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Sandringham Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.

Between
27 and 29 Nov 2024
Details
View Map
Share
Alexandra Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Exeter Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Eastcote Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Coles Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Capthorne Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Alfriston Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Rosecroft Walk

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rosecroft Walk, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
West End Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on West End Avenue, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Broadcroft Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Woodhall Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Woodhall Avenue, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Woodhall Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Woodhall Drive, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Wolverton Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Hathaway Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hathaway Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 16:30.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.

Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Queensbury Circle Parade

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 09:38.

Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.

London Borough Of Hillingdon logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:50.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

UK Power Networks Eastern & London logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Milman Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Milman Close, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Marsworth Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.

Between
2 and 5 Dec 2024
Details
View Map
Share
Fallowfield

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.

Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Fallowfield

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Sep 2024 at 15:50.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Heathbourne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.

Between
4 and 6 Dec 2024
Details
View Map
Share
Naresby Fold

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Naresby Fold

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.

London Borough Of Hillingdon logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Parkfield Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2024 at 16:30.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2024 at 11:02.

Cornerstone Telecommunications Infrastructure logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Weston Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2024 at 13:52.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 22 Dec 2024
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.

Between
11 and 16 Dec 2024
Details
View Map
Share
Follow
Kymberley Road

London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.

Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Havelock Place

London Borough Of Harrow are proposing to carry out roadworks on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 18 Sep 2024 at 17:16.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Sep 2024 at 14:48.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.


Roadworks Map near to Worple Close, HARROW, HA2 9ST

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Sep 2024 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Worple Close, HARROW, HA2 9ST (26 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
EMERGENCY
  
HIGH WORPLE 
(0.1 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 26 Aug 2024 10:30
(Scheduled: 26 Aug 2024 - 20 Sep 2024)
0.1
Details
Share
Follow
2
OVESDON AVENUE 
(0.2 miles)
London Borough Of Harrow
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 20 Sep 2024 - 24 Sep 2024
0.2
Details
Share
Follow
3
Affinity Water logo
EXETER ROAD 
(0.5 miles)
Affinity Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 13 Sep 2024 09:19
(Scheduled: 13 Sep 2024 - 20 Sep 2024)
0.5
Details
Share
Follow
4
Thames Water logo
MAJOR
  
ST MICHAEL'S CRESCENT 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 3 Sep 2024 10:00
(Scheduled: 26 Aug 2024 - 27 Sep 2024)
0.6
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
KINGS ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 21 Aug 2024 - 30 Oct 2024
0.7
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
KINGS ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Complete
27 Aug 2024 12:00 - 30 Aug 2024 12:31
0.7
Details
Share
7
Vodafone logo
RAYNERS LANE 
(0.7 miles)
Vodafone
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
In Progress
Since: 19 Sep 2024 08:00
(Scheduled: 19 Sep 2024 - 21 Sep 2024)
0.7
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
LADBROOK CLOSE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2024 - 6 Oct 2024
0.7
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
LADBROOK CLOSE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 19 Sep 2024 08:16
(Scheduled: 19 Sep 2024 - 6 Oct 2024)
0.7
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
HIGHFIELD AVENUE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Sep 2024 - 11 Oct 2024
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.