ROADWORKS SUMMARY
Headstone Road, HARROW, HA1 1GS
Introduction

View current and future planned roadworks and road closures for Headstone Road, HA1 1GS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Headstone Road, HARROW, HA1 1GS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Headstone Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
28 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:58.
28 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 15 Jan 2025 at 11:47.
31 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.
30 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 17 Apr 2025 at 14:53.
25 Nov 2024 and 16 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.
Sunday
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
30 May 2025
Thames Water are carrying out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:30 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 10:12.
21 Jul 2025
Cadent Gas are carrying out Utility asset works on Alexandra Avenue, Rayners Lane.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 February 2025 at 11:06 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 11:19.
25 Feb and 1 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 31 Dec 2024 at 15:53.
25 Feb and 1 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 4 Dec 2024 at 15:58.
3 Mar and 6 Jun 2025
London Borough Of Ealing were proposing to carry out Highway improvement works on Acton Lane, Park Royal.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2025 at 10:18.
3 Mar and 31 Jul 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Oldfield Lane North, Greenford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Ealing on 15 Nov 2024 at 15:04.
3 Mar and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 11:19.
30 Jun 2025
Affinity Water are carrying out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 10:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 15:45.
30 Jun 2025
Affinity Water are carrying out Utility asset works on Watford Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 10:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 May 2025 at 12:28.
20 Jun 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Tylers Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 09:30 and could run through until 20 June 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 10:37.
17 Mar and 27 May 2025
Cadent Gas were proposing to carry out Utility asset works on Harrow View, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 27 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 16:39.
17 Mar and 27 May 2025
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 27 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 10:11.
Monday
Thames Water are carrying out Statutory Infrastructure Works on Twyford Abbey Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 March 2025 at 11:00 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 08:39.
Sunday
UK Power Networks Eastern & London are carrying out Utility asset works on Central Way, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:00 and could run through until 25 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Mar 2025 at 08:14.
31 Mar and 30 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ruislip Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 13:36.
31 Mar and 30 May 2025
Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Ruislip Road, Northolt.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Mar 2025 at 09:01.
2 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Ballogie Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 16:00 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:20.
Friday
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works are categorised as Major.
The works will start on or after 1 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 14 Jan 2025 at 10:05.
Friday
Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 24 Mar 2025 at 14:06.
5 Apr and 31 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 19:16.
24 Jun 2025
Thames Water are carrying out Utility asset works on Southview Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 11:00 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:25.
7 Apr and 9 Jun 2025
Thames Water were proposing to carry out Utility asset works on Denzil Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:24.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.
15 Jun 2025
National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.
7 Apr 2025 and 1 Sep 2026
Cadent Gas were proposing to carry out Utility asset works on Cecil Park, Pinner.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 1 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 10:31.
7 Apr and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 09:20.
8 Apr and 2 Jun 2025
Thames Water were proposing to carry out Utility asset works on Brenthurst Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 08:04.
18 Jun 2025
Cadent Gas are carrying out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 08:47 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:09.
14 Jul 2025
Thames Water are carrying out Utility asset works on Villiers Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.
8 Jun 2025
Thames Water are carrying out New service connection on Abbey Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 11:43 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 12:04.
22 Apr and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Villiers Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.
9 Jun 2025
Cadent Gas are carrying out Utility asset works on Eastbury Avenue, Northwood.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2025 at 09:59 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:02.
28 May 2025
Thames Water are carrying out Utility repair and maintenance works on Uphill Road, Mill Hill, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 April 2025 at 11:00 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 May 2025 at 15:09.
Friday
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Apr 2025 at 09:25.
28 Apr and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on High Road, Eastcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 11:21.
28 Apr and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on High Road, Eastcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:15.
30 May 2025
Cadent Gas are carrying out Utility asset works on High Road, Eastcote.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 07:54 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 10:12.
29 Apr and 9 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:44.
29 Apr and 9 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.
29 Apr and 9 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Waldeck Road, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:16.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Carew Road, Northwood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 10:00 and could run through until 22 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 May 2025 at 14:39.
16 Jun 2025
Cadent Gas are carrying out Utility asset works on Southfield Park, North Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 May 2025 at 08:08 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 08:53.
