ROADWORKS SUMMARY
Headstone Road, HARROW, HA1 1GS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Headstone Road, HA1 1GS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Headstone Road, HARROW, HA1 1GS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Headstone Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:58.

London Borough Of Ealing logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:47.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

London Borough Of Ealing logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 14:53.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 10:12.

Cadent Gas logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Alexandra Avenue

Cadent Gas are carrying out Utility asset works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 11:06 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 11:19.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 31 Dec 2024 at 15:53.

Affinity Water logo
LONG TERM
Between
25 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Acton Lane

London Borough Of Ealing were proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2025 at 10:18.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 31 Jul 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.

Affinity Water logo
LONG TERM
Between
3 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 11:19.

Affinity Water logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are carrying out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 10:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 15:45.

Affinity Water logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Watford Road

Affinity Water are carrying out Utility asset works on Watford Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 10:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 May 2025 at 12:28.

Hertfordshire County Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Tylers Way

Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 09:30 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:37.

Cadent Gas logo
LONG TERM
Between
17 Mar and 27 May 2025
Details
View Map
Share
Harrow View

Cadent Gas were proposing to carry out Utility asset works on Harrow View, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 16:39.

Cadent Gas logo
LONG TERM
Between
17 Mar and 27 May 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 10:11.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Twyford Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 11:00 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 08:39.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are carrying out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Mar 2025 at 08:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 May 2025
Details
View Map
Share
Follow
Ruislip Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 13:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 May 2025
Details
View Map
Share
Ruislip Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road, Northolt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 09:01.

Thames Water logo
LONG TERM
Until
2 Jun 2025
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are carrying out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 16:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:20.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 14 Jan 2025 at 10:05.

LONG TERM
Finishing
Friday
Details
View Map
Share
Hanger Lane

Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 24 Mar 2025 at 14:06.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
5 Apr and 31 May 2025
Details
View Map
Share
Follow
Oldfield Lane North

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 19:16.

Thames Water logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are carrying out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 11:00 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:25.

Thames Water logo
LONG TERM
Between
7 Apr and 9 Jun 2025
Details
View Map
Share
Denzil Road

Thames Water were proposing to carry out Utility asset works on Denzil Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:24.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.

National Highways logo
LONG TERM
Between
7 Apr and 25 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.

National Highways logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
7 Apr 2025 and 1 Sep 2026
Details
View Map
Share
Cecil Park

Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.

Cadent Gas logo
LONG TERM
Between
7 Apr and 18 Jun 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 09:20.

Thames Water logo
LONG TERM
Between
8 Apr and 2 Jun 2025
Details
View Map
Share
Brenthurst Road

Thames Water were proposing to carry out Utility asset works on Brenthurst Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 08:04.

Cadent Gas logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are carrying out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 08:47 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:09.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are carrying out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.

Thames Water logo
LONG TERM
Until
8 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out New service connection on Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 11:43 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 12:04.

Thames Water logo
LONG TERM
Between
22 Apr and 14 Jul 2025
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Cadent Gas logo
LONG TERM
Until
9 Jun 2025
Details
View Map
Share
Follow
Eastbury Avenue

Cadent Gas are carrying out Utility asset works on Eastbury Avenue, Northwood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 09:59 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:02.

Thames Water logo
LONG TERM
Until
28 May 2025
Details
View Map
Share
Follow
Uphill Road

Thames Water are carrying out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 April 2025 at 11:00 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 15:09.

London Borough Of Hillingdon logo
Finishing
Friday
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Apr 2025 at 09:25.

Cadent Gas logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 11:21.

Cadent Gas logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:15.

Cadent Gas logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
High Road

Cadent Gas are carrying out Utility asset works on High Road, Eastcote.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 07:54 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 10:12.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:44.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Follow
Waldeck Road

Cadent Gas are proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.

Cadent Gas logo
LONG TERM
Between
29 Apr and 9 Jun 2025
Details
View Map
Share
Waldeck Road

Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:16.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Carew Road

Thames Water are carrying out Utility repair and maintenance works on Carew Road, Northwood.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 10:00 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 14:39.

