View current and future planned roadworks and road closures for Headstone Lane, HA2 6NB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Headstone Lane, HARROW, HA2 6NB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Headstone Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Sep 2026
London Borough Of Ealing are carrying out Highway improvement works on Lady Margaret Road, Southall.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2025 at 08:00 and could run through until 30 September 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 7 Jul 2026 at 17:03.
9 Oct 2026
Affinity Water are carrying out Utility asset works on Morland Road, Kenton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2026 at 12:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:30.
1 Jun and 31 Dec 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Road, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Harrow on 1 Jun 2026 at 14:49.
1 Jun and 31 Dec 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Cecil Park, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2026 at 15:49.
9 Oct 2026
Scottish Hydro Electric Power Dis are carrying out New service connection on Oldfield Lane South, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2026 at 08:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Jul 2026 at 08:47.
18 Oct 2026
Cadent Gas are carrying out Utility asset works on Camrose Avenue, Edgware.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 09:20 and could run through until 18 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jul 2026 at 09:33.
Monday
Cadent Gas are carrying out Utility asset works on Bacon Lane, Edgware.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 09:35 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2026 at 13:09.
2 Oct 2026
London Borough Of Harrow are carrying out Highway improvement works on Marsh Road, Pinner.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 14:45.
2 Oct 2026
Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 August 2026 at 10:22 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 07:53.
2 Oct 2026
Affinity Water are carrying out Utility asset works on Kenton Road, Kenton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2026 at 10:22 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 09:33.
Monday
Affinity Water are carrying out Utility asset works on Willowcourt Avenue, Kenton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2026 at 10:22 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:34.
10 Aug 2026 and 4 Feb 2027
Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2026 and could run through until 4 February 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:28.
30 Oct 2026
Affinity Water are carrying out Utility asset works on Blythwood Road, Pinner.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 12:49 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Aug 2026 at 12:49.
30 Oct 2026
Affinity Water are carrying out Utility asset works on Norman Crescent, Pinner.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 18:00 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Aug 2026 at 09:56.
Today
Thames Water are carrying out Utility asset works on Swakeleys Road, Ickenham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 00:30 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Aug 2026 at 11:09.
27 Oct 2026
London Borough Of Harrow are carrying out Highway improvement works on Pinner Road, North Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 08:00 and could run through until 27 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 17 Aug 2026 at 08:40.
15 Oct 2026
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Farndale Crescent, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 11:00 and could run through until 15 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2026 at 11:57.
Today
Affinity Water are carrying out Utility repair and maintenance works on Hill Close, Stanmore.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2026 at 11:32 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 15:13.
Today
Cadent Gas are carrying out Utility asset works on Grange Gardens, Pinner.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 August 2026 at 17:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 10:35.
4 Nov 2026
Cadent Gas are carrying out Utility asset works on Oak Grove, Ruislip.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:41 and could run through until 4 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 09:03.
31 Aug 2026 and 17 Dec 2027
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnfield Road, Edgware.
These works are categorised as Major.
The works will start on or after 31 August 2026 and could run through until 17 December 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 17 Aug 2026 at 13:25.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Slip Road From Kensington Road To Western Avenue, Northolt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2026 and run through until 18 September 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2026 at 08:37.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Islip Manor Road, Northolt.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 18 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Jun 2026 at 11:04.
22 Jan 2027
Cadent Gas are carrying out Utility asset works on Theobald Street, Borehamwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 06:32 and could run through until 22 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 16:16.
Monday
Affinity Water are proposing to carry out Utility asset works on Sudbury Hill Close, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2026 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Jun 2026 at 11:26.
3 Oct 2026
London Borough Of Ealing are carrying out Highway improvement works on Footpath From 444-500 Church Road, Northolt.
The works started on 3 September 2026 at 00:00 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 4 Sep 2026 at 09:20.
Sunday
Affinity Water are carrying out Utility asset works on Upton Gardens, Harrow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 4 Sep 2026 at 14:11.
Sunday
Affinity Water were proposing to carry out Utility asset works on Willowcourt Avenue, Kenton.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 September 2026 and run through until 20 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 12:09.
2 Oct 2026
Affinity Water are carrying out Utility asset works on Sedgecombe Avenue, Harrow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2026 at 13:00 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Sep 2026 at 14:40.
30 Sep 2026
London Borough Of Ealing are carrying out Remedial works on Marnham Crescent, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 00:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 8 Sep 2026 at 09:44.