4 Jun 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Brentfield Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 07:36.
Monday
Cadent Gas are carrying out Utility asset works on Dollis Hill Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 16:47 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 20:30.
Friday
Electricity Network Company were proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Feb 2025 at 10:51.
31 May 2025
Thames Water are carrying out Utility asset works on Madeley Road, Ealing.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 10:44.
Monday
Thames Water were proposing to carry out Utility asset works on Southview Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Jan 2025 at 08:47.
6 May and 20 Jul 2025
Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.
Thursday
London Borough Of Barnet are proposing to carry out Highway improvement works on Pavilion Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 22 May 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Feb 2025 at 16:16.
12 May and 3 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Shackleton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:22.
3 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on Shackleton Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:30 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 16:30.
12 May and 2 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on North Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 11:06.
2 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on North Avenue, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 09:00 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 10:39.
12 May and 2 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 15:48.
2 Jun 2025
London Borough Of Ealing are carrying out Highway improvement works on Greenford Avenue, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:30 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 16:30.
12 May and 8 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 13:22.
12 May and 2 Jun 2025
London Borough Of Ealing were proposing to carry out Highway improvement works on Hurley Road, Greenford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 09:50.
12 May and 2 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Keats Way, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:11.
12 May and 9 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Crossmead Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 May 2025 at 16:11.
10 Jul 2025
Thames Water are carrying out Utility repair and maintenance works on Clifford Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 08:00 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 08:00.
12 May and 12 Jun 2025
Eunetworks were proposing to carry out Utility asset works on Tanfield Avenue, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 09:32.
12 May and 15 Jun 2025
Eunetworks are proposing to carry out Utility asset works on Tanfield Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:56.
15 Jun 2025
Eunetworks are carrying out Utility asset works on Tanfield Avenue, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 10:15 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 12 May 2025 at 10:28.
12 May and 13 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Ballogie Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 18:06.
2 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Hillcroft Crescent, Wembley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 17:00 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 08:08.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Holyrood Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 14:34.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Holyrood Avenue, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 13:41.
Friday
Thames Water are carrying out Utility repair and maintenance works on Holyrood Avenue, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 10:30 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 10:40.
31 May 2025
Cadent Gas are carrying out Utility asset works on East Lane, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 12:28 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:39.
12 May and 15 Jun 2025
Eunetworks are proposing to carry out Utility asset works on Crest Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 6 May 2025 at 13:57.
15 Jun 2025
Eunetworks are carrying out Utility asset works on Crest Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 17 May 2025 at 08:19.
12 May and 8 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.
12 May and 8 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:04.
12 May and 8 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Way, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:53.
11 Jun 2025
Cadent Gas are carrying out Utility asset works on Morford Way, Ruislip.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:36 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 09:29.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Hill Road, Pinner.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 14:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 07:51.
Friday
Cadent Gas were proposing to carry out Utility repair and maintenance works on Cannon Lane, Pinner.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:22.
Friday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 12:22.
Friday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 13:10.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 08:51.
Today
UK Power Networks Eastern & London are carrying out New service connection on Hillview Gardens, North Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 19:18 and could run through until 20 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 16:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Ventnor Avenue, Stanmore.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:30 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 07:27.
12 and 30 May 2025
Murphy Power Distribution are proposing to carry out New service connection on Mowbray Road Access Rear Of Numbers 58 To 96 Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 19 Feb 2025 at 14:26.
30 May 2025
Hertfordshire County Council are carrying out roadworks on Bridlington Road, South Oxhey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 15:16.
13 May and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Stephens Road, West Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:16.
Friday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Barnhurst Path, South Oxhey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 18:08 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 15:15.
20 Jun 2025
Scottish Hydro Electric Power Dis are carrying out New service connection on Ruislip Road, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 19:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 May 2025 at 07:55.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Sudbury Court Drive, Harrow.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 15:46 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 16:24.
Today
Affinity Water were proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 14:42.
Today
Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Mar 2025 at 10:51.
Today
Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 08:45.
Today
Affinity Water are carrying out Utility repair and maintenance works on Watford Heath, Watford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 11:00 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 May 2025 at 11:00.