Cadent Gas logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Southfield Park

Cadent Gas are carrying out Utility asset works on Southfield Park, North Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2025 at 08:08 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 May 2025 at 08:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
4 Jun 2025
Details
View Map
Share
Follow
Brentfield Road

UK Power Networks Eastern & London are carrying out Utility asset works on Brentfield Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 07:36.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Dollis Hill Lane

Cadent Gas are carrying out Utility asset works on Dollis Hill Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 16:47 and could run through until 26 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 20:30.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Colindale Avenue

Electricity Network Company were proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 21 Feb 2025 at 10:51.

Thames Water logo
Until
31 May 2025
Details
View Map
Share
Follow
Madeley Road

Thames Water are carrying out Utility asset works on Madeley Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 10:44.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Southview Avenue

Thames Water were proposing to carry out Utility asset works on Southview Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jan 2025 at 08:47.

Thames Water logo
LONG TERM
Between
6 May and 20 Jul 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Pavilion Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Pavilion Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 22 May 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Feb 2025 at 16:16.

London Borough Of Ealing logo
Between
12 May and 3 Jun 2025
Details
View Map
Share
Follow
Shackleton Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Shackleton Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:22.

London Borough Of Ealing logo
Until
3 Jun 2025
Details
View Map
Share
Follow
Shackleton Road

London Borough Of Ealing are carrying out Highway improvement works on Shackleton Road, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:30 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 16:30.

London Borough Of Ealing logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
North Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on North Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 11:06.

London Borough Of Ealing logo
Until
2 Jun 2025
Details
View Map
Share
Follow
North Avenue

London Borough Of Ealing are carrying out Highway improvement works on North Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 10:39.

London Borough Of Ealing logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Greenford Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 15:48.

London Borough Of Ealing logo
Until
2 Jun 2025
Details
View Map
Share
Follow
Greenford Avenue

London Borough Of Ealing are carrying out Highway improvement works on Greenford Avenue, Southall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:30 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 16:30.

Transport for London (TfL) logo
Between
12 May and 8 Jun 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 13:22.

London Borough Of Ealing logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Hurley Road

London Borough Of Ealing were proposing to carry out Highway improvement works on Hurley Road, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 09:50.

London Borough Of Ealing logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Keats Way

London Borough Of Ealing are proposing to carry out Highway improvement works on Keats Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:11.

London Borough Of Ealing logo
Between
12 May and 9 Jun 2025
Details
View Map
Share
Follow
Crossmead Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Crossmead Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:11.

Thames Water logo
LONG TERM
Until
10 Jul 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are carrying out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 08:00 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:00.

Eunetworks logo
LONG TERM
Between
12 May and 12 Jun 2025
Details
View Map
Share
Tanfield Avenue

Eunetworks were proposing to carry out Utility asset works on Tanfield Avenue, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 09:32.

Eunetworks logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Follow
Tanfield Avenue

Eunetworks are proposing to carry out Utility asset works on Tanfield Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:56.

Eunetworks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Tanfield Avenue

Eunetworks are carrying out Utility asset works on Tanfield Avenue, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:15 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 12 May 2025 at 10:28.

Thames Water logo
LONG TERM
Between
12 May and 13 Jul 2025
Details
View Map
Share
Follow
Ballogie Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Ballogie Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 18:06.

Thames Water logo
Until
2 Jun 2025
Details
View Map
Share
Follow
Hillcroft Crescent

Thames Water are carrying out Utility repair and maintenance works on Hillcroft Crescent, Wembley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 17:00 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 08:08.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Holyrood Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 14:34.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Holyrood Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Holyrood Avenue, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:41.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Holyrood Avenue

Thames Water are carrying out Utility repair and maintenance works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 10:30 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:40.

Cadent Gas logo
Until
31 May 2025
Details
View Map
Share
Follow
East Lane

Cadent Gas are carrying out Utility asset works on East Lane, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 12:28 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:39.

Eunetworks logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Follow
Crest Road

Eunetworks are proposing to carry out Utility asset works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:57.

Eunetworks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Crest Road

Eunetworks are carrying out Utility asset works on Crest Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 May 2025 at 08:19.

Cadent Gas logo
Between
12 May and 8 Jun 2025
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.

Cadent Gas logo
Between
12 May and 8 Jun 2025
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:04.

Cadent Gas logo
Between
12 May and 8 Jun 2025
Details
View Map
Share
Follow
Morford Way

Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:53.