2 Oct 2026
Cadent Gas are carrying out Utility asset works on Cavendish Avenue, Sudbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 10:46 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 11:06.
7 Sep and 4 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Wood End Road, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 15:52.
4 Oct 2026
Cadent Gas are carrying out Utility asset works on Wood End Road, Sudbury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 12:56 and could run through until 4 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:21.
28 Oct 2026
Cadent Gas are carrying out Utility asset works on Cavendish Avenue, Sudbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 14:04 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:14.
8 Oct 2026
Affinity Water are carrying out Utility asset works on St Catherines Road, Ruislip.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 18:00 and could run through until 8 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 06:50.
2 Oct 2026
Thames Water are carrying out Utility repair and maintenance works on Sydney Road, Watford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 11:00 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 11:55.
9 Sep and 8 Oct 2026
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Cheney Street, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 23 Jul 2026 at 14:09.
1 Dec 2026
Murphy Power Distribution are carrying out Utility asset works on Hilfield Lane, Aldenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 08:00 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 9 Sep 2026 at 08:08.
9 Sep and 1 Dec 2026
Murphy Power Distribution are proposing to carry out Utility asset works on Hilfield Lane, Aldenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 28 May 2026 at 11:58.
23 Oct 2026
Scottish Hydro Electric Power Dis are carrying out Utility asset works on Ravenor Park Road, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:40 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Sep 2026 at 08:46.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Station Crescent, Wembley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 11:33 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 14:54.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Burwood Avenue, Eastcote.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 15:20 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 15:54.
Friday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Spencer Road, Wealdstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 09:59 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2026 at 10:41.
Monday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Kingsmead Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 08:13 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2026 at 09:25.
11 and 30 Sep 2026
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Daymer Gardens, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 23 Jul 2026 at 14:05.
30 Sep 2026
London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Daymer Gardens, Eastcote.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Sep 2026 at 08:03.
Cadent Gas carried out Utility repair and maintenance works on Deansbrook Road, Burnt Oak Broadway To Deans Lane, Edgware.
The works were originally planned between 11 Sep 2026 and 21 Sep 2026 and were actually completed between 11 Sep 2026 (19:42) and 16 Sep 2026 (15:57). The works impacted the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 16:33.
Sunday
Affinity Water are carrying out Utility repair and maintenance works on Little Potters, Bushey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2026 at 12:09 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 14:28.
11 Dec 2026
London Borough Of Ealing are carrying out Remedial works on Ruislip Road, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 00:00 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 16 Sep 2026 at 12:19.
21 Dec 2026
London Borough Of Brent are carrying out Highway improvement works on Station Approach, Wembley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 17:00 and could run through until 21 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 16 Sep 2026 at 07:49.
14 Sep and 11 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Wood End Road, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 11:19.
Tuesday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Kenton Gardens, Kenton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:15 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Sep 2026 at 11:05.
28 Sep 2026
Hertfordshire County Council are carrying out Highway repair and maintenance works on St Albans Road, Watford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 15:49 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Sep 2026 at 16:10.
28 Sep 2026
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Farm Avenue, Rayners Lane.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 10:46 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2026 at 13:59.
23 Oct 2026
London Borough Of Harrow are carrying out Highway improvement works on Camrose Avenue, Edgware.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 16 Sep 2026 at 15:37.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Love Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Aug 2026 at 12:49.
Friday
Thames Water are carrying out Utility repair and maintenance works on Love Lane, Pinner.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 11:10 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2026 at 13:05.
18 Sep and 12 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Sudbury Croft, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.
19 Sep and 20 Oct 2026
London Borough Of Brent are proposing to carry out roadworks on Wembley Hill Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 24 Aug 2026 at 14:54.
Tuesday
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 19 Aug 2026 at 07:03.
20 and 28 Sep 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 08:50.
21 and 23 Sep 2026
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 10 Sep 2026 at 17:29.
21 and 23 Sep 2026
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Roundabout, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 15 Sep 2026 at 21:12.
21 and 23 Sep 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Dabbs Hill Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 10:52.
21 and 23 Sep 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Dabbs Hill Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Sep 2026 at 12:07.
21 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out roadworks on Merlins Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:33.
21 Sep and 18 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Northolt Road, South Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Sep 2026 at 10:19.
21 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Malvern Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:43.
21 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Malvern Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:38.
21 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out roadworks on Alexandra Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:34.
21 Sep and 5 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Turner Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 16:38.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Aug 2026 at 16:10.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2026 at 09:32.