29 Aug 2025
London Borough Of Ealing are carrying out Highway improvement works on Oldfield Lane North, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 19 May 2025 at 10:10.
19 May and 30 Jun 2025
Thames Water are proposing to carry out Utility asset works on Chantry Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:51.
Friday
UK Power Networks Eastern & London were proposing to carry out New service connection on Oldborough Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 09:50.
19 May and 12 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.
12 Sep 2025
London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 19 May 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:31.
9 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Woodcock Hill, Harrow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 10:30 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 11:23.
Thursday
Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Feb 2025 at 09:40.
19 May and 9 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 11:00.
19 May and 9 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:12.
19 May and 9 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 11:45.
19 May and 2 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Potter Street Hill, Northwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2025 at 10:53.
19 May and 2 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Potter Street Hill, Northwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 16:14.
Thursday
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Spur Road, Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 22 May 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Feb 2025 at 11:16.
Thursday
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Spur Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Mar 2025 at 08:42.
19 and 28 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Henbury Way, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 28 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Feb 2025 at 11:28.
Tomorrow
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 11:08.
Tomorrow
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 10:07.
Monday
Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Bushey.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 26 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 May 2025 at 08:26.
21 May and 5 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Ealing Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 7 Feb 2025 at 09:14.
21 May and 20 Jun 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 24 Apr 2025 at 08:56.
21 May and 20 Jun 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 25 Apr 2025 at 14:25.
21 May and 18 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Feb 2025 at 10:47.
22 May and 20 Jun 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 14 May 2025 at 09:11.
Thursday
Telefonica UK were proposing to carry out Utility asset works on Edgwarebury Lane Rbw (2nd Section), Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 22 May 2025 The works were due to impact the carriageway only.
This roadwork event was last updated by Telefonica UK on 26 Mar 2025 at 11:20.
23 May and 18 Jul 2025
Thames Water are proposing to carry out Utility asset works on Westview Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 May 2025 at 09:01.
24 May and 11 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Hurley Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 May 2025 at 09:54.
24 May and 11 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Hurley Road, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 15 May 2025 at 15:34.
24 May and 12 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Keats Way, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 14 May 2025 at 16:48.
24 May and 11 Jun 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Crossmead Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 14 May 2025 at 16:48.
Monday
Thames Water are proposing to carry out Statutory Infrastructure Works on Rainsford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 26 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 May 2025 at 16:40.
26 and 30 May 2025
Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 09:03.
26 May and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 15:13.
26 May and 1 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:11.
26 May and 15 Jul 2025
Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 15 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 8 Apr 2025 at 15:36.
26 May and 15 Jul 2025
Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Hanger Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 9 Apr 2025 at 10:41.
26 May and 25 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Brentfield Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:31.
26 and 28 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:02.
26 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on South Way, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 12:03.
26 May and 31 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 12:21.
26 May and 3 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:47.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 4 Mar 2025 at 09:36.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 08:22.
27 and 29 May 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Charville Lane, Hayes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 29 May 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 9 May 2025 at 10:58.
27 May and 20 Jul 2025
Thames Water are proposing to carry out Utility asset works on Westview Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Homefield Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 17:07.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Homefield Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 6 May 2025 at 14:22.
27 and 29 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Sturgess Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:32.
27 and 29 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Sturgess Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 11:28.
27 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.
27 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:48.
27 May and 3 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:23.
27 May and 3 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 11:30.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 4 Feb 2025 at 11:40.
27 and 29 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Dene Road, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 10:28.
27 and 30 May 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Spur Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 2 Apr 2025 at 15:00.
28 and 30 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 15:04.
28 and 30 May 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Kings Avenue, Greenford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 09:39.
28 May and 30 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on High Worple, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 12 May 2025 at 08:58.
28 and 30 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Lanacre Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 15:00.
29 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.
29 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:28.
29 May and 25 Jun 2025
London Borough Of Ealing are proposing to carry out Remedial works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 24 Mar 2025 at 11:26.
29 May and 4 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:47.
29 May and 2 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 24 Apr 2025 at 14:10.
29 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:18.
29 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 14:15.
30 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:40.