Cadent Gas logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Morford Way

Cadent Gas are carrying out Utility asset works on Morford Way, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:36 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 09:29.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Hill Road

Cadent Gas are carrying out Utility repair and maintenance works on Hill Road, Pinner.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 14:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 07:51.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Cannon Lane

Cadent Gas were proposing to carry out Utility repair and maintenance works on Cannon Lane, Pinner.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:22.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Alderton Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 12:22.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Alderton Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 13:10.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Alderton Way

UK Power Networks Eastern & London are carrying out Utility asset works on Alderton Way, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 08:51.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Hillview Gardens

UK Power Networks Eastern & London are carrying out New service connection on Hillview Gardens, North Harrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2025 at 19:18 and could run through until 20 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 16:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Ventnor Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Ventnor Avenue, Stanmore.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:30 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 07:27.

Murphy Power Distribution logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Mowbray Road Access Rear Of Numbers 58 To 96 Edgware Way

Murphy Power Distribution are proposing to carry out New service connection on Mowbray Road Access Rear Of Numbers 58 To 96 Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 19 Feb 2025 at 14:26.

Hertfordshire County Council logo
Until
30 May 2025
Details
View Map
Share
Follow
Bridlington Road

Hertfordshire County Council are carrying out roadworks on Bridlington Road, South Oxhey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 15:16.

Cadent Gas logo
LONG TERM
Between
13 May and 16 Jul 2025
Details
View Map
Share
Follow
St Stephens Road

Cadent Gas are proposing to carry out Utility asset works on St Stephens Road, West Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:16.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Barnhurst Path

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Barnhurst Path, South Oxhey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 18:08 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 15:15.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Ruislip Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 19:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 May 2025 at 07:55.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sudbury Court Drive

Cadent Gas are carrying out Utility repair and maintenance works on Sudbury Court Drive, Harrow.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 15:46 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 16:24.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Watford Heath

Affinity Water were proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 14:42.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Mar 2025 at 10:51.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Watford Heath

Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 08:45.

Affinity Water logo
Finishing
Today
Details
View Map
Share
Follow
Watford Heath

Affinity Water are carrying out Utility repair and maintenance works on Watford Heath, Watford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 11:00 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 May 2025 at 11:00.

London Borough Of Ealing logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Oldfield Lane North

London Borough Of Ealing are carrying out Highway improvement works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 10:10.

Thames Water logo
LONG TERM
Between
19 May and 30 Jun 2025
Details
View Map
Share
Follow
Chantry Crescent

Thames Water are proposing to carry out Utility asset works on Chantry Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Oldborough Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Oldborough Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 09:50.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 19 May 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:31.

Thames Water logo
Until
9 Jun 2025
Details
View Map
Share
Follow
Woodcock Hill

Thames Water are carrying out Utility repair and maintenance works on Woodcock Hill, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 11:23.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Feb 2025 at 09:40.

Cadent Gas logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:00.

Cadent Gas logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:12.

Cadent Gas logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:45.

Thames Water logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Potter Street Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Potter Street Hill, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 10:53.

Thames Water logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Potter Street Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Potter Street Hill, Northwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 16:14.

Cornerstone Telecommunications Infrastructure logo
Finishing
Thursday
Details
View Map
Share
Spur Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Spur Road, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 22 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Feb 2025 at 11:16.

Cornerstone Telecommunications Infrastructure logo
Finishing
Thursday
Details
View Map
Share
Follow
Spur Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Spur Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Mar 2025 at 08:42.

Between
19 and 28 May 2025
Details
View Map
Share
Follow
Henbury Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Henbury Way, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 28 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 11:28.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 11:08.

Hertfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 10:07.

Thames Water logo
Finishing
Monday
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Bushey.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 26 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 08:26.

Virgin Media logo
Between
21 May and 5 Jun 2025
Details
View Map
Share
Ealing Road

Virgin Media were proposing to carry out Utility asset works on Ealing Road, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Feb 2025 at 09:14.

London Borough Of Hillingdon logo
Between
21 May and 20 Jun 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Apr 2025 at 08:56.

London Borough Of Hillingdon logo
Between
21 May and 20 Jun 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Apr 2025 at 14:25.

Electricity Network Company logo
Between
21 May and 18 Jun 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 12 Feb 2025 at 10:47.

London Borough Of Hillingdon logo
Between
22 May and 20 Jun 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 14 May 2025 at 09:11.