21 and 23 Sep 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2026 at 09:40.
21 and 24 Sep 2026
London Borough Of Harrow were proposing to carry out Highway improvement works on Whitchurch Lane, Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 07:58.
21 and 23 Sep 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Marsh Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Jul 2026 at 12:29.
21 and 23 Sep 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Marsh Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Sep 2026 at 09:38.
21 and 23 Sep 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Jul 2026 at 13:04.
21 and 23 Sep 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hempstead Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Sep 2026 at 10:24.
22 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Whitmore Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:41.
22 and 24 Sep 2026
London Borough Of Harrow are proposing to carry out roadworks on Drury Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 09:42.
22 and 24 Sep 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Kenton Road, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Jul 2026 at 10:36.
22 and 24 Sep 2026
Affinity Water were proposing to carry out Utility repair and maintenance works on Kenton Road, Kenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 10:35.
22 and 25 Sep 2026
BT are proposing to carry out Utility asset works on Chalk Hill, Oxhey, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jul 2026 at 09:25.
22 and 25 Sep 2026
BT are proposing to carry out Utility asset works on Bushey Arches Roundabout, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jul 2026 at 09:26.
22 and 25 Sep 2026
BT are proposing to carry out Utility asset works on Lower High Street, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jul 2026 at 09:23.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Church Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:36.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Church Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:42.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Suffolk Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:32.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Suffolk Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:40.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Whittington Way, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 09:32.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Whittington Way, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Sep 2026 at 12:40.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 10:57.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 13:50.
23 and 26 Sep 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 16:27.
24 and 28 Sep 2026
Vodafone are proposing to carry out Utility asset works on Preston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 10 Sep 2026 at 08:21.
24 and 26 Sep 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Vicarage Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Aug 2026 at 13:30.
25 and 29 Sep 2026
Vodafone are proposing to carry out Utility asset works on Preston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 5 Aug 2026 at 13:53.
25 Sep and 5 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Chandos Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2026 at 11:34.
26 Sep and 26 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 11:21.
26 Sep and 24 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 24 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2026 at 14:16.
26 Sep and 10 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 08:57.
26 Sep and 10 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 10:59.
28 Sep and 30 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on South Vale, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 11:16.
28 Sep and 27 Oct 2026
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glebe Avenue, Ickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 27 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 14 Sep 2026 at 09:06.
28 Sep and 3 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on The Broadway, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 13:37.
28 Sep and 3 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 14:14.
28 Sep and 3 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on London Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 1 Sep 2026 at 13:53.
29 Sep and 8 Oct 2026
Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 29 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2026 at 14:52.
29 Sep and 1 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on The Close, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 30 Jun 2026 at 15:15.
29 Sep and 1 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on The Close, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 09:22.
1 and 23 Oct 2026
London Borough Of Ealing are proposing to carry out Remedial works on Ferrymead Avenue, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 3 Aug 2026 at 15:49.
1 and 6 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Purcells Avenue, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2026 at 15:27.
5 Oct and 13 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 13 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2026 at 14:30.
5 and 23 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Eastcote Lane, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2026 at 11:24.
5 and 19 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Islip Manor Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 11:03.
5 and 9 Oct 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Hillside Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2026 at 15:39.
5 and 9 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Queensbury Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2026 at 08:06.
5 and 9 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Queensbury Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Sep 2026 at 12:44.
5 and 16 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Roxborough Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Jun 2026 at 09:16.
5 Oct and 11 Nov 2026
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on North View, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 14 Sep 2026 at 09:07.
5 and 19 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Shaldon Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 14:57.
5 and 8 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Wolverton Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Jun 2026 at 12:13.
5 and 25 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Grange Hill, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 11:31.
5 and 25 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Grange Hill, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 13:40.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sparrows Herne, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2026 at 14:39.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sparrows Herne, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Sep 2026 at 15:23.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2026 at 14:27.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Sep 2026 at 15:22.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chalk Hill, Oxhey, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2026 at 10:18.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chalk Hill, Oxhey, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Sep 2026 at 09:20.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Aug 2026 at 14:27.
5 and 20 Oct 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Sep 2026 at 15:22.
5 and 11 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Jun 2026 at 12:47.
5 and 11 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 11 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 12:24.
6 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 6 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2026 at 14:42.
8 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Quakers Course, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2026 at 10:11.
9 Oct and 3 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Priory Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:50.
9 Oct and 3 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Priory Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.
9 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Fairview Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 9 October 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2026 at 10:42.