2 Jun and 19 Dec 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 25 Feb 2025 at 12:42.
2 and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Rugby Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.
2 and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:35.
2 and 30 Jun 2025
Affinity Water are proposing to carry out Utility asset works on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Mar 2025 at 16:43.
2 Jun and 24 Nov 2025
Affinity Water are proposing to carry out Utility asset works on Harrow Road, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 08:26.
2 and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Mar 2025 at 13:12.
2 and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Midstrath Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 07:49.
2 and 14 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 10:19.
2 and 14 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 00:10.
2 Jun and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Balnacraig Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:10.
2 Jun and 4 Jul 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 29 Apr 2025 at 07:21.
2 and 4 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hillside Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 15:30.
2 and 4 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Mar 2025 at 12:20.
2 and 4 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Elthorne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Apr 2025 at 15:14.
2 and 6 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:10.
2 and 6 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Longley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:44.
2 and 6 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 17:11.
2 and 6 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 May 2025 at 08:36.
2 and 6 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Walton Drive, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 May 2025 at 10:46.
2 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 09:47.
2 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Pinner Road, North Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 10:41.
2 and 5 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Mar 2025 at 11:55.
2 and 5 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:29.
2 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:12.
2 and 13 Jun 2025
Hertfordshire County Council are proposing to carry out Section 50 on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 16:20.
2 and 12 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Eastglade, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 10:32.
3 and 5 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 15:00.
4 and 6 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.
4 and 6 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.
4 and 6 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.
4 and 6 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:54.
4 and 9 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:51.
4 and 9 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ainsdale Road, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 14:01.
4 and 9 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Feb 2025 at 09:53.
4 and 9 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Otley Way, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:12.
4 and 6 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 May 2025 at 14:46.
4 and 6 Jun 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:46.
6 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:48.
6 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:03.
6 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Morford Close, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 08:55.
7 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 15:14.
8 and 12 Jun 2025
Network Rail were proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 May 2025 at 10:38.
8 and 12 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 May 2025 at 10:45.
8 and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 14:15.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Mar 2025 at 16:19.
9 and 13 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oldborough Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:25.
9 and 11 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 3 Mar 2025 at 13:53.
9 and 11 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Apr 2025 at 10:42.
9 and 11 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 May 2025 at 09:42.
9 and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2025 at 14:21.
10 and 13 Jun 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Mayfield Avenue, Kenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2025 at 10:19.
11 Jun and 11 Jul 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on The Vale, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:58.
11 Jun and 11 Jul 2025
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Marlborough Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2025 at 13:47.
11 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hale Lane, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 13:59.
16 Jun and 25 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Strathcona Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on The Mount, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Tudor Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 and 30 Jun 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Greenhill Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.
16 and 17 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Glenwood Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 08:16.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 09:50.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 09:51.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 11:06.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 08:06.
16 and 20 Jun 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Green Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Apr 2025 at 08:04.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Conway Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 15:57.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Waltham Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:19.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nash Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:20.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hay Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:43.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Princes Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:38.
16 and 18 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:20.
16 and 18 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Close, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:05.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.
17 and 19 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.
18 Jun and 1 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Drayton Bridge Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 12:26.
18 Jun and 1 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Greenford Avenue, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 12:27.
18 and 20 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Apr 2025 at 13:47.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:33.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Church Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kenton Road, Harrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:36.
20 Jun and 30 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Cumberland Road, Stanmore.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 12 May 2025 at 09:41.
22 Jun and 22 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.
22 Jun and 22 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Knatchbull Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.
23 Jun and 5 Sep 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:33.
23 Jun and 5 Sep 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Alperton Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2025 at 10:53.
23 Jun and 4 Aug 2025
Affinity Water are proposing to carry out Utility asset works on Elton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.
23 Jun and 13 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 09:50.
23 and 25 Jun 2025
BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 16 Apr 2025 at 13:34.
23 and 25 Jun 2025
BT are proposing to carry out Utility asset works on Spencer Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.
23 and 25 Jun 2025
BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Apr 2025 at 13:16.
23 and 25 Jun 2025
BT are proposing to carry out Utility asset works on The Cross Way, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Apr 2025 at 13:12.