Telefonica UK logo
Finishing
Thursday
Details
View Map
Share
Edgwarebury Lane Rbw (2nd Section)

Telefonica UK were proposing to carry out Utility asset works on Edgwarebury Lane Rbw (2nd Section), Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 22 May 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Telefonica UK on 26 Mar 2025 at 11:20.

Thames Water logo
LONG TERM
Between
23 May and 18 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are proposing to carry out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 09:01.

London Borough Of Ealing logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Hurley Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Hurley Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 09:54.

London Borough Of Ealing logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Hurley Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Hurley Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 15 May 2025 at 15:34.

London Borough Of Ealing logo
Between
24 May and 12 Jun 2025
Details
View Map
Share
Follow
Keats Way

London Borough Of Ealing are proposing to carry out Highway improvement works on Keats Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 May 2025 at 16:48.

London Borough Of Ealing logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Crossmead Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Crossmead Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 May 2025 at 16:48.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Rainsford Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Rainsford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:40.

Thames Water logo
Between
26 and 30 May 2025
Details
View Map
Share
Follow
Lynwood Road

Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:03.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 15:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 1 Jul 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:11.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Hanger Lane

Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 8 Apr 2025 at 15:36.

LONG TERM
Between
26 May and 15 Jul 2025
Details
View Map
Share
Follow
Hanger Lane

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 Apr 2025 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 25 Jun 2025
Details
View Map
Share
Follow
Brentfield Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:31.

London Borough Of Barnet logo
Between
26 and 28 May 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:02.

Cadent Gas logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
South Way

Cadent Gas are proposing to carry out Utility asset works on South Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 12:03.

Cadent Gas logo
LONG TERM
Between
26 May and 31 Jul 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 12:21.

Cadent Gas logo
LONG TERM
Between
26 May and 3 Aug 2025
Details
View Map
Share
Follow
Weston Drive

Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:47.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 4 Mar 2025 at 09:36.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Charville Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 08:22.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Charville Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 29 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 10:58.

Thames Water logo
LONG TERM
Between
27 May and 20 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are proposing to carry out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Homefield Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Homefield Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 17:07.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Homefield Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Homefield Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 6 May 2025 at 14:22.

London Borough Of Barnet logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Sturgess Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Sturgess Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:32.

London Borough Of Barnet logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Sturgess Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Sturgess Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 11:28.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.

Cadent Gas logo
Between
27 May and 20 Jun 2025
Details
View Map
Share
Follow
Mollison Way

Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:48.

London Borough Of Barnet logo
Between
27 May and 3 Jun 2025
Details
View Map
Share
Follow
Westside

London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:23.

London Borough Of Barnet logo
Between
27 May and 3 Jun 2025
Details
View Map
Share
Follow
Westside

London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 11:30.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Feb 2025 at 11:40.

Affinity Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Dene Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 10:28.

Cornerstone Telecommunications Infrastructure logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Spur Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Spur Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 2 Apr 2025 at 15:00.

Affinity Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Kings Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 15:04.

Affinity Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Kings Avenue

Affinity Water were proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 09:39.

LONG TERM
Between
28 May and 30 Jul 2025
Details
View Map
Share
Follow
High Worple

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on High Worple, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 May 2025 at 08:58.

London Borough Of Barnet logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Lanacre Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 15:00.

Transport for London (TfL) logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.

Transport for London (TfL) logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:28.

London Borough Of Ealing logo
Between
29 May and 25 Jun 2025
Details
View Map
Share
Follow
West Gate

London Borough Of Ealing are proposing to carry out Remedial works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 24 Mar 2025 at 11:26.

London Borough Of Barnet logo
Between
29 May and 4 Jun 2025
Details
View Map
Share
Follow
Prince Of Wales Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:47.

London Borough Of Barnet logo
Between
29 May and 2 Jun 2025
Details
View Map
Share
Follow
Prince Of Wales Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Apr 2025 at 14:10.

London Borough Of Barnet logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Church Terrace

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:18.

London Borough Of Barnet logo
Between
29 and 31 May 2025
Details
View Map
Share
Follow
Church Terrace

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 14:15.

London Borough Of Barnet logo
Between
30 and 31 May 2025
Details
View Map
Share
Follow
Church Terrace

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:40.

London Borough Of Ealing logo
LONG TERM
Between
2 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Uxbridge Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Rugby Avenue

Affinity Water are proposing to carry out Utility asset works on Rugby Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:35.