12 Oct and 7 Nov 2026
London Borough Of Ealing are proposing to carry out Highway improvement works on Tangmere Gardens, Northolt.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 14 Sep 2026 at 15:18.
12 and 23 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Copthall Road West, Ickenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 30 Jul 2026 at 13:07.
12 and 14 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 Jul 2026 at 13:18.
12 and 14 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 07:19.
12 and 14 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 09:19.
12 Oct and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Woodcock Hill, Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 08:24.
12 and 14 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Spencer Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Jun 2026 at 11:33.
12 and 26 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Dale Avenue, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 15:59.
12 and 15 Oct 2026
Thames Water are proposing to carry out Utility repair and maintenance works on Longcrofte Road, Canons Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 15 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Sep 2026 at 10:16.
13 Oct and 10 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Gibbs Green, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2026 at 09:12.
14 and 17 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Marsh Road, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 10 Sep 2026 at 18:17.
14 and 16 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Embry Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:05.
15 and 23 Oct 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Lamorna Grove, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Aug 2026 at 16:03.
19 Oct and 8 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Rutherford Way, Wembley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 8 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jul 2026 at 08:55.
19 and 21 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Brookside Close, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:06.
19 and 23 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on College Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 18:00.
19 and 23 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 17:56.
19 and 23 Oct 2026
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 17:41.
19 Oct and 23 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 10:07.
19 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Pinner Park Gardens, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Jun 2026 at 10:12.
19 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Tenby Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 12:30.
19 and 26 Oct 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2026 at 09:20.
21 and 23 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Booth Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 30 Apr 2026 at 12:23.
21 and 23 Oct 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Silver Close, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Jun 2026 at 11:05.
24 Oct and 1 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Wallasey Crescent, Ickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Jul 2026 at 13:21.
24 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Manor Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jun 2026 at 15:17.
24 Oct and 1 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Westholme Gardens, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jun 2026 at 15:18.
26 and 30 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Long Drive, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Jun 2026 at 10:15.
26 and 30 Oct 2026
Murphy Power Distribution are proposing to carry out Utility asset works on Capthorne Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2026 at 15:34.
26 Oct and 22 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Salmon Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 08:23.
26 and 28 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Bridgewater Gardens, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Jul 2026 at 11:33.
26 Oct and 30 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Tooke Close, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Aug 2026 at 13:09.
26 Oct and 11 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 09:54.
26 and 28 Oct 2026
Affinity Water are proposing to carry out Utility asset works on Binyon Crescent, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Aug 2026 at 15:25.
26 Oct and 10 Nov 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2026 at 11:32.
26 and 30 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Hankins Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Mar 2026 at 15:46.
27 and 29 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Jul 2026 at 08:34.
27 and 29 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 14:11.
27 and 29 Oct 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Church Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Sep 2026 at 14:10.
2 Nov and 7 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Church Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.
2 Nov and 7 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Medway Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.
2 and 19 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Elms Park Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.
2 and 19 Nov 2026
Affinity Water are proposing to carry out Utility asset works on St Andrews Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:26.
2 and 19 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Priory Park Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.
2 and 19 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Priory Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:49.
2 Nov 2026 and 1 Feb 2027
Affinity Water are proposing to carry out Utility asset works on Watford Road, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 1 February 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 30 Jul 2026 at 14:38.
3 and 6 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Ash Grove, Harefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Aug 2026 at 09:29.
9 and 13 Nov 2026
BT are proposing to carry out Utility asset works on Old Ruislip Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 7 Aug 2026 at 10:21.
9 and 13 Nov 2026
BT are proposing to carry out Utility asset works on Old Ruislip Road, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 7 Sep 2026 at 15:48.
9 and 11 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Glendale Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 16:51.
9 and 13 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Rofant Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Aug 2026 at 08:18.
9 and 13 Nov 2026
Affinity Water were proposing to carry out Utility asset works on Station Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 November 2026 and run through until 13 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 14:23.
9 and 17 Nov 2026
Affinity Water are proposing to carry out Utility asset works on Station Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 14:24.
10 and 12 Nov 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rickmansworth Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Jul 2026 at 10:24.
10 and 12 Nov 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tolpits Lane, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2026 at 13:46.
11 and 27 Nov 2026
National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Sep 2026 at 18:32.
12 and 14 Nov 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rickmansworth Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Jul 2026 at 10:24.
12 and 14 Nov 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on London Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2026 at 13:48.
12 and 14 Nov 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Tolpits Lane, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Aug 2026 at 13:48.