23 and 28 Jun 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 28 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 11:57.
23 and 28 Jun 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on St Thomas' Drive, Hatch End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 May 2025 at 12:00.
24 and 26 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hindes Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:37.
25 Jun and 11 Jul 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 May 2025 at 13:25.
26 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 15:18.
26 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 11:31.
27 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on St Andrews Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 28 Mar 2025 at 08:55.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 10:15.
30 Jun and 4 Jul 2025
Thames Water are proposing to carry out New service connection on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 May 2025 at 08:30.
30 Jun and 14 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2025 at 08:58.
30 Jun and 11 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2025 at 16:42.
30 Jun and 1 Sep 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 09:03.
1 Jul and 5 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2025 at 17:10.
2 and 15 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Orchard Close, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 07:12.
3 and 7 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Uxbridge Road, Hatch End.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 17:44.
3 and 7 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Woodhall Drive, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 May 2025 at 14:36.
5 and 14 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Greenford Avenue, Hanwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2025 at 14:43.
7 and 18 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Willen Field Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 1 May 2025 at 08:55.
7 and 9 Jul 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 14:23.
7 and 9 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 16:52.
7 and 9 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 May 2025 at 07:37.
7 and 9 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rutland Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 May 2025 at 11:17.
7 and 10 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:29.
7 and 10 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Bonnersfield Lane, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 May 2025 at 09:10.
7 Jul and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.
7 Jul and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:33.
8 and 10 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 09:35.
8 and 10 Jul 2025
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 14:39.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Merlins Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on High Worple, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:09.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Drive, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Imperial Close, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:05.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Argyle Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:06.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Compton Rise, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 16:21.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shooters Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:07.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Stirling Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:06.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Aberdeen Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 08:22.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Abbey Close, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 12:33.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on College Close, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 Apr 2025 at 10:16.
8 and 10 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Snaresbrook Drive, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Apr 2025 at 12:04.
9 and 23 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 08:58.
9 and 23 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 May 2025 at 15:42.
9 and 23 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Yeading Lane Service Road Outside 234-386, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2025 at 08:03.
9 and 23 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Maple Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 May 2025 at 10:58.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Walton Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 16:30.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Drive, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:19.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 15:21.
9 and 11 Jul 2025
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Apr 2025 at 10:56.
9 and 11 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Whitefriars Avenue, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 14:52.
9 and 19 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Oxhey Lane, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:33.
9 and 19 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:39.
10 and 14 Jul 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Perwell Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:24.
10 and 16 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Drive, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 10:53.
10 and 16 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 08:10.
13 and 15 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 10:53.
13 and 21 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 11:58.
13 and 21 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 12:07.
13 and 15 Jul 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 July 2025 and run through until 15 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Mar 2025 at 08:33.
13 and 15 Jul 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Avenue, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 May 2025 at 14:43.
14 Jul and 14 Sep 2025
Thames Water are proposing to carry out Utility asset works on Denzil Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jan 2025 at 18:16.
14 and 21 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 21 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 15:02.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on First Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:24.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Rutts, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Apr 2025 at 11:10.
15 Jul and 26 Aug 2025
Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Feb 2025 at 08:42.
18 Jul and 31 Aug 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Mar 2025 at 10:22.
21 Jul and 17 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:55.
21 Jul and 8 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 May 2025 at 11:39.
21 Jul and 1 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Windermere Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 May 2025 at 11:40.
21 Jul and 17 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:32.
21 and 25 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Carey Way, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 May 2025 at 09:41.
21 and 23 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fourth Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 17:04.
21 and 23 Jul 2025
BT were proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 16 May 2025 at 10:05.
21 and 23 Jul 2025
BT are proposing to carry out Utility repair and maintenance works on Stuart Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 May 2025 at 10:11.
21 and 23 Jul 2025
BT were proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 16 May 2025 at 10:05.
21 and 23 Jul 2025
BT are proposing to carry out Utility repair and maintenance works on Kings Road, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 May 2025 at 10:09.
21 and 23 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2025 at 17:21.
21 and 25 Jul 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Harrow View, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 May 2025 at 13:07.
21 Jul and 31 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Garratt Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 07:24.