Affinity Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 16:43.

Affinity Water logo
LONG TERM
Between
2 Jun and 24 Nov 2025
Details
View Map
Share
Follow
Harrow Road

Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 08:26.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Midstrath Road

Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 07:49.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:19.

Cadent Gas logo
Between
2 and 14 Jun 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 00:10.

Thames Water logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Balnacraig Avenue

Thames Water are proposing to carry out Utility asset works on Balnacraig Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:10.

London Borough Of Hillingdon logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 29 Apr 2025 at 07:21.

Thames Water logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Hillside Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Hillside Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 15:30.

Affinity Water logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Elthorne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Mar 2025 at 12:20.

Affinity Water logo
Between
2 and 4 Jun 2025
Details
View Map
Share
Follow
Elthorne Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Apr 2025 at 15:14.

Affinity Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Longley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:10.

Affinity Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Longley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:44.

Affinity Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Walton Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:11.

Affinity Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Walton Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:36.

Affinity Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Walton Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 10:46.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pinner Road

Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 09:47.

Cadent Gas logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pinner Road

Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 10:41.

Affinity Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Mar 2025 at 11:55.

Affinity Water logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:29.

Hertfordshire County Council logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Eastglade

Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:12.

Hertfordshire County Council logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Eastglade

Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:20.

UK Power Networks Eastern & London logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Eastglade

UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 10:32.

London Borough Of Barnet logo
Between
3 and 5 Jun 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 15:00.

Virgin Media logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.

Virgin Media logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Back Lane

Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.

Virgin Media logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Back Lane

Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.

London Borough Of Barnet logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:54.

Hertfordshire County Council logo
Between
4 and 9 Jun 2025
Details
View Map
Share
Follow
Ainsdale Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:51.

Hertfordshire County Council logo
Between
4 and 9 Jun 2025
Details
View Map
Share
Ainsdale Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:01.

Hertfordshire County Council logo
Between
4 and 9 Jun 2025
Details
View Map
Share
Follow
Otley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:53.

Hertfordshire County Council logo
Between
4 and 9 Jun 2025
Details
View Map
Share
Follow
Otley Way

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:12.

Hertfordshire County Council logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Follow
Richfield Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 14:46.

Hertfordshire County Council logo
Between
4 and 6 Jun 2025
Details
View Map
Share
Ivinghoe Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:46.

Cadent Gas logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.

Cadent Gas logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:03.

Cadent Gas logo
Between
6 and 27 Jun 2025
Details
View Map
Share
Follow
Morford Close

Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:55.

London Borough Of Barnet logo
Between
7 and 13 Jun 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 15:14.

Network Rail logo
Between
8 and 12 Jun 2025
Details
View Map
Share
North Circular Road

Network Rail were proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 May 2025 at 10:38.

Network Rail logo
Between
8 and 12 Jun 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 May 2025 at 10:45.

London Borough Of Barnet logo
Between
8 and 11 Jun 2025
Details
View Map
Share
Follow
Brockley Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 14:15.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Mar 2025 at 16:19.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Oldborough Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:25.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Mar 2025 at 13:53.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:42.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Havelock Place

Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 May 2025 at 09:42.

London Borough Of Barnet logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Brockley Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2025 at 14:21.

UK Power Networks Eastern & London logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Mayfield Avenue

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Mayfield Avenue, Kenton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2025 at 10:19.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
The Vale

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:58.

London Borough Of Hillingdon logo
Between
11 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Marlborough Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:47.

London Borough Of Barnet logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Hale Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hale Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 13:59.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Strathcona Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Strathcona Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
The Mount

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on The Mount, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Tudor Close

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Tudor Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Greenhill Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Greenhill Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

London Borough Of Barnet logo
Between
16 and 17 Jun 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Glenwood Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Glenwood Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 08:16.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 09:50.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 09:51.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 11:06.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 08:06.

UK Power Networks Eastern & London logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Green Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Apr 2025 at 08:04.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Conway Gardens

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Conway Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Waltham Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Waltham Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Nash Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nash Way, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:43.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Princes Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:38.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hillfield Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:20.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hillfield Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:05.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Stag Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.

London Borough Of Barnet logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.

Scottish Hydro Electric Power Dis logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Drayton Bridge Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Drayton Bridge Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 12:26.