16 and 27 Nov 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 30 Jul 2026 at 09:53.
16 and 27 Nov 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Courthope Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 3 Sep 2026 at 11:45.
16 and 20 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Alverstone Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2026 at 11:51.
16 and 19 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Uxbridge Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:47.
16 and 19 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Kenton Lane, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:40.
16 and 19 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:53.
16 and 19 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Uxbridge Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Sep 2026 at 10:31.
16 Nov and 5 Dec 2026
National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Sep 2026 at 18:43.
16 and 20 Nov 2026
UK Power Networks Eastern & London are proposing to carry out New service connection on Home Farm Road, Rickmansworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2026 at 15:20.
17 and 19 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Glendale Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2026 at 12:53.
18 and 20 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Camrose Avenue, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 Sep 2026 at 15:11.
18 and 20 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Stanmore Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Sep 2026 at 13:32.
19 and 28 Nov 2026
Transport for London (TfL) are proposing to carry out Section 50 on Ruislip Road, Northolt.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 19 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2026 at 11:24.
19 and 21 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Imperial Drive, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 10:34.
19 and 21 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Whitchurch Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 10 Sep 2026 at 13:01.
23 Nov and 1 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Deanscroft Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 1 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:00.
23 and 27 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on West Towers, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 16:47.
23 Nov 2026 and 16 Feb 2027
Affinity Water are proposing to carry out Utility asset works on Clayton Field, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 16 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Sep 2026 at 13:53.
23 and 25 Nov 2026
London Borough Of Harrow are proposing to carry out Highway improvement works on Boniface Walk, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2026 at 17:52.
30 Nov and 4 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Clarendon Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Sep 2026 at 12:03.
30 Nov and 8 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Queens Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 15:00.
30 Nov and 4 Dec 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on The Glen, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Aug 2026 at 11:31.
30 Nov 2026 and 21 Jan 2027
Affinity Water are proposing to carry out Utility asset works on Evelyn Drive, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 21 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 20 Aug 2026 at 09:13.
30 Nov 2026 and 25 Jan 2027
Affinity Water are proposing to carry out Utility asset works on Evelyn Drive, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 25 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 10:59.
30 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Chandos Crescent, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 10:24.
30 Nov and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2026 at 11:24.
30 Nov and 2 Dec 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Stephenson Way, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 5 Aug 2026 at 16:48.
2 and 17 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Priory Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Jun 2026 at 19:29.
2 and 17 Dec 2026
Affinity Water are proposing to carry out Utility asset works on Priory Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2026 at 09:50.
2 and 5 Dec 2026
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Allum Lane, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 5 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Sep 2026 at 16:51.
3 and 11 Dec 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Aston Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2026 at 15:20.
3 and 7 Dec 2026
Hutchinson 3G are proposing to carry out Utility asset works on Elton Way, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 7 December 2026. The works will impact the verge only.
This roadwork event was last updated by Hutchinson 3G on 21 Aug 2026 at 15:50.
7 Dec 2026 and 15 Feb 2027
Cadent Gas are proposing to carry out Utility asset works on Talbot Road, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 13:50.
7 and 25 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Pinner View, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 25 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 15:00.
7 and 25 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Pinner View, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 25 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 11:00.
7 and 29 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Headstone Gardens, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 29 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 19:30.
7 and 25 Dec 2026
Cadent Gas were proposing to carry out Utility asset works on Pinner View, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 25 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 09:09.
7 and 29 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Victor Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 29 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 09:03.
7 Dec 2026 and 25 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Haverford Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 14:29.
7 and 15 Dec 2026
Affinity Water were proposing to carry out Utility asset works on Station Road, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2026 and run through until 15 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Sep 2026 at 14:17.
9 and 14 Dec 2026
BT are proposing to carry out Utility asset works on Heronsgate, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Sep 2026 at 11:22.
14 and 19 Dec 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Harewood Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 19 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Aug 2026 at 12:52.
14 and 19 Dec 2026
Affinity Water are proposing to carry out Utility repair and maintenance works on Harewood Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 19 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Sep 2026 at 09:25.
14 and 18 Dec 2026
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Richfield Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 14:01.
Roadworks Map near to Headstone Lane, HARROW, HA2 6NB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Headstone Lane, HARROW, HA2 6NB (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 Sep 2026 - 18 Sep 2026)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
(Scheduled: 16 Sep 2026 - 18 Sep 2026)
(Scheduled: 16 Sep 2026 - 17 Sep 2026)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data