21 and 31 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Prestwick Road, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 10:43.
21 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:38.
21 and 31 Jul 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hayling Road, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 11:47.
23 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.
23 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Winchelsea Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 18:53.
24 Jul and 6 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:17.
24 Jul and 4 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Drive, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:51.
24 Jul and 4 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.
24 Jul and 2 Sep 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hale Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.
24 and 29 Jul 2025
National Highways are proposing to carry out Works for road purposes on Selvage Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Feb 2025 at 09:14.
28 Jul and 1 Aug 2025
Thames Water are proposing to carry out New service connection on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 10:40.
28 Jul and 13 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Ruislip.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 13:58.
28 Jul and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on East Lane, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 22:55.
28 and 30 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 07:22.
28 and 30 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Herlwyn Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 May 2025 at 10:39.
28 Jul and 9 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 9 May 2025 at 08:33.
28 Jul and 9 Aug 2025
Murphy Power Distribution were proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 9 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 6 May 2025 at 08:47.
28 and 31 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Priory Way, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:01.
28 Jul and 29 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.
28 Jul and 29 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2025 at 14:06.
28 Jul and 5 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 22 Oct 2024 at 12:07.
28 Jul and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Bacon Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 15:30.
28 Jul and 3 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Bushey.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 10:05.
28 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:58.
28 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 14:30.
29 Jul and 1 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Eversley Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:53.
29 Jul and 15 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:37.
30 Jul and 2 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Southdown Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:51.
2 and 24 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Maxwell Road, Northwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 08:55.
4 Aug and 15 Sep 2025
Affinity Water are proposing to carry out Utility asset works on Station Approach, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:36.
4 Aug and 15 Sep 2025
Affinity Water are proposing to carry out Utility asset works on Fishers Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:37.
4 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Queens Walk, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 17:00.
4 Aug and 8 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Ruislip.
These works are categorised as Major.
The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:00.
4 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sumner Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:03.
4 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 07:31.
4 and 18 Aug 2025
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 16:47.
4 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Hill Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 16:47.
4 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Tudor Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 15:57.
4 and 6 Aug 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:07.
4 and 6 Aug 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Risingholme Road, Wealdstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 6 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:00.
4 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Boxtree Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 May 2025 at 16:31.
4 and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 10:30.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:13.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Clamp Hill, Harrow Weald.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:11.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:12.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Old Redding, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:18.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:14.
4 Aug and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Common Road, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:17.
4 and 22 Aug 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Harcourt Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 08:25.
5 and 9 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Carey Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 07:01.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Leamington Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 12 May 2025 at 08:54.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on D'arcy Gardens, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 12:20.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Montrose Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:11.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Broadway, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 13:23.
6 and 20 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Green Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 May 2025 at 12:31.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Shaftesbury Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 13:40.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Cannon Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 15:57.
7 and 14 Aug 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Greyhound Hill, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Bridge Street, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:52.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Canning Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:34.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Culver Grove, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 14:45.
7 and 21 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Summit Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 May 2025 at 12:20.
7 and 17 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Beech Walk, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 08:43.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:22.
8 and 13 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:47.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 07:40.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 15:55.
8 and 13 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenton Lane, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:51.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:31.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Honeypot Lane, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 11:21.
8 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Mollison Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 8 May 2025 at 12:08.
9 and 11 Aug 2025
Affinity Water are proposing to carry out Remedial works on Little Bushey Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 May 2025 at 09:26.
10 and 12 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Elm Park, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:59.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Salmon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 16:58.
11 Aug and 5 Sep 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 29 Apr 2025 at 07:54.
11 and 14 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Bridge, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 14:18.
12 and 14 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Masons Avenue, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 13:47.
13 and 15 Aug 2025
Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 16 May 2025 at 11:31.
13 and 16 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Northwick Park Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 16 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 9 May 2025 at 15:51.
13 and 15 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Gardens, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 09:20.
14 and 18 Aug 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 May 2025 at 16:52.
16 and 20 Aug 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 08:54.
Roadworks Map near to Headstone Road, HARROW, HA1 1GS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Headstone Road, HARROW, HA1 1GS (50 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 May 2025 - 20 May 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data