Scottish Hydro Electric Power Dis logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Greenford Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Greenford Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 12:27.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Windmill Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:47.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:33.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Church Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Church Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Kenton Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kenton Road, Harrow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Cumberland Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Cumberland Road, Stanmore.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 12 May 2025 at 09:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Knatchbull Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.

London Borough Of Brent logo
LONG TERM
Between
23 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:33.

London Borough Of Brent logo
LONG TERM
Between
23 Jun and 5 Sep 2025
Details
View Map
Share
Follow
Alperton Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:53.

Affinity Water logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Elton Avenue

Affinity Water are proposing to carry out Utility asset works on Elton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Cadent Gas logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Cuckoo Hill

Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 09:50.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Spencer Road

BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Apr 2025 at 13:34.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Spencer Road

BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
The Cross Way

BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 13:16.

BT logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
The Cross Way

BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 28 Jun 2025
Details
View Map
Share
St Thomas' Drive

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 28 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 11:57.

Cornerstone Telecommunications Infrastructure logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
St Thomas' Drive

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 12:00.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Hindes Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:37.

National Highways logo
Between
25 Jun and 11 Jul 2025
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 May 2025 at 13:25.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.

Transport for London (TfL) logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:31.

London Borough Of Brent logo
Between
27 Jun and 26 Jul 2025
Details
View Map
Share
Follow
St Andrews Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on St Andrews Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 28 Mar 2025 at 08:55.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:15.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2025 at 08:58.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 16:42.

Thames Water logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:03.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Abbey Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:10.

Scottish Hydro Electric Power Dis logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Orchard Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Orchard Close, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 07:12.

Affinity Water logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Uxbridge Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Uxbridge Road, Hatch End.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 17:44.

Affinity Water logo
Between
3 and 7 Jul 2025
Details
View Map
Share
Follow
Woodhall Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhall Drive, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:36.

Scottish Hydro Electric Power Dis logo
Between
5 and 14 Jul 2025
Details
View Map
Share
Greenford Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Greenford Avenue, Hanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2025 at 14:43.

Electricity Network Company logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Willen Field Road

Electricity Network Company are proposing to carry out Utility asset works on Willen Field Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 1 May 2025 at 08:55.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Pinner Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 14:23.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 16:52.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 07:37.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Rutland Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 11:17.

Affinity Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Bonnersfield Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:29.

Affinity Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Bonnersfield Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:10.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Cadent Gas logo
LONG TERM
Between
7 Jul and 7 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.

Affinity Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Fourth Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 09:35.

Between
8 and 10 Jul 2025
Details
View Map
Share
Leamington Crescent

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 14:39.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Merlins Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
High Worple

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on High Worple, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:09.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Imperial Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Drive, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Imperial Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Close, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:05.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Argyle Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Argyle Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:06.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Compton Rise

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Compton Rise, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 16:21.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Shooters Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shooters Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:07.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Stirling Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Stirling Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:06.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Aberdeen Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Aberdeen Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 08:22.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Abbey Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Abbey Close, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 12:33.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
College Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on College Close, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 10:16.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Snaresbrook Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Snaresbrook Drive, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:04.

Scottish Hydro Electric Power Dis logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 08:58.

Scottish Hydro Electric Power Dis logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 May 2025 at 15:42.

Scottish Hydro Electric Power Dis logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Yeading Lane Service Road Outside 234-386

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2025 at 08:03.

Scottish Hydro Electric Power Dis logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Maple Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Maple Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 May 2025 at 10:58.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Walton Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Walton Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
D'arcy Drive

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Drive, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Kenmore Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Culver Grove

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Apr 2025 at 10:56.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Whitefriars Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Whitefriars Avenue, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 14:52.

Hertfordshire County Council logo
Between
9 and 19 Jul 2025
Details
View Map
Share
Follow
Little Oxhey Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:33.

Hertfordshire County Council logo
Between
9 and 19 Jul 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:39.

Between
10 and 14 Jul 2025
Details
View Map
Share
Follow
Perwell Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Perwell Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:24.

UK Power Networks Eastern & London logo
Between
10 and 16 Jul 2025
Details
View Map
Share
Hale Drive

UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Drive, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 10:53.

UK Power Networks Eastern & London logo
Between
10 and 16 Jul 2025
Details
View Map
Share
Ashbourne Grove

UK Power Networks Eastern & London were proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 08:10.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 Jul 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 10:53.

Scottish Hydro Electric Power Dis logo
Between
13 and 21 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 11:58.

Scottish Hydro Electric Power Dis logo
Between
13 and 21 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 12:07.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 Jul 2025
Details
View Map
Share
Western Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 July 2025 and run through until 15 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Mar 2025 at 08:33.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 Jul 2025
Details
View Map
Share
Follow
Western Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 14:43.

Thames Water logo
LONG TERM
Between
14 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are proposing to carry out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 18:16.

UK Power Networks Eastern & London logo
Between
14 and 21 Jul 2025
Details
View Map
Share
Carey Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 15:02.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
First Way

Affinity Water are proposing to carry out Utility repair and maintenance works on First Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:24.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
The Rutts

Affinity Water are proposing to carry out Utility repair and maintenance works on The Rutts, Bushey Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 11:10.

Thames Water logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
18 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Oldfield Lane North

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Mar 2025 at 10:22.

Transport for London (TfL) logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:55.

Thames Water logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Lady Margaret Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:39.

Thames Water logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Windermere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Windermere Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:40.

Thames Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Northview Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:32.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Carey Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 May 2025 at 09:41.

Affinity Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Fourth Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 17:04.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Stuart Avenue

BT were proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:05.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Stuart Avenue

BT are proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:11.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Kings Road

BT were proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:05.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Kings Road

BT are proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 May 2025 at 10:09.

Affinity Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:21.

Affinity Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Harrow View

Affinity Water were proposing to carry out Utility repair and maintenance works on Harrow View, Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 May 2025 at 13:07.

Cadent Gas logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are proposing to carry out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:24.

Hertfordshire County Council logo
Between
21 and 31 Jul 2025
Details
View Map
Share
Follow
Prestwick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 10:43.

Cadent Gas logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:38.

Hertfordshire County Council logo
Between
21 and 31 Jul 2025
Details
View Map
Share
Follow
Hayling Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Winchelsea Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Winchelsea Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.

Thames Water logo
Between
24 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:17.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hale Drive

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Drive, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:51.

UK Power Networks Eastern & London logo
Between
24 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashbourne Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Hale Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

National Highways logo
Between
24 and 29 Jul 2025
Details
View Map
Share
Follow
Selvage Lane

National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Feb 2025 at 09:14.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Lynwood Road

Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:40.

Cadent Gas logo
LONG TERM
Between
28 Jul and 13 Oct 2025
Details
View Map
Share
Victoria Road

Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.

Cadent Gas logo
Between
28 Jul and 18 Aug 2025
Details
View Map
Share
Follow
East Lane

Cadent Gas are proposing to carry out Utility asset works on East Lane, Wembley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 22:55.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Herlwyn Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 07:22.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Herlwyn Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:39.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
The Hyde

Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 9 May 2025 at 08:33.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
The Hyde

Murphy Power Distribution were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 9 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 6 May 2025 at 08:47.

Affinity Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Priory Way

Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:01.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 29 Aug 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.

London Borough Of Barnet logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.

Cadent Gas logo
LONG TERM
Between
28 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Bacon Lane

Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 15:30.

Thames Water logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Bushey.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:05.

Cadent Gas logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:58.

Cadent Gas logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Barnet Lane

Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:30.

Affinity Water logo
Between
29 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Eversley Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Eversley Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:53.

London Borough Of Barnet logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Edgware Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:37.

Thames Water logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Southdown Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Southdown Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:51.

Affinity Water logo
Between
2 and 24 Aug 2025
Details
View Map
Share
Follow
Maxwell Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Maxwell Road, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:55.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Station Approach

Affinity Water are proposing to carry out Utility asset works on Station Approach, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.

Affinity Water logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Fishers Way

Affinity Water are proposing to carry out Utility asset works on Fishers Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.

Cadent Gas logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Queens Walk

Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 17:00.

Cadent Gas logo
LONG TERM
Between
4 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Victoria Road

Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Ruislip.

These works are categorised as Major.

The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:00.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Sumner Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sumner Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:03.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Vaughan Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:31.

Between
4 and 18 Aug 2025
Details
View Map
Share
Vaughan Road

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 16:47.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Hill Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hill Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 16:47.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Tudor Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Tudor Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 15:57.

Affinity Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Risingholme Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:07.

Affinity Water logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Risingholme Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:00.

Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Boxtree Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Boxtree Road, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 16:31.

Cadent Gas logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 May 2025 at 10:30.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Clamp Hill

Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:11.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.

Cadent Gas logo
LONG TERM
Between
4 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Old Redding

Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:18.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.

Cadent Gas logo
LONG TERM
Between
4 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Common Road

Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:17.

Hertfordshire County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Harcourt Road

Hertfordshire County Council are proposing to carry out Highway improvement works on Harcourt Road, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 08:25.

UK Power Networks Eastern & London logo
Between
5 and 9 Aug 2025
Details
View Map
Share
Follow
Carey Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Carey Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 07:01.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Leamington Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 12 May 2025 at 08:54.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
D'arcy Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Gardens, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 12:20.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Montrose Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Montrose Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:11.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
The Broadway

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Broadway, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:23.

Between
6 and 20 Aug 2025
Details
View Map
Share
Follow
Green Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Green Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 12:31.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 13:40.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Cannon Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Cannon Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 15:57.

London Borough Of Barnet logo
Between
7 and 14 Aug 2025
Details
View Map
Share
Follow
Greyhound Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Greyhound Hill, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Bridge Street

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bridge Street, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:52.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Canning Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:34.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Culver Grove

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:45.

Between
7 and 21 Aug 2025
Details
View Map
Share
Follow
Summit Close

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Summit Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 12:20.

UK Power Networks Eastern & London logo
Between
7 and 17 Aug 2025
Details
View Map
Share
Follow
Beech Walk

UK Power Networks Eastern & London are proposing to carry out New service connection on Beech Walk, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
The Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:22.

Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:47.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 07:40.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:55.

Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Kenton Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:51.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Christchurch Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:31.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Honeypot Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:21.

Between
8 and 12 Aug 2025
Details
View Map
Share
Follow
Mollison Way

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:08.

Affinity Water logo
Between
9 and 11 Aug 2025
Details
View Map
Share
Follow
Little Bushey Lane

Affinity Water are proposing to carry out Remedial works on Little Bushey Lane, Bushey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:26.

Between
10 and 12 Aug 2025
Details
View Map
Share
Follow
Elm Park

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elm Park, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:59.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Salmon Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.

Affinity Water logo
Between
11 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tudor Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.

Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
The Bridge

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Bridge, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 14:18.

Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Masons Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Masons Avenue, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:47.

Virgin Media logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 May 2025 at 11:31.

Between
13 and 16 Aug 2025
Details
View Map
Share
Follow
Northwick Park Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Northwick Park Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:51.

Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
The Gardens

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Gardens, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 09:20.

Between
14 and 18 Aug 2025
Details
View Map
Share
Follow
Vaughan Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 16:52.

London Borough Of Barnet logo
Between
16 and 20 Aug 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 08:54.


Roadworks Map near to Headstone Road, HARROW, HA1 1GS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 May 2025 07:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Headstone Road, HARROW, HA1 1GS (50 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
LOWLANDS ROAD 
(0.1 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 20 May 2025 - 22 May 2025
0.1
Details
Share
Follow
2
Virgin Media logo
LOWLANDS ROAD 
(0.1 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 21 May 2025 - 23 May 2025
0.1
Details
Share
Follow
3
Virgin Media logo
ROXBOROUGH AVENUE 
(0.2 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 20 May 2025 - 22 May 2025
0.2
Details
Share
Follow
4
Affinity Water logo
BYRON ROAD 
(0.2 miles)
Affinity Water
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 21 May 2025 - 27 May 2025)
0.2
Details
Share
5
Affinity Water logo
BYRON ROAD 
(0.3 miles)
Affinity Water
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 21 May 2025 - 30 May 2025
0.3
Details
Share
Follow
6
Affinity Water logo
ANGEL ROAD 
(0.3 miles)
Affinity Water
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 21 May 2025 - 30 May 2025
0.3
Details
Share
Follow
7
BT logo
HARROW VIEW 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 12 May 2025 09:49
(Scheduled: 12 May 2025 - 20 May 2025)
0.4
Details
Share
Follow
8
BT logo
HARROW VIEW 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 12 May 2025 - 20 May 2025)
0.4
Details
Share
9
URGENT
  
RADNOR ROAD 
(0.4 miles)
London Borough Of Harrow
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
16 May 2025 08:30 - 08:47
0.4
Details
Share
10
BT logo
BUTLER ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 21 May 2025 - 23 May 2025
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data